HomeMy WebLinkAboutThunder Swamp Phase II MY1 Report Review
>ryan.hamilton@ncdenr.gov Hamilton, Ryan <To:
Wednesday, April 12, 2023 5:09 PM Sent:
> jmceachran@res.us Jamey Mceachran <From:
Send this to Caroline to file please. 2021-0306v2
Ryan,
FW: \[External\] RE: Thunder Swamp Phase II MY1 Report Review Subject:
Hamilton, Ryan <ryan.hamilton@ncdenr.gov>To:
Wednesday, May 17, 2023 3:53 PM Sent:
Merritt, Katie <katie.merritt@deq.nc.gov> From:
email addresses may look different, but email performance will not be impacted.
DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th.Employee
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address is subject to the
Location: 512 N. Salisbury Street, Archdale Building, Raleigh, NC 27604
(704) 651-0357 Cell
North Carolina Department of Environmental Quality
Division of Water Resources
401 & Buffer Permitting Branch
(he/him)Ryan Hamilton
Thanks,
Doc Name: Same as email subject
Doc Type: Mitigation monitoring Report Review
Doc Date: 4/12/2023
DWR#: 2021-0306 v2
Laserfiche Upload: Email with attachments
Please file
Hi Caroline,
Figure 2 - CCPV MY1 - Thunder Swamp Phase II.pdf
image001.png Attachments:
Wednesday, May 17, 2023 3:59:44 PM Date:
FW: \[External\] RE: Thunder Swamp Phase II MY1 Report Review Subject:
Baker, Caroline D To:
Hamilton, Ryan From:
Jamey
Please let us know if you have any questions or require an additional information,
activity will also be discussed further in the MY2 monitoring report.
Attached are some photos documenting the planted trees. This supplemental planting
) live stake poles.Salix nigra with 425 containerized trees and 125 six-foot black willow (
completed as of March 21, 2023. Approximately 2.4 acres within the swamp were planted
The supplemental planting efforts in the swamp (associated with veg. plots 24 and 25) were
replanting efforts around plot 24 are implemented.
required prior to the issuance of a credit release. Anticipate a partial credit release until the
be determined. Additionally, confirmation of bond renewal through next year’s monitoring will be
Once DWR receives a response to the comments above, issuance of monitoring report approval can
above along with supporting documents if required.
Thank you for your attention to these comments. Please provide an adequate response to all items
Attached is a revised MY1 CCPV map.
Please provide an updated and clarified copy of the site map.. c
Legend symbol was revised.
in the legend.
The areas of riparian preservation adjacent to DJ2 have gray circles that are not located. b
Legend symbol was revised.
legend does not clearly show purple triangles.
The riparian restoration area adjacent to DJ4 and DJ7 is difficult to discern as the. a
entirely.
The legend and the map provided in the monitoring report do not appear to match up. 2
RES will ensure vigor data is included for all plots in future monitoring reports.
future monitoring reports.
Vigor data is missing or partial for plots 18-23. Please make sure vigor data is included in. 1
some photos of the planting in the swamp.
Also attached is an updated CCPV and Please see our responses to your questions in blue below.
Hey Katie and Ryan,
Report Spam.attachment to
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an CAUTION:
\[External\] RE: Thunder Swamp Phase II MY1 Report Review Subject:
>mdeangelo@res.us>; Matthew Deangelo <katie.merritt@ncdenr.gov Merritt, Katie <Cc:
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address is subject to the
Location: 512 N. Salisbury Street, Archdale Building, Raleigh, NC 27604
(704) 651-0357 Cell
North Carolina Department of Environmental Quality
Division of Water Resources
401 & Buffer Permitting Branch
Ryan Hamilton
Thank you for patience,
replanting efforts around plot 24 are implemented.
required prior to the issuance of a credit release. Anticipate a partial credit release until the
be determined. Additionally, confirmation of bond renewal through next year’s monitoring will be
Once DWR receives a response to the comments above, issuance of monitoring report approval can
above along with supporting documents if required.
Thank you for your attention to these comments. Please provide an adequate response to all items
Please provide an updated and clarified copy of the site map.. c
in the legend.
The areas of riparian preservation adjacent to DJ2 have gray circles that are not located. b
legend does not clearly show purple triangles.
The riparian restoration area adjacent to DJ4 and DJ7 is difficult to discern as the. a
entirely.
The legend and the map provided in the monitoring report do not appear to match up. 2
future monitoring reports.
Vigor data is missing or partial for plots 18-23. Please make sure vigor data is included in. 1
have the following comments:
DWR has reviewed the Year 1 Monitoring Report for the Thunder Swamp Phase II Mitigation Site and
Hi Jamey,
\[EXTERNAL\] Thunder Swamp Phase II MY1 Report Review Subject:
>katie.merritt@ncdenr.gov Merritt, Katie <Cc:
>jmceachran@res.us Jamey Mceachran <To:
Wednesday, April 5, 2023 3:20 PM Sent:
> ryan.hamilton@ncdenr.gov Hamilton, Ryan <From:
parties by an authorized state official.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third