Loading...
HomeMy WebLinkAbout20071394 Ver 1_Closeout Field Notes_20150604knit �u .29 e FM �•C I�J Tr�,d,s t ism wr-c, 6�Kn (3tiVcr Doi WQ �, S ✓MM2 C �L. , 51-. hl I .1..I I I' J m Nils ® -1 O'N6 L Ymosm I iV t �0 O b/ P Val VNIIOHVD H1tlON swe 4oieW A1Nnoo WVH1tlHO 103fOLd VEM0 !LOEZ6 # (00 N N N33N0 tltl3910 :dtlW S13SCtl in 28 610 Ce n q C 50 6'� am61d I ^ S E 0 N O W v c a U c ❑v � I m I J I 4� 1094 f, ta<d Zoe, 7 I 1 i i 0 u X ZI� e c 4 yF 2 yry p a � � 8 U � Fe � 5 U F � - � y.r✓R� d �SJ� r e2 r r. x o0 t All � a2 v thyr 1 .. -t1 f tr n • i., t� 1 z s,* 4 Y / �/ I MN U ISM x It m w3 r: Ra q ° 0 g Z^ U' p N�m • O � � � N � !3Y- M Ii van � `° E � a N co s o � _�'( .+•'� aV� 8 N y i F`v b to O o R: -, .,}� y�ie/.�•; d22,a w $o o LL CN Doge — ooze -- i Its I1 4'I� r 11 Dore., •" �y I p Op6` :7 i t/i i' rags r �r �ji� f U Saeces Stream: Cross- section should show Tittle chanmeasurements built plans. ifchan ge from as- will be evaluated to deter mine r, they whether they are minor adjustments associated with settling and increased stability or whether they indicate movement toward an unstable condition. gy: No mitigatic success criteria are required for wetland enhancement. G W gages installed for wetland confirmation use only [12.5% 27 days; 8.5 of growing season = °/a = 18 days 1. 9 Cross Sections; V Criteria Met 4 riffle + 2 pool on Yes —Cross section data indicate; 2 riffle + North UT minor adjustments when 1 Pool on South UT compared to as -built cross section data 2 RDS groundwater installed in enhanced wetland along North UT Both gages met the original 12.5/° (27 days) hydro - period during 4 of 5 years, and both met the current 8.5% hydro - period during all 5 years. Credit : wetland 6 CVS plots, North UT buffer _1 minimum 260 native planted trees +shrub stems 5 CVS plots, South UT Yes — 10 of the 12 plots in year 5. per acre 1 CVS buffer toward stream credit exceeded applied P1 Riparian wetland the stream credit criteria. One Plot on the N trib and one on the S trib did not. The one plot ( #5) applied toward wetland credit Ve etation (Buffer Credit): also met criteria. minimum 260 planted + 6 CVS plots, North UT bu volunteer trees + native 5 CVS plots, South UT buffer Yes All 11 CVS shrub stems per toward buffer credit exceeded he acre in year 5. stem density criteria for buffer Bankfull Flows ankfull flow credit. 4d I Crest B indicators evident in 50% of gage on North UT monitoring years. Yes — The crest gage, matted vegetation, and wrack deposits indicated over -bank flow events 2,7 5.7 W every year on both tributaries. �h.eSSCA fv Uvk S sk_ OT Bear Creek (Weaver /McLeod) #92947 Final Close -Out Report -- Mar 2015 l 3o s(t�r't, Ve Yf 3 13U v r-cI dll v`� - 1900 ( w 1 k-,,' k5 eel - 3 tv,: b Cap u� Ss RJG &A Environmental Consultants