Loading...
HomeMy WebLinkAbout310713_Compliance Evaluation Inspection_20230511� Division of Water Resources Facility Number � 7[ O Division of Soil and Water Conservation O Other Agency Type of Visit: 457ompliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: (94outine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: JJunl i n I - t Farm Name, Owner Nam Mailing Andress: Physical Address: Facility Contact: Title: Onsite Representative: U-tAntAJIL Certified Operator: L uI Back-up Operator: Location of Farm: Swine Wean to Finish b}lean to Feeder Feeder to Finish to Feeder to Finish Other Email: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. 11---�I NN on-- La er Design Current Dry Poultry Canacitv Pan. Layers Non -Layers Pullets Turkeys Turkey Puults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify D WR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Region: LkAa Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes M411 ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes Q;�e ❑ NA ❑ NE ❑ Yes F4ft6� ❑ NA ❑ NE Page 1 of 3 511212020 Continned Facilit Number: '2) Date of Inspection: 5 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ®'KO ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z- 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [ 1 o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E ] No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes �o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes CDXb ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑-bIe ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes �� [T ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Qi o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes FD Plo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Eg-1 ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [Q-No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [:ado ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ Pdb ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes EK ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists [:]Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [:)Yes B]Xo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0�'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Ej No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [L].Kb� ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ©-1Qo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes tEj'1qo_ ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No [CD -NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [:j_Np. ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes awo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30, Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes J-Woo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes M-Nk( ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E>o ❑ NA ❑ NE 33, Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [2-Ko ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes L2 No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). a, e�-tw Yo SC,rnQ slue w� (zunouti Wt Reviewer/Inspector Name: Reviewer/Inspector Signature: Phone: D -ac/ LYOyR Date: '5//1/--�3 Page 3 of 3 511212020