HomeMy WebLinkAboutNCC231473_ESC Approval Submitted_20230516 ROY COOPER
Governor siWI, :
i
•
ELIZABETH S.BISER ,t
Secretary -
.tN 11t9+Y''
BRIAN WRENN NORTH CAROt_INA
Director t, lrotunental Quality
May 11, 2022
LETTER OF APPROVAL
Thomason Development,LLC
ATTN: Randy Thomason, Manager
PO Box 820
Southmont NC, 27351
RE: Project Name: NC Hwy 8 Subdivision
Acres Approved: 9.2
Project ID: DAVID-2022-051
County: Davidson
City: Healing Springs Township
Address: NC HWY 8
River Basin:Yadkin-PeeDee
Stream Classification: C
Submitted By: Latham-Walters Engineering, Inc
Date Received by LQS: May 10, 2022
Plan Type: Express - New
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. This plan approval shall expire three (3)
years following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1,2019,all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete,you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future,the new responsible party must obtain a new COC.
D E Q NWinston-Salemorth Carolina Departm
RegionalentOffi of ce 14 Environmenta50 Hanesl Quality
I DivisionSuite300 ofI Energy.Winston-Salem,Mineral andNorth LandCarolin Resourcesa Mill 27t03
iooiy 336 776 9800
Letter of Approval
Thomason Development,LLC
May 11,2022
Page 2 of 2
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1.The approved E&SC plan as well as any approved deviation.
2.The NCG01 permit and the COC,once it is received.
3.Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land-disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land-disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition,it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Zachary Lentz Digitally signed by Zachary Lentz
Date:2022.05.11 15:05:38-04'00'
Zachary Lentz,PE
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
cc: Mitchell S. Latham, PE of Latham-Walters Engineering, Inc. (via email)
WSRO file
64
'� O �; I'll •moo
.
N
N l0 N �.V
.II - 0 I i
C 'O tr
u c =
VI
�/ N J
o ,� I
O" v CARpl � = A c19 ell M cl I
[3/47,11 .)))
I
CV a
0 ,k°E:?4. _ ',1 / CI .4a) = ;"4 '' .' E
CI 4
,„, , v 449' at r )41 '4.4 cd 4 4
t io are W O
° O
"tt Po
`� V
0 Li ° 4..+ 4
r:4 !.: "" C.4
MI C4
co
,4
..4 , , ir,
e,_, .El Lj 'p _ o
too
''� 5
04 v 6 6 w
E-+ e� et Co) Cd �, U U