HomeMy WebLinkAboutNCC201590_Annual Fee NOD Letter (2023 Fee)_20230516 ROY COOPER
Commar
ELIZABETH S.BISER
secretary 0
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
5/16/2023
Albemarle Beach Solar, LLC
Attn: Kenny Habul
192 Raceway Drive
Mooresville, NC 28117-6509
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC201590-2023
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The
annual fee was billed on 4/1/2023 and was due on 5/1/2023.The annual fee applies to the following construction site:
Albemarle Beach Solar Farm-Tree Clearing
Woodlawn Rd, Davis Rd., Saints Delight Rd.,Cross Rd., Mackey's Rd., Roper, NC
Washington County
Certificate of Coverage No. NCC201590
NC Reference No. NCG01-2020-1590
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact me at toby.vinson@ncdenr.gov.
Sincerely,
William E.Vinson,Jr.
Chief of Program Operations
Division of Energy, Mineral,and Land Resources
D_E Q'" NcnihCumliniDepo%VM arEivkamienldQmm ty I DMalnnooErww.WeralwW Land Reaaorees
511 N��lh Seliabury Street 116i2 MNl So vtoe Cells I Raleiph,North Carapna ZM9-WR
919.707.9200