Loading...
HomeMy WebLinkAboutDWR Correspondence- AsBuilt WalkAbout 30% of the vegetation plots were not aligned and many had extra rows that didn't represent planted rows immediately outside of plots (2,6,7,8,15,17,20,26,27,28). DWR expects plots to be planted at the same time as the rest of the site to avoid having plots that misrepresent site conditions. The observations onsite brought awareness to DWR staff that plots may have been planted AFTER or BEFORE the rest of the site which can mis-represent site conditions. Explain the method that Wildlands uses to establish fixed plots. Additionally, DWR will require Wildlands to add 1 transect adjacent to the 10 noted fixed plots and include that data with the Year 1 monitoring report. DWR will analyze the data submitted in the Year 1 report and provide further guidance to Wildlands if additional transects are needed for future monitoring. Transects can be any shape, but must represent the same size (ft2) of the fixed Dlots Culvert Removal asement line was not straight nsite. Portions were on bank nd also in middle of stream. xplain why the easement oundaries onsite were not traight and consistent with the asement line shown on figures i the BPDP. If these figures do of adequately depict the asement lines, submit a correct gure showing those boundaries. Pile of trees within Easement Small portion not planted Project Location Bank Parcel Conservation Easement Project Stream Project Ditch Non -Project Ditch Existing Utility Easement Riparian Restoration for Buffer Credits Riparian Restoration for Nutrient Offset Credits nw, '� Not for Credit Vegetation Plot Existing Utility Line ® u ver emova Photo 1 1 981 ,.• - Culvert Removal LCulvert - eplacement Bank Stabilization r via Overland Flow ° Diffusion and Live L © Staking y Area was not Photo 1 &2 ` adequately planted. k. 9 Extra row of trees need to be Needs supplemental" " ` Bank Grading planted planting in this 9 section. Ban rading ® -- Bank Grading° 1 _ _ Bank Grading i Bank Grading Bank Grading \ Not many plants along this buffer. Seemed © the planting crew stopped at a sandy row Bank Grading near top of bank. Easement line seemed to not include portion of UT3. Wildlands is required to have the stream top of bank (or 4 , —_ _-_. centerline) in the easement. Explain if this has been secured. I"onitoring Components Map W I L D L A N D S 0 150 300 Feet Rosewood Mitigation Bank Parcel kt� E N G I N E E R I N G I I I I Site Walk Request Memo Neuse River Basin (03020201) Wayne County, NC Rosewood As built walkthrough photos (4/3/2023) Photo 1. Looking South along D5 (no trees planted in sandy area) 5F M j X ee q It xw 5:- Photo 2. Looking North along D5 44 t fir„ rx q 9 �^ # rsP ce r.""v � _ r"�' 1� � '!! 'ri �'�9r ■ fie,. i. :"*y? } �s f ° �^ � V'F �� ; • 1 q �rYA��yy i Photo 4. Looking North along UT to Charles Branch I Photo 5. Looking South along UT to Charles Branch