HomeMy WebLinkAbout20150530 Ver 1_Emails_20150605 (2)
Johnson, Alan
To:Gregg Antemann (gregg@cws-inc.net)
Cc:Devane, Boyd
Subject:Indian Trails, town hall
Ok did a quick review. I am out of town all next week
Quick comments:
1)Can I get the site diagram as it lays on the entire property. The diagram submitted are “blow ups” so, I don’t get
the feel of the entire project as it lies within the property boundary. (ie “zoom out”)
2)Design #3 is the preferred. The only difference is the reduced impact to the wetland and the additional stream
created during relocation. The length of the culvert extension is the same.
3)We need the SW design plan and O and M to issue the approval. I don’t think the town of Indian Trail can
approve their own BMP
4)Is the entrance directly across from Chestnut Pkwy? If not can the entrance be adjusted upstream of Stream A
Thanks
Alan
Alan D Johnson – Senior Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2200 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
1