HomeMy WebLinkAbout20071777 Ver 1_Buffer Determination_20071026O~O~ W A T ~9PG
~ ~
~ ~
~ ~
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Cazolina Department of Environment and Natural Resources
October 26, 2007
Peace Presbyterian Church, Inc.
Attn: Mr. James Banks
P.O. Box 71037
Durham, NC 27722
Subject Property: Peace Presbyterian Church Inc. Site
Coleen H. Sullins, Director
Division of Water Quality
DWQ EXP# 07-1777
Durham County
On-Site Determination for Applicability to the Neuse Riparian Area Protection Rules (15A NCAC 2B
.0233) -EXPRESS REVIEW PROGRAM
On October 25, 2007, at the request of Mr. Steven Mallory of Summit Consulting Engineers, an on-site
determination was conducted to review one stream feature located on the subject property for applicability to the
Neuse Buffer Rule (15A NCAC 2B .0233). The features is labeled as "A" on the attached map, initialed by Lia
Myott on October 26, 2007. The Division of Water Quality (DWQ) has determined that the following:
• Feature "A" is not subject to the Neuse Buffer Rule. This feature is an ephemeral stream.
This on-site determination shall expire five (5) years from the date of this letter.
Landowners or affected parties that dispute a determination made by the DWQ that a surface water exists and that
it is subject to the buffer rule may request a determination by the Director. A request for a determination by the
Director shall be referred to the Director in writing c/o Cyndi Karoly, DWQ 401 Oversight/Express Review
Permitting Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. You must act within 60 days of the date that you
receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the
affected party (including downstream and adjacent landowners) is notified of this decision. This determination is
final and binding unless you ask for a hearing within 60 days.
This letter only addresses the applicability to the buffer rules of the stream features listed above and does not
approve any activity within the buffers or address features that were not observed during the site visit. Nor does
this letter approve any activity within Waters of the United States or Waters of the State. If you have any
questions, please contact Lia Myott at 919.733.9502.
Sincerely,
/' CG~Z~
Coleen H. Sullins, Director
NC Division of Water Quality
CHS/cbk/lem
Attachments; NRCS Soil Survey Map, USGS Topo Quad Map, Durham County parcel map
40] Oversight /Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Cazolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands
No c hCarolina
~aturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/] 0% Post Consumer Paper
Peace Presbyterian Church
Page 2 of 2
October 26, 2007
cc: Steven Mallory, Summit Consulting Engineers, 1000 Corporate Dr., Ste 101, Hillsborough, NC 27278
Joe Albiston, 120 E. Parrish St., ls` Floor, Durham, NC 27701
Lauren Witherspoon, NCDWQ Raleigh Regional Office
File Copy
Central Files
Durham CbID1~ND
Strums and Ditches
1 / DITCH
RIVER
STREAM
uarcMOwrl
Highways
l Parcels
. Surface Water_Polygons
Municipal_Boundaries
Chapel Hill
Durham
Morrisville
Raleigh
Ortho_2005
N
A
I
on ice( ~s rw~"sub'~~ -l-D `~- IJe~s~ Bu~~rer 1Z~,
~ `~ Dom. ~, 2~7
`~M
Peace Presbyterian Church Property
TerraServer Image Courtesy of the USGS
,a_,~ ~~ ,~ 0~ ~ 200M 0' ' ZOOy d
~i1MM1~BA19~ ~~~~ Image courtesy of the U.S. Geological Survey
~f~8d8PQ13U04 Microsoft Corporation. Terms of Use Privacy Statement
•~~
~~
Page 1 of 1
http://terraserver.microsoft.com/PrintImage.aspx?T=2&S=11 &Z=17&X=1711&Y=9989&W=3... 10/19/2007
Send To Printer Back To TerraServer Change to 11x17 Print Size Show Grid Lines Change to Landscape
HEET NUMBER 12
_. y.
H
>z
,;; 0;
1v
,~
14 i
N
II
v
d
z
0
v
a~
m
cn
M
O
O
O
m
O
m p
a
..I ~