HomeMy WebLinkAboutNC0050342_Compliance Evaluation Inspection_20150529 AVA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory Donald R. van der Vaart
Governor Secretary
May 29, 2015
City of Winston-Salem
Attn: Ron Hargrove, Director Utilities RECEIVEDIDENRIDWR
P.O. Box 2511 JUN 0 3 Z015
Winston-Salem, NC 27102-2511
Water Quality
Subject: Compliance Evaluation Inspections 7;n:1378347a:
Archie Elledge Wastewater Treatment Plant, NPDES Permit
Muddy Creek Wastewater Treatment Plant, NPDES Permit NC0050342
City of Winston-Salem
Forsyth County
Dear Mr. Hargrove:
Ron Boone of the Winston-Salem Regional Office of the NC Division of Water Resources (DWR or the
Division) conducted compliance evaluation inspections (CEI) of the Archie Elledge Wastewater Treatment
Plant (NC0037834) and the Muddy Creek Wastewater Treatment Plant (NC0050342) on May 21, 2015. The
assistance and cooperation of Jon Southern, Keith Jones, and Carol Bell, during these inspections, was
greatly appreciated. Inspection checklists are attached for your records and inspection findings are
summarized below.
Archie Elledge Wastewater Treatment Plant, NPDES Permit NC0037834
General Information
The WWTP is located at 2801 Griffith Road in Winston Salem, Forsyth County, NC. The permit
authorizes the City to operate this 30 MGD WWTP, which consists of bar screens, grit basins, primary
clarifiers, aeration basins, final clarifiers, sodium hypochlorite and bisulfite feed for disinfection and
dechlorination, lime/magnesium hydroxide blend and caustic feed for alkalinity control, centrifuges with screw
conveyors, sludge digestion, polymer and iron salt feed, odor control systems, a sludge drying facility, waste
sludge lagoons and instrumented flow measurement. The permit authorizes the City to discharge treated
effluent from the plant via outfall 001 into Salem Creek, this section of which is currently classified as Class C
waters in the Yadkin Pee-Dee river basin.
Site Review
As was also the case during the previous inspection, Mr. Southern and his crew continue to do an
outstanding job operating and maintaining the plant. Mr. Boone noted no issues or discrepancies.
Documentation Review
450 West Hanes Mill Road,Suite#300,Winston-Salem,North Carolina 27105
Phone:336-776-98001 Internet:www.ncdenr.gov
An Equal Opportunity\Affirmative Action Employer—Made in part by recycled paper
All documentation was reviewed. Mr. Southern and his staff, as well as Carol Bell and the laboratory
staff, have done an excellent job of documenting the operation and maintenance of the plant and laboratory
operations, as required by the permit; this includes operations/maintenance and operator visitation logs,
discharge monitoring reports, laboratory and field laboratory records, chains of custody, etc.
Muddy Creek Wastewater Treatment Plant, NPDES Permit NC0050342
General Information
The WWTP is located at 4561 Cooper Road in Winston Salem, Forsyth County, NC. The permit
authorizes the City to operate this 21 MGD WWTP, which consists of bar screens, grit chambers, primary
clarification, three aeration basins with fine bubble diffusers, a hydrated lime silo, secondary clarification,
chlorination, dechlorination, instrumented flow measurement, anaerobic sludge digesters, a gravity thickener,
sludge storage lagoons, a belt filter press, a carbon pellet odor scrubber, two emergency generators, an
effluent/flood control pump station, and solids blending tanks. The permit authorizes the City to discharge
treated effluent from this facility into the Yadkin River(outfall 001) or, under flood conditions, into Muddy Creek
(outfall 002). Both receiving waters are currently classified as WS-IV (water supply) waters in the Yadkin Pee-
Dee River Basin.
Site Review
As was the case during the previous inspection, Mr. Jones and his crew continue to do an outstanding
job operating and maintaining the plant. Mr. Boone noted no problems, discrepancies, violations, etc., during
the site review portion of the inspection.
Documentation Review
All documentation was reviewed. Mr. Jones and his staff, as well as Carol Bell and the laboratory staff,
have done an excellent job of documenting the operation and maintenance of the plant and laboratory
operations, as required by the permit; this includes operations/maintenance and operator visitation logs,
discharge monitoring reports, laboratory and field laboratory records, chains of custody,etc.
The Division greatly appreciates the City's efforts to effectively and efficiently operate and maintain the
Elledge and Muddy Creek WWTPs. Mr. Southern and Mr.Jones, and their crews, as well as Carol Bell and the
laboratory staff, have done an excellent job and should be commended for their efforts.
If you have any questions regarding the inspection or this letter, or if we may be of any further
assistance to you, please feel free to call Mr. Boone or me at (336)776-9800. Thank you for your attention to
this matter.
Sincerely,
f^!VU. Corey Basinger
' Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments:
1. BIMS Inspection Report, Archie Elledge NPDES Permit NC0037834
2. BIMS Inspection Report, Muddy Creek NPDES Permit NC0050342
CC: WSRO - SWP
Central Files
NPDES Unit
City of Winston-Salem
Attn: Jon Southern —ORC Archie Elledge WWTP
2801 Griffith Road
Winston-Salem, NC 27103
City of Winston-Salem
Attn: Keith Jones—ORC Muddy Creek WWTP
2801 Griffith Road
Winston-Salem, NC 27103
• United States Environmental Protection Agency Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 �ti 1 2 IS1 3 I N00037834 111 121 15/05/21 117 18�,.� 1912_1 201 I
211 11111 1111111111111111111111111 11111111111 r6
1
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA — Reserved------
671 I 701 I 71 I I 72 I N I 731 I 174 751 1 1 1 1 1 1 180
LJ Section B:FacilityiData Li
l `
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 09:OOAM 15/05/21 09/09/01
Archie Elledge WWTP
Exit Time/Date Permit Expiration Date
2801 Griffith Rd
11:00AM 15/05/21 14/06/30
Winston Salem NC 271036417
Name(s)of Onsite Representative(s)TFitles(s)/Phone and Fax Number(s) Other Facility Data
111
Jon Madison Southem/ORC/336-397-7600/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
James F Crump,2801 Griffith Rd Winston Salem NC 27103641711336-765-0165/
No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
• Permit • Flow Measurement U Operations&Maintenanca I Records/Reports
III Self-Monitoring Program U Sludge Handling Disposal I Facility Site Review I Effluent/Receiving Waters
III Laboratory
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone .. WSRO WQ//336-776-9690/
P**kik- il .5"7 2–1/45"--
Signaturefo Managment Q A Reviewer Agency/Office/Phone and Fax Numbers Date
lL'Li.... v- L+l• � . -57veil/ l5
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
NPDES ydmo/day Inspection Type 1
NC0037834 I11 121 15/05@1 1 17 18 LEI
Section 0:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Please refer to the attached inspection summary letter.
Page* 2
Permit: NC0037834 Owner-Facility: Archie Elledge WWTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 • 0
application?
Is the facility as described in the permit? • 0 0 0
#Are there any special conditions for the permit? 0 • 0 0
Is access to the plant site restricted to the general public? • 0 0 0
Is the inspector granted access to all areas for inspection? • 0 0 0
Comment: None
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • 0 0 0
Is all required information readily available, complete and current? • 0 0 0
Are all records maintained for 3 years(lab. reg. required 5 years)? • 0 0 0
Are analytical results consistent with data reported on DMRs? • 0 0 0
Is the chain-of-custody complete? • 0 0 0
Dates,times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses U
Transported COCs •
Are DMRs complete:do they include all permit parameters? • 0 0 0
Has the facility submitted its annual compliance report to users and DWQ? • 0 0 0
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator • 0 0 0
on each shift?
Is the ORC visitation log available and current? • 0 ❑ 0
Is the ORC certified at grade equal to or higher than the facility classification? • 0 0 0
Is the backup operator certified at one grade less or greater than the facility classification? • 0 0 0 •
Is a copy of the current NPDES permit available on site? • ❑ 0 0
Facility has copy of previous year's Annual Report on file for review? • 0 0 0
Comment: None
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory? • 0 0 0
Are all other parameters(excluding field parameters)performed by a certified lab? • 0 0 0
Page# 3
Permit NC0037834 Owner-Facility: Archie Elledge WWTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Laboratory Yes No NA NE
#Is the facility using a contract lab? 0 • 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • 0 0 0
Celsius)?
Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0.2 degrees? 0 0 0 •
Incubator(BOD)set to 20.0 degrees Celsius+/-1.0 degrees? 0 0 0 •
Comment: None
Influent Sampling Yes No NA NE
#Is composite sampling flow proportional? • 0 0 0
Is sample collected above side streams? • 0 0 0
Is proper volume collected? • 0 0 0
Is the tubing clean? • 0 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • 0 0 0
Celsius)?
Is sampling performed according to the permit? • 0 0 0
Comment: None
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? • 0 0 0
Is sample collected below all treatment units? • 0 0 0
Is proper volume collected? • 0 0 0
Is the tubing clean? • 0 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • 0 0 0
Celsius)?
Is the facility sampling performed as required by the permit(frequency, sampling type • 0 0 0
representative)?
Comment: None
Upstream/Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit(frequency,sampling type,and • 0 0 0
. sampling location)?
Comment: None
Bar Screens Yes No NA NE
Type of bar screen
Page# 4
Permit NC0037834 Owner-Facility: Archie Elledge VwVTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Bar Screens Yes No NA NE
a.Manual 0
b.Mechanical •
Are the bars adequately screening debris? • 0 0 0
Is the screen free of excessive debris? • 0 0 0
Is disposal of screening in compliance? • 0 0 0
Is the unit in good condition? • 0 0 0
Comment: None
Grit Removal Yes No NA NE
Type of grit removal
a.Manual ❑
b.Mechanical •
Is the grit free of excessive organic matter? U 0 0 0
Is the grit free of excessive odor? • 0 0 0
#Is disposal of grit in compliance? • 0 0 0
Comment: None
Primary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? • 0 0 0
Is the site free of excessive buildup of solids in center well of circular clarifier? • 0 0 0
Are weirs level? • 0 0 0
Is the site free of weir blockage? • 0 0 0
Is the site free of evidence of short-circuiting? • 0 0 0
Is scum removal adequate? • 0 0 0
Is the site free of excessive floating sludge? • 0 0 0
Is the drive unit operational? • 0 0 0
Is the sludge blanket level acceptable? 0 0 0 •
Is the sludge blanket level acceptable?(Approximately 1/4 of the sidewall depth) 0 0 0 •
Comment: None
Aeration Basins Yes No NA NE
Mode of operation Ext.Air
Type of aeration system Diffused
Page# 5
Permit NC0037834 • Owner-Facility: Archie Elledge WWfP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Aeration Basins Yes No NA NE
Is the basin free of dead spots? • 0 0 0
Are surface aerators and mixers operational? 0 0 U 0
Are the diffusers operational? • 0 0 0
Is the foam the proper color for the treatment process? • 0 0 0
Does the foam cover less than 25%of the basin's surface? • 0 0 0
Is the DO level acceptable? 0 ❑ 0 •
Is the DO level acceptable?(1.0 to 3.0 mg/I) 0 0 ❑ •
Comment: None
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? • 0 0 0
Is the site free of excessive buildup of solids in center well of circular clarifier? • 0 0 0
Are weirs level? • 0 0 0
Is the site free of weir blockage? • 0 0 0
Is the site free of evidence of short-circuiting? • 0 0 0
Is scum removal adequate? • 0 0 0
Is the site free of excessive floating sludge? • 0 0 0
Is the drive unit operational? • 0 0 0
Is the return rate acceptable(low turbulence)? • 0 0 0
Is the overflow clear of excessive solids/pin floc? • 0 0 0
Is the sludge blanket level acceptable?(Approximately%of the sidewall depth) 0 0 0 III
Comment: None
Pumps-RAS-WAS Yes No NA NE
Are pumps in place? • 0 0 0
Are pumps operational? • 0 0 0
Are there adequate spare parts and supplies on site? ❑ 0 0
Comment: None
Disinfection-Liquid Yes No NA NE
Is there adequate reserve supply of disinfectant? • 0 0 0
(Sodium Hypochlorite)Is pump feed system operational? • 0 0 0
Is bulk storage tank containment area adequate?(free of leaks/open drains) • 0 0 ❑
Page# 6
a
Permit NC0037834 Owner-Facility: Archie Elledge VVVVTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Disinfection-Liquid Yes No NA NE
Is the level of chlorine residual acceptable? 0 0 0 •
Is the contact chamber free of growth,or sludge buildup? • 0 0 0
Is there chlorine residual prior to de-chlorination? 0 0 0 •
Comment: None
De-chlorination Yes No NA NE
Type of system? Liquid
Is the feed ratio proportional to chlorine amount(1 to 1)? 0 0 0 •
Is storage appropriate for cylinders? 0 0 • 0
#Is de-chlorination substance stored away from chlorine containers? • 0 0 0
Are the tablets the proper size and type? 0 0 • 0
Comment: None
Are tablet de-chlorinators operational? 0 0 • 0
Number of tubes in use?
Comment: None
Flow Measurement-Effluent Yes No NA NE
#Is flow meter used for reporting? • 0 0 0
Is flow meter calibrated annually? • 0 0 0
Is the flow meter operational? • 0 0 0
(If units are separated)Does the chart recorder match the flow meter? • 0 0 0
Comment: None
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? • 0 0 0
Are the receiving water free of foam other than trace amounts and other debris? • 0 0 0
If effluent (diffuser pipes are required) are they operating properly? 0 0 • 0
Comment: None
Anaerobic Digester Yes No NA NE
Type of operation: Floating cover
Is the capacity adequate? • 0 0 0
#Is gas stored on site? • 0 0 0
Page# 7
a
Permit NC0037834 Owner-Facility: Archie Elledge WWTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Anaerobic Digester Yes No NA NE
Is the digester(s)free of tilting covers? • 0 0 0
Is the gas burner operational? • 0 0 0
Is the digester heated? • 0 0 0
Is the temperature maintained constantly? • 0 0 0
Is tankage available for properly waste sludge? • 0 0 0
Comment: None
Operations& Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • 0 0 0
Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable • 0 0 0
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: None
Standby Power Yes No NA NE
Is automatically activated standby power available? • 0 0 0
Is the generator tested by interrupting primary power source? • 0 0 0
Is the generator tested under load? • 0 0 0
Was generator tested&operational during the inspection? 0 • 0 0
Do the generator(s)have adequate capacity to operate the entire wastewater site? • 0 0 0
Is there an emergency agreement with a fuel vendor for extended run on back-up power? • 0 0 0
Is the generator fuel level monitored? U 0 0 ❑
Comment: None
Page# 8
United States Environmental Protection Agency Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 E 2 IS I 3 I NCoo5o342 111 12 1 15/05/21 117 18�,. 19 s 201 I
21111111 1111111 11 11 1 11 1111 1 111111 11111111111 r6
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved-------
671 1 701 LJ I 71 I 1 J 72 ti �LJ 7311 174 751 111111 180
Section B:Facility Data
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 11:30AM 15/05/21 09/09/01
Muddy Creek WWTP
Exit Time/Date Permit Expiration Date
4561 Cooper Rd
01:30PM 15/05/21 14/06/30
Winston Salem NC 27102
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
Ozie Keith Jones/ORC/336-397-7679/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
David K Saunders,PO Box 2511 Winston Salem NC
271079998/Director/336-727-8418/ No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
* Permit pi Flow Measurement • Operations&Maintenance pi Records/Reports
Self-Monitoring Program • Sludge Handling Disposal II Facility Site Review II Effluent/Receiving Waters
NI Laboratory
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Ron Boone WSRO WQ//336-776-9690/ 2 7//.5-
Signature
/!.5-.5/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
•
NPDES yr/mo/day Inspection Type 1
31 NC0050342 I11 121 15/05/21 117 18 Lej
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Please refer to the attached inspection summary letter.
Page* 2
•
Permit NC0050342 Owner-Facility: Muddy Creek VVVVTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 II 0
application?
Is the facility as described in the permit? • 0 0 0
#Are there any special conditions for the permit? 0 • 0 0
Is access to the plant site restricted to the general public? • 0 0 0
Is the inspector granted access to all areas for inspection? • 0 0 0
Comment: None
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • 0 0 0
Is all required information readily available, complete and current? • 0 0 0
Are all records maintained for 3 years(lab. reg.required 5 years)? • 0 0 0
Are analytical results consistent with data reported on DMRs? • 0 0 0
Is the chain-of-custody complete? II 0 0 0
Dates,times and location of sampling 111
Name of individual performing the sampling U
Results of analysis and calibration U
Dates of analysis U
Name of person performing analyses •
Transported COCs U
Are DMRs complete:do they include all permit parameters? • 0 0 0
Has the facility submitted its annual compliance report to users and DWQ? • 0 0 0
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator • 0 0 0
on each shift?
Is the ORC visitation log available and current? • 0 0 0
Is the ORC certified at grade equal to or higher than the facility classification? • 0 0 0
Is the backup operator certified at one grade less or greater than the facility classification? • 0 0 0
Is a copy of the current NPDES permit available on site? • 0 0 0
Facility has copy of previous year's Annual Report on file for review? • 0 0 0
Comment: None
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory? • 0 0 0
Are all other parameters(excluding field parameters)performed by a certified lab? • 0 0 0
Page# 3
Permit NC0050342 Owner-Facility: Muddy CreekWVVFP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Laboratory Yes No NA NE
#Is the facility using a contract lab? ❑ • ❑ 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • 0 0 0
Celsius)?
Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0.2 degrees? 0 0 0 •
Incubator(BOO)set to 20.0 degrees Celsius+/-1.0 degrees? 0 0 0 •
Comment: None
Influent Sampling Yes No NA NE
#Is composite sampling flow proportional? • 0 0 0
Is sample collected above side streams? • 0 0 0
Is proper volume collected? • 0 0 0
Is the tubing clean? • 0 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • 0 0 0
Celsius)?
Is sampling performed according to the permit? • 0 0 0
Comment: None
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? • 0 0 0
Is sample collected below all treatment units? • 0 0 0
Is proper volume collected? • 0 0 0
Is the tubing clean? • 0 0 0
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • 0 ❑ 0
Celsius)?
Is the facility sampling performed as required by the permit(frequency,sampling type • 0 0 0
representative)?
Comment: None
Upstream I Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit(frequency, sampling type, and • 0 0 0
sampling location)?
Comment: None
Flow Measurement-Influent Yes No NA NE
#Is flow meter used for reporting? 0 IN 0 0
Page# 4
Permit NC0050342 Owner-Facility: Muddy Creek VVVVTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Flow Measurement- Influent Yes No NA NE
Is flow meter calibrated annually? • 0 0 0
Is the flow meter operational? • 0 0 0
(If units are separated)Does the chart recorder match the flow meter? • 0 0 0
Comment: None
Bar Screens Yes No NA NE
Type of bar screen
a.Manual ❑
b.Mechanical •
Are the bars adequately screening debris? • 0 0 0
Is the screen free of excessive debris? • 0 0 0
Is disposal of screening in compliance? • 0 0 0
Is the unit in good condition? • 0 0 0
Comment: None
Grit Removal Yes No NA NE
Type of grit removal
a.Manual ❑
b.Mechanical •
Is the grit free of excessive organic matter? U 0 0 0
Is the grit free of excessive odor? • 0 0 0
#Is disposal of grit in compliance? El 0 0 0
Comment: None
Primary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? • 0 0 0
Is the site free of excessive buildup of solids in center well of circular clarifier? • 0 0 0
Are weirs level? • 0 0 0
Is the site free of weir blockage? • 0 0 0
Is the site free of evidence of short-circuiting? • 0 0 0
Is scum removal adequate? • 0 0 0
Is the site free of excessive floating sludge? • 0 0 0
Is the drive unit operational? • 0 0 0
Page# 5
•
Permit NC0050342 Owner-Facility: Muddy Creek WWTP
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Primary Clarifier Yes No NA NE
Is the sludge blanket level acceptable? 0 0 0 •
Is the sludge blanket level acceptable?(Approximately%of the sidewall depth) 0 0 0 •
Comment: None
Aeration Basins Yes No NA NE
Mode of operation Ext.Air
Type of aeration system Diffused
Is the basin free of dead spots? • 0 0 0
Are surface aerators and mixers operational? 0 0 • 0
Are the diffusers operational? • 0 0 0
Is the foam the proper color for the treatment process? • 0 0 0
Does the foam cover less than 25%of the basin's surface? • 0 0 0
Is the DO level acceptable? 0 0 0 •
Is the DO level acceptable?(1.0 to 3.0 mg/I) 0 0 0 •
Comment: None
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater? • 0 0 0
Is the site free of excessive buildup of solids in center well of circular clarifier? • 0 0 0
Are weirs level? • 0 0 0
Is the site free of weir blockage? • 0 0 0
Is the site free of evidence of short-circuiting? • 0 0 0
Is scum removal adequate? • 0 0 0
Is the site free of excessive floating sludge? • 0 0 0
Is the drive unit operational? • 0 0 0
Is the retum rate acceptable(low turbulence)? • 0 0 0
Is the overflow clear of excessive solids/pin floc? • 0 0 0
Is the sludge blanket level acceptable?(Approximately%of the sidewall depth) 0 0 0 •
Comment: None
Pumps-RAS-WAS Yes No NA NE
Are pumps in place? • 0 0 0
Are pumps operational? • 0 0 0
Page# 6
Muddy•
Creek WWTP
Permit NC0050342 Owner-Facility:
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Pumps-RAS-WAS Yes No NA NE
Are there adequate spare parts and supplies on site? • 0 0 0
Comment: None
Flow Measurement- Effluent Yes No NA NE
#Is flow meter used for reporting? U 0 0 0
Is flow meter calibrated annually? • 0 0 0
Is the flow meter operational? • 0 0 0
(If units are separated)Does the chart recorder match the flow meter? • 0 0 0
Comment: None
Disinfection-Liquid Yes No NA NE
Is there adequate reserve supply of disinfectant? • 0 0 0
(Sodium Hypochlorite)Is pump feed system operational? • 0 0 0
Is bulk storage tank containment area adequate?(free of leaks/open drains) • 0 0 0
Is the level of chlorine residual acceptable? 0 0 0 •
Is the contact chamber free of growth, or sludge buildup? • 0 0 0
Is there chlorine residual prior to de-chlorination? 0 0 0 •
Comment: None
De-chlorination Yes No NA NE
Type of system ? Liquid
Is the feed ratio proportional to chlorine amount(1 to 1)? 0 0 0 •
Is storage appropriate for cylinders? 0 0 I 0
#Is de-chlorination substance stored away from chlorine containers? • 0 0 0
Are the tablets the proper size and type? ❑ 0 U 0
Comment: None
Are tablet de-chlorinators operational? ❑ ❑ • 0
Number of tubes in use?
Comment: None
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? • 0 0 0
Are the receiving water free of foam other than trace amounts and other debris? • 0 0 ❑
Page# 7
Permit NC0050342 Owner-Facility: Muddy Creek\MNTP •
Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation
Effluent Pipe Yes No NA NE
If effluent (diffuser pipes are required) are they operating properly? 0 0 • 0
Comment: None
Anaerobic Digester Yes No NA NE
Type of operation: Floating cover
Is the capacity adequate? • 0 0 0
#Is gas stored on site? • 0 0 0
Is the digester(s)free of tilting covers? • 0 0 0
Is the gas burner operational? 0 0 0 •
Is the digester heated? • 0 0 0
Is the temperature maintained constantly? • 0 0 0
Is tankage available for properly waste sludge? • 0 0 0
Comment: None
Operations& Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • 0 0 0
Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable • 0 0 0
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: None
Standby Power Yes No NA NE
Is automatically activated standby power available? • 0 0 0
Is the generator tested by interrupting primary power source? • 0 0 0
Is the generator tested under load? ■ 0 0 0
Was generator tested&operational during the inspection? 0 • 0 0
Do the generator(s)have adequate capacity to operate the entire wastewater site? • 0 0 0
Is there an emergency agreement with a fuel vendor for extended run on back-up power? 0 0 0 •
Is the generator fuel level monitored? • 0 0 0
Comment: None
Page# 8