Loading...
HomeMy WebLinkAbout20130412 Ver 1_WRC Comments_20150601 North Carolina Wildlife Resources Commission Gordon Myers, Executive Director Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center • Raleigh, NC 27699 -1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 MEMORANDUM TO: Andrew Williams, Raleigh Regulatory Field Office U.S. Army Corps of Engineers FROM: Shari L. Bryant, Western Piedmont Coordinator Habitat Conservation DATE: 1 June 2015 SUBJECT: Hoosier Dam Pre-Removal Aquatic Community and Habitat Sampling, Hoosier Dam Umbrella Mitigation Bank, Rocky River, Chatham County, North Carolina. The Catena Group, Inc. and Unique Places, LLC have submitted a proposal for pre-removal aquatic community and habitat sampling for Hoosier Dam. The proposed pre-dam removal surveys will determine the existing condition of aquatic species (mussel, macro-snail, and fish) in the impounded and adjacent un-impounded reaches of Rocky River. The proposal includes pre-dam removal surveys for aquatic habitat; rare, endangered or threatened species; and benthic macroinvertebrate communities. Results of the pre-dam removal monitoring will be used in the development of performance standards and success criteria. We offer the following comments or recommendations regarding the Pre-Removal Aquatic Community and Habitat Sampling.  Section 4.0 Field Data Collection – Pre-removal surveys will be conducted at four lotic sites outside the impoundment (two upstream and two downstream), three sites within the impoundment (lower, middle, and upper), and two of the four tributaries that will be used for credit. In addition, two un-impounded reference tributaries will be sampled. We have no objection to pre-removal sampling on only two of the four tributaries that will be used for credit. However, if there is a significant difference in watershed size between these four tributaries, then we suggest sampling the tributary with the smallest watershed and the tributary with the largest watershed. Also, the two un-impounded reference tributaries should have watershed sizes that are comparable to those within the impoundment.  Section 4.3 Fish Community Surveys – It appears fish captured in the impoundment sites will be identified, counted, and returned to the river after processing. Fish captured in the un-impounded reaches also should be identified, counted, and returned to the river after processing. In addition, effort (i.e., the number of seconds (or minutes) of electrofishing or seining/dip netting) should be recorded so catch-per-unit-effort can be calculated. Page 2 1 June 2015 Hoosier Dam Umbrella Mitigation Bank Pre-Removal Sampling Proposal Thank you for the opportunity to comment on this pre-removal sampling protocol. If we can be of further assistance, please contact our office at (336) 449-7625 or shari.bryant@ncwildlife.org. ec: Lynnette Batt, Unique Places, LLC Gabriela Garrison, NCWRC Travis Wilson, NCWRC Ryan Heise, NCWRC Jessica Baumann, NCWRC Corey Oakley, NCWRC