HomeMy WebLinkAbout20230684 Ver 1_Boyd_Farm_CLT10_401-404_IP_20230511_20230511(3 Stantec BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE Army Corps of Engineers Individual Permit North Carolina Individual 401 Certification May 11, 2023 Prepared for: Microsoft Corporation One Microsoft Way Redmond, WA 98052 Prepared by: Stantec Consulting Services Inc. 801 Jones Franklin Road Raleigh, NC 27606 Project Number: SAW-2023-00665 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE This document entitled Boyd Farm Data center (CLT10) Permit Application Narrative was prepared by Stantec Consulting Services Inc. ("Stantec") for the account of Microsoft Corporation (the "Client"). Any reliance on this document by any third party is strictly prohibited. The material in it reflects Stantec's professional judgment in light of the scope, schedule and other limitations stated in the document and in the contract between Stantec and the Client. The opinions in the document are based on conditions and information existing at the time the document was published and do not take into account any subsequent changes. In preparing the document, Stantec did not verify information supplied to it by others. Any use which a third party makes of this document is the responsibility of such third party. Such third party agrees that Stantec shall not be responsible for costs or damages of any kind, if any, suffered by it or any other third party as a result of decisions made or actions taken based on this document. Prepared by (signature) Amber Forestier Reviewed by (signature) Loretta Cummings, PhD N Approved by (signature) Travis Crayosky BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE Table of Contents 1.0 THE APPLICANT/PROJECT OVERVIEW ..................................................................... 1 1.1 THE APPLICANT/PROJECT OVERVIEW...................................................................... 1 1.2 PROJECT LOCATION................................................................................................... 1 1.3 EXISTING SITE CONDITIONS....................................................................................... 1 2.0 PROJECT DESCRIPTION............................................................................................. 8 2.1 LAND OWNERSHIP....................................................................................................... 8 2.2 CONSTRUCTION SEQUENCE...................................................................................... 8 2.3 PROPOSED IMPACTS.................................................................................................10 2.4 STORMWATER QUALITY CONTROLS........................................................................13 3.0 THE PUBLIC NEED......................................................................................................14 4.0 PROJECT PURPOSE AND NEED................................................................................14 4.1 UNITED STATES..........................................................................................................14 4.2 NORTH CAROLINA......................................................................................................15 4.3 CATAWBA COUNTY.....................................................................................................17 5.0 OTHER FEDERAL, STATE, AND LOCAL AUTHORIZATIONS OBTAINED OR REQUIRED & PENDING...............................................................................................18 5.1 STATE WATER QUALITY (401) CERTIFICATION........................................................18 5.2 STORMWATER PERMIT..............................................................................................18 5.3 EROSION AND SEDIMENT CONTROL PERMIT.........................................................18 5.4 SITE PLAN APPROVAL................................................................................................18 5.5 AIR PERMITTING.........................................................................................................18 5.6 DRIVEWAY PERMIT.....................................................................................................18 6.0 PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED.....................................19 6.1 PART I: INFRASTRUCTURE NEEDS...........................................................................19 6.2 PART II: AVOIDANCE (NO ACTION, UPLANDS, AND AVAILABILITY OF OTHERSITES).............................................................................................................20 6.3 PART III: MINIMIZATION (ONSITE ANALYSIS)............................................................32 7.0 MITIGATION.................................................................................................................40 8.0 EVALUATION OF THE 401(B)(1) GUIDELINES (FACTUAL DETERMINATIONS) EVALUATION OF THE 401(B)(1) GUIDELINES (FACTUAL DETERMINATIONS)..................................................................................41 8.1 PHYSICAL SUBSTRATE..............................................................................................41 8.2 WATER CIRCULATION, FLUCTUATION, AND SALINITY............................................41 8.3 SUSPENDED PARTICULATE/TURBIDITY...................................................................41 8.4 CONTAMINANT AVAILABILITY....................................................................................41 8.5 AQUATIC ECOSYSTEM EFFECTS..............................................................................42 8.6 PROPOSED DISPOSAL SITE......................................................................................42 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE 9.0 PUBLIC INTEREST REVIEW.......................................................................................43 9.1 CONSERVATION..........................................................................................................43 9.2 ECONOMICS................................................................................................................43 9.3 AESTHETICS................................................................................................................44 9.4 GENERAL ENVIRONMENTAL CONCERNS(33CFR320.4(P)).....................................44 9.5 WETLANDS (33CFR320.4(B))......................................................................................44 9.6 HISTORIC AND CULTURAL RESOURCES(33CFR320.4(E))......................................44 9.7 FISH AND WILDLIFE VALUES (33CFR320.4(C)).........................................................44 9.8 FLOOD HAZARDS........................................................................................................44 9.9 FLOODPLAIN VALUES (33CFR320.4(1)).....................................................................45 9.10 LAND USE....................................................................................................................45 9.11 NAVIGATION(33CFR320.4(0))....................................................................................45 9.12 SHORE EROSION AND ACCRETION..........................................................................45 9.13 RECREATION...............................................................................................................45 9.14 WATER SUPPLY(33CFR320.4(M))..............................................................................45 9.15 WATER QUALITY (ALSO 33CFR320.4(D)) 030501011102..........................................45 9.16 ENERGY NEEDS(33CFR320.4(N))..............................................................................46 9.17 SAFETY........................................................................................................................46 9.18 FOOD AND FILTER PRODUCTION.............................................................................46 9.19 MINERAL NEEDS.........................................................................................................46 9.20 CONSIDERATIONS OF PROPERTY OWNERSHIP.....................................................46 9.21 ENVIRONMENTAL JUSTICE........................................................................................47 9.22 AIR QUALITY................................................................................................................49 9.23 PREVIOUS PUBLIC OUTREACH.................................................................................50 9.24 INDIRECT AND CUMULATIVE EFFECTS....................................................................50 9.25 CUMULATIVE IMPACTS...............................................................................................51 APPENDIX A APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT ..................A APPENDIX B GRAPHICS...................................................................................................B APPENDIX C JURISDICTIONAL FEATURES....................................................................0 APPENDIX D SOILS...........................................................................................................D APPENDIX E THREATENED & ENDANGERED SPECIES ................................................ E APPENDIX F CULTURAL RESOURCES........................................................................... F APPENDIX G STORMWATER MANAGEMENT PLAN.......................................................G APPENDIX H ENVIRONMENTAL JUSTICE.......................................................................H APPENDIX I MITIGATION.................................................................................................. BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE List of Illustrations Illustration 1. Data Center Locations in the U.S.........................................................................15 Illustration 2. MBC Optical Transport Network...........................................................................16 Illustration 3. Data Center Locations in North Carolina..............................................................16 Illustration 4. Catawba County Offsite Alternative Parcels.........................................................21 Illustration 5. Alternative Site 1 Topography..............................................................................23 Illustration 6. Alternative Site 2 Topography..............................................................................25 Illustration 7. Alternative Site 3 Topography..............................................................................26 Illustration 8. Preferred Site Topography...................................................................................28 Illustration 9. Alternative Layout 1.............................................................................................34 Illustration 10. Alternative Layout 2...........................................................................................36 Illustration 11. Alternative Layout 3...........................................................................................37 Illustration 12. Census Block Groups (EPA EJSCREEN)..........................................................48 List of Tables Table 1. Jurisdictional Features................................................................................................. 2 Table 2. Stream Functional Assessment (NCSAM) Ratings....................................................... 3 Table3. Soils............................................................................................................................. 4 Table 4. Potentially Occurring T&E Species in the vicinity of the CLT10 Boyd Farm Site (USFWS IPaC 03/31/2023).......................................................................................... 5 Table 5. Previously Identified Archaeological Sites within a 1-Mile Radius of the Project Area............................................................................................................................. 6 Table 6. Previously Identified Architectural Resources Within a 1-Mile Radius of the ProjectArea................................................................................................................. 7 Table7. Project Parcels............................................................................................................. 8 Table 8. Jurisdictional Impacts..................................................................................................10 Table 9. Offsite Alternative Impacts...........................................................................................29 Table 10. Offsite Alternatives Criteria........................................................................................30 Table 11. Alternative Layout 1 Estimated Stream Impacts........................................................35 Table 12. Alternative Layout 2 Estimated Stream Impacts........................................................37 Table 13. Alternative Layout 3 Estimated Stream Impacts........................................................38 Table 14. Alternative Layout Impact Comparison......................................................................38 Table 15. Stream Compensatory Mitigation..............................................................................40 Table 16. Census Block Groups................................................................................................48 Table 17. Census Information...................................................................................................49 Executive Summary This document is intended to provide supplementary information in support of the U. S. Army Corps of Engineers' (USACE) preparation of the Environmental Assessment, Finding of No Significant Impact, Statement of Findings, and Review and Compliance Determination according to the 404(b)(1) guidelines for the proposed Boyd Farm Data Center (CLT10) in Maiden, North Carolina. APPLICANT: Microsoft Corporation c/o Mr. Chris Sander One Microsoft Way Redmond, WA 98052 Email: chsandera-microsoft.com Phone: 425-706-7191 Alternate: Ms. Claire Wolanski Email: v-cwolanskia-microsoft.com Phone: 434-981-2898 AGENT: Stantec Consulting Services Inc. - Amber Forestier 801 Jones Franklin Road Raleigh, NC 27606 Email: amber.forestiera-stantec.com Phone: 540-226-5525 The Applicant is proposing to develop a multi -phase data center development with five (5) single -story data center buildings and associated infrastructure that will be collectively known as the Boyd Farm Data Center (CLT10). The proposed project is located on five (5) parcels consisting of approximately 294.73 acres (AC) to the northwest of Zeb Haynes Road, east of Crestwood Street and south of Clarks Creek Circle in the Town of Maiden, NC. (Appendix B; Figures 1 and 2). The primary function of the data center campus is to provide the most efficient, controlled environment for communication servers housed inside the facility. The project includes five 48-megawatt (MW) data center buildings with parking, access roads, a pad site for one (1) Duke Energy substation, security entrances and features, installation and/or relocation of utilities, and stormwater management treatment facilities with impacts to jurisdictional streams. A completed application for a Department of the Army permit is provided for your review in Appendix A. The purpose of the CLT10 project is to provide additional cloud storage capacity in support of Microsoft Corporation's (Microsoft) North Carolina Regional Network Gateway (RNG). Microsoft establishes RNG's around the globe within identified regions. Sites within the RNG are required to meet certain connectivity and redundancy requirements and must be located within 20-kilometers (km) of other data centers in the region that are all connected through fiber optic lines. The North Carolina region is outgrowing the current capacity provided by existing data centers. Because these projects usually take 18-24 months to design and construct each phase, Microsoft is planning now for future growth. This data center design is advanced and is expected to provide optimal operational efficiencies. Within North Carolina, locations for a data center are mainly limited by access to fiber optic lines and adequate electrical power. After analyzing off -site and on -site alternatives, the Preferred Alternative was found to be the Least Environmentally Damaging Practicable Alternative (LEDPA). The Preferred Alternative will result in permanent impacts to 686 LF (0.07 AC) stream channel and temporary impacts to 258 LF (0.02 AC) of stream channel. Compensatory mitigation totaling 1,208 credits is proposed to be provided through a credit purchase from the NCDEQ Division of Mitigation Services (DMS) In -Lieu Fee Program. The Applicant is seeking authorization to take the proposed impacts under an Individual Permit from the U.S. Army Corps of Engineers (USACE), pursuant to Section 404 of the Clean Water Act (33 USC 1344) and authorization under an Individual 401 Water Quality Certification (WQC) from the North Carolina Division of Water Resources (DWR) pursuant to Section 401 of the Clean Water Act and Section15A NCAC 02H.0500 et seq. of the North Carolina Administrative Code. Acronyms/Abbreviations AC Acre BMP Best Management Practice Corps U.S. Army Corps of Engineers FEMA Federal Emergency Management Agency FIRM Flood Insurance Rate Map HPO North Carolina State Historic Preservation Office HUC Hydrologic Unit Code IPaC U.S. Fish and Wildlife Information for Planning and Conservation LEDPA Least Environmentally Damaging Practicable Alternative LF Linear Feet Km Kilometer kV Kilovolts MW Megawatts DEQ North Carolina Department of Environmental Quality DAQ North Carolina Division of Air Quality DCM North Carolina Division of Coastal Management DEMLR North Carolina Division of Energy, Mineral, and Land Resources DMF North Carolina Division of Marine Fisheries DWR North Carolina Division of Water Resources NC North Carolina NCDOT North Carolina Department of Transportation NC SAM North Carolina Stream Assessment Method NC WAM North Carolina Wetland Assessment Method NHDE North Carolina Natural Heritage Data Explorer NHP North Carolina Natural Heritage Program NPDES National Pollutant Discharge Elimination System NRHP National Register of Historic Places OAH North Carolina Office of Archives and History OSA North Carolina Office of State Archaeology PEM Palustrine Emergent Wetlands PFO Palustrine Forested Wetlands PJD Preliminary Jurisdictional Determination POW Palustrine Open Water PSS Palustrine Scrub -Shrub Wetlands SF Square Feet SWM Stormwater Management USFWS U. S. Fish and Wildlife Service WRC North Carolina Wildlife Resources Commission BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE APPLICANT/PROJECT OVERVIEW In THE APPLICANT/PROJECT OVERVIEW 1.1 THE APPLICANT/PROJECT OVERVIEW This document is intended to provide supplementary information in support of the U. S. Army Corps of Engineers' (USACE) preparation of the Environmental Assessment, Finding of No Significant Impact, Statement of Findings, and Review and Compliance Determination according to the 404(b)(1) guidelines for the proposed Boyd Farm Data Center (CLT10) in the Town of Maiden, North Carolina (NC). The Applicant is proposing to develop a multi -phase development with five (5) single -story data center buildings and associated infrastructure that will be collectively known as the Boyd Farm Data Center (CLT10). The primary function of the data center campus is to provide the most efficient, controlled environment for communication servers housed inside the facility. The project will provide 488 MW of data storage and includes five 48-megawatt (MW) data center buildings with parking, access roads, a pad site for one (1) Duke Energy substation, security entrances and features, installation and/or relocation of utilities, and stormwater management treatment facilities with impacts to jurisdictional streams. A completed application for a Department of the Army permit is provided for your review in Appendix A. 1.2 PROJECT LOCATION The proposed Project Site, referred to as the Boyd Farm Data Center (CLT10), is located on five (5) parcels consisting of approximately 294.73 acres (AC) to the northwest of Zeb Haynes Road, east of Crestwood Street and south of Clarks Creek Circle in the Town of Maiden, NC. (Appendix B; Figures 1 and 2). The project site contains Clark Creek, and unnamed tributaries with wetlands which flow into Clark Creek. The site is located within the Upper Clark Creek watershed in Hydrologic Unit Code (HUC) 03050102. 1.3 EXISTING SITE CONDITIONS Land Us - Currently the property is vacant with the northern portion of the site having been farmed with wooded areas along the Clark Creek stream corridor. Within the past 10 years, these previously farmed areas have been reforested in a pine plantation. The eastern -most parcel was recently cleared for agricultural fields. The area around Old Maiden Road, in the southern section of the site, has remained an open field for at least 30 years. ,.%;.2 wFwV,%Atjhy The site is located to the east of Clark Creek and consists of moderate to severe sloping areas with the steepest areas generally adjacent to the 100-year floodplain. Two stream drainages with steep slopes BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE APPLICANT/PROJECT OVERVIEW cross the property. The site generally slopes down from east to west, from a high of 925 feet to a low of 800 feet. 1.3.3 Jurisdictional Features On -site streams and wetlands were first evaluated in the field by Black & Veatch between June 28-30, 2022. Stantec reviewed the existing natural resource investigations completed by Black & Veatch in July 2022 and conducted a site visit on November 10, 2022. A site visit with the LISACOE was completed on December 1, 2022, to evaluate current conditions. Stantec reevaluated portions of Black & Veatch's jurisdictional waters delineation and changes were made to streams extents and classifications based on local regulatory experience. Aquatic features were evaluated and delineated based on the North Carolina Division of Water Resources (DWR) Stream Identification Method (version 4.11) and the 1987 US Army Corps of Engineers Manual and the Eastern Mountains and Piedmont (EMP) Regional Supplement. The following table summarizes the jurisdictional features delineated within the Project Site and approved by the Corps. Table 1. Jurisdictional Features Site Name Latitude Longitude Estimated amount Type of Geographic (decimal (decimal of aquatic aquatic authority to which degrees) degrees) resource in review resource (i.e., the aquatic area (acreage and wetland vs. resource "may linear feet, if non -wetland be" subject (i.e., applicable) waters) Section 404 or Section 10/404 SA 35.589794 -81.235323 1,009 LF Non -wetland Section 404/401 waters SA Intermittent 35.589209 -81.232058 249 LF Non -wetland Section 404/401 waters SB 35.589069 -81.231642 102 LF Non -wetland Section 404/401 waters SC 35.595089 -81.234077 1,400 LF Non -wetland Section 404/401 waters SC Intermittent 35.595198 -81.228817 74 LF Non -wetland Section 404/401 waters Clark's Creek 35.593939 -81.235291 5,994 LF Non -wetland Section 404/401 waters A request for a preliminary jurisdictional determination (PJD) confirmation was submitted to the Corps on January 24, 2023. The PJD was issued by the Corps in a letter dated March 30, 2023. The site was determined to contain 8,828 LF of streams. A copy of the wetland delineation and PJD are included in Appendix C. 1.3.3.1 NORTH CAROLINA STREAM ASSESSMENT METHOD (NCSAM) Functional assessment of the onsite streams was evaluated by Stantec staff on November 10, 2022, using the NC Stream Assessment Method (NC SAM) v.2.1. This methodology consists of a rapid assessment of multiple functions against reference conditions for the stream type to give an overall 2 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE APPLICANT/PROJECT OVERVIEW assessment of function'. All streams evaluated were headwater streams and exhibited narrower confined valley shapes (type B) in small watersheds (Size 1 <0.1 milez). Overall, the streams are incised but not generally unstable except at head cuts near the stream origins. There are some signs of past channel straightening. Forested riparian corridors are wide and do not exhibit an abundance of invasive species. All streams rated as medium quality streams. The assessed stream segment ratings are provided in Table 2. The NC SAM sheets are provided in Appendix C. Table 2. Stream Functional Assessment (NCSAM) Ratings Stream ID Flow Regime Function Rating Summary Overall Stream Rating Hydrology - Low SA Perennial Water Qual.- Medium Medium Habitat - Medium Hydrology - Low SA Intermittent Intermittent Water Qual.- High Medium Habitat - Medium Hydrology - Low SB Intermittent Water Qual.- High Medium Habitat - Medium Hydrology - Medium SC Perennial Water Qual.- Medium Medium Habitat - High Hydrology - Low SC Intermittent Intermittent Water Qual.- Medium Medium Habitat — Medium/High 1.3.4 Soils The U.S. Department of Agriculture Natural Resources Conservation Service Web Soil Survey indicates that there are thirteen different soil units present in the vicinity of the project area. The four most abundant being: 1. Lloyd loam, 2 to 6 percent slopes; 2. Pacolet clay loam, 10 to 25 percent slopes. The natural drainage class is severely eroded; 3. Lloyd loam, 6 to 10 percent slopes; and 4. Lloyd clay loam, 6 to 10 percent slopes. The natural drainage class is moderately eroded. Nine other soil types make up approximately 29% of the site. Lloyd loam is also present at 10 to 15 percent slopes. There is an area of moderately eroded Lloyd clay loam at 2 to 6 percent slope. Frequently flooded Buncombe loamy sand is present on site at 0 to 5 percent slopes. Chewacla loam and Congaree ' N.C. Stream Functional Assessment Team. 2015. N.C. Stream Assessment Method (NCSAM) User Manual. Version 2.1. 3 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE APPLICANT/PROJECT OVERVIEW loam are both present at 0 to 2 percent slopes and are rated as frequently flooded. There is also an area of Dorian fine sandy loam that exists at 0 to 6 percent slopes and is rarely flooded. Moderately eroded Madison -Bethlehem complex is present at 10 to 25 percent slopes. The last two soil types are Pacolet soils at 10 to 25 percent slopes and occasionally flooded Roanoke loam at 0 to 2 percent slopes. Table 3 includes additional information on all the soil types found on site. Best Management Practices (BMPs) to control runoff and sedimentation during construction, as described in the North Carolina Erosion and Sediment Control Planning and Design Manual, (2013), will be used. No adverse impacts are expected to the topography, geology, or soils of the project area or surrounding areas. A copy of the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Custom Soil Report for the project site is included as Appendix D. Table 3. Soils MAP UNIT SYMBOL MAP UNIT NAME HYDRIC SOIL SOIL GROUP AC PERCENT BuB Buncombe loamy sand, 0 to 5 percent slopes, frequently flooded No A 2.8 1.0% ChA Chewacla loam, 0 to 2 percent slopes, frequently flooded Yes B/D 18.0 6.2% CoA Congaree loam, 0 to 2 percent slopes, frequently flooded Yes C 18.7 6.4% DoB Dorian fine sandy loam, 0 to 6 percent slopes, rarely flooded Yes C 15.1 5.2% LcB Lloyd loam, 2 to 6 percent slopes No B 66.9 22.9% LcC Lloyd loam, 6 to 10 percent slopes No B 44.1 15.1 % LcD Lloyd loam, 10 to 15 percent slopes No B 4.2 1.4% LdB2 Lloyd clay loam, 2 to 6 percent slopes, moderately eroded No B 2.0 0.7% LdC2 Lloyd clay loam, 6 to 10 percent slopes, moderately eroded No B 31.2 10.7% MhE2 Madison -Bethlehem complex, 10 to 25 percent slopes, moderately eroded No B 16.9 5.8% PaE3 Pacolet clay loam, 10 to 25 percent slopes, severely eroded No B 64.1 21.9% PeE Pacolet soils, 10 to 25 percent slopes No B 3.0 1.0% RkA Roanoke loam, 0 to 2 percent slopes, occasionally flooded Yes C/D 5.3 1.8% TOTAL 100.0% 1.3.5 Vegetation A variety of vegetative communities are present onsite with at least half the site under timber management and planted with pine trees. Hardwood forests are present along Clark Creek and the tributaries onsite ranging from piedmont alluvial forests along the channels to mesic mixed oak hickory C! BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE APPLICANT/PROJECT OVERVIEW forests on side slopes and ridges. These forests vary in age but primarily exhibit native vegetation. Maintained areas onsite include a few grassy fields, a sanitary sewer easement along Clark Creek and an electrical transmission line along the northern boundary of the site. A large area in the northeast portion of the site has been clearcut and has been left to regenerate in young successional forest. 1.0.0 r%=u%=, ,,y & StGTC'LIJ1%=U I,,,%=u,%=,u= d of r-,,u jil CICd SpCC.ICJ Stantec reviewed the preliminary natural resource investigations completed by Black and Veatch in July 2022 and then visited the site on December 1, 2022, and March 20, 2023. Stantec biologists assessed wetlands and waters of the US, vegetative communities, and threatened and endangered species habitat. A survey for dwarf -flowered Heartleaf (Hexastylis naniflora) was conducted but no specimens were found. Updates to federally protected species as of March 30, 2023 are summarized below and include the proposed listing of the tricolored bat and the absence of dwarf -flowered heartleaf. The USFWS Information for Planning and Consultation (IPaC) has detailed the dwarf -flowered heartleaf as a potentially occurring species for the project area in Catawba County, NC (Table 4). The North Carolina Natural Heritage Program (NHP) January 2023 Q4 Element Occurrence dataset shows an occurrence of tricolored bat in the Pinch Gut Creek culvert under W. Maiden Road approximately 0.25 miles southeast of the project. During field evaluation in December 2022, suitable dwarf flowered heartleaf habitat was found. Stantec performed a site visit within the approved survey window on March 20, 2023, to assess current site conditions and evaluate potential habitat for the dwarf -flowered heartleaf but no individual Hexastylis sp. plants were located. Due to the absence of specimens in the potential habitat, this project has been determined to have no effect on this species. Table 4. Potentially Occurring T&E Species in the vicinity of the CLT10 Boyd Farm Site (USFWS IPaC 03/31/2023) Common Name Scientific Name Federal Status* Habitat Biological Conclusion Tri-colored bat Perimyotis PE Yes Unresolved subfla vus Bog Turtle Glyptemys T-SA Marginal Not Required muhlenbergii Dwarf -flowered Hexastylis naniflora T Yes No Effect Heartleaf Bald Eagle Haliaeetus BGPA No No Effect leucocephalus 'PE= Proposed Endangered; T-SA= Threatened due to similar appearance; T= Threatened; BGPA= Bald and Golden Eagle Protection Act The tri-colored bat has been proposed to be federally listed as endangered and is expected to be officially listed before this site goes to construction. Roosting habitat is present across the site in the form of forested areas. Acoustic surveys are scheduled to occur at the end of May 2023 for this species and further analysis and results will be provided at that time. 5 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE APPLICANT/PROJECT OVERVIEW During field evaluation on December 1, 2022, marginal bog turtle habitat was found in a few wetter areas of the Clark Creek floodplain. These areas are not being disturbed as part of this project.Since bog turtle is listed due to similarity of appearance to the northern bog turtle no further action is required. The monarch butterfly is listed as a candidate species and is not yet listed on the endangered species list. No further action is required. Additionally, during field evaluation in December 2022, no milkweed was observed, and the open fields appeared to be maintained. A memo including the database search results can be found in Appendix E. 1.3.7 Cultural Resources The NC Office of State Archaeology (OSA) files of archaeological sites were examined, and information was retrieved on sites located within a 1.6-kilometer (1-mile) radius of the survey corridor. Additionally, North Carolina Historic Preservation Office (HPO) files of architectural surveys were examined, and information was retrieved on sites located within a 1.6-kilometer (1-mile) radius of the survey corridor. Background research also focused on relevant sources of local historical information and available historical maps, which were examined to provide an historical context for the Project Area and to check for any buildings and other cultural features present within the Project Area. 1.3.7.1 ARCHAEOLOGICAL SITES No previously recorded archaeological sites are located within the Project Area. Four previously recorded archaeological sites are located within a 1.6-kilometer (1-mile) radius of the Project Area (Table 5; Appendix F - Figure 1). Of the four total previously recorded archaeological sites in the vicinity of the Project Area, three are Native American and one is historic. Table 5. Previously Identified Archaeological Sites within a 1-Mile Radius of the Project Area Resource Resource Type Association Reference NRHP Status 31CT129 Lithic Scatter Pre -Contact McCabe et al. 1978 Unassessed 31CT261 Cemetery 19t" Century Farrow & Idol 2016 Unassessed 31CT285 Lithic Scatter Pre -Contact O'Neil 2022 Unassessed 31CT286 Lithic Scatter Pre -Contact O'Neil 2022 Unassessed 1.3.7.2 ARCHITECTURAL RESOURCES No previously recorded architectural resources are located within the Project Area. Seven previously recorded architectural resources are located within a 1.6-kilometer (1-mile) radius of the Project Area (Table 6; Appendix F - Figure 2). Of these, five represent houses with no recorded date and the 1845 William Pinckney Reinhardt House (CT0416) which has been listed on the NHRP and is located 0.5 miles away from the Project Site. The seventh architectural resource is the Carolina Mills, also with no recorded date of construction. C: BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE APPLICANT/PROJECT OVERVIEW Table 6. Previously Identified Architectural Resources Within a 1-Mile Radius of the Project Area Site # Resource Type Date Recorded By NRHP Recommendation CT0416 William Pinckney Reinhardt House 1845 Kooiman 1989 NRHP Listed 1990 CT0476 House n.d. Unknown 1977 Unassessed CT0543 House n.d. Unknown 1977 Unassessed CT0640 Joe Reinhardt House n.d. Unknown 1977 Unassessed CT0751 Carolina Mills n.d. Unknown 1977 Unassessed CT0764 Parker House n.d. Unknown 1977 Unassessed CT0857 Mike Keener House n.d. Unknown 1977 Demolished 1.3.8 Regulated Floodplair The project area is located on the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM) 3710363700J and 3710363800J, which show that the 100-year floodplain is present within the project area. No construction is occurring in the floodplain and this project will not increase the 100-year floodplain elevation. FIRM maps are provided in Appendix B — Figures 3 & 4. 1.0.7 LV11111 j. The five (5) parcels are located in the Town of Maiden and are zoned M-1 — Industrial District. Data centers are a permitted use within the M-1 district under the Unified Development Ordinance of the Town of Maiden, NC. III BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT DESCRIPTION 2.0 PROJECT DESCRIPTION 2.1 LAND OWNERSHIP All five of the parcels within the project limits are owned by the Microsoft. A list of the parcels and their acreages is provided in Table 1. A map of the subject parcels is provided in Appendix B on Figure 5. Table 7. Project Parcels Parcel ID Acreage 363819608696 86.96 363708992517 23.86 363707699340 70.64 363707678981 58.54 363711569552 54.73 TOTAL 294.73 2.2 CONSTRUCTION SEQUENCE The early site works plan dated April 4, 2023, includes mass grading of the site and all jurisdictional impacts will be taken under this construction plan. Construction will follow this construction sequence: 1. Obtain grading/erosion control plan approval from Catawba County. Post the erosion control placard at the jobsite and maintain current approved set of plans. 2. Obtain certificate of coverage from the NC Department of Environmental Quality and store the certificate on -site at all times. Permit must be updated yearly. 3. Set up an on -site pre -construction conference with erosion control inspector to discuss erosion control measures. Failure to schedule such conference 48 hours prior to any land disturbing activity is a violation. 4. Prior to any clearing or installation of erosion control devices, contractor shall stake clearing limits and stake all trees, and structures to remain and be protected. 5. All erosion control measures shall be constructed in accordance with the NC Erosion and Sediment Control Planning and Design Manual, US Department of Agriculture and Catawba County standards and specifications. 6. Install construction entrance, perimeter silt fence, sediment traps, temporary diversion ditches, and other measures as shown on Phase I erosion control plans, clearing only as necessary to install these devices. Sediment basins shall be installed and functioning properly prior to moving forward with remaining clearing and grubbing. E: BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT DESCRIPTION 7. Install 3 culverts as shown on Phase I erosion control plans by implementing stream pump around measures as required. Protect work zone using temporary diversions and double row silt fence as shown on plans. Contractor shall work from downstream to upstream installing the outlet protection first. All sediment laden water from the work zone shall be pumped through a DEQ approved filter bag. Adhere to pump around sequence of construction as shown on design specification. 8. Contractor to block all possible entrances to site besides approved construction entrance(s) with fencing and orange barrels. 9. Contractor shall ensure that erosion control measures are in place and functioning prior to demolition, grubbing, and grading operations. 10. Prepare staging, operations and stockpile areas. 11. Call for on -site inspection by inspector. When approved, inspector issues the grading permit and clearing and grubbing may begin. 12. Begin grading and demolition activities, installing additional erosion control measures as indicated or as deemed necessary by the erosion control inspector. Limit the amount of exposed soil by initiating stabilization measures as construction progresses. 13. Contractor shall fully construct the roadway connection between Northern Drive and the main campus pad as quickly as possible, this drive shall be used as the main connection point to the project. 14. Install storm drain as shown on plans in conjunction with grading operations. Install erosion control measures as required while storm drain systems are installed, including but not limited to, temporary slope drains. 15. As construction commences, the contractor shall adjust diversion ditches and temporary slope drains, as necessary, as site is brought to finished grade. Contractor shall also install additional erosion control measures as shown on the plan and as deemed necessary by the erosion control inspector. Contractor shall maintain a 24-inch berm at the top of all fill slopes, directing water to the slope drains. 16. The contractor shall diligently and continuously maintain all erosion control devices and structures. 17. For phased erosion control plans, contractor shall meet with erosion control inspector prior to commencing with each phase of erosion control measures. 18. Stabilize slopes immediately with permanent erosion control matting and permanent grass seeding once they are brought to finished grade. Slopes greater than 20 feet high shall be seeded when the slope is brought up to the next slope bench. All slopes shall be walked with tracked equipment prior to seeding/grassing. 19. Contractor may install deep storm drainage piping system and other deep utilities as the fill section is being brought up to finish grades. Contractor may use the storm drainage system to route water to sediment basins, including inlet protection as required. 20. Upon reaching pad grades, place stone base on laydown areas, building pads as indicated on the plans for stabilization. Slope stone pads to the temporary ditches. All areas of the pad not to receive a stone base shall be permanently stabilized with seeding/grassing. BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT DESCRIPTION 21. Coordinate with erosion control inspector prior to removal of any erosion control measures. 22. No device shall be removed until site is stabilized. Riser sediment basins 1, 2A, 28, and 2C as shown on Phase I erosion and sediment control plans are to remain installed and operational until future work packages are completed. Riser sediment basin 4, and skimmer sediment basins 3, and 5 may be removed once all work draining to it has been permanently stabilized and with prior approval from the erosion control inspector and engineer. 23. All disturbed areas shall receive either stone, asphalt, or permanent stabilization. Contractor shall be responsible for maintaining the site until full stabilization is complete and the Catawba County erosion control permit is closed. 2.3 PROPOSED IMPACTS The project will have permanent impacts to 686 LF (0.07 AC) stream channel and temporary impacts to 258 LF (0.02 AC) of stream channel (Table 8). The overall impacts are shown on the Jurisdictional Impacts Maps created by WK Dickson located in Appendix B on Figures 6 through 9A. Profile views of the impacts have been included. Computations for riprap outfall protection associated with culverts are based on NC Department of Transportation (NCDOT) and FEMA floodplain requirements. Table 8. Jurisdictional Impacts Impact Type of Impact Permanent Stream Impacts Temporary Stream Impacts AC LF AC LF SA1 Fill for access road 0.001 16 - - SA2 Temporary construction access - - 0.001 11 SA3 Temporary construction access - - 0.003 44 SA4 Road Crossing - Culvert 0.013 225 - - SA5 Riprap Outfall 0.002 33 - - SA6 Temporary construction access - - 0.001 48 SC1 Fill for access road 0.0002 5 - - SC2 Temporary construction access - - 0.004 78 SC3 Temporary construction access - - 0.004 27 SC4 Road Crossing - Culvert 0.049 358 - - SC5 Riprap Outfall 0.007 49 - - SC6 Temporary construction access - - 0.007 50 TOTAL 0.07 AC 686 LF 0.02 AC 258 LF 10 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT DESCRIPTION DISCUSSION OF IMPACTS The project requires impacts to stream channels. All construction within stream channels will occur in the dry. If there is flow in the channel, a pump -around system will be utilized during construction. Design specifications for the pump -around system are provided in Appendix B on Figure 10 provided by WK Dickson. All temporarily impacted stream channels will be returned to pre -construction contours after construction is complete. 1. Impact SA1 — Fill for access road The project will permanently impact 16 LF of intermittent stream with the placement of fill necessary for the construction of an internal access road associated with the security entrance. Utilities will also be installed within the roadbed. The plan and profile for Impact SA1 are provided in Appendix B on Figures 7 & 7A. 2. Impact SA2 - Temporary construction access The construction of the internal access road will also temporarily impact 11 LF of intermittent stream to allow for construction of the slope and installation of perimeter security fencing. The plan and profile for Impact SA2 are provided in Appendix B on Figures 7 & 7A. 3. Impact SA3 - Temporary construction access Temporary impacts associated with the construction of the culvert and wingwalls at the main entrance to the site from Old Maiden Road will occur. The construction will temporarily impact 44 LF of perennial stream to allow access for installation of the culvert, utilities, wingwalls and security fencing. The plan and profile for Impact SA3 are provided in Appendix B on Figures 7 & 7A. 4. Impact SA4 - Road Crossing - Culvert The project will permanently impact 225 LF of perennial stream with the placement of a 204-foot-long 60- inch reinforced concrete pipe (RCP) with wingwalls to construct the main entrance to the site from Old Maiden Road. Utilities will also be installed at the crossing. The culvert will be countersunk 12-inches and back -filled with onsite materials. The plan and profile for Impact SA4 are provided in Appendix B on Figures 7 & 7A. 5. Impact SA5 - Riprap Outfall The installation of riprap outfall protection will permanently impact 33 LF of stream. The plan and profile for Impact SA5 are provided in Appendix B on Figures 7 & 7A. 6. Impact SA6 - Temporary construction access Temporary impacts associated with the construction of the culvert and wingwalls at the main entrance to the site from Old Maiden Road will occur. The construction will temporarily impact 48 LF of perennial stream to allow access for installation of the culvert, utilities, wingwalls, riprap and security fencing. The plan and profile for Impact SA6 are provided in Appendix B on Figures 7 & 7A. 11 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT DESCRIPTION 7. Impact SC1 - Fill for access road The project will permanently impact 5 LF of intermittent stream with the placement of fill necessary for the construction of an internal access road. The slope in this area was increased from a 3:1 slope to a 2:1 slope to decrease impacts. The plan and profile for Impact SC1 are provided in Appendix B on Figures 8 & 8A. The outflow pipe from Wetpond #2C is directed towards the channel and a riprapped ditch has been provided to direct flow towards the stream channel. 8. Impact SC2 - Temporary construction access The construction of the internal access road will also temporarily impact 78 LF of intermittent stream to allow for construction of the slope and installation of perimeter security fencing. A temporary three -foot - tall rip -rap temporary sediment trap will be installed across the stream as described in NCDEQ6.60.2. The stream channel will be returned to pre -construction contours when construction is complete. The plan and profile for Impact SC2 are provided in Appendix B on Figures 8 & 8A. 9. Impact SC3 - Temporary construction access Temporary impacts associated with the construction of the culvert and wingwalls at the crossing between the north and south sections of the site will occur. The construction will temporarily impact 27 LF of perennial stream to allow access for installation of the culvert, utilities, and wingwalls. The plan and profile for Impact SC3 are provided in Appendix B on Figures 9 & 9A. 10. Impact SC4 -Road Crossing —Culverts The project will permanently impact 358 LF of perennial stream and FEMA designated 100-year floodplain with the placement of two 333-foot-long, 84-inch RCP with wingwalls at the crossing between the north and south sections of the site. Multiple ductbanks will be installed at the crossing. The crossing has been designed to meet local and FEMA floodplain construction requirements. The culvert will be countersunk 17-inches to meet FEMA requirements and back -filled with onsite materials. The plan and profile for Impact SC4 are provided in Appendix B on Figures 9 & 9A. 11. Impact SC5 - Riprap Outfall The project will permanently impact 49 LF of perennial stream with the placement of 49-foot-long by 75- foot-wide riprap outfall protection at the crossing between the north and south sections of the site. The plan and profile for Impact SC5 are provided in Appendix B on Figures 9 & 9A. 12. Impact SC6 - Temporary construction access Temporary impacts associated with the construction of the culvert at the crossing between the north and south sections of the site will occur. The construction will temporarily impact 50 LF of perennial stream to allow access for installation of the culvert, utilities, wingwalls and a riprap outfall. The plan and profile for Impact SC4 are provided in Appendix B on Figures 9 & 9A. 12 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT DESCRIPTION 2.4 STORMWATER QUALITY CONTROLS The stormwater runoff for the proposed project originates from driveway access, building roofs, a gravel substation pad site, parking lots and on -site grassed drainage. This project has an assumed proposed/future total impervious area totaling 79.99 acres. Stormwater from the above -mentioned areas is directed to any one of a number of drainage structures, including but not limited to curb inlets, grate inlets, and yard inlets. Once the stormwater has entered the drainage system through these structures, it is directed by gravity flow through the stormwater drainage system to the BMP wet ponds. A copy of the Stormwater Management Plans and Stormwater Report are attached in Appendix G. The following steps will be followed during construction: 1. During the mass grading operation, storm drainage infrastructure should be installed across the site. As part of the Phase I Erosion and Sediment Control Plan (E&SCP), the seven erosion control sediment basins on the site function as the storm drainage system. 2. Phase 2 of the E&SCP will begin following the completion of Phase 1 and will include construction of an access road from Old Maiden Road and Zeb Hayes Road. Mass grading will occur around these drives as it comes onto the site. Access road from Zeb Hayes Road will be paved with asphalt. Grading of the primary entrance from Old Maiden Road will be completed and paved with gravel. Once mass grading is complete and the entire site has been stabilized erosion control sediment basins 3, 4, and 5 will be removed. Erosion control sediment basins 1, 2A, 2B, and 2C will be converted to a BMP wet pond. 3. The 4 BMP wet ponds will provide storm water management for all impervious surfaces at the site. 4. BMP wet pond 1 has been sized to receive storm drainage from the primary entrance with a proposed drainage area of 9.49 acres and a max impervious area of 1.62 acres (17% of total site). BMP wet pond 2A has been sized to receive storm drainage from the future roof drainage, parking areas and driveway access with a proposed drainage area of 53.46 acres and a max impervious area of 41.39 acres (77% of total site). BMP wet pond 2B has been sized to receive storm drainage from the future roof drainage, parking areas and driveway access with a proposed drainage area of 41.02 acres and a max impervious area of 27.63 acres (67% of total site). BMP wet pond 2C has been sized to receive storm drainage from the future roof drainage, parking areas and driveway access with a proposed drainage area of 31.67 acres and a max impervious area of 9.35 acres (30% of total site). 13 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE THE PUBLIC NEED 1.0 THE PUBLIC NEED In the last few years, the workplace has shifted to a hybrid model which has led to a massive increase in the need for data storage. Microsoft (Applicant) develops, manufactures, licenses, and supports a range of services, devices, and software products for a wide variety of devices. Its software products include operating systems for servers, personal computers, and intelligent devices; server applications for distributed computing environments; information worker productivity applications; business solution applications; high-performance computing applications; and software development tools. In the web search portal business, the Applicant provides access to the Internet and operates web sites that provide access to a wide variety of online services. The project is needed to address expanding customer demand for these services in the region as teleworking capacities, cloud -based storage, gaming and contactless living behaviors continue to increase. r'Mict...i rUKPd�C HimU NEED The purpose of the CLT10 project is to provide additional cloud storage capacity in support of Microsoft's North Carolina Regional Network Gateway (RNG). Microsoft establishes RNG's around the globe within regions identified through a rigorous planning process. Sites within the RNG are required to meet certain connectivity and redundancy requirements and must be located within 20-kilometers (km) of other data centers in the region that are all connected through fiber optic lines. The proposed site layout has been optimized to meet the needs of the facility's operational requirements while minimizing site disturbance and disturbance to natural resources. Microsoft has committed to reducing the company's operational carbon footprint by 75% by 2030. They have also added water to their long-standing carbon and energy commitments, launching a new water replenishment strategy to replace what their operations consume in water -stressed regions by the year 2030. 4.1 UNITED STATES In the U.S., data centers are located in a few centralized areas from New York to Virginia on the East Coast, Los Angeles to Seattle on the West Coast; from Miami to Dallas in the south and Chicago in the north. The segment from New Jersey to Virginia contains a large number of data centers. Specifically, larger scale data centers are concentrated where cloud and internet provider companies can best serve their customers. As data storage needs continue to increase, data center locations are expanding across the country along existing long -haul fiber optic lines in order to meet local demand and latency. The Data Center Map in Illustration 2 shows the locations of data centers in the U.S. based on density. 14 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT PURPOSE AND NEED Data Center Map Welcome to Data Center Map • your guide to the global data center market, with Focus on coloration, I transit, cloud and various hosting services. Navigate through the map below, browse through our text -based index, use our search function or request a quote via our quote service. Deta Center Map loud Scher Map Map satelb;e . r 46 >1oRTM �Y � 12 �.y�h-: DAKorR 25 * I 45 io isourr+ 3Q 3 ` a�l.[•;�n �] ::r.: r. .,Cru..: 7 61 't' td Y 14 82 ' s0 r 22 15 64 36 •: v� i U as ed States at to 55 a . 44 4 16 .p:;�^ 18 24 i2 47 t t it 77 67 36 76 73 _ 7d 76 37 Mexico [.O He Map tlata 52078 Ooogle, rNEflr, ORn:' . Source: https://vv wv.data centermap.com/ Illustration 1. Data Center Locations in the U.S. Microsoft identifies data needs in regions and sub -regions to determine where additional data centers are required. On the east coast of the U.S., the data center market is rapidly expanding outwards from the northern Virginia area and North Carolina is currently outgrowing the capacity provided by existing data centers. In recent years a number of fiber optic lines have also been installed under the Atlantic Ocean terminating in Virginia Beach connecting the region with cities in Europe, further increasing the flow of data and need for data centers. 4.2 NORTH CAROLINA Larger scale data centers are concentrated where cloud and internet provider companies can best serve their customers. Because the internet was originally a federal government funded/subsidized service before it was commercialized, the mid -Atlantic region is the global leader in computing and data center capacity. Due to its proximity, North Carolina is becoming a peer hub in the southeast for domestic fiber networks, with growing demand for data centers spurred by the expansion of the market into the private sector. The State of North Carolina encourages data centers to locate within the state and currently provides three sales and use tax exemptions for purchase of items related to data centers and their operations. A map showing Mid -Atlantic Broadband Communities Corporation's [MBC] existing long-range optical transport network in North Carolina as an example is provided in Illustration 2. Starting in 2007, the state attracted data center developments for multiple large companies. As shown in Illustration 3 below, the locations of existing data centers cluster along the existing long -haul fiber lines. The area from Greensboro to Charlotte is becoming a data center corridor. 15 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT PURPOSE AND NEED MBC Network Coverage ie� . •��•• � [UIBER[AN°PLVf.I *01 � 1. .. P�WrMr�• 1•,�•w r�1 IWu. �,I L ��1 •{ij� �Fa•d i\�♦� yR-n• ��� ��� �. R��}}"ii f`�r. � frglrYd ... , i en:id ir. w7 T .. �• e•xh hlrg3Pw �:Iwb•• Jvh•.on C+q° tmu hrl�. rlllc R4r+ N.Eend ih ,I-rii- [nilha t:3 i.1+uf ° 3v..• f 0 Af 0 H r elgh o �R.�'r •r �:hsde MMwr/ Fo Yap q � 1E r IL n � aF•.-�L Ili �. �rcamlle o tea, CLT10 �Iloua "�7 F aV,U—RC 0 ''" e...e« Fa lu Jad�.«i•Ile01a •. 1)Wo rdr gbOn r �.,.. lymv �alun Rra raw lure 4upclaa 7` 1 e r,aaii .-. .. y N �y ¢ rlodh r ifurY�:rm May 10. 2023 1:4,622.324 R 30 so +20 mi MBC Pope — MBC Existing Fiber 0 so 1110 200 hro MBC Qvvned Colo Nodes MBC 3rd Party Leased RU Fiber rn rERE, w,s,•o.„o,.,. wr .EP�ePS Source: httos://mbc-va.com/interactive-coverage-map/ Illustration 2. MBC Optical Transport Network " ra .. .. ....................................... ........... Johnson City 0 -, ., Q H _ Boone Wilkesboro Blowing Rock i a Grn-nsharp ° Burlington Durham I I+gh Poi* rV 0 0 .� Pis}ah Y� Statesville a Chapel HI P igh National Forest Ivt°rgantor I,icko Salisbury Asheboro Asheboro a 9 Asheville Marian' Modsville Black mountain a 4 2e Concord ° Hendersonville a Shelbyll Gastonil IJwfiarri EL National Forest ' r=;q o `J 27flt�� Pinehurst o Gaffne _ Southern Pines FayeQville Greer SPa� r3 RoLFiill ', Rockingham o e Hope Mills -" . .. . ........... Greendille ......... Laurinburg Source: https://v*vw.data centermap.com/ Illustration 3. Data Center Locations in North Carolina 16 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT PURPOSE AND NEED Data centers also require adequate, affordable and reliable electricity. In North Carolina, these needs are met by Dominion Energy North Carolina, Duke Energy, electric membership corporations (EMCs), and municipally -owned electric utilities. 4.3 CATAWBA COUNTY Catawba County is located within an hour of Charlotte, NC and Winston-Salem, NC, and three hours from Boydton, Virginia, the site of a Microsoft campus. With just over 400 square miles, Catawba County's first data center was built in 2009 and the second in 2012. Because Catawba County is already home to several data centers, the county has adequate existing fiber and electrical infrastructure to serve additional sites as well as low taxes, making it a desirable location for data centers. There are high-speed fiber optic lines crossing the county and electrical powerlines are in place or planned to be constructed in the near future. With 25% of the land in the county utilized for agriculture, larger parcels of land are readily available, in areas away from dense residential areas. Data centers require large parcels of land that have access to adequate power, water and sewer and fiber in proximity. Access to sewer and water in agricultural areas is a limiting factor as most local governments restrict the sewer and water in agricultural areas to limit growth. Within Catawba County the smaller towns and cities run their own wastewater treatment plants and water systems, therefore land within or adjoining these areas meets two of the required criteria for data center construction and operation. As discussed in Section 4.0, Microsoft has entered into agreements with Catawba County and the Town of Maiden that include the construction of this project. Catawba County has worked to attract data centers for over 13 years, welcoming its first data center in 2010. While incentives and grants are typically approved for these projects, there are specific monetary performance requirements that need to be met. For example, Microsoft has guaranteed a $1 billion minimum investment in Catawba County associated with four data center sites. The Economic Development Corporation of Catawba County posted an article entitled "Microsoft to Invest $1 Billion in Technology Facilities in Catawba County" on November 8, 20222 that states that the proposed Microsoft data center projects in the county have the support of all of the local governments involved including the leaders of Catawba County, the Cities of Maiden and Hickory and the Town of Maiden. The Town of Maiden Economic Development Department states on its website that: "Looking to replace the vacancies left by companies impacted by economic hardships Maiden has found its place as the perfect location for new industries, including some of the world's foremost technology leaders... Maiden continues to look for growth in this field due to its ideal location for placement of mission critical facilities. Maiden has numerous sites identified with abundant, low cost and reliable power, water and fiber as well as an area typically isolated from disasters.113 The Project is providing an economic boost to the area and will provide jobs for the local community. z https://www.catawbaedc.org/news/microsoft-announcement 3 https:Hmaidennc.com/economic development.html 17 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE OTHER FEDERAL, STATE, AND LOCAL AUTHORIZATIONS OBTAINED OR REQUIRED & PENDING 5.0 OTHER FEDERAL, STATE, AND LOCAL AUTHORIZATIONS OBTAINED OR REQUIRED & PENDING Microsoft will obtain all required permits and approvals required by federal, state, and local entities prior to construction of the Project. The permits described below cover the main approvals necessary for construction of the Project, however other approvals for items such as utility connections, floodplain impacts and/or air quality permits may also be required. 5.1 STATE WATER QUALITY (401) CERTIFICATION Construction of the Project will require a Section 401 Individual Water Quality Certification from the NC Division of Water Resources (DWR) in addition to a Corps permit under the Clean Water Act Section 404. 5.2 STORMWATER PERMIT A request for a general National Pollutant Discharge Elimination System (NPDES) construction stormwater permit, and a Stormwater Management Plan will be submitted to the Town of Maiden for review and approval. The stormwater practices proposed will meet all the requirements of the NC Stormwater Design Manual. 5.3 EROSION AND SEDIMENT CONTROL PERMIT In order to prevent impacts to downstream receiving waters during construction, a Sediment and Erosion Control (E&SC) Plan/ Land Disturbance Permit will be required from Catawba County. The E&SC practices proposed will meet all the requirements of the NC Erosion and Sediment Control Planning and Design Manual. 5.4 SITE PLAN APPROVAL A site plan will be submitted to the Town of Maiden for review and approval prior to construction of the Project. 5.5 AIR PERMITTING An air permit will be required for the proposed 3MW and 500 kW diesel -fired generators. The engines may be eligible for coverage under NCDEQ's General Permit OOOOOG00 (diesel generators with rated capacity not to exceed 8,400 kW). 5.6 DRIVEWAY PERMIT Driveway permits from the NC Department of Transportation (NCDOT) will be required to document that any development submittal requesting access to the state's public highway system is designated, located and constructed to minimum State standards. 18 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED i.0 PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED The following information is provided per the guidance, Guidelines for Preparation of Analysis of Section 404 Permit Applications Pursuant to the Section 404 (B)(1) Guidelines of the Clean Water Act (40 CFR, Section 230). Part I of the Guidance is mostly focused on infrastructure, zoning, location and support needs. Part II of the analysis is primarily focused on environmental concerns and is provided in Section 6.2. 6.1 PART I: INFRASTRUCTURE NEEDS The proposed site was primarily selected due to its ability to provide sufficient and reliable power and utility infrastructure in accordance with the proposed facility's needs. The site selection process was conducted as a joint effort amongst the applicant/owner of the site, Catawba County, the County Economic Development Committee, and the Town of Maiden. Below is a summary of the regional analysis criteria used for the selection of the subject site. The top 11 criteria are provided below in detail. Although each site that is reviewed for site selection and suitability is unique in what it can offer, past successful site candidates have offered most of the following attributes in a package that the client has found to be beneficial, if not necessary, in supporting their critical strategic location decisions: Minimum of 100 contiguous acres with standard geometry to provide adequate buildable area for the required facilities. The facilities required to provide the needed cloud storage facilities include five 48 MW single -story data center buildings with associated equipment, stormwater management drainage pipes and facilities, underground electrical and fiber lines, two electrical substations and a water tower. The calculation also incorporates local open space and buffering requirements. 2. Statutory incentives for taxes and or local rebates/incentives: examples - property tax abatements, income tax free zones, enterprise zones. 3. Low-cost, availability and capacity of utilities (electrical, water, sewer) to serve the site and cost to develop the site to meet the assigned clients' needs. Preference to existing or locally funded infrastructure improvements for sewer, water, and utilities. 4. Cost of Land (possibly owned by the state government, the local county, or in a business park), and constructability of land (ability to construct a data center(s) with reasonable permits). Redundant fiber connection options within 20 kilometers (km) of the site from long -haul fiber sources. A region is a set of data centers set up within a latency defined radius. Latency is the delay before a transfer of data begins following an instruction for its transfer. The 20 km distance allows Microsoft to meet their service level agreements of latency, resiliency, and reliability to customers in the region. 6. Redundant transmission level power service (minimum of a 230kV source) and/or be identified future power service expansion. 19 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED a. Given the client's publicly stated carbon neutrality commitment and imposition of an internal fee on carbon associated with our energy use, they gain business value from cost-effective policies that increase the availability of low carbon and renewable energy for us to use in their operations. 7. Proper zoning in place (industrial or light industrial) or ability to get zoning. 8. Phase 1 environmental studies and preliminary geotechnical borings complete. 9. Land that is: a. Least impactful to the environment (wetlands/waters of the US, other environmental issues, artifacts, and endangered species). b. Not close to airports, freeways, schools, churches, and shopping centers. 10. Non-restrictive local codes, covenants, or restrictions for the following: a. Emergency generators. b. Security fencing and cameras. c. Public ROW for Access/egress. d. Architectural details and building materials. e. Fuel storage tanks. f. No requirement to have storage tanks (diesel and water) below ground. 11. Reasonable timeline for delivery to customer/client for their use (data center, tank farm, substation). 6.2 PART II: AVOIDANCE (NO ACTION, UPLANDS, AND AVAILABILITY OF OTHER SITES) � 2 '1 Nc, action Alternative The No Action Alternative would require that the Applicant's proposed Project be implemented without requiring any approval from the Corps, or that the proposed Project would not be implemented at all. The No Action Alternative would serve as a baseline from which to compare the effects of permitting the proposed Project or an alternative to proceed. Microsoft has considered the possibility of implementing the Project without impacts to jurisdictional features and has determined that, while the No -Action Alternative would be the least environmentally damaging alternative, it would not be practicable or support the Project's purpose and need. The construction of five 48-MW data center buildings with parking, access roads, substations, water tanks, security entrances and features, installation and/or relocation of utilities, and stormwater management treatment facilities requires at least 100 AC of land. As demonstrated through the offsite alternatives in Section 6.2.2.4 below, environmental constraints, in the form of jurisdictional features, floodplains and steep slopes, exist on all the available sites analyzed in Catawba County. Complete avoidance of jurisdictional features was not possible due to the locations of the features in the landscape. During the planning process, the Applicant has avoided and minimized impacts where practicable to offer 20 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED the least environmentally damaging practicable alternative (LEDPA). Appropriate and necessary steps have been taken to minimize potential adverse impacts resulting from the discharge of fill into the aquatic ecosystem. If the Project were not built, future data storage and use would need to be routed to existing, out of state data centers which are already at capacity and the distances would affect the latency, resiliency, and reliability of data storage and transfer to customers in the region. '�.2.2 Mite Alternatk es Ai., lysis The following analysis is included to provide the research and analysis performed to choose a project site within Catawba County. 6.2.2.1 OFFSITE ALTERNATIVES A map of the locations of the three alternative sites analyzed in Catawba County in relation to the Preferred Alternative site (CLT10) is provided in Illustration 4 below. During the due diligence phase, these sites were initially identified based on availability and size. Illustration 4. Catawba County Offsite Alternative Parcels 21 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED While the site layout differs from the Boyd Farm site, the pad -sites and stormwater management impacts are similar in scope. Each offsite alternative was evaluated with respect to the minimal criteria for site selection, including utility availability, overall cost/constructability, and potential environmental constraints Publicly available state and federal environmental databases were reviewed to determine the effect, if any, that each alternative may have on threatened and endangered species, wetlands and Waters of the U.S, and other environmental resources. The United States Geological Survey (USGS) mapping, U.S. Fish & Wildlife Service National Wetlands Inventory (NWI) database, USGS National Hydrography Dataset (NHD) and current LiDAR data were analyzed to determine preliminary limits of jurisdictional features within each alternative property. In order to meet the required data storage needs, the current project includes five 48-MW data center buildings. Potential impacts to jurisdictional features were analyzed by attempting to provide adequate buildable area for five data center buildings and associated infrastructure, a substation pad, parking, access roads, substations, security entrances and features, installation and/or relocation of utilities, and stormwater management treatment facilities. The plans presented to analyze the offsite alternatives are conceptual in nature and do not account for any required grading. Therefore, the jurisdictional impact totals provided are a minimum and potential impacts would be much greater. Probable wetland and steam locations have been assumed based on the National Wetlands Inventory (NWI) maps, soil maps and drainages indicated by topography. All four sites had similar threatened and endangered species results. ALTERNATIVE SITE 1 (TRIVIUM) Alternative Site 1, known as the Trivium parcel, is located approximately 8.3 kilometers southwest of the Preferred Alternative and can be accessed via Trivium Parkway (Appendix B- Figure 11). The property is situated on 108 AC and generally consists of mixed hardwood -pine forest. Historical imagery indicates that the parcel was previously used for agriculture, with the majority of the site cleared in the 1990s. There are unpaved roads across the southern and eastern sides of the site, which connect to a driveway to the south of the site. The parcel is currently zoned for industrial use. An existing Duke Energy electrical transmission line with 160-foot-wide easement transects the center of the property from northwest to southeast, multiple sanitary sewer line owned by the Town of Hickory traverse the project and a gas line easement passes through the eastern portion of the site. Clark Creek extends along the eastern parcel boundary and unnamed tributaries flow into Clark Creek through the site from the western and southern boundaries. Topography indicates extremely steep slopes in the eastern and southeastern sections of the property (Illustration 5). Approximately 0.44 ac of wetlands are likely to be present on site within the floodplains of Clark Creek. 22 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED N N �ZZ y U 924 / 1 942 a 0 948 950 `= 888 878 8)6 ,1 S C Illustration 5. Alternative Site 1 Topography According to the USFWS IPaC, tri-colored bat and dwarf -flowered heartleaf habitat presence are likely. Tri-colored bat presence is highly likely due to clusters of great roosting trees present throughout the site and with multiple foraging corridors existing such as wooded trails, field edges, and stream corridors, a survey may be necessary. Dwarf -flowered heartleaf habitat presence is likely with steep banks being present within the site; a survey may be necessary. Based on the conceptual layout, Alternative Site 1 was not chosen because: • The building layout would impact 0.23 AC of wetlands and 2,700 LF of stream at a minimum, much larger than the impacts associated with the Preferred Alternative. • Based on site limitations, appears only 2 buildings (96 MW) could be built onsite: o Building 1 could not be built as shown because: ■ Structures are not allowed to be constructed within electrical easements, ■ There would be impacts to existing City of Hickory sanitary sewer lines with little to no area available to realign them, and ■ The existing Piedmont Natural Gas line would require additional safety setbacks for building construction, further limiting the buildable area. o Building 2 could not be built as shown with associated roads because the footprint exceeds the property boundary. o Building 4 would have impacts to at least 1.5 AC of a FEMA regulated 100-year floodplain and the associated floodway. The area contains very steep slopes and grading impacts to the floodplain would be much greater. Engineering requirements would be extensive; mitigation for the impacts would not be possible onsite; and permitting requirements (if possible) would extend the timeline of construction. 23 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED • Stormwater management regulations require that sizing of best management practices (ponds) corresponds to 15% of the proposed impervious area on a site. The minimum pond area that would be required for this site is 12.5 AC and the layout only includes 4.8 AC of ponds. • Due to security requirements, structures maintained by outside entities require dedicated access roads outside of the security fences. The placement of the substation would not be acceptable due to its location onsite. • The City of Hickory Land Development Code requires a 35 FT setback and that a 30-foot vegetated buffer be maintained between industrial and residentially zoned sites, further limiting the developable area. This would affect number of buildings that would fit onsite. In summary, Site 1 would not meet the project purpose because of insufficient developable area for the required data storage capacity and would also have greater impacts to the aquatic environment. ALTERNATIVE SITE 2 (SHUFORD', Alternative Site 2, known as the Shuford parcels, is located approximately 7.5 kilometers to the west of the Preferred Alternative and can be accessed via Tate Boulevard. The overall site includes 119 AC and is irregularly shaped. Vegetation generally consists of mixed hardwood -pine forest. Historical imagery indicates that the parcel has remained forested since the 1990s, with some clearing occurring in the early 2000's. One 60-AC parcel is zoned for business use and would require rezoning in order to allow industrial use. An existing Duke Energy transmission line with a 160-foot-wide easement transects the center of the property from southwest to northeast. A conceptual plan for the site is provided in Appendix B on Figure 12. Vegetation generally consists of mixed hardwood forest in the uplands and within the floodplain along Miller Branch, a tributary of Upper Clark Creek. Miller Branch passes through a portion of the property and then extends along the length of the northeastern parcel boundary, with several of its unnamed tributaries extending south towards the center of the parcel. Topography indicates a potential stream valley passing through the center of the largest parcel and all of the parcels contain steep slopes (Illustration 6). Large areas of PFO wetlands are likely to be found within the floodplain of Miller Branch and two ponds connected to Miller Branch through a tributary exist within the property limits. According to the USFWS IPaC, tri-colored bat and dwarf -flowered heartleaf habitat presence are likely. Potential roosting and foraging habitat highly likely for the tri-colored bat with stream corridors and a powerline right of way present; a survey may be necessary. Dwarf -flowered heartleaf habitat may be present along stream corridor with steep banks throughout the site. Furthermore, there are documented populations of Dwarf -flowered heartleaf within a one -mile radius of this site; a survey may be necessary. 24 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED Illustration 6. Alternative Site 2 Topography Based on the conceptual layout for 4 buildings, Alternative Site 2 was not chosen because: • The building layout would impact 1.10 AC of wetlands and 1,450 LF of stream at a minimum, much larger than the impacts associated with the Preferred Alternative. • Based on site limitations, appears only two buildings (96 MW) could be built onsite: o Building 1 could not be built as shown because structures are not allowed to be constructed within electrical easements, o Building 4 could not be built as shown because the footprint exceeds the property boundary. o Buildings 3 and 4 would have extensive impacts to Miller Creek and associated wetlands as well as the FEMA regulated 100-year floodplain and the associated floodway (5.9 AC), effectively blocking flow. Engineering requirements would be extensive, mitigation for the impacts would have to be undertaken onsite through reconstruction of a channel and floodplain to reconnect the 0.89 square mile upstream drainage area with downstream portions maintain stream and floodplain continuity and permitting requirements, if possible, would extend the timeline of construction. The site does not contain adequate buildable area to reconstruct the stream. • Stormwater management regulations require that sizing of best management practices (ponds) corresponds to 15% of the proposed impervious area on a site. The minimum pond area that would be required for this site is 10.5 AC and the layout only includes 7.5 AC of ponds. • This site has access to one existing 8-inch sewer line; however, the project specifications require a minimum of 12-inch sewer tie in. 25 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED • The City of Hickory Land Development Code requires a 10 FT side setback and 20 FT rear setback from the property line between industrial zoned sites, further limiting the developable area. This would affect number of buildings that would fit onsite. In summary, Site 2 would not meet the project purpose because of insufficient developable area for the required data storage capacity, insufficient utilities and would also have greater impacts to the aquatic environment. ALTERNATIVE SITE 3 (MCCREARY FARMS) Alternative Site 3 is located approximately 13.4 kilometers south of the Proposed Alternative Clark Creek and has dual access from Prison Camp Road and is zoned for industrial use. The property is situated on 106.1 AC and generally consists of agricultural land with mixed hardwood -pine forest along tributaries of Pinch Gut Creek. Aerials indicate that the site has been in active agriculture since the 1980s. The parcel is currently zoned industrial and is surrounded by residential land. The parcels bordering the west and east sides of the site were initially analyzed for additional acreage, but they are zoned residential, which would require rezoning and they were not available for purchase. A conceptual plan for the site is provided in Appendix B on Figure 13. Pinch Gut Creek is along the southern edge of the parcel, with one unnamed tributary starting in the middle of the parcel and flowing to the southwestern corner. Based on NWI, there are no wetlands and about 2,670 LF of streams on site. Topography indicates steep slopes along the stream channel that flows across the site from north to south (Illustration 7). Illustration 7. Alternative Site 3 Topography 26 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED According to the USFWS IPaC, tri-colored bat and dwarf -flowered heartleaf habitat presence are likely. Potential roosting habitat present for the tri-colored bat throughout the site in forested area with mature hardwoods; a survey may be necessary. Dwarf -flowered heartleaf potential habitat present with steep banks throughout the site near the stream also located on site; a survey may be necessary. Based on the conceptual layout for 5 buildings, Alternative Site 3 was not chosen because: • The building layout would impact at least 1,800 LF of stream at a minimum, much larger than the impacts associated with the Proposed Alternative. Due to the tight fit and steep slopes along the rear of the site, fill would be required withing the FEMA 100-year floodplain. Avoidance of impacts would not be possible, as the steep slopes on site would require extensive cut and fill. • In order to provide additional stormwater management, one building would need to be sacrificed, reducing the number of buildings to four (192 MW). • The area at the rear of the property along Pinch Gut Creek contains very steep slopes and grading would have impacts to at least 1.5 AC of a FEMA regulated 100-year floodplain and the associated floodway. Engineering requirements would be extensive; mitigation for the impacts would not be possible onsite; and permitting requirements, if possible, would extend the timeline of construction. • Existing electrical service is inadequate. Required substation would be ±4,600 FT from Town of Maiden substation and ±5,000 FT from Duke Energy 230KV transmission line. Connection would require extensive coordination with Duke Energy to provide a new transmission line and would extend the timeline of construction by more than a year due to planning and permitting requirements. • Site would also require an additional 2,000 LF of 12-inch sewer line to tie into an existing 24-inch sewer main. • No existing fiber in proximity. This would require an extension from existing lines. • Stormwater management regulations require that sizing of best management practices (ponds) corresponds to 15% of the proposed impervious area on a site. The minimum pond area that would be required for this site is 11.2 ac and the layout only includes 4.5 AC of ponds. • The Catawba County Unified Development Ordinance requires that a 50-foot buffer be maintained between industrial and residentially zoned sites, further limiting the developable area. This would affect the number of buildings that would fit onsite. In summary, Site 3 would not meet the project purpose because of insufficient developable area for the required data storage capacity, insufficient utilities and would also have greater impacts to the aquatic environment. PREFERRED SITE (BOYD FARM) The Preferred Site, known as Boyd Farm, is located on five (5) parcels consisting of approximately 293.73 AC to the northwest of Zeb Haynes Road and can be accessed via Old Maiden Road. Vegetation generally consists of mixed hardwood -pine forest and planted pine with some agricultural fields. Historical 27 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED imagery indicates that the northern and southern portions of the parcel were farmed, and the central portion has been utilized as a pine plantation. Existing Duke Energy 230 kV and 100 kV power transmission lines are located within an easement along the northern property line. The initial conceptual plans for the site are discussed in Section 6.3 below. Clark Creek and its associated floodplain extends along the length of the western parcel boundary, with two unnamed tributaries flowing from east to west across the parcel. Topography consists of moderate to severe sloping areas with the steepest areas generally adjacent to the 100-year floodplain and the along the stream channels (Illustration 8). The site slopes down from east to west, from a high of 925 FT to a low of 800 FT. The parcel contains 8,828 LF of streams. According to the USFWS IPaC, tri-colored bat and dwarf -flowered heartleaf habitat presence are likely. There is potential roosting habitat present for the tri-colored bat throughout the site in forested area with mature hardwoods; a survey is being conducted at the end of May. Dwarf -flowered heartleaf potential habitat is present with steep banks throughout the site near the streams; a survey was conducted, and no individual specimens were found. Illustration 8. Preferred Site Topography Based on the conceptual layout for five buildings, the Preferred Site was chosen because: • The building layout would impact less than 1,000 LF of stream. There was potential for a 60% decrease in stream impacts from Alternative Site 3. Road crossing would require minor fill within the FEMA 100-year floodplain. 28 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED • Electricity is available from existing Duke Energy 230 kV and 100kV transmission lines east of the campus. • The site has access to the Town of Maiden's existing 12-inch diameter water transmission line located in the northern shoulder of NC Highway 16. • Four existing sewer lines located on or adjacent to site. Two are 12 inch or larger. • Existing fiber is located adjacent to site on the west side. • There is adequate buildable area for 5 data center buildings. • There is adequate buildable area for the required stormwater management BMPs. • There is adequate buildable area to meet the Town of Maiden Zoning Appendix requirements for property line setbacks of 25 FT on the sides and 15 FT at the rear of a parcel and a planted buffer of 30 FT along properties zoned residential. Site Comparison When a direct comparison is made, the preferred project site is the only site analyzed that met the requirements for construction of 5 data center buildings. Table 9 provides the likely impacts for each site and Table 10 below compares the four parcels based on the applicable screening selection criteria. All of the onsite alternatives presented in Section 6.2 included less impacts jurisdictional features than the offsite alternatives. Table 9. Offsite Alternative Impacts ALTERNATIVE SITE DATA STORAGE CAPACITY (MW) IMPACTS WETLANDS (AC) STREAM CHANNELS (LF) FLOODPLAIN (AC) 1 96 0.23 2,700 1.5 2 96 1.10 1,450 5.9 3 240 N/A 1,800 0.5 Preferred site 288 N/A 686 0.6 29 A m m N J m c J v c m N o N J y v O n m O J - O D v m m < c V D m cn N O Z c v m r o n A mN O i N O Om ?.N O n Nn 0 y(D wm O m A N m m J m a O m m A aN 3 O m O O n V O D 0 n o m -. N N o. y x G m x m_ C m y J m N O N n J D a m m N '-' '-' m m a D a �t u ON rn M. 0 m m- D cn co aa oTNl cn N wfr iNo v AN o m m-0 m m m c3 OQ Am a ammN NO a mxmmm 3 smm A O Xm W0 R 3 m o° Q 3 m c m m m m m m m a �_ N 3 o a= < 3 m o m 0 �, m Oo m m N N 3 m O N 3 3 M (D N l a •� O W W O N O O a (O N - O. 3 O Q D a N m m a m m Q N (� m m m a m _ .. - 3 N m o N O TI y cQ 0 0 o o N m a o O N N-J N3a o d aO o o Aom = o smc m3o u a m co m aam co m N < a o m. 0 o a s= o m o' < o a m O a o -o N d m o- a m x m a o W m a m m m O o s y m- f. O � x a co 0 0 x<m N co O r < N amm u D a 3 D a Na ° �J o Fm3 0mm3 m 3 A0 Z3 m a oO mm aOm 0 o0 Z 3 22 o3 Z o 3 D - I 8 nOm 8ua mi =mm O-Q, 0 X 3 wo a o N < a mN o o m co O m a- mN N m mN o o " X. co D xmi m o -o m o N ww a u a o m m m < O -a '' 0 cQ obi '' m m cQ a a m Q m m a O\ o m o a 0 o 3 m a a m q m 0m O c m ry 3' J F O A N o v = w y D N 3 Q ry N o a N N a (T m 0 3 3 m µ cn m a - m m a 3 m a � 3 co co m n o o N m o a x o x w o' m O N 1 a umi - N m O N O y N N 3 J N Tl 3 N '-' xm cm `N co m 3m 0 m m co N co w d Wm (an aW m N(7A o vD r <3 yN 3 OW o Oa o a Ay cQ mo 3. W. Q N m o 3 0 O JZ o fZ Q m o (� Dq am N o 0 NN<m J D o m a m m y m a 3 OW m m 0 m m o O d m o f N a x m 3' f: 0 m m x. Z s N m d x O N .. cn o cn y a a o3i cn m No m m s m fn >• m N cQ J cQ 3 m a 0 o cn a D m a o - o _ c N 3 aa N -w a lm J _ 0 O D O N O N 4 m a o J 3 n 0 a m m 3D m 3 J s 3 O 3� a a N a m W.cQ m - m N I 3 a m m f. ' 3 m 3 0 m a co o m a n Q m a a o a d 3 N a o x 3 a lw q 3 D a yo N xm m m a o wa 0 0 3 a o m 3- � o Dmd 3 o 0 o Omy J m N A Z D m 0 O 0 w s 3 d o N o ww m o o F a a m y m - a a 3 �. - x o m g °' F mOQO N a o a a 5 N m X. m 0 m - oo x N a umi &T m n m 5 o O 0 C m a x '-' m o (T a D D 3 m fm/1 m a o m 3 M m N W 3 cQ m a 0. a of a O n o 0.a m 3 3 y N y N 0 a O O 0 (O K (o m s µ d n N a 3 N 0 a m Wo Q a Q o 3 3 O 0 (� N N 3 N 0- 3_ 5 m 3 m -o m_ O- a D n o 3 m 3 o x m o m m m 3 _ - m a cQ a N m - D- m 3o ° /\\ !!; \\o o }):)\ )3 ( } o \ o 'o \ \/� \ : K22 * o oo / ){ \ \ E x * * 3o \\ / o I { o 2 \ / { ] BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED 6.3 PART III: MINIMIZATION (ONSITE ANALYSIS) The proposed layout of the site is dependent on several issues based on the required components. The project includes five 48 MW data center buildings with parking, access roads, a substation with a switching station, security entrances and features, installation and/or relocation of utilities, and stormwater management treatment facilities consisting of four wet ponds. The project also includes a water tower with maintenance access roads for the Town of Maiden. Water mains and water tanks located onsite will be used for non -contact cooling water. Discharge water will be removed offsite via sanitary sewer. The location and size of the substation is based on Duke Energy's size and connection requirements and became one of the controlling features of the site layout. The substation/switching station pad will be 13.4 AC in size. The substation footprints shown on the impacts map are based on a set design and will not change in size. The connection from the transmission lines is currently planned to come from the north to connect on the east side of the substation pad and no impacts to jurisdictional features are currently anticipated. From an environmental perspective, the project site contains steep slopes along multiple stream valleys with associated drainages. Stream types include Clark Creek, a stream on the western property line, perennial streams and intermittent streams. Portions of the eastern side of the parcel are located within a 100-year floodplain (See Section 1.3.8 for additional information). 6.3.1 Onsite Limitations On -site limitations include: • Only two parcels have road access. The site requires two road access points and main access road location is limited to Old Maiden Road, which requires a stream crossing to access the pad site. • Parcel shape is asymmetrical creating a "bottleneck": an offsite stream valley separating the two data center pad sites. The offsite, triangular parcel appears to contain multiple stream channels. • Steep slopes due to stream valley on eastern side which will require extensive grading and fill to create pad site. • There are two limitations along the south side of Clark Creek: o A 30-foot-wide sanitary sewer line easement. This is a sanitary sewer main and it cannot be moved. o A 100-year floodplain which generally aligns with the sanitary sewer easement. • A 200-foot-wide electrical transmission line easement along the northern portion of the site. Building CLT14 is shifted to south in order to avoid additional grading impacts within the easement. • Substation pad size requirements are provided by Duke Energy based upon internal design specifications and the size cannot be modified. • Substation requires a dedicated stormwater management facility (pond). 32 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED • Microsoft requirements include a security buffer, security fencing around the entire site, and access to substation outside of security gates. Other issues which affect onsite avoidance and minimization planning include: • Two-story building options were considered but did not support the construction schedule (longer initial construction duration). Construction is planned to start in mid-2024. Schedules and need -by dates for this site are driven by customer demand. The current demand necessitated the use of single -Story Pre -Engineered Metal Building (PEMB) construction due to the short duration to design and erect, anticipated to be 18 months. The tenant evaluates project viability by calculating a cost per MW of IT capacity. This internal benchmark is tied to the profit margin and is treated as strictly confidential. The cost for the data centers using the standard single -story design already approximates this internal benchmark because of the requirement of building public roads and utilities required by the County. The baseline evaluation for single -story design was used to establish a viability limit for construction costs, which is proprietary to this client. The building cost for two story construction was weighed against the reduction in cost for site works and the required permittee responsible mitigation. It was determined the net added cost increased the building to approximately 110% of the viability limit. Because these costs are higher than the viability limit, using two story construction for this site was deemed an impractical way to minimize impacts. • Ancillary equipment associated with each of the five (5) colocation units in each building, such as electrical transformers and emergency diesel generators and tanks, cannot be placed on the rooftops due to safety concerns. Cooling equipment is not put on rooftops to maintain high safety standards for installation, maintenance, and roof lifespan. Cooling equipment is located in the interior of the building. The other ancillary equipment is located on the north and south sides of the building along with the electrical conduits, sewer and water lines. Generators are located immediately adjacent to the buildings due to sheer size, weight (fuel capacity of tank is +10,000 gallons), and access for use and maintenance. Locating equipment on the roof is not feasible due to technical challenges in safety and operational maintenance. More specifically: o Having people work from heights is adding potential risk for falls/injury, and frequency of access for equipment would put that in the `high' category for safety in design analysis. o Response time to equipment for issues would be longer and more difficult for multiple people to access. o General maintenance accessibility (snow, ice, etc.). o This is costly as the roof/steel must be able to support additional loads. o Roof failure risk. With these issues in mind, all the alternatives were restricted to larger contiguous land areas while minimizing stream impacts to the greatest extent feasible and staying out of the sanitary sewer easement. 33 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED The following alternative layouts were considered to evaluate the potential environmental impacts of the grading and design features. 6.3.2 Onsite Alternatives All onsite alternatives avoid impacts to the sanitary sewer line easement, grading within the 100-year floodplain along Clark Creek to the greatest extent feasible and the electrical transmission line easement. Note that the onsite alternatives were created prior to approval of the wetlands delineation and designers conservatively assumed streams were present in drainages shown on the topography for the site. Impact totals presented for Alternative Layouts 1, 2 and 3 are based on the anticipated streams as shown on the site layouts. The location of the 90-foot-wide 100-year floodplain crossing connecting the north and south pad sites cannot be avoided due to the parcel shapes, topography, and stormwater management regulations which require stormwater to be treated onsite for each pad site. There will be multiple duct banks installed within the crossing, adjacent to the road bed, in order to minimize stream crossings. 6.3.2.1 ALTERNATIVE LAYOUT 1 Illustration 9. Alternative Layout 1 34 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED As shown in Illustration 9, Alternative Layout 1 in the initial due -diligence phase of planning included six 48 MW (288 MW) and a 10.73 AC substation pad site, a main entrance road, an access road for the substation and an internal road crossing of a stream within the 100-year floodplain. The initial road alignment at the main entrance from Old Maiden Road was running east to west almost parallel to the stream channel in order to allow area for a stormwater management pond between the road and first building and would have impacted more than 610 LF. The road crossing connecting the north and south pad sites would impact 376 LF with the installation of culvert pipes and associated grading. Outlet protection was not included in these impact calculations and would have increased the stream impacts. The three buildings on the north side were pulled away from the electrical transmission easement to avoid grading impacts and impacts to 240 LF of stream channel were anticipated. Overall stream impacts associated with this layout totaled 1,226 LF. Table 11 provides the estimated impact totals. Table 11. Alternative Layout 1 Estimated Stream Impacts IMPACT TYPE ESTIMATED STREAM IMPACTS (LF) Entrance Road impacts 610 Floodplain stream crossing impacts 376 Fill for pad sites/perimeter roads 240 TOTAL 1, 226 LF 35 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED 6.3.2.2 ALTERNATIVE 2 1b 0 r 1•� i i j 11 1 •� i i 1- 1 1 - � Ji ! 1 1 1� i •` i •`•i a� � I 1 � — 1 Lrgrnd �• �[y � I 1 �� fJtt�eal • c, p � '_ Fqui - Yard p i '� Stonmratnr Pond '1 1 � Wnlrl S.naye 0 d ® FarrmrrrsMy a Ms 9 -hnrr 1y. 41;rM.l 4 i — FlCbiry eI o Iso 300 0 ft J o son i aoo c' a b Illustration 10. Alternative Layout 2 As shown in Illustration 10, Alternative Layout 2 included four 48 MW buildings, two smaller 38.4 MW buildings (268.8 MW), a larger 12.67 AC substation pad site, a main entrance road, an entrance to the north pad site, an access road for the substation and an internal road crossing of a stream within the 100- year floodplain. In this alternative the proposed stormwater pond was moved to the west side of the project area and the entrance road was realigned to cross the stream in perpendicular, with the security entrance gates to the east of the entrance. This decreased the road impact to 315 LF. The road crossing connecting the north and south pad sites would still impact 376 LF with the installation of culvert pipes and associated grading. Outlet protection was not included in these impact calculations and would have increased the stream impacts. The substation pad was increased in size while decreasing the size of two buildings in order to try and fit the substation pad in the north east section of the project area. Grading for the northern data center pad site was slightly decreased to an anticipated 120 LF of impacts. Overall stream impacts associated with this layout totaled 921 LF. Table 11 provides the estimated impact totals. 36 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED Table 12. Alternative Layout 2 Estimated Stream Impacts IMPACT TYPE ESTIMATED STREAM IMPACTS (LF) Entrance Road impacts 315 Floodplain stream crossing impacts 376 Fill for pad sites/perimeter roads 230 TOTAL 836 LF 6.3.2.3 ALTERNATIVE 3 Propoud Retain i nq We11l451, —. •\ I I a ; 5ubsWi- o od fs 4 �C1 - / r: -o-'w� I - ��sm�vra�aMsw�n 0 04 I ift an.��Nei O I .rC� 1",I- Illustration 11. Alternative Layout 3 As shown in Illustration 11, Alternative Layout 3 decreased the number of buildings to five 48 MW buildings (240 MW) with an even larger 13.43 ac substation pad site, a main entrance road, an entrance to the north pad site with an access road for the substation and an internal road crossing of a stream within the 100-year floodplain. This alternative included additional engineering, including proposed grading and additional stormwater management design, including maintenance access roads. Fine grading for the entrance road increased impacts to 382 LF. Outlet protection was not included in these impact calculations and would have increased the stream impacts. Due to the increase in the substation pad size and the shape required by Duke Energy the substation pad site was realigned on a north to 37 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED south axis. One building was removed in order to fit the pad site between the northern access road and the electrical transmission easement. Because this layout did not include stormwater management planning for the new substation location, the anticipated impacts with the northern project components decreased to 120 LF. Overall stream impacts associated with this layout totaled 1,201 LF. Table 13 provides the anticipated impact totals. Table 13. Alternative Layout 3 Estimated Stream Impacts IMPACT TYPE ESTIMATED STREAM IMPACTS (LF) Floodplain stream crossing impacts 629 Entrance Road impacts 382 Fill for pad sites/perimeter roads 190 TOTAL 1,201 LF 6.3.2.4 COMPARISON OF ALTERNATIVE LAYOUTS The stream impacts of each alternative are provided in Table 14. Table 14. Alternative Layout Impact Comparison ALTERNATIVE PERMANENT STREAM IMPACTS (LF) 1 1,226 2 836 3 1,201 Preferred 686* (796#) *Based on approved wetlands delineation mapping n Based on the anticipated streams Alternative Layout 1 was not chosen due to excessive impacts to streams with the entrance road and the easternmost building on the northern pad site. Alternative Layout 2 included minimization of the stream impacts associated with the entrance road, but the impacts were still too high and the added requirement to increase the substation pad site required a redesign; therefore, this alternative was not chosen. Alternative 3 was not chosen due to excessive impacts to streams that added over 250 LF of stream impacts to the floodplain crossing. The total amount of data storage also decreased from 288 MW in Alternative Layout 1 to 268.8 MW in Alternative Layout 2 then 244 MW in Alternative Layout 3 and finally 240 MW in the Preferred Alternative. Based on the above analysis, the Preferred Alternative was selected as the least environmentally damaging project alternative, and best meets the project's purpose and need. 38 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PROJECT ALTERNATIVES/ALTERNATIVES CONSIDERED 6.3.3 PREFERRED ALTERNATIVE Avoidance and minimization were further integrated into site planning to ensure the impact proposed are the minimum required to construct the project. In the Preferred Alternative the main entrance road was realigned, and the security entrance features were shifted to the east of the road, thereby reducing impacts to the stream with culvert installation to 225 LF with riprap outfall protection. The floodplain road crossing culvert was minimized through the realignment of maintenance access roads for the stormwater ponds and the addition of wingwalls and has been reduced to 358 LF. With final engineering design, riprap outlet protection has been added to both crossings. The approved wetland delineation determined that the upper portion of the drainageway was not a jurisdictional channel (identified as stream SC on the wetland delineation) within the parcel which was located on the north pad site, reducing the potential impacts in that area. Due to the requirement for a stormwater pond to treat stormwater from the substation site, the road to the south of the substation was shifted further south. Impacts to the headwater of stream SC were reduced through the shifting of parking on the CLT 14 building from the south end to the east side in order to shorten the building footprint. In addition, stormwater runoff from Building CLT14 is routed to the stormwater pond to the west, thereby decreasing the required size of the substation pond. The stormwater management structures have been designed outside the limits of the wetlands. In addition, development has been restricted to only 79.99 ac of the 294.73 ac site, thereby avoiding impacts to 8,142 LF of stream channel, the majority of the 100-year floodplain and preserving open space. The Applicant has avoided and minimized impacts where practicable to offer the least environmentally damaging practicable alternative. Appropriate and necessary steps have been taken to minimize potential adverse impacts resulting from the discharge of fill into the aquatic ecosystem. This project is not expected to impact public water supply, shellfish harvesting areas, spawning grounds, or waterfowl habitat, nor will it disrupt the movement of aquatic life or jeopardize threatened or endangered species, of which we are aware. Therefore, this activity should neither cause nor contribute to significant degradation of waters of the US, nor should the activity adversely or substantially affect human health or welfare, life stages of organisms dependent upon the aquatic ecosystem, ecosystem diversity, productivity, stability, or recreational, aesthetic, or economic values. 39 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE MITIGATION 7.0 MITIGATION Mitigation is required for impacts to stream. Table 15 documents the size of the impact, mitigation ratio, and compensatory mitigation required. Table 15. Stream Compensatory Mitigation Impact p Length of Impact (L) Mitigation Ratio (MR) Compensation Requirement ( ) LF (L x MR) SA1 16 2:1 32 SA4 225 2:1 450 SA5 33 N/A (PNNL)* 0 SC1 5 2:1 10 SC4 358 2:1 716 SC5 49 N/A (PNNL)* 0 TOTAL 686 Total CR 1,208 'Permanent No Net Loss Impacts (Riprap) The mitigation requirement of 1,208 credits will be met with a credit purchase from the NCDEQ Division of Mitigation Services (DMS) In -Lieu Fee Program. A letter of credit availability can be found in Appendix I. :81 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE EVALUATION OF THE 401(B)(1) GUIDELINES (FACTUAL DETERMINATIONS) EVALUATION OF THE 401(B)(1) GUIDELINES (FACTUAL DETERMINATIONS) 8.0 EVALUATION OF THE 401(B)(1) GUIDELINES (FACTUAL DETERMINATIONS) EVALUATION OF THE 401(B)(1) GUIDELINES (FACTUAL DETERMINATIONS) 8.1 PHYSICAL SUBSTRATE The Project area consists of mix of wooded and agricultural areas. Clark Creek flows along the back property line. No impacts to Clark Creek are proposed. There are two stream channels traversing the property from east to west sides and floodplain exists along Clark Creek. The Project will permanently impact 21 LF of stream channel with fill, 583 LF of stream channel with culverts for road crossings and 82 LF of stream with riprap outfalls. Areas of fill are located at the top of two stream reaches and if groundwater flow is encountered the flow downstream will be maintained through the use of slope drains. At road crossings, culverts will be installed with the bottom of the pipes countersunk (where possible). The bottom of the culverts will allow the existing physical substrate to recreate a stream bed. Riprap outfall protection will be utilized where necessary based on hydrologic modeling to avoid scouring. 8.2 WATER CIRCULATION, FLUCTUATION, AND SALINITY The Project is not anticipated to have negative effects on water circulation, fluctuation, or salinity. Hydrology on the Project site consists of two tributaries draining towards floodplain areas and into Clark Creek. The jurisdictional features onsite are all fresh water and the Project will not affect their salinity levels. The use of BMPs, counter -sunk pipes and slope drains where needed in areas of fill will maintain water circulation and water fluctuations due to Project components are not anticipated. 8.3 SUSPENDED PARTICULATE/TURBIDITY The Project will utilize erosion and sediment control measures which will minimize sediment releases downstream. Turbidity increases are most likely during active construction on the site. Stormwater runoff will be directed to sediment basins onsite and denuded areas will be temporarily or permanently stabilized as the areas meet final grade. Therefore, the effects of the Project on turbidity area expected to be minor and short-term. 8.4 CONTAMINANT AVAILABILITY As portions of the Project area were previously used for farming, residual amounts of pesticides and fertilizer may be flushed out during initial grading activities. During construction, a Spill Prevention, Control, and Countermeasures (SPCC) Plan will be followed to ensure containment of hazardous chemicals. For example, fuel storage containers will be placed in secondary containment. Any offsite fill material will be certified as contaminant free prior to use. Wastewater will leave the Project site via sanitary sewer lines. 41 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE EVALUATION OF THE 401(13)(1) GUIDELINES (FACTUAL DETERMINATIONS) EVALUATION OF THE 401(13)(1) GUIDELINES (FACTUAL DETERMINATIONS) 8.5 AQUATIC ECOSYSTEM EFFECTS Long term direct negative effects on aquatic ecosystems will occur due to the use of fill and culverts for road crossings. Fill placed in streams and wetlands will permanently affect the aquatic ecosystems through a complete loss of function. Some aquatic ecosystem function will be maintained through the counter -sinking of culverts placed in streams and connectivity between upper and lower stream segments will be maintained. Short term indirect negative effects may occur due to minor sediment releases during construction. Even properly maintained erosion and sediment control measures allow some turbidity to move downstream, especially in larger storms. 8.6 PROPOSED DISPOSAL SITE No disposal sites are required by the Project. 42 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW ).0 PUBLIC INTEREST REVIEW 9.1 CONSERVATION Development of the Project will follow all erosion control and stormwater management guidelines as required by state and local codes. The Project area contains 8,828 LF of stream of which 8,078 LF of stream channel were avoided. The proposed design preserves more than 91 % of site streams and is the LEDPA while still meeting project needs. 9.2 ECONOMICS The proposed Project will expand the Applicant's ability to provide cloud services through the construction of a data center. The proposed project is needed to address expanding customer demand for Microsoft's services. Catawba County has been guaranteed a minimum investment of $1 billion and the Town of Maiden will have an increase of local tax revenue in the long run based on property tax assessments. The increase in revenue allows the localities to provide additional services to the local communities. Both temporary and permanent jobs will be created. Temporary jobs will be created during the site development and building construction phases, estimated to be 4-7 years. Permanent jobs are related to the functioning of the data center, including IT engineers and programmers, operational staff, maintenance teams, and security personnel. A standard single -story build requires about 50 full-time and contract employees with roles in campus management, critical environment operations, IT operations, electrical and mechanical engineering security, and building maintenance. A standard building requires about 1 million hours of construction labor over 18 to 24 months, equating to 300-350 construction jobs annually. Skilled construction workers include electricians, plumbers and pipefitters, carpenters, iron and steel workers, concrete workers, and earth movers. Microsoft's development in West Des Moines, Iowa is typical for datacenter development in a region where work started in 201 14 , and a third campus was approved for development in December 20205. Currently more than West Des Moines campuses employe more than 300 operations workers; and Microsoft estimates the new campus will require 3.4 million work hours and more than 800 construction workers to build6. 4 Microsoft Starts Building Iowa Data Center I Data Center Knowledge I News and analysis for the data center industry 5 Microsoft gains site approval for third building at Osmium site - DCD (datacenterdynamics.com) 6 Microsoft datacenters in Iowa 43 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW 9.3 AESTHETICS The Project will be designed to be aesthetically pleasing and will include landscaping buffers and lighting plans designed to reduce visual impacts. Existing vegetated buffers along residential areas will be augmented to increase visual buffers. Natural buffers are to be left in place on the northwest side of the project area through the avoidance of Clark Creek and the associated floodplain area. 9.4 GENERAL ENVIRONMENTAL CONCERNS (33CFR320.4(P)) The proposed project will adhere to strict erosion and sediment control and stormwater management practices to minimize impacts to downstream resources. Floodplain and vegetated buffers along Clark Creek have been avoided. Air emissions will be permitted and limited to testing and emergency use of generators onsite as opposed to ongoing emissions associated with traditional fossil fuel generation. The site is bordered to the north and east by residential properties which will potentially have visual and noise impacts from the development of the site. Mitigation methods will include extensive vegetated buffers, berms, possible noise walls, and entrances off of Zeb Haynes Road rather than utilizing internal residential road connections. Additionally, noise from construction will also be minimal and temporary and will be contained within the project area. Once commissioned, the normal daily operation of the data center will be passive and have no substantive impact to the character of the community. 9.5 WETLANDS (33CFR320.4(B)) The Project includes permanent impacts to 686 LF of streams and temporary impacts to 258 LF of stream. See Section 7 for the proposed compensatory mitigation. 9.6 HISTORIC AND CULTURAL RESOURCES (33CFR320.4(E)) No previously recorded archaeological or architectural sites are located within the Project area. 9.7 FISH AND WILDLIFE VALUES (33CFR320.4(C)) The Project is not expected to adversely affect the fish and wildlife value in the area. All stream impacts have been limited to the intermittent tributaries to Clark Creek, avoiding impact to the perennial stream. Strict erosion and sediment control practices will be used to avoid impacts to the streams from sediment and other pollutants. Coordination with USFWS with regards to threatened and endangered species is ongoing in order to ensure that project effects on wildlife will be minimal. 9.8 FLOOD HAZARDS The Project will not result in increased flood hazards within the watershed. While the project will increase the impervious surfaces onsite, resulting in increased runoff during storm events, seven (7) sediment basins will be utilized during construction and four (4) stormwater management wet ponds will be utilized to treat the increased quantity of stormwater runoff from impervious surfaces. BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW 9.9 FLOODPLAIN VALUES (33CFR320.4(1)) Per Executive Order 11988, floodplain development is to be avoided wherever practicable in order to avoid the potential of flooding disasters due to unwise development of the floodplain. The project area is located on the FEMA Flood Insurance Rate Maps 3710363700J and 3710363800J, which show that the 100-year floodplain is present within the project area. The entirety of the proposed project is located outside of the floodplain with the exception of a road crossing between the two pad sites. Due to the location of parcel boundaries, this infringement into the floodplain cannot be avoided. 9.10 LAND USE Historically, the northern portion of the site has been farmed and wooded areas along the Clark Creek stream valley have been avoided. Within the past 10 years, these previously farmed areas have been reforested with pine plantation. Recently, the eastern -most parcel was cleared. The Project would result in the conversion of agricultural land to industrial development. While this would be a major change in land use, the Project site is currently zoned for industrial development and is consistent with long range planning goals for this area. 9.11 NAVIGATION (33CFR320.4(0)) The Project is not located on a Section 10 navigable waterway. 9.12 SHORE EROSION AND ACCRETION The Project is not located in an area where shoreline erosion or accretion are applicable. 9.13 RECREATION No existing recreational facilities will be affected by the Project. 9.14 WATER SUPPLY (33CFR320.4(M)) The Applicant has confirmed that water supply services are available from the Town of Maiden. Maiden Public Works is the water provider for the property. There is an existing 12-inch main line routed through the southern end of the property with another potential connection at the northeast edge of the property along Zeb Haynes Road. The City of Maiden has confirmed capacity is available for the full buildout, no expansions or upgrades are required for water supply. For fire water, a separate site loop is required, and the fire loop needs to be separated from the domestic/cooling water supply system. Offsite water supplies are not anticipated to be impacted by the Project. 9.15 WATER QUALITY (ALSO 33CFR320.4(D)) 030501011102 A DWR Individual Certification is required for the issuance of this requested Individual Permit from the Corp, has been applied for in association with this permit application. Special conditions are anticipated, 45 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW and a copy of these conditions will be provided to the Corps. No major impacts to water quality are expected. However, increases in turbidity during construction, loss of nutrient removal capacity of the impacted streams, and some discharge of pollutants and nutrients in the runoff could result. The controls required under the erosion and sediment control plan approved by the Town of Maiden will provide water quality protection. A Town approved stormwater management plan will also be required for the project. Four (4) SWM BMPs (wet ponds) will be constructed to treat the increased runoff from the impervious surfaces associated with the proposed project for both water quality and quantity. These BMP's will prevent unintended impacts to receiving waters from pollutants, flooding, and erosion. 9.16 ENERGY NEEDS (33CFR320.4(N)) The Project will have an energy need of 240 MW, increasing the need for energy in the area. There are existing 230 kV and 100 kV power lines traversing the property. The applicant has received confirmation that Duke Energy will provide a substation within the project limits to provide power to the five data center buildings. Duke Energy has indicated that there will be adequate capacity for the Project. 9.17 SAFETY All project entrances will meet the standards of the NC Department of Transportation. Additionally, all safety regulations imposed by state law and the Occupational Safety and Health Administration (OSHA) will be followed during the construction of the Project. The completed Project will be surrounded by a fence and gated access to limit public access for the safety of both the data centers and potential trespassers. Stormwater management basins will be located within the fencing. 9.18 FOOD AND FILTER PRODUCTION The Project is located within an area historically used for silviculture or agricultural production, but the current land use is vacant. The Project is not anticipated to impact food or fiber production in the area. 9.19 MINERAL NEEDS Consideration of mineral needs is not applicable to the Project, as the previous land use did not involve the production of minerals. 9.20 CONSIDERATIONS OF PROPERTY OWNERSHIP While the Project may affect adjacent landowners, the applicant has established a need for the project based on customer demands. The Project meets all zoning requirements and has the support of the Town of Maiden and Catawba County, and the adjacent properties will be adequately screened with existing vegetation or landscaping. The adjacent landowners may also experience increased commercial interest in their property, leading to higher land values. BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW 9.21 ENVIRONMENTAL JUSTICE The US Environmental Protection Agency (USEPA) defines Environmental Justice as the fair treatment and meaningful involvement of all people regardless of race, color, national origin, or income with respect to the development, implementation, and enforcement of environmental laws, regulations, and policies. The State of North Carolina does not provide specific standards for assessing environmental justice issues. For this assessment, Stantec utilized the Virginia Environmental Justice Act of 2020 (VEJA)7 code requirements to assess the potential for disproportionate and adverse environmental impacts among local communities in Catawba County, NC. Environmental justice communities under VEJA (§2.2-234) are defined as: • Environmental justice community: any low-income community or community of color. • Fenceline community: an area that contains all or part of a low-income community or community of color and that presents an increased health risk to its residents due to its proximity to a major source of pollution. • Community of color: any geographically distinct area where the population of color, expressed as a percentage of the total population of such area, is higher than the population of color in the Commonwealth expressed as a percentage of the total population of the Commonwealth. However, if a community of color is composed primarily of one of the groups listed in the definition of "population of color," the percentage population of such group in the Commonwealth shall be used instead of the percentage population of color in the Commonwealth. Low-income community: any census block group in which 30 percent or more of the population is composed of people with low income. Low income: having an annual household income equal to or less than the greater of (i) an amount equal to 80 percent of the median income of the area in which the household is located, as reported by the Department of Housing and Urban development, and (ii) 200 percent of the Federal Poverty Level. Stantec conducted online search to determine whether populations of people of color or low-income communities, according to the definitions under VEJA, are present within one mile of the project area. Stantec used data from the Environmental Protection Agency's EJScreen website8, 2020 U.S. Census Bureau9, Clarion Ledger - American Community Survey (ACS)10 2015-2019, and Department of Housing and Urban Development (HUD)11. Search results are provided in Appendix G. https:Hlaw.lis.virginia.qov/vacodefull/title2.2/chapter2/articlel 2/ 8 https:Heiscreen.epa.gov/mapper/ 9 https:Hdata.census.gov/ 10 https:Hdata.clarionledger.com/american-community-survey/ 11 https://www.huduser.qov/portal/datasets/i1.html#2020 A BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW Illustration 12. Census Block Groups (EPA EJSCREEN) Table 16. Census Block Groups Census Block Depicted in Map Above County Block Group #, Census Tract # A Catawba County, NC Group 2, Tract 117.02 B Catawba County, NC Group 1, Tract 117.02 C Catawba County, NC Group 3, Tract 117.02 D Catawba County, NC Group 3, Tract 116.01 E Catawba County, NC Group 1, Tract 116.02 F Catawba County, NC Group 4, Tract 117.02 The 1-mile buffer surrounding the project area contains percentages higherthan or matching the state average of less than high school education, under the age of 5 and over the age of 64. Within the same buffer there are two schools and one place of worship. The final project components will not produce any emissions or excessive noise. Temporary construction impacts (for example noise, traffic, et cetera) can be expected, but are limited in nature. BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW Table 17. Census Information TWO Low-income Census Total Minority Hispanic 3 Black/ African American Asian Pacific Some ece or areas as defined by Block Populations' American Indian Islander Race 4 Ra More VEJA Races (<$55,500) A 16% 5% 3% 1% 0% 2% 2% $68,268 B 25% 19% 5% 0% 1% 0% 3% 0% $68,083 C 8% 3% 0% 1% 0% 0% 3% 4% $75,385 D 6% 12% 0% 0% 0% 0% 21 % $72,125 E 13% 0% 0% 0% 0% 6% 0% $42,778 F 20% 9% 10% 0% 0% 0% 7% 0% $52,399 1. Red cells indicate EJ populations based on VEJA thresholds. 2. Detail may not sum to totals due to rounding. 3. Hispanic Population can be of any race. 4. While "Some Other Race" is not considered People of Color under the VEJA, several CBGs have significant populations of "Some Other Race". These CBGs also have high Hispanic population percentages and are otherwise classified as Communities of Color based upon those criteria. 5. CBGs in orange do not intersect the project area directly but do intersect the 1-mile buffer surrounding the project area. The total population of color is above the state average in one CBG. One out of six CBGs have higher percentages of Hispanic population, and two out of six are higher in American Indian population. The Asian population in one out of six CBGs is higher than average but only in the CBG's that do not directly intersect the project area. Two CBGs would be considered low-income communities. There are no fenceline communities present as the project would not be a major source of pollution. The project is expected to have impacts that will generally be contained within the project area and/or will be temporary in nature. Onsite impacts will include land clearing activities that would remove vegetation and affect wildlife. Construction and post -construction stormwater discharges will be addressed through approval of erosion and sediment control and stormwater management plans. Air emissions will be minimal and limited to construction and emergency generators. No hazardous material will be stored onsite or generated during operation. Noise from construction will also be minimal and temporary and will be contained within the project area. In addition, the applicant has engaged a subject matter expert consultant to support comprehensive community engagement planning and outreach for projects located within Catawba County. Once commissioned, the daily operation of the data centers will be passive and have no substantive impact to the character of the community. As such, no disproportionate impacts to the identified environmental justice communities are expected. This project will create jobs within the local area, thereby improving the local economy. 9.22 AIR QUALITY The Project includes diesel -fired generators as a back-up energy source which will be eligible for coverage under NCDEQ's Division of Air Quality General Permit OOOOOG00. • BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW 9.23 PREVIOUS PUBLIC OUTREACH The applicant has engaged a subject matter expert consultant to support comprehensive community engagement planning and outreach for projects located within Catawba County. The Community is aware that Microsoft is developing on this site, but there has not been formal outreach to date. 9.24 INDIRECT AND CUMULATIVE EFFECTS 9.24.1 INDIRECT EFFECTS 9.24.1.1 INCREASE IN POPULATION IN THE AREA The proposed project will not increase the population in the area because it is an industrial use. 9.24.1.2 TRAFFIC INCREASE A temporary increase in traffic will occur during construction; however, the long-term increase in traffic will be negligible because the number of full-time employees onsite at a given time will not be significant. 9.24.1.3 ECONOMY The Project is needed to address expanding customer demand for cloud services in the region. An economic boost for the Town of Maiden and Catawba County is expected due to an increase in local tax revenue in the long run, due to the large facilities and the associated property tax assessments. Temporary and permanent jobs will also add to the local economy. 9.24.1.4 COMMUNITY The Project will have positive effects for the City of Maiden's community. Microsoft is committed to the long-term health of the communities in which we operate and where our employees live and work. Through conversations with community leaders and organizations, they work to support inclusive economic opportunity, protect fundamental rights, build a sustainable future, and earn trust. Examples of community investment include restoring native habitat as a community space for Chase City, Virginia creating job centers to provide employment opportunities, and partnering with local non -governmental organizations such as Loudoun Hunger Relief in northern Virginia. 9.24.1.5 WATER QUALITY Erosion and sediment control and stormwater management pose a risk of degradation of water quality due to potential sediment releases during construction; however, the erosion and sediment controls required under the NC Erosion and Sediment Control Planning and Design Manual, and the stormwater minimum design criteria required under the NC Stormwater Design Manual should provide adequate water quality protection. 50 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE PUBLIC INTEREST REVIEW 9.25 CUMULATIVE IMPACTS Wildlife — Cumulative impacts to wildlife resources would be primarily related to habitat loss, habitat fragmentation, and animal displacement. This project will utilize both open pasture/field and forest land. Due to the abundance of both open pasture/field and forests in the County, a significant negative cumulative effect on wildlife is not anticipated. Air Quality — Cumulative effects to air quality when proposed Project emissions are combined with impacts from background emissions sources associated with other past and present actions. Cumulative effects in the vicinity of the Project would be minimal as the surrounding land use is residential and has remained stable for over 20 years. The area is currently in and will remain in an air quality attainment area. Total cumulative impacts are expected to remain below the National Ambient Air Quality Standards (NAAQS) for the region. Visual Resources — The data center buildings will be visible from the road, but screening will be maintained to residential areas. A significant cumulative visual affect is not anticipated. Environmental Justice — No negative cumulative effects to the protected communities is anticipated. The project, along with other land development in the County, will be an overall positive effect including job creation and strengthening the tax base for the region. Socioeconomics — This project, along with other land development in the County, will be an overall positive effect including job creation and strengthening the tax base for the region. Growth — This Project is not likely to create secondary growth in the area. While it will contribute to the economy, it is not likely to cause a need for housing or support services. Aquatic Resources — The Project would not have a negative cumulative effect when considered in the context of other past, present, and future actions. For the purpose of assessing cumulative effects that the proposed action may have to the aquatic environment, it is reasonable to evaluate the effects within the project boundaries and downstream of the Project as it could affect the watershed. Direct impacts of the Project include permanent impacts to 686 LF of stream. Stormwater discharge from the Project is not anticipated to affect downstream properties or the natural environment. Overall, the anticipated effects of the proposed project would be moderate relative to similar types of projects in the region, and taken alone, do not present a significant or imminent threat to the stability and integrity of the aquatic ecosystem within the watershed. The type of wetland and stream system that would be impacted is not a particularly unique or high -quality resource. Clark Creek, the largest system in the area, has no direct impacts. By implementing proposed best management practices, such as the retention of stormwater and the implementation of sediment and erosion control measures, the effects of the project will be somewhat reduced. The direct loss of stream function would also be replaced by the proposed mitigation. 51 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT n U.S. Army Corps of Engineers (USACE) Form Approved - APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB No. 0710-0003 33 CFR 325. The proponent agency is CECW-CO-R. Expires: 01-08-2018 The public reporting burden for this collection of information, OMB Control Number 0710-0003, is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at whs. mc-alex.esd.mbx.dd-dod-information-collections(cr) mail. mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR APPLICATION TO THE ABOVE EMAIL. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. System of Record Notice (SORN). The information received is entered into our permit tracking database and a SORN has been completed (SORN #A1145b) and may be accessed at the following website: http://dpcld.defense.gov/Privacy/SORNslndex/DOD-wide-SORN-Article-View/Article/570115/a1145b-ce.aspx (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Chris Middle - H. Last - Sander First - Amber Middle - Last - Forestier Company - Microsoft Corporation Company - Stantec Consulting Services Inc. E-mail Address - chsander(a,microsoft.com; lexijones(ac�xnicrosoft.com E-mail Address - amber.forestierLy),stantec.com 6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS: Address- One Microsoft Way Address- 801 Jones Franklin Road City - Redmond State - WA Zip - 9805 Country -USA City - Raleigh State - NC Zip - 2760 Country -USA 7. APPLICANT'S PHONE NOs. w/AREA CODE 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax a. Residence b. Business c. Fax N/A (434)594-1390 N/A N/A (540)226-5525 N/A STATEMENT OF AUTHORIZATION 11. I hereby authorize, Stantec Consulting Services Inc. to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support or this permit application. Chris(May 10, 2023 07:06 PDT) May 10, 2023 NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) Boyd Farm Data Center 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) unnamed tributaries to Clark Creek; Clark Creek Address 1250 OLD MAIDEN RD 15. LOCATION OF PROJECT Latitude: -N 35.59474 Longitude: -W-81.230705 City - Maiden, State- NC Zip- 28650 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Municipality Town of Maiden Section - Township - Range - ENG FORM 4345, MAY 2018 PREVIOUS EDITIONS ARE OBSOLETE. Page 3 of 1 17. DIRECTIONS TO THE SITE From I495 exit 16 head northwest on NC-16 N for 26 miles then turn left onto Balls Creek Rd/Providence Mill Rd. Continue for 3 miles then turn right onto Joe Campbell Rd. After 0.5 mile turn left onto St James Church Rd and continue onto Mays Chapel Church Rd. Follow for 1.2 miles and turn right on US-321 BUS N. After 0.5 mile turn left onto Zeb Haynes Rd and then turn right onto Haynes Dr. Project site is at end of road. 18. Nature of Activity (Description of project, include all features) The Applicant is proposing to develop a multi -phase development with five (5) single -story data center buildings and associated infrastructure that will be collectively known as the Boyd Farm Data Center (CLT10). The primary function of the data center campus is to provide the most efficient, controlled environment for communication servers housed inside the facility. The project includes five 48- megawatt (MW) data center buildings with parking, access roads, one (1) Duke Energy substation, security entrances and features, installation and/or relocation of utilities, and stormwater management treatment facilities with impacts to jurisdictional streams. The Town of Maiden is a regional water provider to local municipalities and local governments. The project also includes water towers with storage tanks and maintenance access roads. Please see narrative for additional information. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The purpose of the CLT04 project is to provide additional cloud storage capacity in support of Microsoft's North Carolina Regional Network Gateway (RNG). Microsoft establishes RNG's around the globe within identified regions. Sites within the RNG are required to meet certain connectivity and redundancy requirements and must be located within 20-kilometers (km) of other data centers in the region that are all connected through fiber optic lines. The North Carolina region is outgrowing the current capacity provided by existing data centers. Because these projects usually take 18-24 months to design and construct each phase, Microsoft is planning now for future growth. This data center design is advanced and is expected to provide optimal operational efficiencies. Within North Carolina, locations for a data center are mainly limited by access to fiber optic lines and adequate electrical power. Please see narrative for additional information. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge Discharge of fill in jurisdictional areas is necessary for pad site construction, culverts and riprap outfalls associated with road crossings. Please see narrative for additional information. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards Fill - 1.56 cy Culvert - 200.78 cy Riprap - 27.89 cy 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres or Linear Feet 686 LF 23. Description of Avoidance, Minimization, and Compensation (see instructions) Avoidance measures included alignment of road crossings perpendicular to the streams in sections with less sinuosity where possible. Impacts were minimized through limiting road crossings to the minimum width necessary to allow for access, placing utilities within the roadbed and utilizing the minimum riprap dimensions allowed under NCDOT requirements; and the use of 2:1 slopes to minimize impacts to a headwater stream. Please see narrative for additional information. ENG FORM 4345, MAY 2018 Page 3 of 2 24. Is Any Portion of the Work Already Complete? Yes F—)(]No IF YES, DESCRIBE THE COMPLETED WORK N/A 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a.Address- SEE ATTACHED LIST AND MAP City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL' IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER USACE PJD SAW-2023-00665 01/24/2023 03/30/2023 N/A Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. r1 1 May 10, 2023 Chn, Sander (May 10, 2023 07 06 PX SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, MAY 2018 Page 3 of 3 W W W W W W W W W W W W W W iG1 W W � W W W W W W W W W W W W W W 07 W W y ONO OND OND OND OND OND W W W W W O O D O O O O O O m m m m m N O mmJ m WWW - - - - - - -J - cn M M M MCi r O a J— J W U) A W— w A W (JI O J A A W 0 W W �� W w W A W N w W O W U) A W J w Ili A w w U) O W O W U) W O OO W A 0) J OD (9 U) O J 0) OD OD U) O O O N j Z N N N W w W W W W N W 'AJ Ul U) U) J O W W O N W A U) O W D - J A U) U) U) U) J J J Ul W w A O Ul Ul O m X N n m O1 O1 O1 O1 O1 O1 O1 O1 O1 0 s (D � m Zm D (D (DCm (D0<(D(D 77 77 77 77 77 77 77� AA QQQ-77 (7 (7 (7 (7 (7 (7 (7 (7 (7 Q Q 0 00 00 00 (n o0 00 0 o 0 ; co z oC C ((D ((D ((D (D (D (D O 0 1 N C N 0 N N D (D O (D C m N N N 3 v:: m m' a v r m p 3 m m D D D n n v( 2 0 co r v v v D v v n m 0 v 3 v 0 r 7 51 7 7 O O O C N N ' `< O_ 7 (D (D (D W W W 3 S N N N D cQ cQ cQ 0 0 0 m o m m m m — * 3 N p 2. Qc Qc Qc (D (D a)— n r n v v v fN fN :3c�i c CD G� G� w v 7 S S S N N 0 3 3 3 co co CD N N N U) U) N (D (D (D 3 3 (D O O O N N N (D (OD 7 7 7 7 N CD N Q fA Q 0 O CD CD V) CD O -u -u - j -u -u� Ln N N N W D D D N-u D D D D Ul D O O Ul O U) O U) O J A w A w W W W O w O O W W W W A O r O o o o o 0 0 0 O o x� p 0 O O o Z j 0W � N N N N 0 0� w� (9 (DO O cnO W J W N 0 D 0 (7 (7 (7 (7 N N 0 �' O O cri °0 0 m m m m 2 2 N Q m U) r r r r r- cn (n N V)w Q m w O c) 0 Z Z Z Z Z Z Z Z Z Z m r m r Z CD S (D (D (D (D (D (D (D (D (D (D w 0 0 (D N 5 5 5 5 5 5 5 5 5 5 Q; 0 0 5-0 O O O O O O O O 0 (D O (D G O G O (D (D Z Z Z Z Z Z Z Z Z Z Z Z z Z z Z Z V) m m W W W W W W W W W OD OD OD W OD W OD OD N W W Ul W Ul W Ul W Ul W Ul W Ul W Ul W Ul W Ul W Ul W Ul OD f9 O (9 OD (9 O (9 W Ul (r OO OO OO OO OD OD OD OD OD OO O OD W OD W OD L W W W W w w O O O W w w O w O w co O O O O W W O O W U) O J O J O m m m O N N j j m ONO — O cn O cn A O Catawba county Geospatial N0Marinc. riviNs. errrEa. Information $erVIGeS Adjoining Properties N W E SS 21 Selected Parcels 1 in=1600ft This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2023 Catawba County NC 03/21 /2023 From: 401PreFile To: Ruiz, Melissa Subject: Automatic reply: [External] 401/Buffer Pre -filing Meeting Request Date: Wednesday, February 1, 2023 9:40:32 AM This email confirms receipt of your pre -filing meeting request. Please retain this email for your records and submit this documentation as part of your 401 application (PCN Application) as required by federal law. DWR will not be able to accept your application without this federally required documentation. 401 applications received without documentation that a pre -filing meeting request was submitted at least 30 days prior will be returned as incomplete. Responses to this email are not monitored. If you need to contact 401/Buffer Permitting Staff, please use the following link(s) to access of staff contact list(s). For Non -Transportation Central Staff: https://deq.nc.gov/about/divisions/water-resources/water-quality_permitting/401-buffer- permitting/401-buffer-permitting-contacts For Non -Transportation Regional Staff: httl2s://edocs.deg.nc.gov/WaterResources/DocView.asl2x?dbid=0&id=2162034&cr=1 For all Transportation Projects Including NCDOT Projects: https://deq.nc.gov/about/divisions/water-resources/water-resources-permits/transportation- permitting/staff-contacts BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX B GRAPHICS Location & Vicinity Maps So slephers � - 'Arryq}I Hickory Reek9pm LyFe Cr e _ Lnrq Via,. - Gov gpe t I nil ri i . •.1Yf. -, .i Claanlo n[ . N.-klord y .. ... s° ,s O 2 41 Ntnlon L�I.•i. ;IE7 tt a. r,b unman Tp C " "It r '.nr Flix 1 FC 'sk SR,yrc Lace ,• c,�ek c`r P 4^Acri " May�.]w Lreev an' F rny' Parr y Lrc � e,F �Fce* ra`n 'A A.v-_% it - 14an � 1 H ow4r •'.r s C,n k C c ,ern L� �x ,t Rxkavry�+ Lur .. Iril •ir Iron :J-t11?r1 r'o 0 2,500 5,000 N Legend metres a Project Study Area (At original document size of 8.5x11) 1:201,220 ® Stantec ■ Pmject Location Prepared by GRG on 2022-12-01 TR by AL C on 2022-12-0. Catawba County, NC IR Review by MMR on 2022-12-20 Client/Project 203401902 REVA Microsoft Notes 1. Coordinate System: NAD 1983 StatePlane North CLT10 Data Center Carolina FIPS 3200 Feet Figure No. 2. Data Sources: Catawba County Parcels data 1 3. Background: Sources: Esn, HERE, Gannin, Intermap, increment P Corp., GEBCO, USGS, FAO, Tale NPS, NRCAN, GeoBase, IGN, Kadaster NL, Vicinity Map. Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which may be incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness of the data. • � 1 f 1 y "�� pG�p ' 1. ,I "N. • Cyr^= ■ • . • �� } 'A , •- �., CCf��� f - � � A I• I G 00 �. • , �. -o I ' �ti--�"� .` l , ; �� —.:-_ ram._ !. ' �� k •A�'� � f�r I 1 • : T ¢r �� ` 1.6 0 300 600 n' Legend metres a Project Study Area At original document size of B.6x11) 1:24,000 ® Stantec ■ Pro,jecILooati— Prepared by GRG on 2022-12-07 TR by ALC on 2022-120' Catawba County, NC IR Review by MMR on 2022-12:20 C! nNProject 203401902 REVA Notes Microsoft 1. Coordinate System: NAD 1983 StatePlane North CLT10 Data Center Carolina FIPS 3200 Feet Fig —No. 2. Data Sources: Catawba County Parcels data 3. Background: Sources: Esn, HERE, Gannin, 2 Intermap, increment P Corp., GEBCO, USGS, FAO, Doe NPS, NRCAN, GeoBase, IGN, Kadaster NL, Project Location Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which may be incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness of the data. FEMA Floodplain Maps 89 669' ERNE 9' y� .titw14 4;.•.. MMUL FL= MRAME Aa 11 mlic ,_p a .W­k� terr. Fj JIM qi' Ga® �911131A491R5 'a @ E{ ��P pg. 8a68 P��'S1§S l dE� {Er { 1t 4 pi fill, _ AIDE fill fill� 1 [ 'i if" 3I i-i T,nait ali i i I Parcel Map ,catawba county ..,. HYING. WHIR. Geospatial Real Estate Search Information Services N W + E s 5 Selected Parcels Parcel la Size (ac) 363707678981 58,54 363707699340 70.64 363819608696 85.25 363711569552 54.73 363708992517 23.86 1 in=1200ft Figure 5 This map/report product was prepared from the Catawba County, NC Geospatial Information Services. Catawba County has made substantial efforts to ensure the accuracy of location and labeling information contained on this map or data on this report. Catawba County promotes and recommends the independent verification of any data contained on this map/report product by the user. The County of Catawba, its employees, agents, and personnel, disclaim, and shall not be held liable for any and all damages, loss or liability, whether direct, indirect or consequential which arises or may arise from this map/report product or the use thereof by any person or entity. Copyright 2023 Catawba County NC 03/20/2023 L r MN 4 rwL �m rMI O �00 n 0 m cn m 0 to m m m w m cn to m m m m>> A 1 0 0 0 0 0 g D D D D D D M D M U? w N T cn ? w N n O O O D D to r X X XDD D D C D zO z0 c o 0 0 0 0 o D m m m Z7 m O D o a o m m cn (n p (n cn m o co N N W D �u BCD o > m m n m C Z D frail D frail O D W cn D z ;0 -u Z m rC. 03 cn w rN„ rn 0 D O D O m mcn z < D D A Dm Z o 0 0 0 0 0 o D O O m D O y0� N o 0 0 W o o c) mr�i D D m cn Q QO QO O o -0 O rncNo o z Z z m rnO0n aoo i<n n n n nnrn a m m m m m O cn m >00 O �D A m z m D \\� — m \\ O AO i\=mO )//� x X = m II o, � cn — > co C / m\ I \\\ \ M 0 A �/ d m A D n \ V m m z m0 m �� p CO D// L l 1�0, I M = m \ /co 0 ZZ z \ /� l CAMPU c— 1=� \ S BOUNDgRy m O < m o_ m a}� r n ■ o mcn 00 S. o °°N�IY , c \ 0 0 `7v,m i N I o ✓ �� i N � w u oo % m M K cn / D r r m m n�mo n _ /' O O NZ / \ 7 m7 0 33 0 o _iI D W D �C r m N> I z (D L C) I( ) co 1 I } (�/ lFj )02 \wxo � m D 1\�Z on \ m 'o 'o C) O 'o \ \ \ ND w� ) rZ I � O p � A ��O �B Nnm \��\ \ \ nD f / '�/ m �O �O �O o D 1 p m p m r p O O oD \\ l\J D� I z � -n �m �m m n \\\ J / / O n m m W O > O > D A + A \ / I f z m a ,Nod I � OD \ \ \\\ I \ \ Am \\ I ) I I 1 I Il \ \ \ \ I I\ \ '+O\ oD o m cn jt\ , o \ /�I I I l \ \ II 1 m o I I I I 1 } / Ill ( \\ m`ov+ �) I I II \l jlll /� J J�I \ \ n ti \� 0Dl rnm\ o o 1 ( I \ \ \ \\ I\ 1 \ �11\) 1 / Io D o � �7 l I\ \ I 1 // ^\t I/ ° o o r b o z mho I >1 m Nz I m} cn co D m m O 0) m O O O O Ul W W O Ul W W W O Ul O W Ul A O A Cl O N ® 807.08 O O 1 +O 808.23 m STA 0+48.30 crio ELEV.808.20 — m O _ D HW# A-1 INV OUT: 807.90 (A-2) 0 co m D^ + 809.43 917.62 p �.. _.. p O "0 no 0 D o 809.49 r Om M + D O 834.24 n m N O W o p o O m z rn ) oo co — D+ 810.10 — 1 0 — — 835.67 00 zz 1 n O D V, I + 811.66 1 — 829.68 0 � I D CY)+ 812.36 H W# A-2 00` INV IN: 811.37 (A-1) I + 813.76 I O W v Ul O O O Cl W W O Cl W W W O Cl O W co Cl A O A Cl m x z O O D m m C� O r Cn O O W W 0 W W W W A A Do cn o cn -1 O Cn O Cn O Cn (n r D0 n l m n N u �I rn 0 m �O O if a a a a a a a a a a Do 0 0C� oC� oC� o N 840 o III ;0 (n _0 E r-- O O m D O D O m 09 \ / / D 5: m m0 m0 AO o A O O m 0 m X O p O p D O �� Cl) n m m m -n m� m� n >O >m D 0 z OD X. 1 ~ OD \ a> >m \�\ o nA� m O Yn z l� ` �ZIT 0 0 0 a D� 83o \ o O o -n 0/ J �� r-----� 8S oo I / \ i \ o — o a o z�0 z a� x O zo, >/ �— C) nmo r �z m / O C,o m m \ r co cn /— m x z m O � O O m D O 0 co m m (9 0 O W W W W n co A IA w w o cn o cn o cn o D cn o cn �p m + O D 828.58 C�0 o ° z m ^) + 828.83cri �. O !'1 0 1 z ^ + O N O 1` � �Y o I \ Ill o cn�u l r m o o on mc00-0o 00-0D o o oo ��0 > o00� z00�A o o �m Cl) m T m T m-1 m� \ 1\ \ \l\\ \l \ m v �� �z m J l \\\� o 810 / (Dm I I ( I \ + l f r 820 D f i l I I l \ om ( 1 1 \ D � n > } 0 840 cn �I// i// i/J/r / i \ / r I IIII i / //� �� I( I II I1I I I 1 otie � I /' m r > / 0 I+ z N .0 850 -am D Is A 840 D o � m 3 I I/ 830 V� 0 0� I o D (n \ J J a w i r,01 o o ^� f I W I `, \� 2 1 \ V I VD1 'o c� D 0 So R o QZ 1 eI 0 o o Do m oro \ D zl o �� U) 1 m N z o m) cn If �Ocn O CO Cl O O O Cl O N N W W A Cl O Cl O Cl O A Cl Cl Cl O Cl O N + 801.75 O O I O0 w ++ 801.79 o STA 0+49.96 mm o ELEV.801.79 — D m — (PD + 802.20 HW# F-1 O 0 810.37 INV OUT: 799.69 (F-2) 0 1 m _> + 803.61 O O 0 926.40 D 842.95 O X m I z W + 804.62 I. n O 0 850.12 a I.. CVA7� (� + 806.12 n O `Ln/ I m I � z — 843.20 0 CD 806.71 I 826.68 0 H W# F-2 NV IN: 804.38 (F-1) cn l I cn o +9 V ) m C T� N 0 Z 0 n cc r. MN 0 X D (j) W Z < N 0 mm n m 0 _ —0 Z C m Z O D m z ri mr- Q m 0 m F- m D W n W -,I 0) U1 A W N D 0 W 5 j 0 j D m Z Z -1 j 0 Z r—zC==0=z7z��r=mn r n�mmzmm 0mcn0) 0(j) m(j) z 0 n D D D D n D Z�o�DDOD*>mWCC> = 0 t m m-4 Z-4 D� 0 m r D ,��0cn0mD0Dmm0 zCzOz�m�� ��� m Zr-Q,Q�p m< m r Z r r m O 0 r z cco DmDXmmDcDmmcco u> cnm�u t0) � ��7\Z W nxD< OWmn�mDzp W D � r G� 0 m D m W p O z 0= D r- m O p z =-0 0 W D- D W m om<< zmm>bm� m p 0 ;0 W <0 m-- � W p W mz*0 r00Dm�D 0 m p��00��Z 0 O <=m m��r zu 0— m-mZ D mDD 7\cnzr- F� OmZz m� DDODC C C) co 0rz7 --�m O7-0 co z 0 W * W F 0w07DND G� G� W WC Z W= W D 00 D O r O Zm W ZN>0 C)M r- n-jM m m p mm mprmm m p p m O D� D m 00,D **WZ�r-m -n m ==0>,u WO W n 0 m 0 W m D C D� � DD=� �m�7 < p D D C< D D Orm z�z CO ,-Im7 Z 0-n m DWG—cn m m W � zcnm0 W��O OmmmZ D 0 ���7r r 00 Z N �t �0 0 pmp r mOm m� r O mco = 0 D O 00 D m z c 0 mm < � 0 0 = � m m m W m m m < z o m m m m m = 0 m z � m co� � Dr 7\ m m m X z 0 0 n D 0 m 0 co m D W < N mm m0 —0 �C Om Z D mr 0 m 0 m F- m m D W n 0) Cl A W N Z 0 m 00 m = = 00 X mmmmm0 0 D D ZD z�DO �m0 p m D m 0 W N _ c W mo0CDpm 0�Wm m�=0C0 ccZC0�m < p m D c p 0 0WO cn0 Om D 0 D < 0 ��umz z mm<p m <�0< 0 OD7Dz W m = m 0 m <z>� D D un 0 m ZZDD W m m m n W m m N � C, r 0 = 0mm0 z D0Oci) D OZ�0 p co mci = � � Z co Z Z c m mZ 0 p 0 0 m 0=z 0cn �00 (fir (n mm D � W 0> m = 00 p D07 W C D m A W � W O D • I% t• • "Ol� • I III •-0 • III Nei L�� n ■ � v n D z � z = �u p � 0 � 0 m mcm m = z p 0 m mZ 0 W = D m0 CO Zj Om zm M m 0p >W> 0 Dr m-0 m O m F- m D W n Z C) C) 0000 mcn�m 0 � � . Ocn nm0 00zu zz D D p C r z -1 n0 Zm� O 0 ��* m W D W Z0 mr 0< �zM r D = =n� mm T.om 05p violYs zz e� �q PROJECT NAME: REVISION RECORD Q �E o 8 ➢ g CLT0 OFFSITE ALTERNATIVES MICROSOFT CORPORAT. REDMOND, WA HINGTON RA j TRIVIUM PROPERTY OPTION El 0 N b- 0 O o 2 0 o p ! ink No 7 o0 9��8 �o o ° yy o z b z o -J a N D `a• ° r v oA O \ Z Or yp �n n Z om m0p m`Z cAn m DvWAZ m _ m z CA N n n n o D a so so so o m A m ED m VNml U1 n°li N _a0 _(J A N FOR CONCFPTUAI USF ONI Y - NOT FOR CONSTRUCTION I :E Q g ° —n . sF j N � $ g 1 PROJECT NAME: CL104 OFFSITE A—RNATNES MICROSOFT CORPORATION REDMOND, W0. HINGTON _ _ _— REVISION RECORD 5�➢ SHUFORD PROPERTY OPTION — BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX C JURISDICTIONAL FEATURES Wetlands Delineation U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2023-00665 County: CatawbaU.S.G.S. Quad: NC -Maiden NOTIFICATION OF JURISDICTIONAL DETERMINATION Requestor: Microsoft Corporation Chris Sanders Address: One Microsoft way Redmond. WA 98052 Telephone Number: 434-584-1390 E-mail: chsanderkmicrosoft.com Size (acres) 292.43 Nearest Waterway C1arkCreek USGS HUC 03050102 Nearest Town Maiden RiverBasin Santee Coordinates Latitude:35.589794 Longitude:-81.235323 Location description: Project is located Northwest of the intersection of Old Maiden Road and Zeb Haynes Drive, near the town of Maiden. Catawba County, North Carolina. PIN(s):363707678981.363707699340.363708992517.363711569552 and 363819608696 Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters on the above described project area/property, thatmay be subjectto Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 ofthe Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been delineated, and the delineation has beenverifiedby the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 3/22/2023. Therefore this preliminary jurisdiction determination maybe used in the permit evaluation process, including determining compensatory mitigation. For purposes of computationof impacts, compensatory mitigationrequirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat allwaters and wetlands thatwould be affected in anyway by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, y ou m ay reque st a n a pproved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters on the above described project area/property, thatmay be subjectto Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 ofthe Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of C WA/RHA jurisdiction over allof the waters at the project area, which is not sufficiently accurate andreliable to support an enforceable permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultantto conduct a delineation thatcan be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters ofthe United States within the above describedproject area/property subjectto the permit requirements of Section 10 of the Rivers andHarbors Act (RHA) (33 USC § 403) and Section 404 ofthe Clean WaterAct (CWA)(33USC§ 1344). Unless there is a change in law or our published regulations, this determination maybe relied upon for a period not to exceed five years from the date of this notification. ❑ There are waterson the above described project area/property subjectto the permit requirements of Section 404 ofthe Clean WaterAct(CWA)(33USC§ 1344). Unless there is a change in the law or our published regulations, this determination maybe relied upon fora period notto exceed five years from the date ofthis notification. ❑ We recommend you have the waters on your project area/property delineated. As the Corps may notbe able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation thatcan be verified by the Corps. ❑ The waters on yourproject area/property have been delineated and the delineation has beenverifiedby the Corps. The approximate boundaries of these waters are shown onthe enclosed delineationmapdatedDATE. We strongly suggest youhave SAW-2023-00665 this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWAjurisdiction on your property which, provided there is no change in the law or our published regulations, maybe relied upon for a periodnotto exceed five years. ❑ The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination maybe relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, pre sent on the above described project area/property which are subject to the permit requirements of Section404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination maybe relied upon for a period notto exceed five years from the date of this notification. ❑ The property is located in one of the 2 0 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of CoastalMa nagement in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placementof dredged or fill materialwithin waters of the US, including wetlands, without aDepartment oftheArmy permit may constitute a violation of Section 301 of the Clean WaterAct (33 USC § 1311). Placement of dredged or fill material,construction or placement of structures, or work within navigable waters ofthe United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or403). If you have any questions rega rdin g this determination and/or the Corps regulatory program, please contact Krystynka B Stygar at 252-545-0507 or krystynka.b.stygar&sace.army.mil. C. Basis For Determination: Based on information submitted by the applicant and available to the U.S. Army Corps of Engineers, the proiect area exhibits criteria for waters of the U.S. as defined in 33 CFR 328, Regulatory Guidance Letter 05-05, the 1987 Wetland Delineation Manual, and/or the Regional Supplement to the 1987 Manual: Eastern Piedmont and Mountains v2.0: See the preliminary jurisdictional determination form dated 3/30/2023. D. Remarks: See approximate aquatic resources on map, "Figure 3, 0312212023" E. Attention USDA Program Participants This delineation/determinationhas been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may notbe valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) If you object to this determination, you may request an adin inistrativeappeal under Corps regulations at33CFRPart 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. Ifyourequest to appealthis determ ination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth StreetSW,FloorM9 Atlanta, Georgia 3 0303-8803 AND PH I L I P.A. SHANNIN&USACE.ARMY.MIL In order for an RFAto be accepted by the Corps, the Corps must determine that it is complete, thatit meets the criteria for appeal under 33 CFR part 331.5, andthat it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. * * It is not necessary to submit anRFAform to the Division Office if you do notobject to the determination in this correspondence.** Corps Regulatory Official: /> Date of JD: 3/30/2023 Expiration Date of JD: Not applicable SAW-2023-00665 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: Stantee Melissa Ruiz Address: 801 Jones Franklin Road Suite 300 Raleigh, NC 27606 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Microsoft Corporation, Chris Sanders File Number:SAW-2023-00665 Date:3/30/2023 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMITDENIAL C APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies yourrights and options regarding an administrative appealof the above decision. Additional information may be found at orhttp://www.usace.army.miUMissions/CivilWorks/Regulatory Pro aamandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and yourwork is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appealthe permit, including its terms and conditions, and approved jurisdictionaldeterminations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain term sand conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit yourright to appealthe permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a)modify the permit to address allof your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluatingyour objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appealthe permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and yourwork is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appealthe permit, including its terms and conditions, and approved jurisdictionaldeterminations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appealthe declined permit underthe Corps of Engineers Administrative AppealProcess by completing Section II of this form and sendingthe form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appealthe denialof a permit underthe Corps of Engineers Administrative AppealProcess by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept orappealthe approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appealthe approved JD. • APPEAL: If you disagree with the approved JD, you may appealthe approved JD under the Corps of Engineers Administrative AppealProcess by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which maybe appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe yourrea sons for appea ling the decision or your obj ections to an initial proffered permit in clear concise statements. You may attach additionalinformation to this form to clarify where yourreasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appealis limited to a review of the administrative record, the Corps memorandum forthe record of the a ppea I conference ormeeting, and any supplemental information that the review officerha s determined is needed to clarify the administrative record. Neither the appellant northe Corps may add new information oranalysesto the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regardingthis decision and/or the If you only have questions regardingthe appealprocess you may appealprocess you may contact: also contact: District Engineer, Wilmington Regulatory Division MR. PHILIP A. SHANNIN Attn: Krystynka B Stygar ADMINISTRATIVE APPEAL REVIEW OFFICER Charlotte Regulatory Office CESAD-PDS-O U.S Army Corps of Engineers 60 FORSYTH STREET SOUTHWEST, FLOOR M9 8430 University Executive Park Drive, Suite 615 ATLANTA, GEORGIA 30303-8803 Cha rlottc, No rth Carolina 28262 PHONE: (404) 562-5136; FAX(404) 562-5138 EMAIL: PHILIP.A.SHANNINna,USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appealprocess. You will be provided a 15-day notice of any site investigation, and will have the opportunity to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Krystynka B Stygar, 8430University Executive Park Drive, suite 615, Charlotte, North Carolina 28262 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CE SAD-PDO, 60 Forsyth Street, Room 10M15, Atla nta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 03/27/2023 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Microsoft Corporation, Chris Sanders, One Microsoft way, Redmond, WA 98052 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, CLT 10_Microsoft, SAW- 2023-00665 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: Project is located Northwest of the intersection of Old Maiden Road and Zeb Haynes Drive, near the town of Maiden, Catawba County, North Carolina. PIN(s):363707678981, 363707699340, 363708992517, 363711569552 and 363819608696 (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Catawba City: Maiden Center coordinates of site (lat/long in degree decimalformat): Latitude: 35.589794 Longitude: -81.235323 Universal Transverse Mercator: Name of nearestwaterbody: Clark Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): December 1, 2022 TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION Site Number Latitude Longitude Estimated Type of aquatic Geographic (decimal (decimal amountof resources (i.e., authority to which degrees) degrees) aquatic wetland vs. non- the aquatic resources in wetland waters) resource "may be" reviewarea subject (i.e., (acreage and Section 404or linear feet, if Section 10/404) applicable SA 35.589794 -81.235323 1009 LF Non -wetland waters Section 404 SA intermittent 35.589209 -81.232058 249 LF Non -wetland waters Section 404 SB 35.589069 -81.231642 102 LF Non -wetland waters Section 404 Sc 35.595089 -81.234077 1400 LF Non -wetland waters Section 404 SC Intermittent 35.595198 -81.2288170 74 LF Non -wetland waters Section 404 Clarks Creek 35.593939 -81.235291 5994 LF Non -wetland waters Section 404 1. The Corps of Engineers believes that there may bejurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or othergeneral permitverification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the rightto request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subjectpermit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative orjudicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be"waters of the U.S. and/or that there "maybe" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affectedby the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items are included in the administrative record and are appropriately cited: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: ® Data sheets prepared/submitted by or on behalf of the PJD requestor. Datasheets: ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: El Corps navigable waters' study: El U.S. Geological Survey Hydrologic Atlas: ❑USGS NHD data: ❑ USGS 8 and 12 digit HUC maps: ® U.S. Geological Survey map(s). Cite scale & quad name: 24 K : NEWTON ® Natural Resources Conservation Service Soil Survey. Citation: Catawba County Soil Survey ®Nationalwetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-yearFloodplain Elevation is: (National Geodetic Vertical Datum of 1929) ❑Photographs: ❑ Aerial (Name & Date): or ❑ Other (Name & Date): ❑Previous determination(s). File no. and date of response letter: ❑Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corns and should not be relied upon for later jurisdictional determinations. SigrKature and da e of Regulatory staff member completing PJD 3/30/2023 Signature and date of person requesting PJD (REQUIRED, unless obtainingthe signature is impracticable)' 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respondwithin the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action_ Legend EJ Project Study Area Potential Jurisdictional Streams - Perennial _ Potential Jurisdictional Streams - Intermittent Notes 1. Coordinate System: NAD 1983 State Plane North Carolina RIPS 3200 Feet 2. Data Sources: 3. Background: Source: Een, Maxar, GeoEye, Earth star Geographics, CNES/Airbus DS, USDA, U SGS, AeroGRID, IGN, and the GIs User Community 5��300 N metres (At original document size of B.Sx 11) 1:12,000 ® Stantec ■ Pmject Location Prepared by GRG on 2023-02-01 TR by ALC on 2023-03-22 Catawba County, NC IR Review by MMR on 2023-03-22 CMent/Pmject 203401902 REVB Microsoft CLT10 Data Center Preliminary Jurisdictional Determination Potential Jurisdictional Features. Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness ofthis information and shall not be responsible for any errors or omissions which may be incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness ofthe data. ® Stantec To: Krysta Stygar USACE Charlotte Field Office Project/File: Microsoft Data Centers Reference: CLT10 Boyd Farm Data Center From: Melissa Ruiz Raleigh Date: January 24, 2023 Microsoft proposes to construct a data center at a site referred to as CLT10 Boyd Farm Data Center northwest of Maiden in Catawba County. Stantec reviewed the existing natural resource investigations completed by Black and Veatch in July 2022. A site visit was completed on December 1, 2022, to evaluate current conditions. Stantec reevaluated portions of Black and Veatch's jurisdictional waters delineation and changes were made to streams extents and classification based on local regulatory experience. Wetland extents were not changed and a summary by Black and Veatch of the wetland characteristics is attached. Also please find a preliminary jurisdictional determination (PJD) packet for your review. Microsoft and its consultants will use the PJD information in order to avoid and minimize impacts to waters of the U.S. (WOUS) to the maximum extent possible. The Boyd Farm site consists of Catawba County tax parcels #363707678981, 363707699340, 363708992517, 363711569552, and 363819608696 (Subject Parcels). Three wetlands and 4 streams were delineated totaling approximately 0.09 acres wetland and of 8,828 linear feet of stream. Thank you, PWS Principal Phone: 919-865-7529 Mobile: 919-649-0545 melissa.ruiz@stantec.com Attachment: Field Investigation Summary Vicinity Map USGS Figure USDA-NRCS Soil Survey Figure NWI Figure JD Features Data Forms Photos Design with community in mind Black and Veatch Onsite Delineation Survey Results Wetland Delineation Sample Points 0 Three wetlands were delineated during survey activities and were designated PEM1, PEM2, and PEM3. Total acreage for each delineated wetland is as follows: PEM1, 0.05 acre; PEM2, 0.03 acre; and PEM3, 0.01 acre. Representative sample points were taken at wetland and upland locations to confirm wetland criteria and wetland boundaries, resulting in a total of six documented sample points. Delineated wetlands are depicted on Figure 4-2 and photographs of sample points are available in Appendix B. USACE Wetland Determination Data Forms are located in Appendix C. Sample Point WET1 (taken within wetland PEM1): The dominant vegetation was Commelina diffusa, which has a facultative wetland (FACW) hydric rating. Vegetation met both the dominance and prevalence index hydrophytic vegetation indicators. Prominent redox concentrations were observed in soil at a depth of 0 to 13 inches. The soil matrix color was recorded as 10YR 4/4 to 10YR 4/3 with 25 percent redox concentrations of color 2.5YR 3/6. Given the local concave relief, it was determined that soils would meet the F8 hydric soil indicator for redox depressions. The soil was saturated and showed evidence of oxidized rhizospheres on living roots, meeting both A3 and C3 wetland hydrology indicators. Sample point WET1 was determined to be within a palustrine emergent wetland. Sample Point UPL1 (taken near wetland PEM1): The vegetation varied from Acer negundo (facultative; FAC) and Juniperus virginiana (facultative upland; FACU) in the tree stratum to Microstegium vimineum (FAC) in the herb stratum. Overall, vegetation passed the dominance test for hydrophytic vegetation. Soil color was observed to be 10YR 5/6 from 0 to 12 inches with no redox features. No wetland hydrology indicators were observed. This was determined an upland sample point. Sample Point WET2 (taken within wetland PEM2): The vegetation on the site was dominated by Scirpus cyperinus (FACW) and Ludwigia palustris (obligate; OBL). Vegetation met both the dominance and prevalence index hydrophytic vegetation indicators. Soil matrix color at the point was recorded as 10YR 4/2 with 25 percent redox concentrations of color 5YR 4/6. It was determined that soils met both depleted matrix (F3) and redox depressions (F8) hydric soil indicators. Soil saturation was present at the surface and oxidized rhizospheres were observed, meeting both A3 and C3 wetland hydrology indicators. Though no standing water was present at the time of sampling, the presence of Ludwigia palustris indicates that shallow, ponded water occurs within this feature in most years. Sample point WET2 was determined to be within a palustrine emergent wetland. Sample Point UPI-2 (taken near wetland PEM2): Dominant vegetation at the sample point varied across strata from Acer negundo (FAC) to Solidago altissima (FACU) to Lonicera japonica (FACU). Overall, the vegetation passed the dominance test for hydrophytic vegetation. Soil color was recorded as 7.5YR 4/4 from 0 to 12 inches with no redox features. No wetland hydrology indicators were observed. This was determined an upland sample point. Sample Point WET3 (taken within wetland PEM3): Dominant vegetation at the sample point was Scirpus polyphyllus (OBL) and an unidentified species of Sagittaria (assumed OBL). Vegetation met both the dominance and prevalence index hydrophytic vegetation indicators. Soil matrix color was recorded to be 7.5YR 4/1 with 20 percent redox concentrations of color 7.5YR 4/6. It was determined that soils met both depleted matrix (F3) and redox depressions (F8) hydric soil indicators. Oxidized rhizospheres were observed on living roots, meeting the C3 indicator for wetland hydrology. Sample point WET3 was determined to be in a palustrine emergent wetland. Sample Point UPL3 (taken near wetland PEM3): Dominant vegetation at the sample point included Liquidambar styraciflua (FAC), Froxinus pennsylvanica (FACW), Pyrus calleryana (upland; UPL), and Microstegium vimineum (FAC). Overall, vegetation passed the dominance test for hydrophytic vegetation. Soil matrix color was recorded to be 7.5YR 4/4 throughout the 12-inch depth sample. No wetland hydrology indicators were observed. This was determined an upland sample point. Design with community in mind urisdictional Determination Reauest US Army Corps of Engineers. Wilmington District This form is intended for use by anyone requesting a jurisdictional determination (JD) from the U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all supporting information, as described within each category, with your request. You may submit your request via mail, electronic mail, or facsimile. Requests should be sent to the appropriate project manager of the county in which the property is located. A current list of project managers by assigned counties can be found on-line at: http://www.saw.usace.aimy.mil/Missions/Re ul�atoiyPermitProi4ram/Contact/CountyLocator.aspx, by calling 910-251-4633, or by contacting any of the field offices listed below. Once your request is received you will be contacted by a Corps project manager. ASHEVILLE & CHARLOTTE REGULATORY FIELD OFFICES US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 General Number: (828) 271-7980 Fax Number: (828) 281-8120 RALEIGH REGULATORY FIELD OFFICE US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 General Number: (919) 554-4884 Fax Number: (919) 562-0421 INSTRUCTIONS: WASHINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 2407 West Fifth Street Washington, North Carolina 27889 General Number: (910) 251-4610 Fax Number: (252) 975-1399 WILMINGTON REGULATORY FIELD OFFICE US Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 General Number: 910-251-4633 Fax Number: (910) 251-4025 All requestors must complete Parts A, B, C, D, E, F and G. NOTE TO CONSULTANTS AND AGENCIES: If you are requesting a JD on behalf of a paying client or your agency, please note the specific submittal requirements in Part H. NOTE ON PART D — PROPERTY OWNER AUTHORIZATION: Please be aware that all JD requests must include the current property owner authorization for the Corps to proceed with the determination, which may include inspection of the property when necessary. This form must be signed by the current property owner(s) or the owner(s) authorized agent to be considered a complete request. NOTE ON PART D - NCDOT REQUESTS: Property owner authorization/notification for JD requests associated with North Carolina Department of Transportation (NCDOT) projects will be conducted according to the current NCDOT/USACE protocols. NOTE TO USDA PROGRAM PARTICIPANTS: A Corps approved or preliminary JD may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should also request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Version: May 2017 Page 1 Jurisdictional Determination Request A. PARCEL INFORMATION Street Address: 1250 OLD MAIDEN RD City, State: Maiden, North Carolina County: Catawba Parcel Index Number(s) (PIN): See parcel list B. REQUESTOR INFORMATION Name: Stantec. Melissa Ruiz Mailing Address: 801 Jones Franklin Rd. Suite 300 Telephone Number: Electronic Mail Address: Select one: Raleigh, NC 27606 (919) 649-0545 melissa.ruiz@stantec.com I am the current property owner. I am an Authorized Agent or Environmental Consultanti Interested Buyer or Under Contract to Purchase Other, please explain. C. PROPERTY OWNER INFORMATION Name: Microsoft Corporation, Chris Sander Mailing Address: One Microsoft Way Redmond, WA 98052 USA Telephone Number: (434)-584-1390 Electronic Mail Address: chsander@microsoft.com; lexijones@r 1 Must provide completed Agent Authorization Form/Letter. 2 Documentation of ownership also needs to be provided with request (copy of Deed, County GIS/Parcel/Tax Record). Version: May 2017 Page 2 Parcel Number Address 363711569552 1250 OLD MAIDEN RD 363707678981 363707699340 363819608696 363708992517 Jurisdictional Determination Request D. PROPERTY ACCESS CERTIFICATION',4 By signing below, I authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on - site investigations, if necessary, and issuing a jurisdictional determination pursuant to Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, the undersigned, am either a duly authorized owner of record of the property identified herein, or acting as the duly authorized agent of the owner of record of the property. Melissa Ruiz Print Name Capacity: ❑ Owner Z Authorized Agent' Date E. REASON FOR JD REQUEST: (Check as many as applicable) ❑ I intend to construct/develop a projector perform activities on this parcel which would be designed to avoid all aquatic resources. ❑ I intend to construct/develop a projector perform activities on this parcel which would be designed to avoid all jurisdictional aquatic resources under Corps authority. ❑✓ I intend to construct/develop a projector perform activities on this parcel which may require authorization from the Corps, and the JD would be used to avoid and minimize impacts to jurisdictional aquatic resources and as an initial step in a future permitting process. ❑ I intend to construct/develop a projector perform activities on this parcel which may require authorization from the Corps; this request is accompanied by my permit application and the JD is to be used in the permitting process. ❑ I intend to construct/develop a project or perform activities in a navigable water of the U.S. which is included on the district Section 10 list and/or is subject to the ebb and flow of the tide. ❑ A Corps JD is required in order obtain my local/state authorization. ❑ I intend to contest jurisdiction over a particular aquatic resource and request the Corps confirm that jurisdiction does/does not exist over the aquatic resource on the parcel. ❑ I believe that the site may be comprised entirely of dry land. ❑ Other: ' For NCDOT requests following the current NCDOT/USAGE protocols, skip to Part E. a If there are multiple parcels owned by different parties, please provide the following for each additional parcel on a continuation sheet. s Must provide agent authorization form/letter signed by owner(s). Version: May 2017 Page 3 Jurisdictional Determination Request F. JURISDICTIONAL DETERNIINATION (JD) TYPE (Select One) 7 I am requesting that the Corps provide a preliminM JD for the property identified herein. A Preliminary Jurisdictional Determination (PJD) provides an indication that there may be "waters of the United States" or "navigable waters of the United States"on a property. PJDs are sufficient as the basis for permit decisions. For the purposes of permitting, all waters and wetlands on the property will be treated as if they are jurisdictional "waters of the United States". PJDs cannot be appealed (33 C.F.R. 331.2); however, a PJD is "preliminary" in the sense that an approved JD can be requested at any time. PJDs do not expire. ❑ I am requesting that the Corps provide an approved JD for the property identified herein. An Approved Jurisdictional Determination (AJD) is a determination that jurisdictional "waters of the United States" or "navigable waters of the United States" are either present or absent on a site. An approved JD identifies the limits of waters on a site determined to be jurisdictional under the Clean Water Act and/or Rivers and Harbors Act. Approved JDs are sufficient as the basis for permit decisions. AJDs are appealable (33 C.F.R. 331.2). The results of the AJD will be posted on the Corps website. A landowner, permit applicant, or other "affected party" (33 C.F.R. 331.2) who receives an AJD may rely upon the AJD for five years (subject to certain limited exceptions explained in Regulatory Guidance Letter 05- 02). ❑ I am unclear as to which JD I would like to request and require additional information to inform my decision. G. ALL REQUESTS Map of Property or Project Area. This Map must clearly depict the boundaries of the review area. ✓❑ Size of Property or Review Area 292.43 acres. ❑ The property boundary (or review area boundary) is clearly physically marked on the site. Version: May 2017 Page 4 Jurisdictional Determination Request H. REQUESTS FROM CONSULTANTS Project Coordinates (Decimal Degrees): Latitude: 35.59474 Longitude:-81.230705 A legible delineation map depicting the aquatic resources and the property/review area. Delineation maps must be no larger than 1 Ix 17 and should contain the following: (Corps signature of submitted survey plats will occur after the submitted delineation map has been reviewed and approved).6 ■ North Arrow ■ Graphical Scale ■ Boundary of Review Area ■ Date ■ Location of data points for each Wetland Determination Data Form or tributary assessment reach. For Approved Jurisdictional Determinations: ■ Jurisdictional wetland features should be labeled as Wetland Waters of the US, 404 wetlands, etc. Please include the acreage of these features. ■ Jurisdictional non -wetland features (i.e. tidal/navigable waters, tributaries, impoundments) should be labeled as Non -Wetland Waters of the US, stream, tributary, open water, relatively permanent water, pond, etc. Please include the acreage or linear length of each of these features as appropriate. ■ Isolated waters, waters that lack a significant nexus to navigable waters, or non - jurisdictional upland features should be identified as Non -Jurisdictional. Please include a justification in the label regarding why the feature is non jurisdictional (i.e. "Isolated", "No Significant Nexus", or "Upland Feature"). Please include the acreage or linear length of these features as appropriate. For Preliminary Jurisdictional Determinations: Wetland and non -wetland features should not be identified as Jurisdictional, 404, Waters of the United States, or anything that implies jurisdiction. These features can be identified as Potential Waters of the United States, Potential Non -wetland Waters of the United States, wetland, stream, open water, etc. Please include the acreage and linear length of these features as appropriate. Completed Wetland Determination Data Forms for appropriate region (at least one wetland and one upland form needs to be completed for each wetland type) 6 Please refer to the guidance document titled "Survey Standards for Jurisdictional Determinations" to ensure that the supplied map meets the necessary mapping standards. hM2://www.saw.usace.4rmy.mil/Missions/Regulatoly-Permit- Pro gram/Jurisdiction/ Version: May 2017 Page 5 Jurisdictional Determination Request F4Completed appropriate Jurisdictional Determination form • PJDs, please complete a Preliminary Jurisdictional Determination Form' and include the Aquatic Resource Table • AJDS• please complete an Approved Jurisdictional Determination Form'. Vicinity Map Aerial Photograph USGS Topographic Map Soil Survey Map Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site Plan, previous delineation maps, LIDAR maps, FEMA floodplain maps) Landscape Photos (if taken) NCSAM and/or NCWAM Assessment Forms and Rating Sheets NC Division of Water Resources Stream Identification Forms hJ Other Assessment Forms ' www.saw.usace.4rmy.mil/Portals/59/docs/regulatory/readocs/JD/RGL 08-02_App A Prelim _JD_Form fillable.pdf 8 Please see hM2://www.saw.usace.4M.mil/Missions/Regulatory-Permit-Program/Jurisdiction/ Principal Purpose: The information that you provide will be used in evaluating your request to determine whether there are any aquatic resources within the project area subject to federaljurisdiction under the regulatory authorities referenced above. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public, and may be made available as part of a public notice as required by federal law. Your name and property location where federal jurisdiction is to be determined will be included in the approved jurisdictional determination (AJD), which will be made available to the public on the District's website and on the Headquarters USAGE website. Disclosure: Submission of requested information is voluntary; however, if information is not provided, the request for an AJD cannot be evaluated nor can an AJD be issued. Version: May 2017 Page 6 Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: January 24, 2023 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Melissa Ruiz, 801 Jones Franklin Rd. Suite 300 Raleigh, NC 27606 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County/parish/borough: Catawba City: Maiden Center coordinates of site (lat/long in degree decimal format): Lat.: 35.594740 Long.:-81.230705 Universal Transverse Mercator: Name of nearest waterbody: Clark Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ■❑ Field Determination. Date(s): June 28-30, 2022; November 10, 2022 TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resource in review area (acreage and linear feet, if applicable) Type of aquatic resource (i.e., wetland vs. non -wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) See Attached Site Number Latitude Longitude Estimated Type of Geographic (decimal (decimal amount of aquatic authority to degrees) degrees) aquatic resource (i.e., which the resource in wetland vs. aquatic review area non -wetland resource "may (acreage and waters) be" subject linear feet, if (i.e., Section applicable) 404 or Section 10/404 PEM1 35.599205 -81.232771 0.05 ac Wetland Section 404/401 PEM2 35.600955 -81.231508 0.03 ac Wetland Section 404/401 PEM3 35.598228 -81.233267 0.01 ac Wetland Section 404/401 SA 35.589794 -81.235323 1,009 if Non -wetland Section waters 404/401 SA 35.589209 -81.232058 249If Non -wetland Section Intermittent waters 404/401 SIB 35.589069 -81.231642 102If Non -wetland Section waters 404/401 SC 35.595089 -81.234077 1,400If Non -wetland Section waters 404/401 SC 35.595198 -81.228817 74If Non -wetland Section Intermittent waters 404/401 Clark's Creek 35.593939 -81.235291 5,994 If Non -wetland Section waters 404/401 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre - construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ■❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: 0 Data sheets prepared/submitted by or on behalf of the PJD requestor. ❑ Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ■❑ U.S. Geological Survey map(s). Cite scale & quad name: 24K Newton ■❑ Natural Resources Conservation Service Soil Survey. Citation: Catawba County Soil Survey ■❑ National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: .(National Geodetic Vertical Datum of 1929) ❑ Photographs: ❑ Aerial (Name & Date): or ❑ Other (Name & Date): ❑ Previous determination (s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory staff member completing PJD Signature nd date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' ' Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. So 51ephers � - 'Arryq}I Hickory Reekup. LyFe Cr e _ Lnrq Via,. - Gov gpe I I nil ri i . •.1Yf. -, .i Claanlo n[ . N.-klord y .. ... s° ,s O 2 41 Ntnlon L�I.•i. ;IE7 tt a. r,b unman Tp C " "It r '.nr Flix 1 FC 'sk SR,yrc Lace ,• c,�ek c`r P 4^Acri " May�.]w Lreev an' F rny' Parr y Lrc � e,F �Fce* ra`n 'A A.v-_% it - 14an � 1 H ow4r •'.r s C,n�. C c ,ern L� �x ,t Rxkavry�+ Lur .. Iril •ir Iron :J-t11?r1 r'o 0 2,500 5,000 N Legend metres a Project Study Area (At original document size of 8.5x11) 1:201,220 ® Stantec ■ Pmject Location Prepared by GRG on 2022-12-01 TR by AL C on 2022-12-0. Catawba County, NC IR Review by MMR on 2022-12-20 Client/Project 203401902 REVA Microsoft Notes CLT10 Data Center 1. Coordinate System: NAD 1983 StatePlane North Preliminary Jurisdictional Determination Carolina FIPS 3200 Feet Figure No. 2. Data Sources: Catawba County Parcels data 1 3. Background: Sources: Esn, HERE, Gannin, Intermap, increment P Corp., GEBCO, USGS, FAO, Tale NPS, NRCAN, GeoBase, IGN, Kadaster NL, Vicinity Map. Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which may be incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness of the data. • � 1 f 1 y "�� pG�p ' 1. ,I "N. • Cyr^= � ■ • . • �� � } � � � '� , •- �., CCf��� f - � � A I• I G 00 �. • , �. -o I ' �ti--�"� .` l , ; �� —.:-_ ram._ !. ' �� k •A�'� � f�r I 1 • : T ¢r �� ` 1.6 0 300 600 n Legend metres a Project Study Area At original document size of B.6x11) 1:24,000 ® Stantec ■ Project Location Prepared by GRG on 2022-12-07 TR by ALC on 2022-120' Catawba County, NC IR Review by MMR on 2022-12:20 Client/Project 203401902 REVA Microsoft Notes CLT10 Data Center 1. Coordinate System: NAD 1983 StatePlane North Carolina FIPS 3200 Feet Preliminary Jurisdictional Determination 2. Data Sources: Catawba County Parcels data Figure No. 2 3. Background: Sources: Esn, HERE, Gannin, Intermap, increment P Corp., GEBCO, USGS, FAO, Tale NPS, NRCAN, GeoBase, IGN, Kadaster NL, Project .Study Area Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which may be incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness of the data. o` O o g Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness of this information and shall not be responsible for any v errors or omissions which may be incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness of the data. U • t i' - �� p1 F ir zf� • s i r , � r 04 4* = • S r It A ' � M 0 140 280 N Legend metres a Project Study Area (At original document size of 8.5x11) 1:11,362 Potential Jurisdictional Streams - _ Perennial Potential Jurisdictional Streams - ® Stantec ■ _ Intermittent Pmject Location Prepared by GRG on 2022-12-07 USACE Data Points TR by Al on 2022-12-OB Catawba County, NC IR Review by MMR on 2022-12-20 Client/Project 203401902 REVA Microsoft Notes CLT10 Data Center 1. Coordinate System: NAD 1983 StatePlane North Carolina FIPS 3200 Feet Preliminary Jurisdictional Determination 2. Data Sources: Esri, Maxar, Earthstar Geographics, Figure No. 3 and the GIs User Community 3. Background: Esri, HERE, Garmin, (c) Tale OpenStreetMap contributors, and the GIs user Potential Jurisdictional Features. community 4. Field Date(s): June 28-30, 2022 by Black & Veatch, November 10, 2022 by Stantec Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY Figure 3-4 USFWS NWI Features Site CLT10, Boyd Farm- Catawba County, North Carolina = NWI Features = Site Boundary 0 0.25 0.5 0.75 Miles J.England, N. Pellegrini July 20, 2022 Figure 3-4 USFWS NWI Features BLACK & VEATCH I Preliminary Data Gathering and Synthesis 0. BLACK & VEATCH Sources: Esri Topo (basemap) Projection:NAD 1983 StatePlane North.Carolina—FIPS 3200 Feet 3-8 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY Figure 3-5 MRCS Soil Map Units Site CLT10. Boyd Farm, Catawba County. North Carolina BLACK & VEATCH Site Boundary NRCS Soil Map Units Selected Hydric Sails 025 0.5 0.75 1 Mlles Swrcem. Er r. arf212} (bm m ap] J. Enp lend_ N. PaIW ini J u it/ 20. 2022 PA*wdiw.NAD_15�3_StafePfane_Mwil:_carof+na_ rips _3200_Feet Figure 3-5 NRCS Soil Map Units BLACK & VEATCH I Preliminary Data Gathering and Synthesis 3-9 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY U.S. Army Carps of Engineers 0MR cont, k a7}a-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ER11i TR-07-24: the proponent agency is CECW-CO-R {Authority: AR 335.15, paragraph 5.2a) ProjecltlSite: MSFT - Boyd CitylCounty: Catawba County Sampling Date: M29122 ApplicantlCwner: State: NC Sampling Point: WET1 Investigator(s): Richter/Symonds Section, Township, Range: North Carolina is a non-PLSS region Landform (hillside, terrace, etc.): floodplain LccaI relief (concave, convex, none): concave Slope (%): 0-1% Subregion (LRR or MLRA]: LRR P, MLRA 136 Lat: 35.59919 Long:-81.23277 Datum: NAD'83 Soil Map Unit Name: ChA, BuB -see soils remarks forfull map unit names NWI classification: PUBF Are climatic 1 hydrologic conditions on the site typical for this time of year? Yes X No _ (If no, explain in Remarks.) Are Vegetation _, Soil _, or Hydrology_ significantly disturbed? Are "Normal Circumstances' present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. IHydrophytio Vegetation Present? Yes X No Is the Sampled Area I Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: PUBF = Palustrine, Unconsolidated Bottom, Semipermanently Flooded HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two reauired) Primary Indicators {minimum of one is reouiredi check all that si _Surface Soil Cracks (B6) _Surface Water (At) _True Aquatic Plants (B14) _Sparsely Vegetated Concave Surface (138) _High Water Table (A2) _Hydrogen Sulfide Odor (Cl) _Drainage Patterns (510) X Saturation (A3) X Oxidized Rhizospheres on Living Roots (C3) Moss Trim Lines IS16) _Water Marks (1131) Presence of Reduced Iran (04) Dry -Season Water Tabla (C2) Sediment Deposits (82) _Recent Iron Reduction in Tilled Sails (C6) _Crayfish Burrows (C5) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Met or Crust (Ii _Other (Explain in Remarks) _Stunted or Stressed Plants (DI) Iron Deposits (85) X Geomorphic Position (02) Inundation Visible on Aerial Imagery (137) Shallow Aquitard (133) —Water-Stained Leaves (139) _Microtopographic Reliaf (D4) _Aquatic Fauna (1313) X FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Wale rTable Present? Yes No X Depth (inches): Saturation Present? Yes X No Depth (inches): 0 Wetland Hydrology Present? Yes X No includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections). If available: Remarks: sample location occurs within FEMA Zane AF 100-year flood hazard area - ENG FORM 6116-4-SG, JItL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-2 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY VEGETATION (Four Strata) - Use scientific names cf plants. sampling Point: WET1 Absolute Dominant Indicator Tree Stratum (Plot size: 30 =I. r. ) % Cover Species? Status Dominance Test worksheets 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC 1 (A) 3. Total NLim berof Dominant 4, Species Across All Strata: 1 {B) 5- Percent of Dominant Species 6. That Are OBL, FACW, or FAD, 100.0% {AIB} 7. Prevalence Index worksheets =Total Cover Total %Coverof: Multiply by: 50% of total cover: 20% of total cover: QBL species 0 x 1 = 0 SaolinolShrub Stratum (Plot size: 15 ft r. } FACW species 100 x 2 = 200 1. FAG species 0 x 3 = D 2. FACU species 0 x 4 = 0 3- Ill species 0 x 5 = 0 4. Column Totals: 100 (A) 200 (B) 5. Prevalence Index = BIA = 2M B- Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic. Vegetation 8, X 2 - Dominance Test is �50% 9. X 3 - Prevalence Index is s3 0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover, 20% of total cover data in Remarks or on a separate sheet) Herb Stratum (Plot size: 5 ft. r. ) _ Problematic Hydrophytic Vegetation' (Explain) 1. Commelina diffusa 100 Yes FACW 11indicators of hydric soil and wetland hydrology must be 2. present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4• Tree - Woody plants, excluding vines, 3 in. (7,15 cm) or 5• more in diameter M breast height (DBH), regardless of 8 height. 7• Saplingl5hrub - Woody plants, excluding vines, less 8, than 3 in. Di and greater than or equal to 3.28 R 9. (1 m)tail. 10 Herb -All herbaceous (non -woody) plards, regardless 11 of size, and woody plants less than 3 2B ft tall. 1 DO =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: s0 20% of total cover: 20 height. Woody Vine Stratum (Plot size: 30 ft, r- } 1. 2. 3. 4, 5. Hydrophytic -Total Cover Vegetation 50% of total cover 20% of total cover: Present? Yes X No Remarks (Include photo numbers here or on a separate sheet.) EN FORM 6116-4-SG, Jl1L 2018 Eastern Mountains and Piedmont- Version 2.0 BLACK & VEATCH I Appendix C C-3 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY SOIL Sampling Point WETS Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators_) Depth Matrix Redox Features inches Color (moist] F Color (moist) I Type Loc Texture Rema ks 0-10 10YR 414 75 2.5YR 316 25 C PLIM LoamylClayey Prominent redox concentrations 10-13 10YR 413 75 2.5YR 316 25 C PLIM LoamylClayey Prominent redox concentrations 13-16 5Y 311 100 Mucky Loarri greasy texture 'Type: C=Concentration, D=De letion, RM=Reduced Matrix, MS=Masked Sand Grains. 21-ocation PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric I ls3: Histosol (Al) �HisticEpipedon Polyvalue Below Surface (SS) (MLRA 147,148) 2 cm Muck (At 0) (MLRA 147) (A2) _Thin Dark Surface (S9) (MLRA 147, 148) _Coast Prairie Redox (A16) _ Slack H islic(A3) _ Loamy Mucky Mineral (F1){MLRA 136) (MLRA 147, 10) _Hydrogen Sulfide (A4) _Loamy Gleyed Matdx (F2) _Piedmont Flocdplain Soils (F19) _Stratified Layers (A5) _Depleted Matrix(F3) (MLRA136, 147) _2 cm Muck (A10) (LRR N) Redox Dark Surface (F6) Red Parent Material (F21) `_Depleted _Depleted Below Dark Surface (Ali) Dark Surface (F7) (outside MLRA 127, 147, 148) Thick Dark Surface (Al2) X Redox Depressions (F8) Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _Iron -Manganese Masses IF12) (LRR N, _other (Explain in Remarks) Sandy Gleyed Matrix (54) MLRA 136) _ Sandy Redox (S5) Urnbric Surface (F13) (MLRA 122, 136) 31ndicators of hydrophytic vegetation and _Stripped Matrlx(S6) _Piedmont Fldodplain Soils (F19) (MLRA 148) wetland hydrology mustbe present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Type' Depth (inches): Hydric Soil Present? Yes X No Remarks' ChA = Chewacla loam, 0 to 2 percent slopes, frequently flooded, noted as an NRCS hydric soil map unit. BuB = Buncombe loamy sand, 0 to 5 percent slopes, frequently flooded, not listed as an NRCS hydric soil map unit- Both soil map units listed as map unit boundary line approximately bisects the sample point location. ENO FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-4 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY U.S. Army Carps of Engineers 0MR cont, A, a7}a-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ER11i TR-07-24: the proponent agency is CECW-CO-R {Aufhorilyr AR 335.15, paragraph 5.2a) ProjectlSite: MSFT - Boyd CitylCounty: Catawba County Sampling Date: M29122 ApplicantlOwner: State: NC Sampling Point: UPL1 Investigator(s): Richter/Symonds Section, Township, Range: North Carolina is a non-PLSS region Landform (hillside, terrace, etc.): upland LccaI relief (concave, convex, none)! hillslope Slope (%)! 3-50% Subregion (LRR or MLRA]: LRR P, MLRA 138 Lat: 35.59904 Long:-81.23284 Datum: NAD'83 Soil Map Unit Name: Bub -5ee soils remarks for full map unit name NWI classification: none Are climatic 1 hydrologic conditions on the site typical for this time of year? Yes X No _ (If no, explain in Remarks.) Are Vegetation _, Soil _, or Hydrology_ significantly disturbed? Are "Normal Circumstances' present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling paint locations, transects, important features, etc. Hydrophytio Vegetation Present? Yes x No I Is the Sampled Area Hydric Soil Present? Yes_ No X within aWetland? Yes_ No X Wetland Hydrology Present? Yes_ No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two reauired] Primary Indicators {minimum of one is reouiredi check all that aonly) _Surface Soil Cracks (B6) _Surface Water (At) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (B8) _High Water Table (A2) _Hydrogen Sulfide Odor (Cl) _Drainage Patterns (B10) Saturation (A3) Oxidized Rhizospheres on Living Roots (C3) Moss Trim Lines IS16) —Dry-Season _Water Marks (B1) _Presence of Reduced Iran (04) Water Tabla (C2) Sediment Deposits (82) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) —Drift Deposits (133) —Thin Muck Surface (U) _ Saturation Visible on Aerial Imagery (C9) _Algal Met or Crust (Ii _Other (Explain in Remarks} _Stunted or Stressed Plants (DI) Iron Deposits (85) Geomorphic Position (02) --Shallow _Inundation Visible on Aerial Imagery (87) Aquitard (133) —Water-Stained Leaves (139) Microtopographic Reliaf (D4) _Aquatic Fauna (1313) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes_ No X Depth (inches) Wetland Hydrology Present? Yea_ No x includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections). If available: Remarks' sample location occurs within FEMA Zane AF 100-year flood hazard area - ENG FORM 6116-4-SG, JItL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-5 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY VEGETATION (Four Strata) - Use scientific names of plants. sampling Point: UPL1 Absolute Dominant Indicator Tree Stratum (Plot size: 30 =I. r. ) % Cover Species? Status Dominance Test worksheets 1. Acernegundo 30 Yes FAC Nu mber of Dom I n ant Sped es 2, Juniperus Orginiana 20 Yes FACU That Are OBL, FACW, or FAC 5 (A) 3. Acerrubrum 15 No FAC Total NLim berof Dominant 4. Morus rubra 15 No FACU Species Across All Strata: 9 {B) 5. Linodendr❑n Mipifera 10 N❑ FACU Percent of Dominant Species 6. Prunus serotins 5 No FACU That Are OBL, FACW, or FAC, 55.6% (AJB) 7. Prevalence Index worksheets 95 =Total Cover Total %Cover oi: Multiply by: 501% of total cover: 48 20% of total cover: 19 QBL species 0 x 1 = 0 SaolinolShruh Stratum (Plot size: 15 ft r. } FACW species 14 x 2 = 28 1. Pyrus calleryana 10 Yes UPL FAC species 105 x 3 = 405 2. Ligustrum vulgare 5 Yes FACU FACU species 65 x 4 = 280 3- Acer neguxlo 5 Yes FAC UPL species 20 x 5 = 100 4. Column Totals: 234 (A) 793 (B) 5. Prevalence Index = BIA = 3.39 B- Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic. Vegetation 8, X 2 - Dominance Test is �60% 9. 3 - Prevalence Index is s3 0' 20 =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover, 10 20% of total cover 4 data in Remarks or on a separate sheet) Herb Stratum (Plot size: 5 ft. r. ) _ Problematic Hydrophytic Vegetation' (Explain) 1. Microsregium vimineum 80 Yes FAC ' Indicators of hydric soil and wetland hydrology must be 2. FVyslicfvum acrosflchaldes 10 No UPL present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Ligustrum vulgare 5 No FACU 4, Pilea purnile 2 No FACW Tree - Woody plants, excluding Vines, 3 in. (7,6 cm) or 5. Fraxinus ponnsylvanica 2 No FACW more in diameter M breast height (DBH), regardless of 6 height. 7• Saplingl5hrub - Woody plants, excluding vines, less g, than 3 in. Di and greater than or equal to 3.28 R (1 m)tail. 10 Herb -All herbaceous (non -woody) plants, regardless 11 nt size, and woody plants less than 3 2B ft tali. 99 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 50 20% of total cover: 20 height. Woody Vine Stratum (Plot size: 30 ft, r. } 1. Vilis riparia 10 Yes FACW 2. L❑nkera japonica 5 Yes FACU 3. 6ignonia capreolala 5 Yes FAC 4, 5, Hydrophytic 20 -Total Cover Vegetation 50% of total cover 10 20% of total cover: 4 Present? Yes X No Remarks (Include photo numbers here or on a separate sheet.) EN FORM 6116-4-SG, Jl1L 2018 Eastern Mountains and Piedmont- Version 2.0 BLACK & VEATCH I Appendix C C-6 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY SOIL Sam piing Point UPI. 1 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators_) Depth Matrix Redox Features inches Color (moist) Color (moist) I Type Loc Texture Remarks 0-12 10YR 516 109 LoamylClayey limited sand present in soil 'Type: C=Concentration, D=De letion, RM=Reduced Matrix, MS=Masked Sand Grains. 21-ocation PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric I ls3: Histosol (Al) �HisticEpipedon _Polyvalue Below Surface (SS) (MLRA 147,148) 2 cm Muck (At0) (MLRA 147) (A2) _Thin Dark Surface (S9) (MLRA 147, 148) _Coast Prairie Radox (A16) _ Slack H islic(A3) _Loamy Mucky Mineral (F1){MLRA 136) (MLRA 147, 10} _Hydrogen Sulfide (A4) _Loamy Gleyed Matdx (F2) _Piedmont Floodplain Soils (F19) _Stratified Layers (A5) _Depleted Matrix(F3) (MLRA136, 147) _2 cm Muck (A10) (LRR N) Redox Dark Surface (F6) `_Depleted Red Parent Material (F21) _Depleted Below Dark Surface (Ali) Dark Surface (F7) (outside MLRA 127, 147, 149) Thick Dark Surface (Al2) Redox Depressions (F8) Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _Iron -Manganese Masses IF12) (LRR N, _other (Explain in Remarks) Sandy Gleyed Matrix (54) MLRA 136) _ Sandy Redox (S5) Urnbric Surface (F13) (MLRA 122, 136) 31ndicators of hydrophytic vegetation and _Stripped Matrlx(S6) _Piedmont Fldodplain Soils (F19) (MLRA 148) wetland hydrology m ust be present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Type Depth (inches): Hydric Soil Present? Yes No X Remarks' Bug = Buncombe loamy sand, 0 to 5 percent slopes, frequently flooded, not listed as an NRCS hydric soil map unit. ENO FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-7 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY U.S. Army Carps of Engineers 0MR cont, A, a7}a-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ERIJCIEL TR-07-24: the proponent agency is CECW-CO-R {Authority: AR 335.15, paragraph 5.2a) ProjecitlSite: MSFT - Boyd CitylCounty: Catawba County Sampling Date: 06129/22 ApplicantlCwner: State: NC Sampling Point: WET2 Investigator(s): Richter/Symonds Section, Township, Range: North Carolina is a non-PLSS region Landform (hillside, terrace, etc.): floodplain Local relief (concave, convex, none): concave Slope (%): 0-1% Subregion (LRR or MLRA]: LRR P, MLRA 136 Lat: 35.60099 Long:-81.23148 Datum: NAD'83 Soil Map Unit Name: LcS -see sails remarks for full map unit names NW I classification: PUBF Are climatic 1 hydrologic conditions on the site typical for this time of year? Yes X No _ (If no, explain in Remarks.) Are Vegetation _, Soil _, or Hydrology_ significantly disturbed? Are "Normal Circumstances' present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. IHydrophytio Vegetation Present? Yes X No Is the Sampled Area I Hydric Soil Present? Yes X No within a Wetland? Yes X No Wetland Hydrology Present? Yes X No Remarks: PUBF = Palustrine, Unconsolidated Bottom, Semipermanently Flooded HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two reauired) Primary Indicators {minimum of one is reouired: check all that aonly) _Surface Soil Cracks (B6) _Surface Water (At) _True Aquatic Plants (B14) _Sparsely Vegetated Concave Surface (68) _High Water Table (A2) _Hydrogen Sulfide Odor (Cl) _Drainage Patterns (510) X Saturation (A3) X Oxidized Rhizospheres on Living Roots (C3) Moss Trim Lines IS16) _Water Marks (1131) Presence of Reduced Iran (04) Dry -Season Water Tabla (C2) Sediment Deposits (82) _Recent Iron Reduction in Tilled Sails (C6) _Crayfish Burrows (C5) —Drift Deposits (133) —Thin Muck Surface (U) _ Saturation Visible on Aerial Imagery (C9) _Algal Met or Crust (Ii _Other (Explain in Remarks) _Stunted or Stressed Plants (DI) Iron Deposits (85) X Geomorphic Position (02) Inundation Visible on Aerial Imagery (137) Shallow Aquitard (133) —Water-Stained Leaves (139) _Microtopographic Reliaf (D4) _Aquatic Fauna (1313) X FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes X No Depth (inches): 0 Wetland Hydrology Present? Yes X No includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections). If available: Remarks: sample location occurs within FEMA Zane AF 100-year flood hazard area Water table encountered at 20 Inches depth_ EN FORM 6116-4-SG, JItL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-8 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY VEGETATION (Four Strata) - Use scientific names of plants. Sampling Point: WET2 Absolute Dominant Indicator Tree Stratum (Plot size: 30 =I. r. ) % Cover Species? Status Dominance Test worksheets 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC 2 (A) 3. Total NLim berof Dominant 4, Species Across All Strata: 2 {B) 5- Percent of Dominant Species 6. That Are OBL, FACW, or FAD, 100.0% {AIB} 7. Prevalence Index worksheets =Total Cover Total%Cover of: Multiply by 50% of total cover: 20% of total cover: QBL species 20 x 1 = 20 SaolinolShrub Stratum (Plot size: 15 ft r. } FACW species 75 x 2 = 150 1. FAG species 0 x 3 = 0 2. FACU species 0 x 4 = 0 3- Ill species 0 x 5 = 0 4. Column Totals: 95 (A) 170 (B) 5. Prevalence Index = BIA = 1.79 B- Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic. Vegetation 8, X 2 - Dominance Test is �50% 9. X 3 - Prevalence Index is s3 0' =Total Cover 4 - Marphologi cal Adaptations' (Provide supporting 50% of total cover, 20% of total cover data in Remarks or on a separate sheet) Herb Stratum (Plot size: 5 ft. r. ) _ Problematic Hydrophytic Vegetation' (Explain) 1. Scirpus cypeanus 75 Yes FACW 'Indicators of hydric soil and wetland hydrology must be 2. Ludwigm palusIns 20 Yes OBL present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. 4• Tree - Woody plants, excluding vines, 3 in. (7,15 cm) or 5• more in diameter M breast height (DBH), regardless of 8 height. 7• Saplingl5hrub - Woody plants, excluding vines, less 8, than 3 in. Di and greater than or equal to 3.28 R 9. (1 m)tail. 10 Herb -All herbaceous (non -woody) plards, regardless 11 of size, and woody plants less than 3 2B ft tall. 95 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 48 20% of total cover: 19 height. Woody Vine Stratum (Plot size: 30 ft, r- } 1. 2. 3. 4, 5. Hydrophytic -Total Cover Vegetation 50% of total cover 20% of total cover: Present? Yes X No Remarks (Include photo numbers here or on a separate sheet.) EN FORM 6116-4-SG, Jl1L 2018 Eastern Mountains and Piedmont- Version 2.0 BLACK & VEATCH I Appendix C C-9 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY SOIL Sam piing Point WET2 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators_) Depth Matrix Redox Features inches Color (moist) F Color (moist) I Type Loc Texture Remarks 0-12 10YR 412 75 5YR 416 25 C PLIM LoamylClayey silty 'Type: C=Concentration, D=De letion, RM=Reduced Matrix, MS=Masked Sand Grains. 21-ocation PL=Pore Lining, M=Matrix. Hydric Boll Indicators: Indicators for Problematic Hydric I ls3: Histosol (Al) �HisticEpipedon _Polyvalue Below Surface (SS) (MLRA 147,148) 2 cm Muck (At0) (MLRA 147) (A2) _Thin Dark Surface (S9) (MLRA 147, 148) _Coast Prairie Radox (A16) _ Slack H islic(A3) _Loamy Mucky Mineral(FI) JMLRA 136) (MLRA 147, 10) _Hydrogen Sulfide (A4) _Loamy Gleyed Matrix (F2) _Piedmont Flocdplain Soils (F19) _Stratified Layers (A5) x Depleted Matrix(F3) (MLRA136, 147) _2 cm Muck (A10) (LRR N) Redox Dark Surface (F6) Red Parent Material (F21) _Depleted Below Dark Surface (A11) _Depleted Dark Surface (F7) (outside MLRA 127, 147, 148) Thick Dark Surface (Al2) X Redox Depressions (F8) Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _Iron -Manganese Masses IF12) (LRR N, _other (Explain in Remarks) Sandy Gleyed Matrix (54) MLRA 136) _ Sandy Redox (S5) Urnbric Surface (F13) (MLRA 122, 136) 31ndicators of hydrophytic vegetation and _Stripped Matrlx(S6) _Piedmont Fldodplain Soils (F19) (MLRA 148) wetland hydrology m ust be present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Type Depth (inches): Hydric Soil Present? Yes X No Remarks' LcB = Lloyd loam, 2 to S percent slopes, not listed as an NRCS hydric soil map unit. ENO FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-10 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY U.S. Army Carps of Engineers 0MR cont, A, a7}a-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ER11i TR-07-24: the proponent agency is CECW-CO-R {Aufhorilyr AR 335.15, paragraph 5.2a) ProjectlSite: MSFT - Boyd CitylCounty: Catawba County Sampling Date: M29122 ApplicantlOwner: State: NC Sampling Point: Ull Investigator(s): Richter/Symonds Section, Township, Range: North Carolina is a non-PLSS region Landform (hillside, terrace, etc.): upland Local relief (concave, convex, none): hillslope Slope (%)! 3-50% Subregion (LRR or MLRA]: LRR P, MLRA 138 Lat: 35.60105 Long:-81.23146 Datum: NAD'83 Soil Map Unit Name: LcS -see sails remarks for full map unit name NW I classification: none Are climatic 1 hydrologic conditions on the site typical for this time of year? Yes X No _ (If no, explain in Remarks.) Are Vegetation _, Soil _, or Hydrology_ significantly disturbed? Are "Normal Circumstances' present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling paint locations, transects, important features, etc. Hydrophytio Vegetation Present? Yes x No I Is the Sampled Area Hydric Soil Present? Yes_ No X within aWetland? Yes_ No X Wetland Hydrology Present? Yes_ No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two reauired] Primary Indicators {minimum of one is reouiredi check all that aonly) _Surface Soil Cracks (B6) _Surface Water (At) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (B8) _High Water Table (A2) _Hydrogen Sulfide Odor (Cl) _Drainage Patterns (B10) Saturation (A3) Oxidized Rhizospheres on Living Roots (C3) Moss Trim Lines IS16) —Dry-Season _Water Marks (B1) _Presence of Reduced Iran (04) Water Tabla (C2) Sediment Deposits (82) _Recent Iron Reduction in Tilled Soils (C6) _Crayfish Burrows (C8) —Drift Deposits (133) —Thin Muck Surface (U) _ Saturation Visible on Aerial Imagery (C9) _Algal Met or Crust (Ii _Other (Explain in Remarks} _Stunted or Stressed Plants (DI) Iron Deposits (85) Geomorphic Position (02) --Shallow _Inundation Visible on Aerial Imagery (87) Aquitard (133) —Water-Stained Leaves (139) Microtopographic Reliaf (D4) _Aquatic Fauna (1313) FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes_ No X Depth (inches): Wetland Hydrology Present? Yea_ No x includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections). If available: Remarks: sample location occurs within FEMA Zane AF 100-year flood hazard area - ENG FORM 6116-4-SG, JItL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-11 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY VEGETATION (Four Strata) - Use scientific names cf plants. Sampling Point: JPL2 Absolute Dominant Indicator Tree Stratum (Plot size: 30 =I. r. ) % Cover Species? Status Dominance Test worksheets 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC 5 (A) 3. Total NLim berof Dominant 4, Species Across All Strata: 8 {B) 5- Percent of Dominant Species 6. That Are OBL, FACW, or FAD, 62.5% {AIB} 7. Prevalence Index worksheets =Total Cover Total %Cover oi: Multiply by 50% of total cover: 20% of total cover: QBL species 0 x t = 0 SaolinolShrubStratum (Plotsize: 15fLr. } FACW species 20 x2= 40 1. Acer negundo 12 Yes FAC FAC species 85 x 3 = 255 2. Viburnum dentatum 5 Yes FAC FACU species 50 x 4 = 200 3- Sam6ucus racemosa 5 Yes FACU UPL species 0 x 5 = D 4. Fraxinus pannsylvanica 5 Yes FACW Column Totals: 155 (A) 495 (B) 5. Prevalence Index = BIA = 3.19 6- Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic. Vegetation 8, X 2 - Dominance Test is �50% 9. 3 - Prevalence Index is s3 0' 27 =Total Cover 4 - Marphologi cal Adaptations' (Provide supporting 50% of total cover, 14 20% of total cover, 6 data in Remarks or on a separate sheet) Herb Stratum (Plot size: 5 ft. r. ) _ Problematic Hydrophytic Vegetation' (Explain) 1. Sotidago altissima 30 Yes FACU 11indicators of hydric soil and wetland hydrology must be 2. Rubus pensilvanicus 25 Yes FAC present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Arundinaria giganfea 15 No FACW 4, Verbesina alteraftia 15 No FAC Tree - Woody plants, excluding vines, 3 in. (7,6 cm) or 5. Dichaniholium clandestinum 10 No FAC more in diameter M breast height (DBH), regardless of 6. Viburnum dentatum t0 No FAC height. 7• Saplingl5hrub - Woody plants, excluding vines, less g, than 3 in. Di and greater than or equal to 3.28 R (1 m)tail. 10 Herb -All herbaceous (non -woody) plards, regardless 11 of size, and woody plants less than 3 2B ft tali. 1 D5 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 53 20% of total cover: 21 height. Woody Vine Stratum (Plot size: 30 ft, r. } 1. Lvnicera japonica 15 Yes FACU 2. Vitis rotunddotia 8 Yes FAC 3, 4, 5, Hydrophytic 23 -Total Cover Vegetation 50% of total cover 12 20% of total cover: 5 Present? Yes X No Remarks (Include photo numbers here or on a separate sheet.) EN FORM 6116-4-SG, Jl1L 2018 Eastern Mountains and Piedmont- Version 2.0 BLACK & VEATCH I Appendix C C-12 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY SOIL Sam piing Point UPI 2 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators_) Depth Matrix Radox Features inches Color (moist) Color (moist) I Type Loc Texture Remarks 0-12 7.5YR 414 103 LoamylClayey limited sand present in soil 'Type: C=Concentration, D=De letion, RM=Reduced Matrix, MS=Masked Sand Grains. 21-ocation PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric I ls3: Histosol (Al) �HisticEpipedon Polyvalue Below Surface (SS) (MLRA 147,148) 2 cm Muck (At0) (MLRA 147) (A2) _Thin Dark Surface (S9) (MLRA 147, 148) _Coast Prairie Radox (A16) _ Slack H islic(A3) _ Loamy Mucky Mineral (F1){MLRA 136) (MLRA 147, tdt)} _Hydrogen Sulfide (A4) _Loamy Gleyed Matrix (F2) _Piedmont Floodplain Soils (F19) _Stratified Layers (A5) _Depleted Matrix(F3) (MLRA136, 147) _2 cm Muck (A10) (LRR N) Redox Dark Surface (F6) `_Depleted Red Parent Material (F21) _Depleted Below Dark Surface (Ali) Dark Surface (F7) (outside MLRA 127, 147, 149) Thick Dark Surface (Al2) Redox Depressions (F8) Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _Iron -Manganese Masses (F12) (LRR N, Qther (Explain in Remarks) Sandy Gleyed Matrix (54) MLRA 136) _ Sandy Redox (S5) Urnbric Surface (F13) (MLRA 122, 136) 31ndicators of hydrophytic vegetation and _Stripped Matrlx(S6) _Piedmont Fldodplain Soils (F19) (MLRA 148) wetland hydrology m ust be present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Type Depth (inches): Hydric Soil Present? Yes No X Remarks' LcB = Lloyd loam, 2 to S percent slopes, not listed as an NRCS hydric soil map unit. ENO FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-13 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY U.S. Army Carps of Engineers 0MR cont, k a7}a-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ER11i TR-07-24: the proponent agency is CECW-CO-R {Aufhorilyr AR 335.15, paragraph 5.2a) ProjectlSite: MSFT - Boyd CitylCounty: Catawba County Sampling Date: 06130/22 ApplicantlCwner: State: NC Sampling Point: WET3 Investigator(s): Richter/Symonds Section, Township, Range: North Carolina is a non-PLSS region Landform (hillside, terrace, etc.): floodplain LccaI relief (concave, convex, none): concave Slope (%): 0-1% Subregion (LRR or MLRA]: LRR P, MLRA 138 Lat: 35.59824 Long:-81.23328 Datum: NAD'83 Soil Map Unit Name: ChA -see soils remarks for full map unit names NWI classification: none Are climatic 1 hydrologic conditions on the site typical for this time of year? Yes X No _ (If no, explain in Remarks.) Are Vegetation _, Soil _, or Hydrology_ significantly disturbed? Are "Normal Circumstances' present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling point locations, transects, important features, etc. Hydrophytio Vegetation Present? Yes X No_ Is the Sampled Area Hydric Soil Present? Yes X No withinaWelland? Yes X No Wetland Hydrology Present? Yes X No Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two reauired] Primary Indicators {minimum of one is reouiredi check all that aonly) _Surface Soil Cracks (B6) _Surface Water (At) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (B8) _High Water Table (A2) _Hydrogen Sulfide Odor (Cl) _Drainage Patterns (B10) Saturation (A3) X Oxidized Rhizospheres on Living Roots (C3) Moss Trim Lines IS16) —Dry-Season _Water Marks (B1) Presence of Reduced Iran (04) Water Tabla (C2) Sediment Deposits (82) _Recent Iron Reduction in Tilled Sails (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Met or Crust (Ii _Other (Explain in Remarks} _Stunted or Stressed Plants (DI) Iran Deposits (85) X Geomorphic Position (02) Inundation Visible on Aerial Imagery (87) Shallow Aquitard (133) —Water-Stained Leaves (139) _Microtopographic Reliaf (D4) _Aquatic Fauna (1313) X FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Wale rTable Present? Yes No X Depth (inches): Saturation Present? YeS No X Depth (inches): Wetland Hydrology Present? Yes X No includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections). If available: Remarks: sample location occurs within FEMA Zane AF 100-year flood hazard area - ENG FORM 6116-4-SG, JItL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-14 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY VEGETATION (Four Strata) - Use scientific names of plants. sampling Point: WETS Absolute Dominant Indicator Tree Stratum (Plot size: 30 =I. r. ) % Cover Species? Status Dominance Test worksheets 1 Number of Dominant Species 2. That Are OBL, FACW, or FAC 2 (A) 3. Total NLim berof Dominant 4, Species Across All Strata: 2 {B) 5- Percent of Dominant Species 6. That Are OBL, FACW, or FAD, 100.0% {AIB} 7. Prevalence Index worksheets =Total Cover Total %Cover oi: Multiply by 50% of total cover: 20% of total cover: QBL species 85 x t = 85 SaolinolShrub Stratum (Plot size: 15 ft r. } FACW species Is x 2 = 30 1. FAC species 25 x 3 = 7n 2. FACU species 0 x 4 = 0 3- Ill species 0 x 5 = 0 4. Column Totals: 125 (A) 190 (B) 5. Prevalence Index = BIA = 1.52 B- Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic. Vegetation 8, X 2 - Dominance Test is �50% 9. X 3 - Prevalence Index is s3 0' =Total Cover 4 - Morphological Adaptations' (Provide supporting 50% of total cover, 20% of total cover data in Remarks or on a separate sheet) Herb Stratum (Plot size: 5 ft. r. ) _ Problematic Hydrophytic Vegetation' (Explain) 1. Sc rpus polyphyllus 55 Yes OBL Indicators of hydric soil and wetland hydrology must be 2. Saginaria sp. 30 Yes OBL present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Soehmeria cylindrica 15 No FACW 4, MimVegium virn;mum 15 No FAC Tree - Woody plants, excluding vines, 3 in. (7,6 cm) or 5. Rubus psn. idvanicus 10 No FAC more in diameter M breast height (DBH), regardless of 6 height. 7• Saplingl5hrub - Woody plants, excluding vines, less 8, than 3 in. Di and greater than or equal to 3.28 R 9. (1 m)tail. 10 Herb -All herbaceous (non -woody) plards, regardless 11 of size, and woody plants less than 3 2B ft tali. 125 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 63 20% of total cover: 25 height. Woody Vine Stratum (Plot size: 30 ft, r- } 1. 2. 3. 4, 5. Hydrophytic -Total Cover Vegetation 50% of total cover 20% of total cover: Present? Yes X No Remarks (Include photo numbers here or on a separate sheet.) EN FORM 6116-4-SG, Jl1L 2018 Eastern Mountains and Piedmont- Version 2.0 BLACK & VEATCH I Appendix C C-15 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY SOIL Sam piing Point WETS Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators_) Depth Matrix Redox Features inches Color (moist) F Color (moist) I Type Loc Texture Remarks 0-12 7.5YR 411 80 7.5YR 416 20 C PLIM LoamylClayey Prominent redox concentrations 'Type: C=Concentration, D=De letion, RM=Reduced Matrix, MS=Masked Sand Grains. 21-ocation PL=Pore Lining, M=Matrix. Hydric Boll Indicators: Indicators for Problematic Hydric I ls3: Histosol (Al) �HisticEpipedon Polyvalue Below Surface (SS) (MLRA 147,148) 2 cm Muck (At0) (MLRA 147) (A2) _Thin Dark Surface (S9) (MLRA 147, 148) _Coast Prairie Radox (A16) _ Slack H islic(A3) _Loamy Mucky Mineral (F1){MLRA 136) (MLRA 147. 10) _Hydrogen Sulfide (A4) _Loamy Gleyed Matrix (F2) _Piedmont Flocdplain Soils (F19) _Stratified Layers (A5) x Depleted Matrix(F3) (MLRA 136, 147) _2 cm Muck (A10) (LRR N) Redox Dark Surface (F6) Red Parent Material (F21) _Depleted Below Dark Surface (A11) _Depleted Dark Surface (F7) (outside MLRA 127, 147, 148) Thick Dark Surface (Al2) X Redox Depressions (F8) Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _Iron -Manganese Masses IF12) (LRR N, _other (Explain in Remarks) Sandy Gleyed Matrix (54) MLRA 136) _ Sandy Redox (S5) Urnbric Surface (F13) (MLRA 122, 136) 31ndicators of hydrophytic vegetation and _Stripped Matrlx(S6) _Piedmont Fldodplain Soils (F19) (MLRA 148) wetland hydrology m ust be present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Type Depth (inches): Hydric Soil Present? Yes X No Remarks' ChA = Chewacla loam, 0 to 2 percent slopes, frequently flooded, noted as an MRCS hydric soil map unit. ENO FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-16 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY U.S. Army Carps of Engineers 0MR cont, A, a7}a-xxxx, Exp: Pending WETLAND DETERMINATION DATA SHEET— Eastern Mountains and Piedmont Region Requirement Control Symbol EXEMPT: See ER11i TR-07-24: the proponent agency is CECW-CO-R {Aufhorilyr AR 335.15, paragraph 5.2a) ProjectlSite: MSFT - Boyd CitylCounty: Catawba County Sampling Date: 06130/22 ApplicantlOwner: State: NC Sampling Point: Ull Investigator(s): Richter/Symonds Section, Township, Range: North Carolina is a non-PLSS region Landform (hillside, terrace, etc.): upland LccaI relief (concave, convex, none): hillslope Slope (%)! 3-50% Subregion (LRR or MLRA]: LRR P, MLRA 138 Lat: 35.59815 Long:-81.23319 Datum: NAD'83 Soil Map Unit Name: RkA -see soils remarks for full map unit name NWI classification: none Are climatic 1 hydrologic conditions on the site typical for this time of year? Yes X No _ (If no, explain in Remarks.) Are Vegetation _, Soil _, or Hydrology_ significantly disturbed? Are "Normal Circumstances' present? Yes X No Are Vegetation Soil or Hydrology naturally problematic? (If needed, explain any answers in Remarks.) SUMMARY OF FINDINGS — Attach site map showing sampling paint locations, transects, important features, etc. Hydrophytio Vegetation Present? Yes x No I lathe Sampled Area Hydric Soil Present? Yes_ No X within aWetland? Yes_ No X Wetland Hydrology Present? Yes_ No X Remarks: HYDROLOGY Wetland Hydrology Indicators: Secondary Indicators (minimum of two reauired] Primary Indicators {minimum of one is reouiredi check all that aonly) _Surface Soil Cracks (B6) _Surface Water (At) _True Aquatic Plants (1314) _Sparsely Vegetated Concave Surface (B8) _High Water Table (A2) _Hydrogen Sulfide Odor (Cl) _Drainage Patterns (B10) Saturation (A3) Oxidized Rhizospheres on Living Roots (C3) Moss Trim Lines IS16) —Dry-Season _Water Marks (B1) _Presence of Reduced Iran (04) Water Tabla (C2) Sediment Deposits (82) _Recent Iron Reduction in Tilled Sails (C6) _Crayfish Burrows (C8) _Drift Deposits (133) _Thin Muck Surface (C7) _Saturation Visible on Aerial Imagery (C9) _Algal Met or Crust (Ii _Other (Explain in Remarks} _Stunted or Stressed Plants (DI) Iran Deposits (85) — Geomorphic Position (02) Inundation Visible on Aerial Imagery (87) Shallow Aquitard (133) —Water-Stained Leaves (139) Microtopographic Reliaf (D4) _Aquatic Fauna ill FAC-Neutral Test (D5) Field Observations: Surface Water Present? Yes No X Depth (inches): Water Table Present? Yes No X Depth (inches): Saturation Present? Yes_ No X Depth (inches): Wetland Hydrology Present? Yea_ No x includes capillary fringe) Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections). If available: Remarks: sample location occurs within FEMA Zane AF 100-year flood hazard area - ENG FORM 6116-4-SG, JItL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-17 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY VEGETATION (Four Strata) - Use scientific names cf plants. sampling Point: UPL3 Absolute Dominant Indicator Tree Stratum (Plot size: 30 ft. r. ) % Cover Species? Status Dominance Test worksheets 1. Liquidamberslyraoffva 30 Yes FAC Nu mber of Dom I n ant Sped es 2. Fraxinuspennsytvanica 20 Yes FACW That Are OBL, FACW, or FAC 9 (A) 3. Platanus occidenta6s 20 Yes FACW Total NLim berof Dominant 4, Acerrubrum 20 Yes FAC Species Across All Strata: 12 {B) 5. Prunvs serotina 10 No FACU Percent of Dominant Species 6. That Are OBL, FACW, or FAD, 75.0% {AIB} 7. Prevalence Index worksheets 100 =Total Cover Total %Cover oi: Multiply by 50% of total cover: 50 20% of total cover: 20 QBL species 0 x t = 0 SaolinolShruhStratum (Plotsize: 15ftr. } FACW species 50 x2= 100 1. Pyrus calieryana 25 Yes UPL FAC species 170 x 3 = 510 2. Ligustrum vulgate 20 Yes FACU FACU species 30 x 4 = 120 3- Asimina triloba 15 Yes FAC UPL species 25 x 5 = 125 4. Column Totals: 275 (A) 855 (B) 5. Prevalence Index = BIA = 3A1 B- Hydrophytic Vegetation Indicators: 7. _ 1 - Rapid Test for Hydrophytic. Vegetation 8, X 2 - Dominance Test is �60% 9. 3 - Prevalence Index is s3 0' 60 =Total Cover 4 - Marphologi cal Adaptations' (Provide supporting 50% of total cover, 30 20% of total cover- 12 data in Remarks or on a separate sheet) Herb Stratum (Plot size: 5 ft. r. ) _ Problematic Hydrophytic Vegetation' (Explain) 1. Microsregium vimineum 60 Yes FAC Indicators of hydric soil and wetland hydrology must be 2. Rosa multifiora 25 Yes present, unless disturbed or problematic. Definitions of Four Vegetation Strata: 3. Acer negundo 15 No FAC 4, Toxicodendron r20can3 10 No FAC Tree - Woody plants, excluding Vines, 3 in. (7,6 cm) or 5. Fraxinus ponnsylvanica 10 No FACW more in diameter M breast height (DBH), regardless of 6 height. 7• Saplingl5hrub - Woody plants, excluding vines, less g, than 3 in. Di and greater than or equal to 3.28 ft (1 m)tail. 10 Herb -All herbaceous (non -woody) plants, regardless 11 of size, and woody plants less than 3 2B ft tall. 120 =Total Cover Woody Vine - All woody vines greater than 3.28 ft in 50% of total cover: 60 20% of total cover: 24 height. Woody Vine Stratum (Plot size: 30 ft, r. } 1. Toxicodendron radicans 10 Yes FAC 2. Vitis rotundifolia 5 Yes FAC 3. 5mitax rolundifolia 5 Yes FAC 4, 5, Hydrophytic 20 -Total Cover Vegetation 50% of total cover 10 20% of total cover: 4 Present? Yes X No Remarks (Include photo numbers here or on a separate sheet.) EN FORM 6116-4-SG, Jl1L 2018 Eastern Mountains and Piedmont- Version 2.0 BLACK & VEATCH I Appendix C C-18 Microsoft I POTENTIAL WATERS OF THE U.S./ FEDERAL AND STATE LISTED SPECIES DESKTOP AND FIELD SURVEY SOIL Sam piing Point UPL3 Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators_) Depth Matrix Radox Features inches Color (moist) Color (moist) I Type Loc Texture Remarks 0-12 7.5YR 414 103 LoarnylClayey limited sand present in soil 'Type: C=Concentration, D=De letion, RM=Reduced Matrix, MS=Masked Sand Grains. 21-ocation PL=Pore Lining, M=Matrix. Hydric Soil Indicators: Indicators for Problematic Hydric I ls3: Histosol (Al) �HisticEpipedon Polyvalue Below Surface (SS) (MLRA 147,148) 2 cm Muck (At0) (MLRA 147) (A2) _Thin Dark Surface (S9) (MLRA 147, 148) _Coast Prairie Radox (A16) _ Slack H islic(A3) _ Loamy Mucky Mineral (F1){MLRA 136) (MLRA 147, tdt)} _Hydrogen Sulfide (A4) _Loamy Gleyed Matrix (F2) _Piedmont Floodplain Soils (F19) _Stratified Layers (A5) _Depleted Matrix(F3) (MLRA136, 147) _2 cm Muck (A10) (LRR N) Redox Dark Surface (F6) `_Depleted Red Parent Material (F21) _Depleted Below Dark Surface (Ali) Dark Surface (F7) (outside MLRA 127, 147, 149) Thick Dark Surface (Al2) Redox Depressions (F8) Very Shallow Dark Surface (F22) _Sandy Mucky Mineral (S1) _Iron -Manganese Masses IF12) (LRR N, _other (Explain in Remarks) Sandy Gleyed Matrix (54) MLRA 136) _ Sandy Redox (S5) Urnbric Surface (F13) (MLRA 122, 136) 31ndicators of hydrophytic vegetation and _Stripped Matrlx(S6) _Piedmont Fldodplain Soils (F19) (MLRA 148) wetland hydrology m ust be present, Dark Surface (S7) Red Parent Material (F21) (MLRA 127, 147, 148) unless disturbed or problematic. Restrictive Layer (if observed): Typc Depth (inches): Hydric Soil Present? Yes No X Remarks' RkA = Roanoke loam, 0 to 2 percent slopes, occasionally Pcoded, listed as an NRCS hydrlc soiE map unit. ENO FORM 6116-4-SG, JUL 2018 Eastern Mountains and Piedmont— Version 2.0 BLACK & VEATCH I Appendix C C-19 NC DWQ Stream Identification Form Version 4.11 Date: November 10, 2022 Project/Site: SAP Latitude: 35.589847 Evaluator: ALC TGW County: Catawba Longitude: -81.235298 Total Points: 31 Stream is at least intermittent Stream Determination: Other: if >_ 19 or perennial if >_ 30 Intermittent e.g. Quad Name: A.fGeomor holo (fubtotal = 17) Absen Wea Modera Stron 19. Continuity of bed and bank ❑ 0 ❑ 1 0 2 ❑ 3 2. Sinuosity of channel along thalweg ❑ 0 ❑ 1 0 2 ❑ 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence ❑ 0 ❑ 1 0 2 ❑ 3 4. Particle size of stream substrate ❑ 0 ❑ 1 0 2 ❑ 3 5. Active/relict floodplain ❑ 0 ❑ 1 0 2 ❑ 3 6. Depositional bars or benches ❑ 0 ❑ 1 ❑ 2 0 3 7. Recent alluvial deposits ❑ 0 ❑ 1 0 2 ❑ 3 8. Headcuts 0 0 ❑ 1 ❑ 2 ❑ 3 9. Grade controls ❑ 0 P 0.5 ❑ 1 ❑ 1.5 10. Natural valley ❑ 0 10 0.5 ❑ 1 10 1.5 11. Second or greater order channel 0 No ❑ Yes a Man-made ditches are not rated; see discussions in manual B. Hydrology ( Subtotal = 7) 12. Presence of Baseflow 0 0 ❑ 1 ❑ 2 ❑ 3 13. Iron oxidizing bacteria ❑ 0 ❑ 1 0 2 ❑ 3 14. Leaf litter ❑ 1.5 ❑ 1 0 0.5 ❑ 0 15. Sediment on plants or debris ❑ 0 0 0.5 ❑ 1 ❑ 1.5 16. Organic debris lines or piles ❑ 0 ❑ 0.5 0 1 ❑ 1.5 17. Soil -based evidence of high water table? ❑ No 0 Yes C. Biology ( Subtotal = 7) 18. Fibrous roots in streambed ❑ 3 0 2 ❑ 1 ❑ 0 19. Rooted upland plants in streambed ❑ 3 0 2 ❑ 1 ❑ 0 20. Macrobenthos (note diversity and abundance) El 0 ❑ 1 ❑ 2 ❑ 3 21. Aquatic Mollusks ❑ 0 0 1 ❑ 2 ❑ 3 22. Fish ❑ 0 ❑ 0.5 ❑ 1 0 1.5 23. Crayfish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 24. Amphibians 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 25. Algae ❑ 0 0 0.5 ❑ 1 ❑ 1.5 26. Wetland plants in streambed ❑ FACW ❑ 0 Other OBL * perennial streams may also be identified using other methods. See p. 35 of manual Notes: Scored conservatively. Might be more macros in the summer. 6" OHWM, surrounding banks 4' Sketch: Bank Height (ft): 4 Bank full Width (ft): 2.5 Water Depth (in): 2 NC DWQ Stream Identification Form Version 4.11 Date: November 10, 2022 Project/Site: SA Latitude: 35.589233 Evaluator: Melissa Ruiz, Amber County: Catawba Longitude:-81.231894 Coleman Total Points: 29 Stream Determination: Other: Stream is at least intermittent Intermittent e.g. Quad Name: if >_ 19 or perennial if >_ 30 A. Geomorphology ( Subtotal = 15.5) Absen Wea Modera Stron 19. Continuity of bed and bank ❑ 0 ❑ 1 0 2 ❑ 3 2. Sinuosity of channel along thalweg ❑ 0 ❑ 1 0 2 ❑ 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence ❑ 0 0 1 ❑ 2 ❑ 3 4. Particle size of stream substrate ❑ 0 ❑ 1 0 2 ❑ 3 5. Active/relict floodplain ❑ 0 0 1 ❑ 2 ❑ 3 6. Depositional bars or benches 0 0 ❑ 1 ❑ 2 ❑ 3 7. Recent alluvial deposits 0 0 ❑ 1 ❑ 2 ❑ 3 8. Headcuts ❑ 0 ❑ 1 ❑ 2 0 3 9. Grade controls 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 10. Natural valley ❑ 0 10 0.5 ❑ 1 10 1.5 11. Second or greater order channel ❑ No 0 Yes a Man-made ditches are not rated; see discussions in manual B. Hydrology ( Subtotal = 7.5) 12. Presence of Baseflow ❑ 0 ❑ 1 0 2 ❑ 3 13. Iron oxidizing bacteria ❑ 0 ❑ 1 0 2 ❑ 3 14. Leaf litter ❑ 1.5 ❑ 1 0 0.5 ❑ 0 15. Sediment on plants or debris 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 16. Organic debris lines or piles 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 17. Soil -based evidence of high water table? ❑ No 0 Yes C. Biology ( Subtotal = 6) 18. Fibrous roots in streambed 0 3 ❑ 2 ❑ 1 ❑ 0 19. Rooted upland plants in streambed 0 3 ❑ 2 ❑ 1 ❑ 0 20. Macrobenthos (note diversity and abundance) El 0 ❑ 1 ❑ 2 ❑ 3 21. Aquatic Mollusks 0 0 ❑ 1 ❑ 2 ❑ 3 22. Fish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 23. Crayfish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 24. Amphibians 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 25. Algae 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 26. Wetland plants in streambed ❑ FACW ❑ 0 Other OBL * perennial streams may also be identified using other methods. See p. 35 of manual Notes: 2nd order Sketch: Bank Height (ft): 1 Bank full Width (ft): 4 Water Depth (in): 3 NC DWQ Stream Identification Form Version 4.11 Date: November 10, 2022 Project/Site: SB Latitude: 35.589017 Evaluator: Melissa Ruiz, Amber County: Catawba Longitude:-81.231721 Coleman Total Points: 19 Stream Determination: Other: Stream is at least intermittent Intermittent e.g. Quad Name: if >_ 19 or perennial if >_ 30 A. Geomorphology ( Subtotal = 9) Absen Wea Modera Stron 19. Continuity of bed and bank ❑ 0 0 1 ❑ 2 ❑ 3 2. Sinuosity of channel along thalweg ❑ 0 0 1 ❑ 2 ❑ 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 0 ❑ 1 ❑ 2 ❑ 3 4. Particle size of stream substrate ❑ 0 ❑ 1 0 2 ❑ 3 5. Active/relict floodplain ❑ 0 0 1 ❑ 2 ❑ 3 6. Depositional bars or benches 0 0 ❑ 1 ❑ 2 ❑ 3 7. Recent alluvial deposits 0 0 ❑ 1 ❑ 2 ❑ 3 8. Headcuts ❑ 0 ❑ 1 ❑ 2 0 3 9. Grade controls 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 10. Natural valley ❑ 0 10 0.5 0 1 10 1.5 11. Second or greater order channel 0 No ❑ Yes a Man-made ditches are not rated; see discussions in manual B. Hydrology ( Subtotal = 6) 12. Presence of Baseflow ❑ 0 0 1 ❑ 2 ❑ 3 13. Iron oxidizing bacteria ❑ 0 ❑ 1 0 2 ❑ 3 14. Leaf litter ❑ 1.5 ❑ 1 ❑ 0.5 0 0 15. Sediment on plants or debris 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 16. Organic debris lines or piles 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 17. Soil -based evidence of high water table? ❑ No 0 Yes C. Biology ( Subtotal = 4) 18. Fibrous roots in streambed ❑ 3 0 2 ❑ 1 ❑ 0 19. Rooted upland plants in streambed ❑ 3 0 2 ❑ 1 ❑ 0 20. Macrobenthos (note diversity and abundance) 0 0 ❑ 1 ❑ 2 ❑ 3 21. Aquatic Mollusks 0 0 ❑ 1 ❑ 2 ❑ 3 22. Fish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 23. Crayfish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 24. Amphibians 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 25. Algae 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 26. Wetland plants in streambed ❑ FACW ❑ 0 Other OBL * perennial streams may also be identified using other methods. See p. 35 of manual Notes: Sketch: Bank Height (ft): 0.5 Bank full Width (ft): 2 Water Depth (in): 2 NC DWQ Stream Identification Form Version 4.11 Date: November 10, 2022 Project/Site: SC Latitude: 35.594534 Evaluator: TGW ALC County: Catawba Longitude:-81.229619 Total Points: 40.75 Stream is at least intermittent Stream Determination: Other: if >_ 19 or perennial if >_ 30 Perennial e.g. Quad Name: A. Geomorphology ( Subtotal = 24.5) Absen Wea Modera Stron 19. Continuity of bed and bank ❑ 0 ❑ 1 ❑ 2 0 3 2. Sinuosity of channel along thalweg ❑ 0 ❑ 1 ❑ 2 0 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence ❑ 0 ❑ 1 ❑ 2 0 3 4. Particle size of stream substrate ❑ 0 ❑ 1 ❑ 2 0 3 5. Active/relict floodplain ❑ 0 ❑ 1 0 2 ❑ 3 6. Depositional bars or benches ❑ 0 ❑ 1 ❑ 2 0 3 7. Recent alluvial deposits ❑ 0 ❑ 1 ❑ 2 0 3 8. Headcuts 0 0 ❑ 1 ❑ 2 ❑ 3 9. Grade controls 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 10. Natural valley ❑ 0 10 0.5 ❑ 1 10 1.5 11. Second or greater order channel ❑ No 0 Yes a Man-made ditches are not rated; see discussions in manual B. Hydrology ( Subtotal = 8) 12. Presence of Baseflow ❑ 0 ❑ 1 ❑ 2 0 3 13. Iron oxidizing bacteria 0 0 ❑ 1 ❑ 2 ❑ 3 14. Leaf litter ❑ 1.5 0 1 ❑ 0.5 ❑ 0 15. Sediment on plants or debris 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 16. Organic debris lines or piles ❑ 0 ❑ 0.5 0 1 ❑ 1.5 17. Soil -based evidence of high water table? ❑ No 0 Yes C. Biology ( Subtotal = 8.25) 18. Fibrous roots in streambed 0 3 ❑ 2 ❑ 1 ❑ 0 19. Rooted upland plants in streambed 0 3 ❑ 2 ❑ 1 ❑ 0 20. Macrobenthos (note diversity and abundance) ❑ 0 0 1 ❑ 2 ❑ 3 21. Aquatic Mollusks 0 0 ❑ 1 ❑ 2 ❑ 3 22. Fish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 23. Crayfish ❑ 0 0 0.5 ❑ 1 ❑ 1.5 24. Amphibians 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 25. Algae 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 26. Wetland plants in streambed 0 FACW ❑ ❑ Other OBL * perennial streams may also be identified using other methods. See p. 35 of manual Notes: Caddisfly case found under rocks Crayfish burrow found just I/P Sketch: Bank Height (ft): 4 Bank full Width (ft): 6 Water Depth (in): 3 NC DWQ Stream Identification Form Version 4.11 Date: November 10, 2022 Project/Site: SC Intermittent Latitude: 35.594882 Evaluator: Melissa Ruiz, Amber County: Catawba Longitude:-81.229085 Coleman Total Points: 24.5 Stream Determination: Other: Stream is at least intermittent Intermittent e.g. Quad Name: if >_ 19 or perennial if >_ 30 A. Geomorphology ( Subtotal = 12.5) Absen Wea Modera Stron 19. Continuity of bed and bank ❑ 0 ❑ 1 0 2 ❑ 3 2. Sinuosity of channel along thalweg ❑ 0 0 1 ❑ 2 ❑ 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence ❑ 0 0 1 ❑ 2 ❑ 3 4. Particle size of stream substrate ❑ 0 0 1 ❑ 2 ❑ 3 5. Active/relict floodplain ❑ 0 0 1 ❑ 2 ❑ 3 6. Depositional bars or benches ❑ 0 ❑ 1 0 2 ❑ 3 7. Recent alluvial deposits ❑ 0 0 1 ❑ 2 ❑ 3 8. Headcuts ❑ 0 ❑ 1 0 2 ❑ 3 9. Grade controls 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 10. Natural valley ❑ 0 10 0.5 ❑ 1 10 1.5 11. Second or greater order channel 0 No ❑ Yes a Man-made ditches are not rated; see discussions in manual B. Hydrology ( Subtotal = 7) 12. Presence of Baseflow ❑ 0 ❑ 1 ❑ 2 0 3 13. Iron oxidizing bacteria 0 0 ❑ 1 ❑ 2 ❑ 3 14. Leaf litter ❑ 1.5 ❑ 1 0 0.5 ❑ 0 15. Sediment on plants or debris 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 16. Organic debris lines or piles ❑ 0 0 0.5 ❑ 1 ❑ 1.5 17. Soil -based evidence of high water table? ❑ No 0 Yes C. Biology ( Subtotal = 5) 18. Fibrous roots in streambed ❑ 3 0 2 ❑ 1 ❑ 0 19. Rooted upland plants in streambed 0 3 ❑ 2 ❑ 1 ❑ 0 20. Macrobenthos (note diversity and abundance) El 0 ❑ 1 ❑ 2 ❑ 3 21. Aquatic Mollusks 0 0 ❑ 1 ❑ 2 ❑ 3 22. Fish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 23. Crayfish 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 24. Amphibians 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 25. Algae 0 0 ❑ 0.5 ❑ 1 ❑ 1.5 26. Wetland plants in streambed ❑ FACW ❑ 0 Other OBL * perennial streams may also be identified using other methods. See p. 35 of manual Notes: Possibly perennial Sketch: Bank Height (ft): 1 Bank full Width (ft): 2 Water Depth (in): 4 NC SAM SHEETS NC SAM FIELD ASSESSMENT RESULTS Accompanies User Manual Version 2.1 USACE AID #: NCDWR #: INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT/SITE INFORMATION: 1. Project name (if any): CLT10 2. Date of evaluation: 11/10/2022 A. Coleman and 3. Applicant/owner name: Microsoft 4. Assessor name/organization: T.Walker/Stantec 5. County: Catawba 6. Nearest named water body 7. River basin: Catawba on USGS 7.5-minute quad: Clark Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.589847,-81.235298 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): SA 10. Length of assessment reach evaluated (feet): 100 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 4 ❑Unable to assess channel depth. 12. Channel width at top of bank (feet): 2.5 13. Is assessment reach a swamp steam? ❑Yes ❑No 14. Feature type: ®Perennial flow ❑Intermittent flow ❑Tidal Marsh Stream STREAM CATEGORY INFORMATION: 15. NC SAM Zone: ❑ Mountains (M) ® Piedmont (P) ❑ Inner Coastal Plain (1) ❑ Outer Coastal Plain (0) 16. Estimated geomorphic ❑AL J ®B valley shape (skip for Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip ®Size 1 (< 0.1 mi2) ❑Size 2 (0.1 to < 0.5 mil) ❑Size 3 (0.5 to < 5 mil) ❑Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? ®Yes ❑No If Yes, check all that apply to the assessment area. ❑Section 10 water ❑Classified Trout Waters ❑Water Supply Watershed (❑l ❑II ❑III ❑IV ❑V) ❑Essential Fish Habitat ❑Primary Nursery Area ❑ High Quality Waters/Outstanding Resource Waters ❑Publicly owned property ❑NCDWR Riparian buffer rule in effect ❑Nutrient Sensitive Waters ❑Anadromous fish ❑303(d) List ❑CAMA Area of Environmental Concern (AEC) ❑Documented presence of a federal and/or state listed protected species within the assessment area. List species: ❑Designated Critical Habitat (list species) 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? ®Yes ❑No 1. Channel Water - assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) ❑A Water throughout assessment reach. ❑B No flow, water in pools only. ❑C No water in assessment reach. 2. Evidence of Flow Restriction - assessment reach metric ❑A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is severely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impoundment on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates, debris jams, beaver dams). ®B Not 3. Feature Pattern - assessment reach metric ®A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). ❑B Not 4. Feature Longitudinal Profile - assessment reach metric ®A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). ❑B Not 5. Signs of Active Instability - assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). ❑A < 10% of channel unstable ®B 10 to 25% of channel unstable ❑C > 25% of channel unstable Streamside Area Interaction — streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB ❑A ❑A Little or no evidence of conditions that adversely affect reference interaction ®B ®B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) ❑C ❑C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide Water Quality Stressors — assessment reach/intertidal zone metric Check all that apply. ❑A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) ®B Excessive sedimentation (burying of stream features or intertidal zone) ❑C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem ❑D Odor (not including natural sulfide odors) ❑E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in "Notes/Sketch" section. ❑F Livestock with access to stream or intertidal zone ❑G Excessive algae in stream or intertidal zone ❑H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc) ❑I Other: (explain in "Notes/Sketch" section) ❑J Little to no stressors 8. Recent Weather — watershed metric (skip for Tidal Marsh Streams) For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. ❑A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours ❑B Drought conditions and rainfall exceeding 1 inch within the last 48 hours ®C No drought conditions 9. Large or Dangerous Stream — assessment reach metric ❑Yes ®No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types — assessment reach metric 10a. ❑Yes ®No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for Size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) ❑A Multiple aquatic macrophytes and aquatic mosses F, W ❑F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) F E ❑G Submerged aquatic vegetation ®B Multiple sticks and/or leaf packs and/or emergent o w ❑H Low -tide refugia (pools) vegetation Y r ❑I Sand bottom ❑C Multiple snags and logs (including lap trees) r ❑J 5% vertical bank along the marsh ®D 5% undercut banks and/or root mats and/or roots ❑K Little or no habitat in banks extend to the normal wetted perimeter ❑E Little or no habitat ***************************** 'REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate —assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a. ❑Yes ®No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). ®A Riffle -run section (evaluate 11c) ❑B Pool -glide section (evaluate 11d) ❑C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffle sections, check all that occur below the normal wetted perimeter of the assessment reach — whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but < 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P ® ❑ ❑ ❑ ❑ Bedrock/saprolite ® ❑ ❑ ❑ ❑ Boulder (256 — 4096 mm) ❑ ® ❑ ❑ ❑ Cobble (64 — 256 mm) ❑ ❑ ® ❑ ❑ Gravel (2 — 64 mm) ❑ ❑ ❑ ® ❑ Sand (.062 — 2 mm) ❑ ❑ ❑ ® ❑ Silt/clay (< 0.062 mm) ❑ ® ❑ ❑ ❑ Detritus ❑ ® ❑ ❑ ❑ Artificial (rip -rap, concrete, etc.) 11 d. ❑Yes ❑No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life — assessment reach metric (skip for Tidal Marsh Streams) 12a. ®Yes ❑No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. ❑No Water ❑Other: 12b. ®Yes ❑No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for Size 1 and 2 streams and "taxa" for Size 3 and 4 streams. ❑ ❑Adult frogs ❑ ❑Aquatic reptiles ❑ ❑Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) ❑ ❑Beetles ❑ ❑Caddisfly larvae (T) ❑ ❑Asian clam (Corbicula) ❑ ❑Crustacean (isopod/amphipod/crayfish/shrimp) ❑ ❑Damselfly and dragonfly larvae ❑ ❑Dipterans ❑ ❑Mayfly larvae (E) ❑ ❑Megaloptera (alderfly, fishfly, dobsonfly larvae) ❑ ❑Midges/mosquito larvae ❑ ❑Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) ❑ ❑Mussels/Clams (not Corbicula) ❑ ®Other fish ❑ ❑ Sal amanders/tadpoles ❑ ®Snails ❑ ❑Stonefly larvae (P) ❑ ❑Tipulid larvae ❑ ❑Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB ❑A ❑A Little or no alteration to water storage capacity over a majority of the streamside area ❑B ❑B Moderate alteration to water storage capacity over a majority of the streamside area ❑C ❑C Severe alteration to water storage capacity over a majority of the streamside area (examples: ditches, fill, soil compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB ❑A ❑A Majority of streamside area with depressions able to pond water >_ 6 inches deep ❑B ❑B Majority of streamside area with depressions able to pond water 3 to 6 inches deep ❑C ❑C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB ❑Y ❑Y Are wetlands present in the streamside area? ON ON 16. Baseflow Contributors — assessment reach metric (skip for Size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. ®A Streams and/or springs (jurisdictional discharges) ❑B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) ❑C Obstruction passing flow during low -flow periods within the assessment area (beaver dam, leaky dam, bottom -release dam, weir) ❑D Evidence of bank seepage or sweating (iron in water indicates seepage) ®E Stream bed or bank soil reduced (dig through deposited sediment if present) ❑F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. ❑A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) ❑B Obstruction not passing flow during low -flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) ❑C Urban stream (>_ 24% impervious surface for watershed) ❑D Evidence that the streamside area has been modified resulting in accelerated drainage into the assessment reach ❑E Assessment reach relocated to valley edge OF None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. ®A Stream shading is appropriate for stream category (may include gaps associated with natural processes) ❑B Degraded (example: scattered trees) ❑C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB ®A ®A ❑A ®A >_ 100 feet wide or extends to the edge of the watershed ❑B ❑B ®B ❑B From 50 to < 100 feet wide ❑C ❑C ❑C ❑C From 30 to < 50 feet wide ❑D ❑D ❑D ❑D From 10 to < 30 feet wide ❑E ❑E ❑E ❑E < 10 feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB ®A ®A Mature forest ❑B ❑B Non -mature woody vegetation or modified vegetation structure ❑C ❑C Herbaceous vegetation with or without a strip of trees < 10 feet wide ❑D ❑D Maintained shrubs ❑E ❑E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB ❑A ❑A ❑A ❑A ❑A ❑A Row crops ❑B ❑B ❑B ❑B ❑B ❑B Maintained turf ❑C ❑C ❑C ❑C ❑C ❑C Pasture (no livestock)/commercial horticulture ❑D ❑D ❑D ❑D ❑D ❑D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB ®A ®A Medium to high stem density ❑B ❑B Low stem density ❑C ❑C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer — streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10 feet wide. LB RB ®A ®A The total length of buffer breaks is < 25 percent. ❑B ❑B The total length of buffer breaks is between 25 and 50 percent. ❑C ❑C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB ®A ®A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. ❑B ❑B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. ❑C ❑C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity —assessment reach metric (skip for all Coastal Plain streams) 25a. ❑Yes ®No Was conductivity measurement recorded? If No, select one of the following reasons. ❑No Water ❑Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ❑A < 46 ❑B 46 to < 67 ❑C 67 to < 79 ❑D 79 to < 230 ❑E >_ 230 Notes/Sketch Draft INC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name CLT10 SA Date of Assessment 11/10/2022 Stream Category Pb1 Assessor Name/Organization A. Coleman and T.Walker/Stantec Notes of Field Assessment Form (Y/N) NO Presence of regulatory considerations (Y/N) NO Additional stream information/supplementary measurements included (Y/N) YES NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Perennial USACE/ NCDWR Function Class Rating Summary All Streams Intermittent (1) Hydrology LOW (2) Baseflow HIGH (2) Flood Flow LOW (3) Streamside Area Attenuation MEDIUM (4) Floodplain Access MEDIUM (4) Wooded Riparian Buffer HIGH (4) Microtopography NA (3) Stream Stability LOW (4) Channel Stability MEDIUM (4) Sediment Transport LOW (4) Stream Geomorphology LOW (2) Stream/Intertidal Zone Interaction NA (2) Longitudinal Tidal Flow NA (2) Tidal Marsh Stream Stability NA (3) Tidal Marsh Channel Stability NA (3) Tidal Marsh Stream Geomorphology NA (1) Water Quality MEDIUM (2) Baseflow HIGH (2) Streamside Area Vegetation HIGH (3) Upland Pollutant Filtration HIGH (3) Thermoregulation HIGH (2) Indicators of Stressors NO (2) Aquatic Life Tolerance LOW (2) Intertidal Zone Filtration NA (1) Habitat MEDIUM (2) In -stream Habitat LOW (3) Baseflow HIGH (3) Substrate LOW (3) Stream Stability MEDIUM (3) In -stream Habitat MEDIUM (2) Stream -side Habitat HIGH (3) Stream -side Habitat HIGH (3) Thermoregulation HIGH (2) Tidal Marsh In -stream Habitat NA (3) Flow Restriction NA (3) Tidal Marsh Stream Stability NA (4) Tidal Marsh Channel Stability NA (4) Tidal Marsh Stream Geomorphology NA (3) Tidal Marsh In -stream Habitat NA (2) Intertidal Zone NA Overall MEDIUM NC SAM FIELD ASSESSMENT RESULTS Accompanies user ivianuai version c.,i I USACE AID #: NCDWR #: I INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT/SITE INFORMATION: 1. Project name (if any): CLT10 2. Date of evaluation: 11/10/2022 3. Applicant/owner name: Microsoft 4. Assessor name/organization: T.Walker/M Ruiz/A Coleman 5. County: Catawba 6. Nearest named water body 7. River basin: Catawba on USGS 7.5-minute quad: Clark Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.589233,-81.231894 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): SA Int 10. Length of assessment reach evaluated (feet): 100 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 5 ❑Unable to assess channel depth. 12. Channel width at top of bank (feet): 4 13. Is assessment reach a swamp steam? ❑Yes ❑No 14. Feature type: ❑Perennial flow ®Intermittent flow ❑Tidal Marsh Stream STREAM CATEGORY INFORMATION: 15. NC SAM Zone: ❑ Mountains (M) ® Piedmont (P) ❑ Inner Coastal Plain (I) ❑ Outer Coastal Plain (0) 16. Estimated geomorphic ❑AL J valley shape (skip for Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip ®Size 1 (< 0.1 mi2) ❑Size 2 (0.1 to < 0.5 mil) ❑Size 3 (0.5 to < 5 mil) ❑Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? ®Yes ❑No If Yes, check all that apply to the assessment area. ❑Section 10 water ❑Classified Trout Waters ❑Water Supply Watershed (❑I ❑II ❑III ❑IV ❑V) ❑Essential Fish Habitat ❑Primary Nursery Area ❑ High Quality Waters/Outstanding Resource Waters ❑Publicly owned property ❑NCDWR Riparian buffer rule in effect ❑Nutrient Sensitive Waters ❑Anadromous fish ❑303(d) List ❑CAMA Area of Environmental Concern (AEC) ❑Documented presence of a federal and/or state listed protected species within the assessment area. List species: ❑Designated Critical Habitat (list species) 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? ❑Yes ❑No 1. Channel Water — assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) ❑A Water throughout assessment reach. ❑B No flow, water in pools only. ❑C No water in assessment reach. 2. Evidence of Flow Restriction — assessment reach metric ❑A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is severely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impoundment on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates, debris jams, beaver dams). ®B Not 3. Feature Pattern — assessment reach metric ®A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). ❑B Not 4. Feature Longitudinal Profile — assessment reach metric ®A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). ❑B Not 5. Signs of Active Instability — assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). ❑A < 10% of channel unstable ❑B 10 to 25% of channel unstable ®C > 25% of channel unstable Streamside Area Interaction — streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB ❑A ❑A Little or no evidence of conditions that adversely affect reference interaction ❑B ❑B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) ®C ®C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide Water Quality Stressors — assessment reach/intertidal zone metric Check all that apply. ❑A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) ❑B Excessive sedimentation (burying of stream features or intertidal zone) ❑C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem ❑D Odor (not including natural sulfide odors) ❑E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in "Notes/Sketch" section. ❑F Livestock with access to stream or intertidal zone ❑G Excessive algae in stream or intertidal zone ❑H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc) ❑I Other: (explain in "Notes/Sketch" section) ®J Little to no stressors 8. Recent Weather — watershed metric (skip for Tidal Marsh Streams) For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. ❑A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours ❑B Drought conditions and rainfall exceeding 1 inch within the last 48 hours ®C No drought conditions 9. Large or Dangerous Stream — assessment reach metric ❑Yes ®No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types — assessment reach metric 10a. ®Yes ❑No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for Size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) ❑A Multiple aquatic macrophytes and aquatic mosses W ❑F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) M ❑G Submerged aquatic vegetation ❑B Multiple sticks and/or leaf packs and/or emergent o w ❑H Low -tide refugia (pools) vegetation Y r ❑I Sand bottom ❑C Multiple snags and logs (including lap trees) r ❑J 5% vertical bank along the marsh ❑D 5% undercut banks and/or root mats and/or roots ❑K Little or no habitat in banks extend to the normal wetted perimeter ®E Little or no habitat ***************************** 'REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate —assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a. ❑Yes ®No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). ®A Riffle -run section (evaluate 11c) ❑B Pool -glide section (evaluate 11d) ❑C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffle sections, check all that occur below the normal wetted perimeter of the assessment reach — whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but < 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P ® ❑ ❑ ❑ ❑ Bedrock/saprolite ® ❑ ❑ ❑ ❑ Boulder (256 — 4096 mm) ❑ ® ❑ ❑ ❑ Cobble (64 — 256 mm) ❑ ® ❑ ❑ ❑ Gravel (2 — 64 mm) ❑ ❑ ❑ ® ❑ Sand (.062 — 2 mm) ❑ ❑ ❑ ® ❑ Silt/clay (< 0.062 mm) ❑ ® ❑ ❑ ❑ Detritus ® ❑ ❑ ❑ ❑ Artificial (rip -rap, concrete, etc.) 11 d. ❑Yes ❑No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life — assessment reach metric (skip for Tidal Marsh Streams) 12a. ®Yes ❑No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. ❑No Water ❑Other: 12b. ❑Yes ®No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for Size 1 and 2 streams and "taxa" for Size 3 and 4 streams. ❑ ❑Adult frogs ❑ ❑Aquatic reptiles ❑ ❑Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) ❑ ❑Beetles ❑ ❑Caddisfly larvae (T) ❑ ❑Asian clam (Corbicula) ❑ ❑Crustacean (isopod/amphipod/crayfish/shrimp) ❑ ❑Damselfly and dragonfly larvae ❑ ❑Dipterans ❑ ❑Mayfly larvae (E) ❑ ❑Megaloptera (alderfly, fishfly, dobsonfly larvae) ❑ ❑Midges/mosquito larvae ❑ ❑Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) ❑ ❑Mussels/Clams (not Corbicula) ❑ ❑Other fish ❑ ❑ Sal amanders/tadpoles ❑ ❑Snails ❑ ❑Stonefly larvae (P) ❑ ❑Tipulid larvae ❑ ❑Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB ❑A ❑A Little or no alteration to water storage capacity over a majority of the streamside area ❑B ❑B Moderate alteration to water storage capacity over a majority of the streamside area ❑C ❑C Severe alteration to water storage capacity over a majority of the streamside area (examples: ditches, fill, soil compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB ❑A ❑A Majority of streamside area with depressions able to pond water >_ 6 inches deep ❑B ❑B Majority of streamside area with depressions able to pond water 3 to 6 inches deep ❑C ❑C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB ❑Y ❑Y Are wetlands present in the streamside area? ON ON 16. Baseflow Contributors — assessment reach metric (skip for Size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. ®A Streams and/or springs (jurisdictional discharges) ❑B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) ❑C Obstruction passing flow during low -flow periods within the assessment area (beaver dam, leaky dam, bottom -release dam, weir) ❑D Evidence of bank seepage or sweating (iron in water indicates seepage) ®E Stream bed or bank soil reduced (dig through deposited sediment if present) ❑F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. ❑A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) ❑B Obstruction not passing flow during low -flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) ❑C Urban stream (>_ 24% impervious surface for watershed) ❑D Evidence that the streamside area has been modified resulting in accelerated drainage into the assessment reach ❑E Assessment reach relocated to valley edge OF None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. ®A Stream shading is appropriate for stream category (may include gaps associated with natural processes) ❑B Degraded (example: scattered trees) ❑C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB ®A ®A ®A ®A >_ 100 feet wide or extends to the edge of the watershed ❑B ❑B ❑B ❑B From 50 to < 100 feet wide ❑C ❑C ❑C ❑C From 30 to < 50 feet wide ❑D ❑D ❑D ❑D From 10 to < 30 feet wide ❑E ❑E ❑E ❑E < 10 feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB ®A ®A Mature forest ❑B ❑B Non -mature woody vegetation or modified vegetation structure ❑C ❑C Herbaceous vegetation with or without a strip of trees < 10 feet wide ❑D ❑D Maintained shrubs ❑E ❑E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB ❑A ❑A ❑A ❑A ❑A ❑A Row crops ❑B ❑B ❑B ❑B ❑B ❑B Maintained turf ❑C ❑C ❑C ❑C ❑C ❑C Pasture (no livestock)/commercial horticulture ❑D ❑D ❑D ❑D ❑D ❑D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB ®A ®A Medium to high stem density ❑B ❑B Low stem density ❑C ❑C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer — streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10 feet wide. LB RB ®A ®A The total length of buffer breaks is < 25 percent. ❑B ❑B The total length of buffer breaks is between 25 and 50 percent. ❑C ❑C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB ®A ®A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. ❑B ❑B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. ❑C ❑C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity —assessment reach metric (skip for all Coastal Plain streams) 25a. ❑Yes ®No Was conductivity measurement recorded? If No, select one of the following reasons. ❑No Water ❑Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ❑A < 46 ❑B 46 to < 67 ❑C 67 to < 79 ❑D 79 to < 230 ❑E >_ 230 Notes/Sketch Draft INC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name CLT10 SA Int Date of Assessment 11/10/2022 Stream Category Pb1 Assessor Name/Organization T.Walker/M Ruiz/A Coleman Notes of Field Assessment Form (Y/N) NO Presence of regulatory considerations (Y/N) NO Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Intermittent USACE/ NCDWR Function Class Rating Summary All Streams Intermittent (1) Hydrology LOW LOW (2) Baseflow HIGH HIGH (2) Flood Flow LOW LOW (3) Streamside Area Attenuation LOW LOW (4) Floodplain Access LOW LOW (4) Wooded Riparian Buffer HIGH HIGH (4) Microtopography NA NA (3) Stream Stability LOW LOW (4) Channel Stability LOW LOW (4) Sediment Transport LOW LOW (4) Stream Geomorphology LOW LOW (2) Stream/Intertidal Zone Interaction NA NA (2) Longitudinal Tidal Flow NA NA (2) Tidal Marsh Stream Stability NA NA (3) Tidal Marsh Channel Stability NA NA (3) Tidal Marsh Stream Geomorphology NA NA (1) Water Quality HIGH HIGH (2) Baseflow HIGH HIGH (2) Streamside Area Vegetation HIGH HIGH (3) Upland Pollutant Filtration HIGH HIGH (3) Thermoregulation HIGH HIGH (2) Indicators of Stressors NO NO (2) Aquatic Life Tolerance HIGH NA (2) Intertidal Zone Filtration NA NA (1) Habitat MEDIUM MEDIUM (2) In -stream Habitat LOW LOW (3) Baseflow HIGH HIGH (3) Substrate LOW LOW (3) Stream Stability LOW LOW (3) In -stream Habitat LOW LOW (2) Stream -side Habitat HIGH HIGH (3) Stream -side Habitat MEDIUM MEDIUM (3) Thermoregulation HIGH HIGH (2) Tidal Marsh In -stream Habitat NA NA (3) Flow Restriction NA NA (3) Tidal Marsh Stream Stability NA NA (4) Tidal Marsh Channel Stability NA NA (4) Tidal Marsh Stream Geomorphology NA NA (3) Tidal Marsh In -stream Habitat NA NA (2) Intertidal Zone NA NA Overall MEDIUM MEDIUM NC SAM FIELD ASSESSMENT RESULTS Accompanies user ivianuai version c.,i USACE AID #: NCDWR #: INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT/SITE INFORMATION: 1. Project name (if any): CLT10 2. Date of evaluation: 11/10/2022 3. Applicant/owner name: Microsoft 4. Assessor name/organization: T.Walker/M Ruiz/A Coleman 5. County: Catawba 6. Nearest named water body 7. River basin: Catawba on USGS 7.5-minute quad: Clark Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.589276,-81.232182 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): SB 10. Length of assessment reach evaluated (feet): 100 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 5 ❑Unable to assess channel depth. 12. Channel width at top of bank (feet): 4 13. Is assessment reach a swamp steam? ❑Yes ❑No 14. Feature type: ❑Perennial flow ®Intermittent flow ❑Tidal Marsh Stream STREAM CATEGORY INFORMATION: 15. NC SAM Zone: ❑ Mountains (M) ® Piedmont (P) ❑ Inner Coastal Plain (I) ❑ Outer Coastal Plain (0) 16. Estimated geomorphic ❑A ®B valley shape (skip for Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip ®Size 1 (< 0.1 mi2) ❑Size 2 (0.1 to < 0.5 mil) ❑Size 3 (0.5 to < 5 mil) ❑Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? ®Yes ❑No If Yes, check all that apply to the assessment area. ❑Section 10 water ❑Classified Trout Waters ❑Water Supply Watershed (❑I ❑II ❑III ❑IV ❑V) ❑Essential Fish Habitat ❑Primary Nursery Area ❑ High Quality Waters/Outstanding Resource Waters ❑Publicly owned property ❑NCDWR Riparian buffer rule in effect ❑Nutrient Sensitive Waters ❑Anadromous fish ❑303(d) List ❑CAMA Area of Environmental Concern (AEC) ❑Documented presence of a federal and/or state listed protected species within the assessment area. List species: ❑Designated Critical Habitat (list species) 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? ❑Yes ❑No 1. Channel Water — assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) ❑A Water throughout assessment reach. ❑B No flow, water in pools only. ❑C No water in assessment reach. 2. Evidence of Flow Restriction — assessment reach metric ❑A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is severely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impoundment on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates, debris jams, beaver dams). ®B Not 3. Feature Pattern — assessment reach metric ®A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). ❑B Not 4. Feature Longitudinal Profile — assessment reach metric ®A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). ❑B Not 5. Signs of Active Instability — assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). ❑A < 10% of channel unstable ❑B 10 to 25% of channel unstable ®C > 25% of channel unstable Streamside Area Interaction — streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB ❑A ❑A Little or no evidence of conditions that adversely affect reference interaction ❑B ❑B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) ®C ®C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide Water Quality Stressors — assessment reach/intertidal zone metric Check all that apply. ❑A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) ❑B Excessive sedimentation (burying of stream features or intertidal zone) ❑C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem ❑D Odor (not including natural sulfide odors) ❑E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in "Notes/Sketch" section. ❑F Livestock with access to stream or intertidal zone ❑G Excessive algae in stream or intertidal zone ❑H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc) ❑I Other: (explain in "Notes/Sketch" section) ®J Little to no stressors 8. Recent Weather — watershed metric (skip for Tidal Marsh Streams) For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. ❑A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours ❑B Drought conditions and rainfall exceeding 1 inch within the last 48 hours ®C No drought conditions 9. Large or Dangerous Stream — assessment reach metric ❑Yes ®No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types —assessment reach metric 10a. ®Yes ❑No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for Size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) ❑A Multiple aquatic macrophytes and aquatic mosses F, W ❑F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) F E ❑G Submerged aquatic vegetation ❑B Multiple sticks and/or leaf packs and/or emergent o w ❑H Low -tide refugia (pools) vegetation Y r ❑I Sand bottom ❑C Multiple snags and logs (including lap trees) r ❑J 5% vertical bank along the marsh ❑D 5% undercut banks and/or root mats and/or roots 0 :5 ❑K Little or no habitat in banks extend to the normal wetted perimeter ®E Little or no habitat ***************************** 'REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate —assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a. ❑Yes ®No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). ®A Riffle -run section (evaluate 11c) ❑B Pool -glide section (evaluate 11d) ❑C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffle sections, check all that occur below the normal wetted perimeter of the assessment reach — whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but < 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P ® ❑ ❑ ❑ ❑ Bedrock/saprolite ® ❑ ❑ ❑ ❑ Boulder (256 — 4096 mm) ❑ ® ❑ ❑ ❑ Cobble (64 — 256 mm) ❑ ® ❑ ❑ ❑ Gravel (2 — 64 mm) ❑ ❑ ❑ ® ❑ Sand (.062 — 2 mm) ❑ ❑ ❑ ® ❑ Silt/clay (< 0.062 mm) ❑ ® ❑ ❑ ❑ Detritus ® ❑ ❑ ❑ ❑ Artificial (rip -rap, concrete, etc.) 11d. ❑Yes ❑No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life — assessment reach metric (skip for Tidal Marsh Streams) 12a. ®Yes ❑No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. ❑No Water ❑Other: 12b. ❑Yes ®No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for Size 1 and 2 streams and "taxa" for Size 3 and 4 streams. ❑ ❑Adult frogs ❑ ❑Aquatic reptiles ❑ ❑Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) ❑ ❑Beetles ❑ ❑Caddisfly larvae (T) ❑ ❑Asian clam (Corbicula) ❑ ❑Crustacean (isopod/amphipod/crayfish/shrimp) ❑ ❑Damselfly and dragonfly larvae ❑ ❑Dipterans ❑ ❑Mayfly larvae (E) ❑ ❑Megaloptera (alderfly, fishfly, dobsonfly larvae) ❑ ❑Midges/mosquito larvae ❑ ❑Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) ❑ ❑Mussels/Clams (not Corbicula) ❑ ❑Other fish ❑ ❑ Sal amanders/tadpoles ❑ ❑Snails ❑ ❑Stonefly larvae (P) ❑ ❑Tipulid larvae ❑ ❑Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB ❑A ❑A Little or no alteration to water storage capacity over a majority of the streamside area ❑B ❑B Moderate alteration to water storage capacity over a majority of the streamside area ❑C ❑C Severe alteration to water storage capacity over a majority of the streamside area (examples: ditches, fill, soil compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB ❑A ❑A Majority of streamside area with depressions able to pond water >_ 6 inches deep ❑B ❑B Majority of streamside area with depressions able to pond water 3 to 6 inches deep ❑C ❑C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB ❑Y ❑Y Are wetlands present in the streamside area? ON ON 16. Baseflow Contributors — assessment reach metric (skip for Size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. ®A Streams and/or springs (jurisdictional discharges) ❑B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) ❑C Obstruction passing flow during low -flow periods within the assessment area (beaver dam, leaky dam, bottom -release dam, weir) ❑D Evidence of bank seepage or sweating (iron in water indicates seepage) ®E Stream bed or bank soil reduced (dig through deposited sediment if present) ❑F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. ❑A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) ❑B Obstruction not passing flow during low -flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) ❑C Urban stream (>_ 24% impervious surface for watershed) ❑D Evidence that the streamside area has been modified resulting in accelerated drainage into the assessment reach ❑E Assessment reach relocated to valley edge OF None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. ®A Stream shading is appropriate for stream category (may include gaps associated with natural processes) ❑B Degraded (example: scattered trees) ❑C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB ®A ®A ®A ®A >_ 100 feet wide or extends to the edge of the watershed ❑B ❑B ❑B ❑B From 50 to < 100 feet wide ❑C ❑C ❑C ❑C From 30 to < 50 feet wide ❑D ❑D ❑D ❑D From 10 to < 30 feet wide ❑E ❑E ❑E ❑E < 10 feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB ®A ®A Mature forest ❑B ❑B Non -mature woody vegetation or modified vegetation structure ❑C ❑C Herbaceous vegetation with or without a strip of trees < 10 feet wide ❑D ❑D Maintained shrubs ❑E ❑E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB ❑A ❑A ❑A ❑A ❑A ❑A Row crops ❑B ❑B ❑B ❑B ❑B ❑B Maintained turf ❑C ❑C ❑C ❑C ❑C ❑C Pasture (no livestock)/commercial horticulture ❑D ❑D ❑D ❑D ❑D ❑D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB ®A ®A Medium to high stem density ❑B ❑B Low stem density ❑C ❑C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer — streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10 feet wide. LB RB ®A ®A The total length of buffer breaks is < 25 percent. ❑B ❑B The total length of buffer breaks is between 25 and 50 percent. ❑C ❑C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB ®A ®A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. ❑B ❑B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. ❑C ❑C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity —assessment reach metric (skip for all Coastal Plain streams) 25a. ❑Yes ®No Was conductivity measurement recorded? If No, select one of the following reasons. ❑No Water ❑Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ❑A < 46 ❑B 46 to < 67 ❑C 67 to < 79 ❑D 79 to < 230 ❑E >_ 230 Notes/Sketch Draft INC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name CLT10 SB Int Date of Assessment 11/10/2022 Stream Category Pb1 Assessor Name/Organization T.Walker/M Ruiz/A Coleman Notes of Field Assessment Form (Y/N) NO Presence of regulatory considerations (Y/N) NO Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Intermittent USACE/ NCDWR Function Class Rating Summary All Streams Intermittent (1) Hydrology LOW LOW (2) Baseflow HIGH HIGH (2) Flood Flow LOW LOW (3) Streamside Area Attenuation LOW LOW (4) Floodplain Access LOW LOW (4) Wooded Riparian Buffer HIGH HIGH (4) Microtopography NA NA (3) Stream Stability LOW LOW (4) Channel Stability LOW LOW (4) Sediment Transport LOW LOW (4) Stream Geomorphology LOW LOW (2) Stream/Intertidal Zone Interaction NA NA (2) Longitudinal Tidal Flow NA NA (2) Tidal Marsh Stream Stability NA NA (3) Tidal Marsh Channel Stability NA NA (3) Tidal Marsh Stream Geomorphology NA NA (1) Water Quality HIGH HIGH (2) Baseflow HIGH HIGH (2) Streamside Area Vegetation HIGH HIGH (3) Upland Pollutant Filtration HIGH HIGH (3) Thermoregulation HIGH HIGH (2) Indicators of Stressors NO NO (2) Aquatic Life Tolerance HIGH NA (2) Intertidal Zone Filtration NA NA (1) Habitat MEDIUM MEDIUM (2) In -stream Habitat LOW LOW (3) Baseflow HIGH HIGH (3) Substrate LOW LOW (3) Stream Stability LOW LOW (3) In -stream Habitat LOW LOW (2) Stream -side Habitat HIGH HIGH (3) Stream -side Habitat MEDIUM MEDIUM (3) Thermoregulation HIGH HIGH (2) Tidal Marsh In -stream Habitat NA NA (3) Flow Restriction NA NA (3) Tidal Marsh Stream Stability NA NA (4) Tidal Marsh Channel Stability NA NA (4) Tidal Marsh Stream Geomorphology NA NA (3) Tidal Marsh In -stream Habitat NA NA (2) Intertidal Zone NA NA Overall MEDIUM MEDIUM NC SAM FIELD ASSESSMENT RESULTS Accompanies User Manual Version 2.1 USACE AID #: NCDWR #: INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT/SITE INFORMATION: 1. Project name (if any): CLT10 3. Applicant/owner name: Microsoft 5. County: Catawba 7. River basin: Catawba 2. Date of evaluation: 11/10/2022 4. Assessor name/organization: T.Walker/M Ruiz/ A Coleman 6. Nearest named water body on USGS 7.5-minute quad: Clark Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.594952,-81.234701 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): SC 10. Length of assessment reach evaluated (feet): 100 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 4 ❑Unable to assess channel depth. 12. Channel width at top of bank (feet): 6 13. Is assessment reach a swamp steam? ❑Yes ❑No 14. Feature type: ®Perennial flow ❑Intermittent flow ❑Tidal Marsh Stream STREAM CATEGORY INFORMATION: 15. NC SAM Zone: ❑ Mountains (M) ® Piedmont (P) ❑ Inner Coastal Plain (1) ❑ Outer Coastal Plain (0) 16. Estimated geomorphic ❑A� J ®B valley shape (skip for Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip ®Size 1 (< 0.1 mi2) ❑Size 2 (0.1 to < 0.5 mil) ❑Size 3 (0.5 to < 5 mil) ❑Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? ®Yes ❑No If Yes, check all that apply to the assessment area. ❑Section 10 water ❑Classified Trout Waters ❑Water Supply Watershed (❑l ❑II ❑III ❑IV ❑V) ❑Essential Fish Habitat ❑Primary Nursery Area ❑ High Quality Waters/Outstanding Resource Waters ❑Publicly owned property ❑NCDWR Riparian buffer rule in effect ❑Nutrient Sensitive Waters ❑Anadromous fish ❑303(d) List ❑CAMA Area of Environmental Concern (AEC) ❑Documented presence of a federal and/or state listed protected species within the assessment area. List species: ❑Designated Critical Habitat (list species) 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? ❑Yes ❑No 1. Channel Water - assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) ❑A Water throughout assessment reach. ❑B No flow, water in pools only. ❑C No water in assessment reach. 2. Evidence of Flow Restriction - assessment reach metric ❑A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is severely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impoundment on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates, debris jams, beaver dams). ®B Not 3. Feature Pattern - assessment reach metric ®A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). ❑B Not 4. Feature Longitudinal Profile - assessment reach metric ®A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). ❑B Not 5. Signs of Active Instability - assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). ®A < 10% of channel unstable ❑B 10 to 25% of channel unstable ❑C > 25% of channel unstable Streamside Area Interaction — streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB ❑A ❑A Little or no evidence of conditions that adversely affect reference interaction ®B ®B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) ❑C ❑C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide Water Quality Stressors — assessment reach/intertidal zone metric Check all that apply. ❑A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) ❑B Excessive sedimentation (burying of stream features or intertidal zone) ❑C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem ❑D Odor (not including natural sulfide odors) ❑E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in "Notes/Sketch" section. ❑F Livestock with access to stream or intertidal zone ❑G Excessive algae in stream or intertidal zone ❑H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc) ❑I Other: (explain in "Notes/Sketch" section) ®J Little to no stressors 8. Recent Weather — watershed metric (skip for Tidal Marsh Streams) For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. ❑A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours ❑B Drought conditions and rainfall exceeding 1 inch within the last 48 hours ®C No drought conditions 9. Large or Dangerous Stream — assessment reach metric ❑Yes ®No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types — assessment reach metric 10a. ❑Yes ®No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for Size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) ❑A Multiple aquatic macrophytes and aquatic mosses W ❑F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) F M ❑G Submerged aquatic vegetation ®B Multiple sticks and/or leaf packs and/or emergent o w ❑H Low -tide refugia (pools) vegetation Y r ❑I Sand bottom ❑C Multiple snags and logs (including lap trees) r ❑J 5% vertical bank along the marsh ®D 5% undercut banks and/or root mats and/or roots ❑K Little or no habitat in banks extend to the normal wetted perimeter ❑E Little or no habitat ***************************** 'REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate —assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11a. ®Yes ❑No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). ®A Riffle -run section (evaluate 11c) ❑B Pool -glide section (evaluate 11d) ❑C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffle sections, check all that occur below the normal wetted perimeter of the assessment reach — whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but < 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P ® ❑ ❑ ❑ ❑ Bedrock/saprolite ® ❑ ❑ ❑ ❑ Boulder (256 — 4096 mm) ❑ ® ❑ ❑ ❑ Cobble (64 — 256 mm) ❑ ❑ ❑ ❑ ❑ Gravel (2 — 64 mm) ❑ ❑ ❑ ® ❑ Sand (.062 — 2 mm) ❑ ❑ ® ❑ ❑ Silt/clay (< 0.062 mm) ❑ ® ❑ ❑ ❑ Detritus ® ❑ ❑ ❑ ❑ Artificial (rip -rap, concrete, etc.) 11 d. ❑Yes ❑No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life — assessment reach metric (skip for Tidal Marsh Streams) 12a. ®Yes ❑No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. ❑No Water ❑Other: 12b. ®Yes ❑No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for Size 1 and 2 streams and "taxa" for Size 3 and 4 streams. ❑ ❑Adult frogs ❑ ❑Aquatic reptiles ® ❑Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) ❑ ❑Beetles ❑ ❑Caddisfly larvae (T) ❑ ❑Asian clam (Corbicula) ® ❑Crustacean (isopod/amphipod/crayfish/shrimp) ❑ ❑Damselfly and dragonfly larvae ❑ ❑Dipterans ❑ ❑Mayfly larvae (E) ❑ ❑Megaloptera (alderfly, fishfly, dobsonfly larvae) ❑ ❑Midges/mosquito larvae ❑ ❑Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) ❑ ❑Mussels/Clams (not Corbicula) ❑ ❑Other fish ❑ ❑ Sal amanders/tadpoles ❑ ❑Snails ❑ ❑Stonefly larvae (P) ❑ ❑Tipulid larvae ❑ ❑Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB ❑A ❑A Little or no alteration to water storage capacity over a majority of the streamside area ❑B ❑B Moderate alteration to water storage capacity over a majority of the streamside area ❑C ❑C Severe alteration to water storage capacity over a majority of the streamside area (examples: ditches, fill, soil compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB ❑A ❑A Majority of streamside area with depressions able to pond water >_ 6 inches deep ❑B ❑B Majority of streamside area with depressions able to pond water 3 to 6 inches deep ❑C ❑C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB ❑Y ❑Y Are wetlands present in the streamside area? ON ON 16. Baseflow Contributors — assessment reach metric (skip for Size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. ®A Streams and/or springs (jurisdictional discharges) ❑B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) ❑C Obstruction passing flow during low -flow periods within the assessment area (beaver dam, leaky dam, bottom -release dam, weir) ❑D Evidence of bank seepage or sweating (iron in water indicates seepage) ®E Stream bed or bank soil reduced (dig through deposited sediment if present) ❑F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. ❑A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) ❑B Obstruction not passing flow during low -flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) ❑C Urban stream (>_ 24% impervious surface for watershed) ❑D Evidence that the streamside area has been modified resulting in accelerated drainage into the assessment reach ❑E Assessment reach relocated to valley edge OF None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. ®A Stream shading is appropriate for stream category (may include gaps associated with natural processes) ❑B Degraded (example: scattered trees) ❑C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB ®A ®A ®A ®A >_ 100 feet wide or extends to the edge of the watershed ❑B ❑B ❑B ❑B From 50 to < 100 feet wide ❑C ❑C ❑C ❑C From 30 to < 50 feet wide ❑D ❑D ❑D ❑D From 10 to < 30 feet wide ❑E ❑E ❑E ❑E < 10 feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB ®A ®A Mature forest ❑B ❑B Non -mature woody vegetation or modified vegetation structure ❑C ❑C Herbaceous vegetation with or without a strip of trees < 10 feet wide ❑D ❑D Maintained shrubs ❑E ❑E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB ❑A ❑A ❑A ❑A ❑A ❑A Row crops ❑B ❑B ❑B ❑B ❑B ❑B Maintained turf ❑C ❑C ❑C ❑C ❑C ❑C Pasture (no livestock)/commercial horticulture ❑D ❑D ❑D ❑D ❑D ❑D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB ®A ®A Medium to high stem density ❑B ❑B Low stem density ❑C ❑C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer — streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10 feet wide. LB RB ®A ®A The total length of buffer breaks is < 25 percent. ❑B ❑B The total length of buffer breaks is between 25 and 50 percent. ❑C ❑C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB ®A ®A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. ❑B ❑B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. ❑C ❑C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity —assessment reach metric (skip for all Coastal Plain streams) 25a. ❑Yes ®No Was conductivity measurement recorded? If No, select one of the following reasons. ❑No Water ❑Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ❑A < 46 ❑B 46 to < 67 ❑C 67 to < 79 ❑D 79 to < 230 ❑E >_ 230 Notes/Sketch Draft INC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name CLT10 SC Date of Assessment 11/10/2022 Stream Category Pb1 Assessor Name/Organization T.Walker/M Ruiz/ A Coleman Notes of Field Assessment Form (Y/N) NO Presence of regulatory considerations (Y/N) NO Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Perennial USACE/ NCDWR Function Class Rating Summary All Streams Intermittent (1) Hydrology MEDIUM (2) Baseflow HIGH (2) Flood Flow MEDIUM (3) Streamside Area Attenuation HIGH (4) Floodplain Access HIGH (4) Wooded Riparian Buffer HIGH (4) Microtopography NA (3) Stream Stability LOW (4) Channel Stability HIGH (4) Sediment Transport LOW (4) Stream Geomorphology LOW (2) Stream/Intertidal Zone Interaction NA (2) Longitudinal Tidal Flow NA (2) Tidal Marsh Stream Stability NA (3) Tidal Marsh Channel Stability NA (3) Tidal Marsh Stream Geomorphology NA (1) Water Quality MEDIUM (2) Baseflow HIGH (2) Streamside Area Vegetation HIGH (3) Upland Pollutant Filtration HIGH (3) Thermoregulation HIGH (2) Indicators of Stressors NO (2) Aquatic Life Tolerance LOW (2) Intertidal Zone Filtration NA (1) Habitat HIGH (2) In -stream Habitat HIGH (3) Baseflow HIGH (3) Substrate HIGH (3) Stream Stability MEDIUM (3) In -stream Habitat HIGH (2) Stream -side Habitat HIGH (3) Stream -side Habitat HIGH (3) Thermoregulation HIGH (2) Tidal Marsh In -stream Habitat NA (3) Flow Restriction NA (3) Tidal Marsh Stream Stability NA (4) Tidal Marsh Channel Stability NA (4) Tidal Marsh Stream Geomorphology NA (3) Tidal Marsh In -stream Habitat NA (2) Intertidal Zone NA Overall MEDIUM NC SAM FIELD ASSESSMENT RESULTS Hccomnanies user ivianuai version z.i I USACE AID #: NCDWR #: I INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT/SITE INFORMATION: 1. Project name (if any): CLT10 3. Applicant/owner name: Microsoft 5. County: Catawba 7. River basin: Catawba Date of evaluation: 11/10/2022 Assessor name/organization: T.Walker/M Ruiz/ A Coleman Nearest named water body on USGS 7.5-minute quad: Clark Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.595055,-81.228903 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): SC-int 10. Length of assessment reach evaluated (feet): 100 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 2 ❑Unable to assess channel depth. 12. Channel width at top of bank (feet): 4 13. Is assessment reach a swamp steam? ❑Yes ❑No 14. Feature type: ❑Perennial flow ®Intermittent flow ❑Tidal Marsh Stream STREAM CATEGORY INFORMATION: 15. NC SAM Zone: ❑ Mountains (M) ® Piedmont (P) ❑ Inner Coastal Plain (1) ❑ Outer Coastal Plain (0) 16. Estimated geomorphic ❑A` J ®B valley shape (skip for Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip ®Size 1 (< 0.1 mi2) ❑Size 2 (0.1 to < 0.5 mil) ❑Size 3 (0.5 to < 5 mil) ❑Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? ®Yes ❑No If Yes, check all that apply to the assessment area. ❑Section 10 water ❑Classified Trout Waters ❑Water Supply Watershed (❑l ❑II ❑III ❑IV ❑V) ❑Essential Fish Habitat ❑Primary Nursery Area ❑ High Quality Waters/Outstanding Resource Waters ❑Publicly owned property ❑NCDWR Riparian buffer rule in effect ❑Nutrient Sensitive Waters ❑Anadromous fish ❑303(d) List ❑CAMA Area of Environmental Concern (AEC) ❑Documented presence of a federal and/or state listed protected species within the assessment area. List species: ❑Designated Critical Habitat (list species) 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? ®Yes ❑No 1. Channel Water — assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) ❑A Water throughout assessment reach. ❑B No flow, water in pools only. ❑C No water in assessment reach. 2. Evidence of Flow Restriction — assessment reach metric ❑A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is severely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impoundment on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates, debris jams, beaver dams). ®B Not 3. Feature Pattern — assessment reach metric ®A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). ❑B Not 4. Feature Longitudinal Profile — assessment reach metric ®A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). ❑B Not 5. Signs of Active Instability — assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). ®A < 10% of channel unstable ❑B 10 to 25% of channel unstable ❑C > 25% of channel unstable Streamside Area Interaction — streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB ❑A ❑A Little or no evidence of conditions that adversely affect reference interaction ®B ®B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) ❑C ❑C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide Water Quality Stressors — assessment reach/intertidal zone metric Check all that apply. ❑A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) ❑B Excessive sedimentation (burying of stream features or intertidal zone) ❑C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem ❑D Odor (not including natural sulfide odors) ❑E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in "Notes/Sketch" section. ❑F Livestock with access to stream or intertidal zone ❑G Excessive algae in stream or intertidal zone ❑H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc) ❑I Other: (explain in "Notes/Sketch" section) ®J Little to no stressors 8. Recent Weather — watershed metric (skip for Tidal Marsh Streams) For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. ❑A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours ❑B Drought conditions and rainfall exceeding 1 inch within the last 48 hours ®C No drought conditions 9. Large or Dangerous Stream — assessment reach metric ❑Yes ®No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types —assessment reach metric 10a. ❑Yes ®No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for Size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) ❑A Multiple aquatic macrophytes and aquatic mosses F, W ❑F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) 2 E ❑G Submerged aquatic vegetation ®B Multiple sticks and/or leaf packs and/or emergent o w ❑H Low -tide refugia (pools) vegetation Y r ❑I Sand bottom ❑C Multiple snags and logs (including lap trees) r ❑J 5% vertical bank along the marsh ❑D 5% undercut banks and/or root mats and/or roots 0 :5 ❑K Little or no habitat in banks extend to the normal wetted perimeter ❑E Little or no habitat ***************************** 'REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate —assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11 a. ❑Yes ®No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). ®A Riffle -run section (evaluate 11c) ❑B Pool -glide section (evaluate 11d) ❑C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffle sections, check all that occur below the normal wetted perimeter of the assessment reach — whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams). Not Present (NP) = absent, Rare (R) = present but < 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P ® ❑ ❑ ❑ ❑ Bedrock/saprolite ® ❑ ❑ ❑ ❑ Boulder (256 — 4096 mm) ® ❑ ❑ ❑ ❑ Cobble (64 — 256 mm) ❑ ® ❑ ❑ ❑ Gravel (2 — 64 mm) ❑ ❑ ® ❑ ❑ Sand (.062 — 2 mm) ❑ ❑ ® ❑ ❑ Silt/clay (< 0.062 mm) ❑ ® ❑ ❑ ❑ Detritus ® ❑ ❑ ❑ ❑ Artificial (rip -rap, concrete, etc.) 11 d. ❑Yes ❑No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life — assessment reach metric (skip for Tidal Marsh Streams) 12a. ®Yes ❑No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. ❑No Water ❑Other: 12b. ❑Yes ®No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for Size 1 and 2 streams and "taxa" for Size 3 and 4 streams. ❑ ❑Adult frogs ❑ ❑Aquatic reptiles ❑ ❑Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) ❑ ❑Beetles ❑ ❑Caddisfly larvae (T) ❑ ❑Asian clam (Corbicula) ❑ ❑Crustacean (isopod/amphipod/crayfish/shrimp) ❑ ❑Damselfly and dragonfly larvae ❑ ❑Dipterans ❑ ❑Mayfly larvae (E) ❑ ❑Megaloptera (alderfly, fishfly, dobsonfly larvae) ❑ ❑Midges/mosquito larvae ❑ ❑Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) ❑ ❑Mussels/Clams (not Corbicula) ❑ ❑Other fish ❑ ❑ Sal amanders/tadpoles ❑ ❑Snails ❑ ❑Stonefly larvae (P) ❑ ❑Tipulid larvae ❑ ❑Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB ❑A ❑A Little or no alteration to water storage capacity over a majority of the streamside area ❑B ❑B Moderate alteration to water storage capacity over a majority of the streamside area ❑C ❑C Severe alteration to water storage capacity over a majority of the streamside area (examples: ditches, fill, soil compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB ❑A ❑A Majority of streamside area with depressions able to pond water >_ 6 inches deep ❑B ❑B Majority of streamside area with depressions able to pond water 3 to 6 inches deep ❑C ❑C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB ❑Y ❑Y Are wetlands present in the streamside area? ®N ®N 16. Baseflow Contributors — assessment reach metric (skip for Size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. ❑A Streams and/or springs (jurisdictional discharges) ❑B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) ❑C Obstruction passing flow during low -flow periods within the assessment area (beaver dam, leaky dam, bottom -release dam, weir) ❑D Evidence of bank seepage or sweating (iron in water indicates seepage) ®E Stream bed or bank soil reduced (dig through deposited sediment if present) ❑F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. ❑A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) ❑B Obstruction not passing flow during low -flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) ❑C Urban stream (>_ 24% impervious surface for watershed) ❑D Evidence that the streamside area has been modified resulting in accelerated drainage into the assessment reach ❑E Assessment reach relocated to valley edge ®F None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. ®A Stream shading is appropriate for stream category (may include gaps associated with natural processes) ❑B Degraded (example: scattered trees) ❑C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB ®A ®A ®A ®A >_ 100 feet wide or extends to the edge of the watershed ❑B ❑B ❑B ❑B From 50 to < 100 feet wide ❑C ❑C ❑C ❑C From 30 to < 50 feet wide ❑D ❑D ❑D ❑D From 10 to < 30 feet wide ❑E ❑E ❑E ❑E < 10 feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB ®A ®A Mature forest ❑B ❑B Non -mature woody vegetation or modified vegetation structure ❑C ❑C Herbaceous vegetation with or without a strip of trees < 10 feet wide ❑D ❑D Maintained shrubs ❑E ❑E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB ❑A ❑A ❑A ❑A ❑A ❑A Row crops ❑B ❑B ❑B ❑B ❑B ❑B Maintained turf ❑C ❑C ❑C ❑C ❑C ❑C Pasture (no livestock)/commercial horticulture ❑D ❑D ❑D ❑D ❑D ❑D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB ®A ®A Medium to high stem density ❑B ❑B Low stem density ❑C ❑C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer — streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10 feet wide. LB RB ®A ®A The total length of buffer breaks is < 25 percent. ❑B ❑B The total length of buffer breaks is between 25 and 50 percent. ❑C ❑C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB ®A ®A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. ❑B ❑B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. ❑C ❑C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity —assessment reach metric (skip for all Coastal Plain streams) 25a. ❑Yes ®No Was conductivity measurement recorded? If No, select one of the following reasons. ❑No Water ❑Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ❑A < 46 ❑B 46 to < 67 ❑C 67 to < 79 ❑D 79 to < 230 ❑E >_ 230 Notes/Sketch: This section of SC has been straightened in the past. Riparian zone is forested and made of primarily successional native vegetation Draft INC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name CLT10 SC Int Date of Assessment 11/10/2022 Stream Category Pb1 Assessor Name/Organization T.Walker/M Ruiz/ A Coleman Notes of Field Assessment Form (Y/N) YES Presence of regulatory considerations (Y/N) NO Additional stream information/supplementary measurements included (Y/N) YES NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Intermittent USACE/ NCDWR Function Class Rating Summary All Streams Intermittent (1) Hydrology LOW LOW (2) Baseflow HIGH HIGH (2) Flood Flow LOW LOW (3) Streamside Area Attenuation MEDIUM MEDIUM (4) Floodplain Access MEDIUM MEDIUM (4) Wooded Riparian Buffer HIGH HIGH (4) Microtopography NA NA (3) Stream Stability LOW LOW (4) Channel Stability HIGH HIGH (4) Sediment Transport LOW LOW (4) Stream Geomorphology LOW LOW (2) Stream/Intertidal Zone Interaction NA NA (2) Longitudinal Tidal Flow NA NA (2) Tidal Marsh Stream Stability NA NA (3) Tidal Marsh Channel Stability NA NA (3) Tidal Marsh Stream Geomorphology NA NA (1) Water Quality MEDIUM MEDIUM (2) Baseflow HIGH HIGH (2) Streamside Area Vegetation HIGH HIGH (3) Upland Pollutant Filtration HIGH HIGH (3) Thermoregulation HIGH HIGH (2) Indicators of Stressors NO NO (2) Aquatic Life Tolerance LOW NA (2) Intertidal Zone Filtration NA NA (1) Habitat MEDIUM HIGH (2) In -stream Habitat LOW MEDIUM (3) Baseflow HIGH HIGH (3) Substrate LOW LOW (3) Stream Stability MEDIUM MEDIUM (3) In -stream Habitat LOW HIGH (2) Stream -side Habitat HIGH HIGH (3) Stream -side Habitat HIGH HIGH (3) Thermoregulation HIGH HIGH (2) Tidal Marsh In -stream Habitat NA NA (3) Flow Restriction NA NA (3) Tidal Marsh Stream Stability NA NA (4) Tidal Marsh Channel Stability NA NA (4) Tidal Marsh Stream Geomorphology NA NA (3) Tidal Marsh In -stream Habitat NA NA (2) Intertidal Zone NA NA Overall MEDIUM MEDIUM BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX D SOILS USDA United States Department of Agriculture N RCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Catawba County, North Carolina CLT10 April 4, 2023 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https:Hoffices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. Contents Preface.............................................................................................................. . How Soil Surveys Are Made............................................................................ SoilMap............................................................................................................. SoilMap.......................................................................................................... Legend............................................................................................................ MapUnit Legend............................................................................................. MapUnit Descriptions..................................................................................... Catawba County, North Carolina................................................................. BuB—Buncombe loamy sand, 0 to 5 percent slopes, frequently flooded ChA—Chewacla loam, 0 to 2 percent slopes, frequently flooded............ CoA—Congaree loam, 0 to 2 percent slopes, frequently flooded............ DoB—Dorian fine sandy loam, 0 to 6 percent slopes, rarely flooded...... LcB—Lloyd loam, 2 to 6 percent slopes .................................................. LcC—Lloyd loam, 6 to 10 percent slopes ................................................ LcD—Lloyd loam, 10 to 15 percent slopes .............................................. LdB2—Lloyd clay loam, 2 to 6 percent slopes, moderately eroded......... LdC2—Lloyd clay loam, 6 to 10 percent slopes, moderately eroded...... MhE2—Madison-Bethlehem complex, 10 to 25 percent slopes, moderately eroded............................................................................ PaE3—Pacolet clay loam, 10 to 25 percent slopes, severely eroded..... PeE—Pacolet soils, 10 to 25 percent slopes ........................................... RkA—Roanoke loam, 0 to 2 percent slopes, occasionally flooded......... References........................................................................................................ .2 ..5 .8 ..9 10 11 11 14 14 15 16 17 18 19 20 21 22 23 25 26 27 29 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil -vegetation -landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil -landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil -landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field -observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. Ilk- .. i' �► - 7IN I Clarks Creek C � - it ChA Vol, PeE CoA LcB LcC LdQ PaE3 �. ChA DoB LcB BuB PaE3 LcB d. RkA LdC2 ,,#� LcC DoB fff PaE3' Lvd 2 ChA r. PaE3 hA LcC LdC�E3 LcBV - CoA LdC2�, t b LcB, .. MhE2 L LdC2 PaE3 r,. LdC2-> LdC2 PaE3 L--dC2 L-cB LcB LcB� LcD MhE2 � f A ._ _ 14 '. C) CO) D ■ � ❑ N ❑ A o o + 0 0 q °F � �} �P �, x f� O U) cn cn cn = CD cn cn A v m r r O O 0 (� co 0o � 3. cn cn cn N D Q o o o m 0 �' CD �' m C)CLm < v v m o m ° ° ncn g °. °. �_ m m °. m 0 D cn cn v' O ° cn p o - r m o o o 0 2 0 N m 0 m 6 c c co c CL CD Q o O O _ O �D O CD y N Z 0 D 0 D ° 0 N r m W Q if 0 N M m 0 „ ± Z m v D CL r C _ ) (n cp Oc pj n O O O 0. O O (D N r cn O O -cn c (D O CL CD CL 2 O_ O (n O N 9 0 N V1 CD (p N O U� 0 3 o p 01 cn 60 cn cn C O o� 3 v > CL O S O 01 C) � U) O m O 3 v CD lD 3 O N (D O- - 3 U) lD N O"6 O O 0 N 01 C N Ul N 0 O CD O Q D N) .... N O O w O-O `< C D < 0 N Q O O '_' �` N Q N o O 7 O CD w= 0 - 00 = Q N' 5 3 CD 01 0 C: __ N .G 01 N. .0 O � N 5 � - O_ 3 lD (n U) 1 N N •G O � 01 O_ O Q O N p D 7 N CL n C W w CD < N -O 7 N= •G .G lD (Q O O- N 01 CD N 01 0 N N OF1 a N N < ,_� 3 -O CD N `< 3 CD N O CD O O S DN 3 C z E; 0' CD QCD � N N s CD <� 01 �v NCD U) 0 -o CD O �E °' D 3 C lD (D N CD CL 0 O_ 'O �. - C 01 U) O O 3 CL U) U) 01 l CLN O 0-O_ CD CD O N C S Z1 CD -6 O N 7 0 S 0 0 NO O Z N3 S 0) .G 3 3 O N W D O 0 lD O .-. 7 CD 0 7 O TI v N (Q N U) D .* N O j 3 .O-. 01 N (j N O O D-0 •< 7 01 O CD 1 'O `< C O CD O N- 7 O O N O 3 0- U)) CD O N, 3 N pD zm U) 0- o N N rn C7 3 D O CD 3 C p N O D N C N Q D N 3 3 N ON3 z � s� �0 N U) N CD _ 3 N _0 O N C) X 0 M M W 7 lD (,� 01 N N O .-. N - C w m 3 Q OD cn O .O-. N Z O S N 3 n O N N 3 01 7 N lD lD u CD O N v 7 O O cD � _ N O 6 n N lD - C- U)(� O_ lD C 0- CD 01 CD O- 7' 07 U)N O 0) Q .-N-. O 3 O N N '6 fl.1 Q N i N Q O N N N lD G N N N O 0) N l J C O 3 cn OT N CD O C 0 0 CT N CD O ;I- Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BuB Buncombe loamy sand, 0 to 5 2.8 1.0% percent slopes, frequently flooded ChA Chewacla loam, 0 to 2 percent 18.0 6.2% slopes, frequently flooded CoA Congaree loam, 0 to 2 percent 18.7 6.4% slopes, frequently flooded DoB Dorian fine sandy loam, 0 to 6 15.1 5.2% percent slopes, rarely flooded LcB Lloyd loam, 2 to 6 percent 66.9 22.9% slopes LcC Lloyd loam, 6 to 10 percent 44.1 15.1 % slopes LcD Lloyd loam, 10 to 15 percent 4.2 1.4% slopes LdB2 Lloyd clay loam, 2 to 6 percent 2.0 0.7% slopes, moderately eroded LdC2 Lloyd clay loam, 6 to 10 percent 31.2 10.7% slopes, moderately eroded MhE2 Madison -Bethlehem complex, 16.9 5.8% 10 to 25 percent slopes, moderately eroded PaE3 Paco let clay loam, 10 to 25 64.1 21.9% percent slopes, severely eroded PeE Pacolet soils, 10 to 25 percent 3.0 1.0% slopes RkA Roanoke loam, 0 to 2 percent 5.3 1.8% slopes, occasionally flooded Totals for Area of Interest 292.6 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. 11 Custom Soil Resource Report Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into Iandforms or Iandform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The 12 Custom Soil Resource Report pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 13 Custom Soil Resource Report Catawba County, North Carolina BuB—Buncombe loamy sand, 0 to 5 percent slopes, frequently flooded Map Unit Setting National map unit symbol. 2mlww Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Buncombe and similar soils: 95 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Buncombe Setting Landform: Natural levees on flood plains Down -slope shape: Convex Across -slope shape: Convex Parent material: Sandy alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 10 inches: loamy sand C1 - 10 to 55 inches: sand C2 - 55 to 80 inches: sandy loam Properties and qualities Slope: 0 to 5 percent Depth to restrictive feature: More than 80 inches Drainage class: Excessively drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): High to very high (1.98 to 19.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 3.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: A Ecological site: F136XY630GA - Flood plain levee forest, sandy Hydric soil rating: No 14 Custom Soil Resource Report ChA—Chewacla loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 2vy6r Elevation: 330 to 660 feet Mean annual precipitation: 39 to 47 inches Mean annual air temperature: 55 to 63 degrees F Frost -free period: 200 to 250 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Chewacla, frequently flooded, and similar soils: 90 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Chewacla, Frequently Flooded Setting Landform: Flood plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread, talf Down -slope shape: Linear Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 6 inches: loam Bw - 6 to 52 inches: sandy clay loam Cg - 52 to 80 inches: stratified sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat poorly drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.20 to 2.00 in/hr) Depth to water table: About 6 to 24 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Ecological site: F136XY610GA - Flood plain forest, wet Hydric soil rating: No 15 Custom Soil Resource Report Minor Components Wehadkee, frequently flooded Percent of map unit. 5 percent Landform: Flood plains Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread, talf Down -slope shape: Linear Across -slope shape: Linear Hydric soil rating: Yes CoA—Congaree loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 2mlxx Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Prime farmland if protected from flooding or not frequently flooded during the growing season Map Unit Composition Congaree and similar soils: 85 percent Minor components: 3 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Congaree Setting Landform: Flood plains Down -slope shape: Linear Across -slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 10 inches: loam C - 10 to 80 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 30 to 48 inches Frequency of flooding: FrequentNone Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 9.6 inches) it. Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: C Ecological site: F136XY620GA - Flood plain forest, moist Hydric soil rating: No Minor Components Wehadkee, undrained Percent of map unit: 3 percent Landform: Depressions on flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes DoB—Dorian fine sandy loam, 0 to 6 percent slopes, rarely flooded Map Unit Setting National map unit symbol: 2mlwg Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Dorian and similar soils: 90 percent Minor components: 3 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Dorian Setting Landform: Flats on stream terraces Landform position (three-dimensional): Tread Down -slope shape: Concave Across -slope shape: Linear Parent material: Old clayey alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 6 inches: fine sandy loam E - 6 to 10 inches: fine sandy loam Bt1 - 10 to 18 inches: clay loam Bt2 - 18 to 50 inches: clay C - 50 to 80 inches: sandy clay loam Properties and qualities Slope: 0 to 6 percent Depth to restrictive feature: More than 80 inches 17 Custom Soil Resource Report Drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high (0.20 to 0.57 in/hr) Depth to water table: About 18 to 36 inches Frequency of flooding: Rare Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Ecological site: F136XY66ONC - High-bottomland forest, moist Hydric soil rating: No Minor Components Roanoke, undrained Percent of map unit. 3 percent Landform: Backswamps on stream terraces, depressions on stream terraces Landform position (three-dimensional): Flat Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes LcB—Lloyd loam, 2 to 6 percent slopes Map Unit Setting National map unit symbol: 2mml y Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Lloyd and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lloyd Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss 18 Custom Soil Resource Report Typical profile Ap - 0 to 8 inches: loam Btl - 8 to 38 inches: clay Bt2 - 38 to 49 inches: clay loam BC - 49 to 80 inches: loam Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No LcC—Lloyd loam, 6 to 10 percent slopes Map Unit Setting National map unit symbol: 2mml z Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Lloyd and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lloyd Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap - 0 to 8 inches: loam 19 Custom Soil Resource Report Btl - 8 to 38 inches: clay Bt2 - 38 to 49 inches: clay loam BC - 49 to 80 inches: loam Properties and qualities Slope: 6 to 10 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No LcD—Lloyd loam, 10 to 15 percent slopes Map Unit Setting National map unit symbol. 2mm20 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Lloyd and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lloyd Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap - 0 to 8 inches: loam Btl - 8 to 38 inches: clay Bt2 - 38 to 49 inches: clay loam 20 Custom Soil Resource Report BC - 49 to 80 inches: loam Properties and qualities Slope: 10 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No LdB2—Lloyd clay loam, 2 to 6 percent slopes, moderately eroded Map Unit Setting National map unit symbol. 2mm2b Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Lloyd, moderately eroded, and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lloyd, Moderately Eroded Setting Landform: I me rfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap - 0 to 7 inches: clay loam Btl - 7 to 58 inches: clay Bt2 - 58 to 73 inches: clay loam C - 73 to 80 inches: loam 21 Custom Soil Resource Report Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No LdC2—Lloyd clay loam, 6 to 10 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mm2c Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Lloyd, moderately eroded, and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lloyd, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap - 0 to 7 inches: clay loam Btl - 7 to 58 inches: clay Bt2 - 58 to 73 inches: clay loam C - 73 to 80 inches: loam Properties and qualities Slope: 6 to 10 percent 22 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No MhE2—Madison-Bethlehem complex, 10 to 25 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mm2l Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Madison, moderately eroded, and similar soils: 48 percent Bethlehem, moderately eroded, and similar soils: 45 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Madison, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from mica schist and/or other micaceous metamorphic rock Typical profile Ap - 0 to 6 inches: gravelly sandy loam Bt - 6 to 37 inches: clay BC - 37 to 50 inches: sandy clay loam C - 50 to 80 inches: sandy loam Properties and qualities Slope: 10 to 25 percent 23 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No Description of Bethlehem, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from metamorphic rock and/or schist Typical profile Ap - 0 to 8 inches: gravelly sandy clay loam Bt - 8 to 30 inches: clay BC - 30 to 34 inches: gravelly sandy clay loam Cr - 34 to 45 inches: weathered bedrock R - 45 to 80 inches: unweathered bedrock Properties and qualities Slope: 10 to 25 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Very low to low (0.00 to 0.01 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low (about 4.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Ecological site: F136XY83ONC - Acidic upland forest, dry -moist Hydric soil rating: No 24 Custom Soil Resource Report PaE3—Pacolet clay loam, 10 to 25 percent slopes, severely eroded Map Unit Setting National map unit symbol. 2mlx1 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Pacolet, severely eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pacolet, Severely Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile A - 0 to 3 inches: clay loam Bt - 3 to 29 inches: clay BC - 29 to 37 inches: clay loam C1 - 37 to 52 inches: clay loam C2 - 52 to 80 inches: loam Properties and qualities Slope: 10 to 25 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No 25 Custom Soil Resource Report PeE—Pacolet soils, 10 to 25 percent slopes Map Unit Setting National map unit symbol: 2mm2r Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Pacolet and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Pacolet Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile A - 0 to 3 inches: gravelly sandy loam E - 3 to 7 inches: gravelly sandy loam Bt - 7 to 25 inches: sandy clay C - 25 to 80 inches: sandy clay loam Properties and qualities Slope: 10 to 25 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Ecological site: F136XY820GA - Acidic upland forest, moist Hydric soil rating: No W Custom Soil Resource Report RkA—Roanoke loam, 0 to 2 percent slopes, occasionally flooded Map Unit Setting National map unit symbol. 2mm35 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Roanoke, undrained, and similar soils: 80 percent Roanoke, drained, and similar soils: 10 percent Minor components: 2 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Roanoke, Undrained Setting Landform: Backswamps on stream terraces, depressions on stream terraces Landform position (three-dimensional): Flat Down -slope shape: Concave Across -slope shape: Linear Parent material: Old clayey alluvium derived from igneous and metamorphic rock Typical profile A - 0 to 4 inches: silt loam Btg1 - 4 to 13 inches: silty clay loam Btg2 - 13 to 43 inches: silty clay Cg - 43 to 80 inches: silty clay loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Low to moderately high (0.01 to 0.20 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: NoneOccasional Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: C/D Ecological site: F136XY640VA - Bottomland swamp forest, hydric soils Hydric soil rating: Yes 27 Custom Soil Resource Report Description of Roanoke, Drained Setting Landform: Backswamps on stream terraces, depressions on stream terraces Landform position (three-dimensional): Flat Down -slope shape: Concave Across -slope shape: Linear Parent material: Old clayey alluvium derived from igneous and metamorphic rock Typical profile Ap - 0 to 4 inches: silt loam Btg1 - 4 to 13 inches: silty clay loam Btg2 - 13 to 43 inches: silty clay Cg - 43 to 80 inches: silty clay loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Poorly drained Runoff class: Very high Capacity of the most limiting layer to transmit water (Ksat): Low to moderately high (0.01 to 0.20 in/hr) Depth to water table: About 0 to 12 inches Frequency of flooding: NoneOccasional Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: C/D Ecological site: F136XY640VA - Bottomland swamp forest, hydric soils Hydric soil rating: Yes Minor Components Wehadkee, undrained Percent of map unit. 2 percent Landform: Depressions on flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes 28 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ n res/d eta i I/n ati o n a I/s o i Is/?cid = n res 142 p2_0 54262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www. nres. usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www. nres. usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepastu re/?cid=stelprdb1043084 29 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ n res/d eta i I/so i Is/scie ntists/?cid=n res 142 p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid = n res 142 p2_05 3624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:H www.nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl 42p2_052290. pdf 30 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX F THREATENED & ENDANGERED SPECIES E BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX f THREATENED & ENDANGERED SPECIES Stantec Consulting Services Inc. 521 East Morehead Street, Suite 425 Stantec Charlotte NC 28202-2695 March 30,2023 Lexi Jones Microsoft Corporation RE: Protected Species Evaluation of CLT10- Boyd Farm Site Maiden, Catawba County, NC Dear Mrs. Jones: Stantec has been contracted by Microsoft to evaluate the Boyd Farm Site (CLT10) for the current extents of jurisdictional waters and potential presence of protected species. Stantec reviewed the existing natural resource investigations completed by Black and Veatch in July 2022. On December 1, 2022, and March 20, 2023, Stantec biologists visited the site to assess wetlands and waters of the US, vegetative communities, and threatened and endangered species habitat. A survey for dwarf -flowered Heartleaf (Hexastylis naniflora) was conducted but no specimens were found. Updates to federally protected species as of March 30, 2023, are summarized below and generally include the proposed listing of tricolored bat and the absence of dwarf -flowered heartleaf. Rare species are protected by the Endangered Species Act and the Bald and Golden Eagle Protection Act administered by the United States Fish and Wildlife Service (USFWS). Black and Veach evaluated the site for the potential presence of protected species habitat in June 2022. Stantec reviewed their findings and obtained up-to-date listing and occurrence information from USFWS and NC Natural Heritage Program (NCNHP). Stantec performed a site visit within the approved survey window on March 20, 2023, to assess current site conditions and evaluate potential habitat for the dwarf -flowered heartleaf. The USFWS Information for Planning and Consultation (IPaC) has detailed the potentially occurring species for the project area in Catawba County, NC (Table 1). The NCNHP January 2023 Q4 Element Occurrence dataset shows an occurrence of tricolored bat in the Pinch Gut Creek culvert under W Maiden Road approximately 0.25 miles southeast of the project. Table 1. Potentially Occurring T&E Species in the vicinity of the CLT10 Boyd Farm Site (USFWS IPaC 03/31 /2023) Common Name Scientific Name Federal Status* Habitat Biological Conclusion Tri-colored bat Perimyotis PE Yes Unresolved subflavus Bog Turtle Glyptemys T-SA Marginal Not Required muhlenber ii Dwarf -flowered Hexastylis T Yes No Effect Heartleaf naniflora Bald Eagle Haliaeetus BGPA No No Effect leucoce halus *PE= Proposed Endangered; T-SA= Threatened due to similar appearance; T= Threatened; BGPA= Bald and Golden Eagle Protection Act A variety of vegetative communities are present onsite with at least half the site under timber management and planted with pine trees. Hardwood forests are present along Clark Creek and the tributaries onsite Design with community in mind March 30, 2023 LexiJones Page 2 of 2 Reference: Protected Species Evaluation and Update ranging from piedmont alluvial forests along the channels to mesic mixed oak hickory forests on side slopes and ridges. These forests vary in age but primarily exhibit native vegetation. Maintained areas onsite include a few grassy fields, a sanitary sewer easement along Clark Creek and an electrical transmission line along the northern boundary of the site. A large area in the northeast portion of the site has been clearcut and has been left to regenerate in young successional forest. The tri-colored bat has been proposed as Endangered and is expected to be officially listed before this site goes to construction. Roosting habitat is present across the site in the form of forested areas. Acoustic surveys are scheduled in May 2023 for these species and further analysis and recommendations will be provided at that time. During field evaluation in December 2022, suitable dwarf flowered heartleaf habitat was found. No individual Hexastylis sp. plants were found. Stantec revisited the site on March 20, 2023, to assess the potential habitat for dwarf -flowered heartleaf but no specimens were located. Due to the absence of specimen in the potential habitat this project has been determined to have no effect on this species. During field evaluation on December 1, 2022, marginal bog turtle habitat was found in a few wetter areas of the Clark Creek floodplain. These areas will not be impacted by the project and USFWS has confirmed that no surveys are needed. Since bog turtle is listed due to similarity of appearance to the northern bog turtle no further action is required. Monarch butterfly is listed as a candidate species and is not yet listed on the endangered species list. No further action is required. Additionally, during field evaluation in December 2022, no milkweed was observed and the open fields appeared to be maintained. Additionally, no water bodies large enough or sufficiently open to be considered potential feeding sources for bald eagle were identified. Due to lack of habitat and known occurrences it has been determined that this project will not affect this species. Stantec is appreciative of the opportunity to provide natural resource services to our client. Please don't hesitate to contact Melissa Ruiz (Melissa.ruiz@stantec.com/ 919-649-0545) if you have any questions or concerns. Sincerely, STANTEC CONSULTING SERVICES INC. Pronmental T Mrcuic Princip En Scientist Phone:919-649-0545 Melissa.ruizgstantec.com Design with community in mind IPaC U.S. Fish & Wildlife Service IPaC resource list This report is an automatically generated list of species and other resources such as critical habitat (collectively referred to as trust resources) under the U.S. Fish and Wildlife Service's (USFWS) jurisdiction that are known or expected to be on or near the project area referenced below. The list may also include trust resources that occur outside of the project area, but that could potentially be directly or indirectly affected by activities in the project area. However, determining the likelihood and extent of effects a project may have on trust resources typically requires gathering additional site - specific (e.g., vegetation/species surveys) and project -specific (e.g., magnitude and timing of proposed activities) information. Below is a summary of the project information you provided and contact information for the USFWS office(s) with jurisdiction in the defined project area. Please read the introduction to each section that follows (Endangered Species, Migratory Birds, USFWS Facilities, and NWI Wetlands) for additional information applicable to the trust resources addressed in that section Location Catawba County, North Carolina Local office Asheville Ecological Services Field Office k. (828) 258-3939 Ja (828) 258-5330 160 Zillicoa Street Asheville, NC 28801-1082 � GO 0 Endangered species This resource list is for informational purposes only and does not constitute an analysis of project level impacts. The primary information used to generate this list is the known or expected range of each species. Additional areas of influence (AOI) for species are also considered. An AOI includes areas outside of the species range if the species could be indirectly affected by activities in that area (e.g., placing a dam upstream of a fish population even if that fish does not occur at the dam site, may indirectly impact the species by reducing or eliminating water- flow downstream). Because species can move, and site conditions can change, the species on this list are not guaranteed to be found on or near the project area. To fully determine any potential effects to species, additional site -specific and project -specific information is often required. Section 7 of the Endangered Species Act requires Federal agencies to "request of the Secretary Information whether any species which is listed or proposed to be listed may be present in the area of such proposed action" for any project that is conducted, permitted, funded, or licensed by any Federal agency. A letter from the local office and a species list which fulfills this requirement can only be obtained by requesting an official species list from either the Regulatory Review section in IPaC (see directions below) or from the local field office directly_ For project evaluations that require USFWS concurrence/review, please return to the IPaC website and request an official species list by doing the following: 1. Draw the project location and click CONTINUE. 2. Click DEFINE PROJECT. 3. Log in (if directed to d❑ so). 4. Provide a name and description for your project. 5. Click REQUEST SPECIES LIST. Listed species! and their critical habitats are managed by the Ecological Services Program of the U.S. Fish and Wildlife Service (USFWS) and the fisheries division of the National Oceanic and Atmospheric Administration (NOAA Fisheriesl). Species and critical habitats under the sole responsibility of NOAA Fisheries are not shown on this list. Please contact NOAA Fisheries for species under their jurisdiction. 1. Species listed under the Endangered Species Act are threatened or endangered; IPaC also shows species that are candidates, or proposed, for listing. See the listing status page for more information. IPaC only shows species that are regulated by USFWS (see FAQ). 2. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. The following species are potentially affected by activities in this location: Mammals NAME STATUS Tricolored Bat Perimyotis subflavus Wherever found No critical habitat has been designated for this species. https://ecos.fws.gov/ecp/species/10515 Reptiles NAME Bog Turtle Glyptemys muhlenbergii No critical habitat has been designated for this species. https://ecos.fws.gov/ecplspecies/6962 Insects NAME Monarch Butterfly ❑anaus plexippus Wherever Found No critical habitat has been designated for this species. https://ecos.fws.gov/ecplspecies/9743 Flowering Plants NAME Dwarf -flowered Heartleaf Hexastyiis naniflora Wherever found No critical habitat has been designated for this species. https://ecos.fws.ggy/e plspecies124 Critical habitats Proposed Endangered STATUS SAT STATUS Candidate STATUS Threatened Potential effects to critical habitat(s) in this location must be analyzed along with the endangered species themselves. There are no critical habitats at this location. You are still required to determine if your project(s) may have effects on all above listed species. Migratory birds Certain birds are protected under the Migratory Bird Treaty Act! and the Bald and Golden Eagle Protection Acts. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. Additional information can be found using the following links: • Birds of Conservation Concern https://www.fws.gov//program/migratory-birds/species • Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/collections/avoidi ng-a nd-mi nimizing-incidental-take-migratory-birds • Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/documents/nationwide-standard-conservation- measures.pdf The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCQ list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird fist, including haw to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. NAW Chimney Swift Chaetura pelagica This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Prairie Warbler Dendroica discolor This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. BREEDING SEASON Breeds Mar 15 to Aug 25 Breeds May 1 to Jul 31 Red-headed Woodpecker Melanerpes erythrocephalus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Breeds May 10 to Sep 10 Probability of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: 1. The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number ❑f survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability ❑f presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence ❑n week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. To see a bar's probability of presence score, simply hover your mouse cursor over the bar. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the gird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (') Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. To see a bar's survey effort range, simply hover your mouse cursor over the bar. No Data( ) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. probability of presence breeding season survey effort no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Chimney Swift — --_ _ _ _ _ — _ ++ -1 1 1 , BCC Rangewide (CON) Prairie Warbler - - - - - - - - - - - - Jill Jill Jill -+++ ,'+- ---- ---- BCC Rangewide (CON) Red-headed — - - - - - - - - - -- - - -- III nil 1111 fill Woodpecker BCC Rangewide (CAN) r Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the list of migratory girds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCC) and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network [AKN). The AKN data is based on a growing collection of survey, banding, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 1 Okm grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Bogie Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey., banding, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year- round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (SCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal, The Portal also offers data and information about othertaxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS tntegrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the ❑wing Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Loring. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. Facilities National Wildlife Refuge lands Any activity proposed on lands managed by the National Wiidlife Refuge system must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. There are no refuge lands at this location. Fish hatcheries There are no fish hatcheries at this location. 0 e\P% \,00 CAW) r Wetlands in the National Wetlands Inventory (NWI) Impacts to NWI wetlands and other aquatic habitats may be subject to reguiation under Section 404 of the Clean Water Act, or other State/Federal statutes. For more information please contact the Regulatory Program of the local U.S. Army Corps of Engineers District. Wetland information is not available at this time This can happen when the National Wetlands Inventory (NWI) map service is unavailable, or for very large projects that intersect many wetland areas. Try again, or visit the NWI map to view wetlands at this location. Data limitations The Service's objective of mapping wetlands and deepwater habitats is to produce reconnaissance level information on the location, type and size of these resources. The maps are prepared from the analysis of high altitude imagery. Wetlands are identified based on vegetation, visible hydrology and geography. A margin of error is inherent in the use of imagery; thus, detailed on -the -ground inspection of any particular site may result in revision of the wetland boundaries or classification established through image analysis. The accuracy of image interpretation depends on the quality of the imagery, the experience of the image analysts, the amount and quality of the collateral data and the amount of ground truth verification work conducted. Metadata should be consulted to determine the date of the source imagery used and any mapping problems. Wetlands or other mapped features may have changed since the date of the imagery or field work. There may be occasional differences in polygon boundaries or classifications between the information depicted on the map and the actual conditions on site. Data exclusions Certain wetland habitats are excluded from the National mapping program because of the limitations of aerial imagery as the primary data source used to detect wetlands. These habitats include seagrasses or submerged aquatic 41* vegetation that are found in the intertidal and subtidal zones of estuaries and nearshore coastal waters. Some deepwater reef communities (coral or tuberficid worm reefs) have also been excluded from the inventory. These:\*4 habitats, because of their depth, go undetected by aerial imagery. Data precautions Federal, state, and local regulatory agencies with jurisdiction over wetlands may define and describe wetlands in a different manner than that used in this inventory. There is no attempt, in either the design or products of this inventory, to define the limits of proprietary jurisdiction of any Federal, state, or local government or to establish the geographical scope of the regulatory programs of government agencies. Persons intending to engage in activities involving modifications within or adjacent to wetland areas should seek the advice of appropriate Federal, state, or local agencies concerning specified agency regulatory programs and proprietary jurisdictions that may affect such activities. Roy Cooper, Governor 9" 0 INC DEPARTMENT OF ""i ■ WMk.M 1 NATURAL AND CULTURAL RESOURCES ■-000 May 5, 2023 Amber Coleman Stantec 801 Jones Franklin Road Raleigh, NC 27606 RE: CLT 10 Boyd Farm Data Center; 203401902 Dear Amber Coleman: 13. Reid Wilson, Secretary Misty Buchanan Deputy Director, Natural Heritage Program 041011 .11]�AN ZP AI The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. A query of the NCNHP database indicates that there are records for rare species, important natural communities, natural areas, and/or conservation/managed areas within the proposed project boundary. These results are presented in the attached `Documented Occurrences' tables and map. The attached `Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists. Tables of natural areas and conservation/managed areas within a one -mile radius of the project area, if any, are also included in this report. If a Federally -listed species is documented within the project area or indicated within a one -mile radius of the project area, the NCNHP recommends contacting the US Fish and Wildlife Service (USFWS) for guidance. Contact information for USFWS offices in North Carolina is found here: httr)s://www.fws.gov/offices/Directory/ListOffices.cfm?statecode=37. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. Also please note that the NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve, Registered Heritage Area, Land and Water Fund easement, or an occurrence of a Federally -listed species is documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at rod ney.butler�ncdcr.gov or 919-707-8603. Sincerely, NC Natural Heritage Program DEPARTMENT OF NATURAL AND CULTURAL RESOURCES 121 1N. JON S STREET, RALEIGI I_ NC 27603 - 16Sl MAOL SERVICE CENTER. PAL EIGH. rkc 276�0 OFC 919.707.9120 • FAK 919.707.9421 2 \ @ HE s o y=°G 2 2 ID \ _ _ / z z © 3 % ®/ Cl) \®&ƒ\\ \/ (.^ ® c c \ 2 { ƒ / _ \ \ j j /.0J� / \ § \ D ) / a)\®` = J 0m o z (D6 \ (D\ a- > } m » J,: /(D (D - \ -( \\ > 5 (\\2 � a) s : \ 0 -)3 a) D- (D\ » (D \ - \ } \/ ƒ/ »/ G (D (D D n \ z �«(D/ MD \0 =2/( \}\ID \ <. © \:{\ }? y \\ \\ \�\\ /\/ \0 F- O \ \ � \ / t a) o cl) < j % \ g \o (D\ \ < ID\ \\j2 \\\\J ::=.j / \ (D % /\2.Z s2\« \ \ 2. 0— - $\ / \ \ / \ / \ / \ \ \ -0 \ (D c z / 2 + ® J m G (D// K\J \ \ / \ / � \ / \cn (Dn / j j ) \\ 2 2 \ » /_\\ƒ / / J } \ \ (D cn } / k /.o / J 6 - / \ / / } = m J//% J ± j y m _. m \ =.m c (D J ° » / s t § m - z T) } o = J \ 2 Z \ K / G o m Z 2J«S o (D /\\ /cn /\/ sc=G s % m m \ / \ 6 / j /. (D \/3� « J (D 3 >_ = o s«/\ ƒ(D 0 / /} s/Z / 0 Z (7D / > Z /U9/J \0\�\ ^ \\/ cm= (D (D c ■ j ■ j 2 \ CA � s o (_ G 2 2 Z 2 s G m z z z o z / / « \\ \\\ f j / \ / / \ \ J £ z D- \ / n\\ -\ ( a) a) \ 30 /\ / ° / w m) 0 -o 9 / ® % \ \ / \ / z j \ ` / \ 0 \ \ e m o s / m e / = \ / \ } ( � / \ < z z / / / 0- f 3 \ \ g (D \ (/§mD j\ \ O \ \ _ // % ® t z (D \\\ a)} k \z c s « / m / / } \ ® m 0 / }y / s / % /. \ _ / = (7 m m }e 7 \ / s \ j 0 \/ g g. \ \ \CT » aO} \ \ / ) ID } - I g g � \} g g \. s: g \� 2// - m 2 / z J 0\ ®j j c g g \/ ^ \ < \ - e \ \ \\ / ƒ / [ ID J o \ \ \ {\ j /s }/ /3 %/ =s zc s2 \/ /\ a) E\ a) (D c }3 m ^ ® \ a)o -0e % _ / m z J / \ \ j \ J — c 0 » G G 2_ { a ® « 2 e \ \ / \ 2 s m \ \ J m W 3 0 C a N R�1 d C.1 W Q � � n CD CL w n °1 n °c m a n ul s r„ T a Startowrt kd .. a I.4 C m 9ryo � op}e W ,pp• :,alk PG Spy Ro helo S ry K v� J a c 3 y J' �b ~� any J N {i w 01 d any pull N 1 Z c is o y N O j 0- 4 Ul oti d b �v Y F R � } � R •„ O a n 3 ro � m � S pr ay st sa mes Chi in ae ' 'rP'lrfi I � ;fRu ply G T N Z C) Z m r� OD N C) 1 0 V❑ QT I ?ad Y.7.� {p \Y BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX F CULTURAL RESOURCES 4u�n' TIMM CT261 - 4 -!'! IWO 0000 �� J:1_]f:a...1 l�.,� •ems;•-rt �' Sill- �• ` CT285 :._�0 CT286 (J` ° : �� I � •lit . —� � ��� - -- —" � .a� ��-. X _. �. tt •� �ti i�Tr ER 21-2241_- CT129 a r 0 1,250 2,500 N Project Area Feet (At original document size of 8 Sx11) L Historic Site Location 1:30,000 - Prehistoric Site Location ® Surveyed Area Stantec a 1-Mile Buffer rqe a ion Prepared by ECL on 2022-12-23 TR by BJW on 2023-01-24 Catawba County, North Carolina IR by BSS on 2023-01-03 Clien"p- 203401902 Microsoft Notes MS CLT10 Environmental Permitting 1. Coordinate System: NAD 1983 StatePlane Virginia South FI PS 4502 Feet Figure No. 2. Data Sources: Microsoft, Stantec, NC Geodetic Survey, and NC State Historic Preservation Office 3. Topographic map © USGS 7.5 Minute Series Topographic Tdle Map, Maiden, NC Quadrangle, 1996 Previously Identified Archaeological Sites within a 1-Mile Radius of the Project Area Page 5.3 Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness ofthis information and shall not be responsible for any errors or omissions which maybe incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness of the data. CT0416 1 CT0476 • J `_�+�" a '�'_�'A ■ � f- - ,fit CT0640 • . �, i 4001 CT0543 Y woo.• / a� CT0751 CT0857 u '�'� ;i -.'w�--'%bra `I..,• `� � - 0 1,250 2,500 N National Register individual listing Feet Surveyed Only (At original document size of 8.Sx11) 1:30,000 Surveyed, Gone Project Area a 1-Mile Buffer Stantec rqe a Ion Prepared by ECL on 2022-12-21 TR by BJW on 2023-01-24 Catawba County, North Carolina IR by BSS on 2023-01-03 11 902 Cllenf/F_ 203401 Microsoft Notes MS CLT10 Environmental Permitting 1. Coordinate System: NAD 1983 StatePlane Virginia South FI PS 4502 Feet Figure No. 2. Data Sources: Microsoft, DCR, NC Geodetic Survey, and NC 2State Historic Preservation Office 3. Topographic map © USGS 7.5 Minute Series Topographic Tdle Map, Maiden, NC Quadrangle, 1996 Previously Identified Architectural Resources within a 1-Mile Radius of the Project Area Page 5.4 Disclaimer: This document has been prepared based on information provided by others as cited in the Notes section. Stantec has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which maybe incorporated herein as a result. Stantec assumes no responsibility for data supplied in electronic format, and the recipient accepts full responsibility for verifying the accuracy and completeness of the data. BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX G STORMWATER MANAGEMENT PLAN & REPORT G G) 00 "---T- 7- � < , - - - - - - - - - -Mi OD 15 CURIE IN m REEK HIM pq -1 m m mm mu no WA2 Sol! 1 SON IN g! to It SO up a a OR hm sp 1 1 a moo q mm p 4 1 Q ih mq MOM n SH MR "MUM ONLY- NOT MR MWIMON cl cc:) sm 1 to >.,� A. . 1 ,Illlllllllllh N . 1 HOW* !oil P-11 A O O O z 0 m D r 1 1 gR 1 1 1 ' 1 � 1 1 1 _ 1 1 1 1 1 � 1 1 cf)1 ml ml c1 \ 21 ' ml �1 01 � \ of 5 ob 1 - �r �� % 1 � 1 1 1 \ 1 '.. 1- - - r '=------=------------- —i— —y--------------------- NOI1Hf1NI1N00 210J Z08-1 -0-07L10133HS 33S .. a lull I' m ■ FOR PERMITTING ONLY NOT FOR CONSTRUCTION n A9 e� C &� C j '1 3{ i M � O � ,o Illllllllll�h �= 11�'€ �I � I 9 � hll m o ■■ C7 °� � gao o I I II III I I I li ; g.l �.� �$� `-� `�' lil���s l `4 �' ' � f , _= D N Ov. n r z o vAA V/ co m ■ SEE SHEET CLT10-C-D1-B01 FOR CONTINUATION - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- ------ - - - ------ --- ----- --- ----------- ---- ---- - ---------- - ---- -- ------ I• I . I - T ---------------- - - ------------- -------------------------- ------- --------- - --- ------ ------- ------ - - - :: -------- --------- ------- ---------- - - - --------- - ---- - --- --- -- - ----- - -- ------ ---- - ----- - --------- ----- --- ....--- - ---- ----- --- - --- -- - -- ----- ------- --- ---- - ------ - ------ .... --- ---------- -------------- - ------------- ------------ --------- - Ir"X I/ rz ------ ---------- ------------- -- --- --- -- :i ------ -------- -------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NoilvnNIiNO0 2IOJ C09-10-0-01i-10 i�]�IHS �I3S C-3 El �4 > > �m m > in co mz 0 SEE SHEET CLT10-C-D1-B02 FOR CONTINUATION ----------------------------------------------------------------------- 1 DMA ------------ --------------- ---------------- ---------- ------------ ----------- V . ..... 1% - ---------- ----- --- - ----------------- --------- - ----- ---- ----- - - ---------- - - ------- - - n1...... M -nj ol 71 ZI ------------------------------------------- ---------------------------- NoiivnNIiNOO 2]03 V09-10-0-01i10 i33HS 33S M -OR PERMITTING ONLY NOT FOR CONSTRUCTION C) M> IF 1 Im no co > > =0 z > M. MZ M. '2 ll If 0 A co 5 0 0 0 A O 0 0 z 0 m z D r SEE SHEET CLT10-C-D1-B03 FOR CONTINUATION wa,�ww7ry ww w�wa w�wawwwwwat w,ww� aafww V_J `v n O Q a '•\ /- fir\ \ % '\ pd FOR PERMITTING ONLY NOT FOR CONSTRUCTION n o > ee= "`! E?9 ° fi�B;f9 30139 m O Ln IM co DAO - mf? :I :I f 5 m,ll fll n e�n O zmg� A m "" z r ■ A O O 0 z m m D r 1 1 1 1 1 1 1 1 1 1 � 1 1 1 I I 1/ 1 1 1 � I f 1 1 1 cf)1' 1 1cf) m, Im cf)1 1cf) mi im A 1 1-A 1 �I Ir II 1J 10 �I 1 I� o17 to 'L 1' 01 10 I AI 1 A 1 01 ' 10 Iz ZI _Al 1� ZI IZ CI IC i A A OI i -A `� 1Z 0 1 ZI 1 1 I 1 1 P J II---------- --ram--- � i NOIlHfNIlN00 210ZZOO- 64-0-0[_ 0133H7S3S l i Ii � If m � :•�#!�-:j �'.i i i a� E i E?� t e�•. s FOR PERMITTING ONLY NOT FOR CONSTRUCTION r (n n n � � � I .1 C �( a �y I1 �� � [�sl C I( II I j 7 p�{ 9 I o 19 9 m �� n Ar p ❑ II II II ,eN--1�;$; w£ I1g, ;��": z= D� Q g� o "erg m z A O O 0 IM D r SEE SHEET CLT10-C-D1-001 FOR CONTINUATION - _ ............. . - _ 1 .mil - 1 - , 1 1 PAL t t _. >0,� 1 ml t + tIm ml 1 5 --- -- Im cn �1 -.�I - _ _ _ _ _ -_ I 21 Im ml - ---_ 1 t t \ - ,m 10 - - r- loo of to ON \ a p ZI Cl l _ IC i D 1� 1 ® t gg 1 r- 1 ` J 1 1---------------- --- -_-�- ------------------ - - - - -� NOIlHf1NIlN00 2iO3 COO- 64-0-06110133HS 33S FOR PERMITTING ONLY NOT FOR CONSTRUCTION n II II'II I r =Ily c ;+Mi ;jolty m o ■■I C7 �' 4yiy�➢if iJtyy8riy y y DNo n nA>- i ❑ i N a m n =f$f ; 1 9, s cD J n =G7 �iRNo �o N mg m o A K 0 A O 0 0 0 m z D r SEE SHH_EET CLT10-C-D1-0O2 FOR CONTINUATION Ini 2. im Im (O I ( 1 p) ml _ 1m ICE cpI Icp 01 10 pl � Ip ICU WI m o IW TI IT 01 10 Z111 1 Z1 nl In 01 10 z1 1z Z1 1Z yl ID OI 10 1 1 1 1 1 1 1 1 1 1 1 1 1 oa a 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 • 1 FOR PERMITTING ONLY NOT FOR CONSTRUCTION o H. II I P €` ° ';i� ;i9 ".' 'iol�9 m ■■ C7 C+ �' o gso kH11l�i o.e$`- z_>� ®s•�• c,. ODa asEl a:: I If<I 8 oMZ ■ W m R A O O 0 z 0 z D r 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ' 1 r M. ti �^ 1 QP71\1l11QIIIQWON! [a WIN a 0 Me] 9 0 WE 1 1 1 1 1 1 1 1 1 1 1 1 I 1 / 1 1 1 m m / 1 cn 1= Im / 1--i / 10 / 10 O In 1� 1 10 IT 10 IA 11� 10 1 lz ID 1 10 Iz 9= ; 1 1 1 1 1 1 1 Q _a 1 a� 1 1 1 ---------------------- it 1, 1� O �1 Y - i • -OR PERMITTING ONLY NOT FOR CONSTRUCTION � g i 1i i M. Ar Spo I p i of i-f igi i9f i E P i I 4 D O A CY zz c) r 6 ZAO§ a m 0 n 'xee � Mg pIM m zO i ■ ;1� C) A O 00 0 z m m z D r SEE SHEET CLT10-C-D1-D01 FOR CONTINUATI r— ---------------- ZI 1 — IL 1 — —enw — — ------41-- I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ------------------------1 1 1 n 1 1 1 5 ]2 1 1 — 1 1 1 gay � 1 - - 1 1cn Im m IM Im r �< F IIII I4�o mo O fA 3g ,.p I �� foi =s f4f ses. of £fe 1 I E 9 S ! t�iz D � N z A o 3 .• - - R.I f` a m=; 'f g I I i 8 O j^ .en / A o z o Q v A V �g i1 m nzUQ o A O O 0 Z 0 z D r I I I I v If SnE� �w 'n i r' i I -D02 FOR CONTINUATION i 1 1 1 1 1 1 ' 1 1 .1 1 1 1 l 1 1 1 1 1 1 1 1 dm 1 1m I In 1 cn 'm 1 1� 1 1 J lcp ICE Ip 1� ICE IW 'T I 1 Zl 1 10 IZ 'z 'C 1 1> 10 IZ 1 ; \, 1 •\ 1 �\ 1 1 1 1 ' •\ i ,\ 1 1 1 i ` 1 r I 1 Il 'III - a �� �e®BOIJn®��Illilo II �I FOR PERMITTING ONLY NOT FOR CONSTRUCTION n M>IIIIIIIIIIIFP ! _�€° __� ;t, foll9 m o ■■ C7 zz > ■■ mM. o m g m 8g, L s = M ALn w n ` 0 A 0 0 0 IM 0 D r 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1cf) Im Im 1cf) 12 Im Im I0 Ir 1� 10 1(� 1� 1� Ip IC? __ IT 10 1 ICE 10 / Iz 1� 1 im 1 Noi1vnN1lN00 2iO3 Z03 64 0 06110 133HS 33S 1, y � 1 1; O 1 1 / , FOR PERMITTING ONLY NOT FOR CONSTRUCTION m o cm Ate. y o ❑ �� ,el =,m`.? p.,, :,£v zN Dm IS 8118 = eezo mo A o nz 3 IM _ ■� SEE SHEET CLT10-C-D1-E01 FOR CONTINUATION - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - --- - -- - - - - - - - - - - RA cf) j~ cf) / �.. ml ' T Im cf) MI ol. K)r -nI I zI il I 11z 21 I� 11 Iz cl, c ID ZI M >m o II - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - L - - - - - - - - - - - - - - - - - I NoiivnNIiNOO 2IOJ C0�1-10-0-01i-10 i�]�IHS �I�S FOR PERMITTING ONLY NOT FOR CONSTRUCTION < o > > coH. El z oz > o M =0 26)� M M MZ K O A 0 O 0 Z O m D r SEE SHEET CLT10-C-D1-E02 FOR CONTINUATION ---------- .,-----_— I I __�_ ____ _�__�------------- ----------1 I I --- 1 I I 1 ' / 1 nz i 1 Im 1 Y I I ,IM I I I (!J J I m 1 I 1 1 j I I In 1 `� 1 1 I ----- I 4---- 10 1 \ I ._. _. _.... __ 1 ,,\ \ - - - - - - - - - - - - — - - - - - - - — - - - - - - - - --------- c) 1;0 1 -- ----------- 10 C `.\ tilyyy _�yWv+'YV•rv'�vWYvvWvwvv rYvyvYVY.,rr'O 1 _ 1 �a 1 1 1 1 ZfE HAyN f 1 ROgo S 1 i 2„i:E'E` EEEEE ':;Ft. FOR PERMITTING ONLY NOT FOR CONSTRUCTION C) m o p 9p ij E E .. o Ate. y ie4=im :;i?i. wl o'fn4 al mY I f E zN D O ®8� mJ o 0 A 0 O 0 Z T 0 m D r 1 . / 1 - 1 1 ......... _I 1 1� .. s 7 - IT IO lO `� �m •�y''.'x'`tir Iz 1� ID • , �`� _v - _.Jv JV J �/ •' - ��'1ry_ti � '; Q� ; Vim" /'� 1 1 i f �^ 1 1 r � 1 ---------------------- ---------------------� N0uvnNIlN00 210J £0J-10-0-01i10 133HS 33S I' m I t� FOR PERMITTING ONLY NOT FOR CONSTRUCTION ' 'Il ol99 m ■■ n i x� ■■ O EL' $,�`o�£ fi` _ o :: I a I I o i<P, 8 C� j .�� //♦t D m Q gZ O n A O 00 0 mm z D r SEE SHEET CLT10-C-D1-F02 FOR CONTINUATION 1 1 1 _ 1 \ 1 1 \ a 1 \ 1 1 1m m . 1 i� \ ti o �� Ix Im Ir .a lj to - -- - —_--- - 1w0 :T �! \, I0 4V0`J S3NAVH 837 tlJ 10 2E I z i 10 1z 1 1 1 1 n 1 1 a 1 1 a 1 m 1 1 1 1 1 1 1 1 ,I j Y s FOR PERMITTING ONLY NOT FOR CONSTRUCTION n o �� se= II � � II Ilfl r 1[ f"3i:�rt9 ' t o l rl m o ■■ n 0 A�: II II II Ili o:;�;g, :,£ g, ,4��": o? DO os ®eyG�7 n ZAOi '- ❑. �gm" f f f m.11 m m eY mO 0 fi g. ',. ■ m 0 O 0 n 0 z m m z D r 8 V el P9, ipMp ig q. i�a a ,�v�o GSA t; i�/ � / Lo -OR PERMITTING ONLY NOT FOR CONSTRUCTION M > gag IIIII II Ili o nfeg; g �" > > oz > z F, H�p I t h mo FOR PERMITTING ONLY NOT FOR CONSTRUCTION M > C) F2. CD -7 _T z > c) ®ate IM q 9i z o 90 cf) IM lz a $ a I,,I I;I� �;��, . , M Pa 8 m� mom ------------ ---------- 2.11M 3h HE. ---- — ----- --- III h g� A r* j �q M 3 W2III II 111 II -OR PERMITTING ONLY NOT FOR CONSTRUCTION gao IIIII II Ili > z > Tm > 2 M. CE) m mz 6 6 II II II II I II I I I I—t-F I I I III !I L- Ai - - - ------------------ ------ ------ ------------ ----------- ------ II I II I II - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - -- — - — - - - - - - - - - - - - — - — - — - — - — - — - II FOR PERMITTING ONLY NOT FOR CONSTRUCTION Q Cf) M 0 03 o cn z Cf) -0 Cf) c!) F2. FT7177— N LO z > M z o IM �u CD K n A O 0 0 z m m z D r - a ue5 5 g e a� = • ' a g c A� H a? H v :isa a � e ^dA 1 L z fig. e TM 6 6 411 - - - - - - - - - - - - - - - - - - - - - L—A FOR PERMITTING ONLY NOT FOR CONSTRUCTION ®® cn m o --i uj cf) (n c!) > > > z o o o 177) CD N, 2, H 'HE Z 'All all L PH H H Ego N Ty Hg T 0 Lo -OR PERMITTING ONLY NOT FOR CONSTRUCTION z > z m o mp gp ` v ��� 6 0mz A g. :1 �.,C Cf) mz oo I I A UL — — -- — — — — — — — As 123 1 810� FOR PERMITTING ONLY NOT FOR CONSTRUCTION m �ppW > cf) cf) F71 m , > mg < > z > M Z 0 o --i M cf) IM M 0 i m"LRi L 10 m - o z > 0 > 42 m G) L,) M M mz m - o z > F9 0 > _zM �M 0 - m G) 00 M M 6 mz zm > o z > 0> m G) > 0 0 M m : ~�d)\§;z o -1 % `� \ ci) o m --. ; - F2. mmmnR > 0 0> M H z o M m m > o F2. 0 m G) 0 m - O ®sue z > z o lo 0 > F � m > 0 ) 5 m c!) mz m - o mmmnRym lo o 0 m G) S M M c!) > 0 1 (-) i . I > > oI O>F mz 00 m ff. a. m -- o F2. > ". mmmnR I i � z > 0) m �4j oI m>o p m � % `� \ M m �u > ci) K " F 9 f 0 § 6 mmmnR \g§HH!//§ j (�~ 2 ii CD m )2oI 0 > z( b`(°©» ^© ` G \ \ \;}\!} / !: m m o 0 m 6 S M M > o 0 M, STORMWATER REPORT Prepared For: OANC BOYD FARM CLT10 MAIDEN, NORTH CAROLINA Prepared By: W.K. DICKSON & CO., INC. CHARLOTTE, NORTH CAROLINA WKD Project # 20230068.00.CL MARCH 2O23 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO. F-0374 TABLE OF CONTENTS Page 1.0 CONSTRUCTION NARRATIVE....................................................................................I 1.1 PROJECT DESCRIPTION..................................................................................... 1 1.2 SITE DESCRIPTION............................................................................................. 1 1.3 ADJACENT PROPERTIES................................................................................... 1 1.4 SOILS..................................................................................................................... 1 2.0 STORMWATER CONSTRUCTION SEQUENCE.......................................................2 3.0 PERMANENT STORMWATER MEASURES..............................................................3 3.1 PROPOSED STORMWATER SYSTEM.............................................................. 3 3.2 STORMWATER CALCULATIONS..................................................................... 4 APPENDICES APPENDIX A — STORMWATER CALCULATIONS SUPPLEMENTAL DOCUMENTS APPENDIX B — PERMANENT STORMWATER CALCULATIONS APPENDIX C — EROSION CONTROL CALCULATIONS -i- CLT10 — DATA CENTER Stormwater Report March 2023 WhWK iffDICKSON community infrastructure consultants 1.0 CONSTRUCTION NARRATIVE 1.1 PROJECT DESCRIPTION The 296.41 acre site will serve for a future data center for Microsoft, and it will have five new one- story Ballard Design data centers and one new Duke Energy Substation. This stormwater submittal will cover the following activities at the site: the erosion control phase 1 and 2, mass grading, utilities, storm piping network, parking lot/driveway access and BMP (best management practices) Wetponds installation. 1.2 SITE DESCRIPTION The site is largely vacant farmland with some wooded areas. The site, latitude N35°35'22" and longitude W81°13'49", is situated in Maiden, North Carolina. The 7.5 Minute Series USGS Topographical Map (Maiden, North Carolina) was published in 2022, and included in Appendix A. The site naturally drains east to west into the floodplain of Clark Creek. See Exhibit 1 "Pre - Development Drainage Area Map" in Appendix B. 1.3 ADJACENT PROPERTIES The land use in the vicinity is mainly undeveloped with neighboring farm/residential properties. 1.4 SOILS The project site soils are in Hydrologic Soil Group's B, C, & D. See Soil Data Section in Appendix A of this report. -1- CLT10 — DATA CENTER Stormwater Report March 2023 N&WK iffDICKSON community infrastructure consultants 2.0 STORMWATER CONSTRUCTION SEQUENCE 1. During the mass grading operation, storm drainage infrastructure should be installed across the site. As part of the Phase 1 Erosion and Sediment Control Plan (E&SCP), the seven erosion control sediment basins on the site function as the storm drainage system. Please refer to Appendix C for the calculations related to sediment basins. 2. Phase 2 of the E&SCP will begin following the completion of Phase 1 and will include construction of an access road from Old Maiden Road and Zeb Hayes Road. Mass grading will occur around these drives as it comes onto the site. Access road from Zeb Hayes Road will be paved with asphalt. Grading of the primary entrance from Old Maiden Road will be completed and paved with gravel. Once mass grading is complete and the entire site has been stabilized erosion control sediment basins #3, 94, and #5 will be removed. Erosion control sediment basins #1, #2A, #2B, and #2C will be converted to a BMP Wetponds. See Exhibit 3 "Overall BMP Phasing Plan" in Appendix B. 3. The four (4) BMP Wetponds will serve will provide storm water management for all impervious surfaces at the site. 4. BMP Wetpond #1 has been sized to receive storm drainage from the primary entrance with a proposed drainage area of 9.49 acres and a max impervious area of 1.62 acres (17% of total site). BMP Wetpond #2A has been sized to receive storm drainage from the future roof drainage, parking areas and driveway access with a proposed drainage area of 53.46 acres and a max impervious area of 41.39 acres (77% of total site). BMP Wetpond #2B has been sized to receive storm drainage from the future roof drainage, parking areas and driveway access with a proposed drainage area of 41.02 acres and a max impervious area of 27.63 acres (67% of total site). BMP Wetpond #2C has been sized to receive storm drainage from the future roof drainage, parking areas and driveway access with a proposed drainage area of 31.67 acres and a max impervious area of 9.35 acres (30% of total site). See Exhibit 2 "Post -Development Drainage Area Map" in Appendix B. -2- CLT10 — DATA CENTER Stormwater Report March 2023 WhWK iffDICKSON community infrastructure consultants 5. If impervious acreages from these areas are more than previously stated, the Wetponds will be re-evaluated/re-designed to account for the increase. 3.0 PERMANENT STORMWATER MEASURES 3.1 PROPOSED STORMWATER SYSTEM The stormwater runoff for the project, once totally built out, primarily originates from driveway access, building roofs, gravel substations, parking lots and on -site grassed drainage. This project has an assumed proposed/future total impervious area totaling 79.99 acres. See Exhibit 2 "Post -Development Drainage Area Map" for the drainage areas for each of the proposed stormwater management facilities. Stormwater from the above mentioned areas are directed to any one of a number of drainage structures, including but not limited to curb inlets, grate inlets, and yard inlets. Once the stormwater has entered the drainage system through these structures, it is directed by gravity flow through the stormwater drainage system to the BMP Wetponds. For the proposed Point of Interests (POI) 91 and 92, Hydrology analysis using TR-55 Tables provided a weighted curve number (CNw) of 57.9 (POI #1) and 61.9 (POI #2) for pre -developed area, and a CNw of 67.5 (BMP #1), 89.7 (BMP 92A), 85.9 (BMP #213), 71.9 (BMP #2C), 62.3 (POI #1 BYPASS), and 61.7 (POI #2 BYPASS) for post -developed area. See Appendix B for CNw calculations. Rainfall depth data from NOAA Atlas 14, Volume 2, Version 3. See Appendix A for NOAA storm depths. The SCS methodology using Hydraflow Hydrographs was utilized to calculate pre -development and post -development peak discharges. Table 1 summarizes the discharges at both POI. -3- CLT10 — DATA CENTER Stormwater Report March 2023 WhWK iffDICKSON community infrastructure consultants TABLE 1. SUMMARY OF PRE/POST PEAK DISCHARGES & MAX ELEVATIONS ANALYSIS POINT - WETPOND OUTFALL PEAK CONTROL STORM EVENTS PRE- DEVELOPMENT POI #1 POST- DEVELOPMENT POI #1 PRE- DEVELOPMENT POI #2 POST- DEVELOPMENT POI #2 ELEVATION BMP #1 FBMP #2A BMP #213 BMP #2C TopofDam 825.00 825.00 830.00 860.00 100YR-24HR 70.88 CFS 40.49 CFS 273.46 CFS 539.62 CFS 820.44 823.78 828.70 857.50 25YR-24HR 42.33 CFS 25.03 CFS 171.42 CFS 253.00 CFS 819.89 823.15 827.94 856.44 10YR-24HR 26.81 CFS 16.61 CFS 114.66 CFS 135.93 CFS 819.59 822.75 827.67 855.85 2YR-24HR 7.02 CFS 5.42 CFS 37.55 CFS 35.78 CFS 819.16 822.03 826.53 855.14 1YR-24HR 2.66 CFS 2.58 CFS 18.06 CFS 17.73 CFS1 818.96 1 821.23 1 825.80 854.78 To comply with the requirements set forth by the NCDEQ and Town of Maiden UDO (The Unified Development Ordinance of the Town of Maiden, North Carolina), it is necessary to reduce the post -developed peak discharge for the 1-year, 24-hour storm event. The analysis shows that the installation of the BMP Wetponds will reduce the post -development peak discharge at both POIs. Riprap dissipaters in conjunction with matting and riprap lined channels are used to reduce flow velocities. Furthermore, after the stormwater runoff has exited the riprap dissipators, it will flow through undisturbed existing vegetated areas, further decreasing the velocity before entering surface waters adjacent to the site. Results can be found in Appendix B. 3.2 STORMWATER CALCULATIONS Stormwater calculations were performed using the rational method to determine the peak flow through any one drainage structure. These flows were added together, proceeding downstream in the system to ensure that each subsequent pipe was capable of handling the peak flows. The rational coefficient (C) was conservatively assumed to be constant throughout the drainage area, even in areas that will be landscaped or grassed. The 25-year 24-hour storm event was used with a 5 minute time -of -concentration to yield an intensity (i) value for the storm drainage piping system. See Appendix B for results. Based on the existing and proposed topography, two culverts will be required to maintain the current stream flowing through the site. The "small culvert" is located near the entrance to Old Maiden Road, where the entrance drive crosses the existing stream. The "large culvert" is located -4- CLT10 - DATA CENTER Stormwater Report March 2023 OftwK II<SON community infrastructure consultants near the center of the project under the drive that connects the southern building pads to the northern building pads. These locations can be found in Exhibit 2 "Post -Development Drainage Area Map". Since both streams are live, maintaining habitat was considered. As such, both culverts were designed with a 20% embedment to allow wildlife to move through the culvert as they currently do. Basin delineation was completed using a combination of survey and GIS topography. A total of 26.7 AC was determined to drain to the small culvert and 170.1 AC to the large culvert in the post - development condition. Weighted curve numbers for each drainage basin were determined using TR-55 tables for the post -development conditions, small culvert curve number is 62 and the large culvert is 71. Rainfall depth data is from NOAA Atlas 14, Volume 2, Version 3; see Appendix A for NOAA storm depths. The SCS methodology in Hydraflow Hydrographs was utilized to calculate the post -development peak flows. The flow values were inputted into HY-8 software to simulate and determine the size for the culverts. Wetpond calculations were performed using Hydrographs while treating the 1st inch of rainfall with the outlet structure controlling the 1-year 24-hour storm events, resulting in the flows from post -development being less than the pre -development flows. The Wetpond #1 outlet control structure (OCS) has been designed to handle a 1-year storm event with a peak flow of 0.06 cubic -feet -per -second (cfs). The top of the OCS can accommodate a 100- year storm event, with a 15-foot broad crested weir located on the side of the dam. The top OCS sits 2.5 feet below the top of the berm, and the emergency overflow weir is set to be 1.5 feet below the dam. The Wetpond #2A OCS has been designed to handle a 1-year storm event with a peak flow of 1.30 cfs. The top of the OCS can accommodate a 100-year storm event, with a 25-foot broad crested weir located on the side of the dam. The top OCS sits 2.5 feet below the top of the berm, and the emergency overflow weir is set to be 1.5 feet below the dam. The Wetpond #2B OCS has been designed to handle a 1-year storm event with a peak flow of 0.95 cfs. The top of the OCS can accommodate a 100-year storm event, with a 15-foot broad crested weir located on the side of the dam. The top OCS sits 2.5 feet below the top of the berm, and the emergency -5- CLT10 — DATA CENTER Stormwater Report March 2023 O&WK iODICKSON community infrastructure consultants overflow weir is set to be 1.5 feet below the dam. The Wetpond #2C OCS has been designed to handle a 1-year storm event with a peak flow of 0.48 cfs. The top of the OCS can accommodate a 100-year storm event. The top OCS sits 2.5 feet below the top of the berm. The proposed stormwater management facilities (Wetponds) are designed to treat approximately 79.99 acres of development on data center site. If future impervious are constructed upon final development, Wetponds shall be resized, or additional facilities installed. Microsoft will be required to maintain the design and development records for each lot to ensure that no more than 46.22 impervious area coverage is provided in the future. Microsoft will be responsible for the overall construction and future operation and maintenance of the stormwater measure. -6- CLT10 — DATA CENTER Stormwater Report March 2023 APPENDIX A STORMWATER CALCULATIONS SUPPLEMENTAL DOCUMENTS USGS TOPOGRAPHY MAP SOIL DATA ki f L T- .t� LcG Doh paB ChA PeE LcC LdC»2 LMR LcC .+rChA LcB WoO L LcC LcB PaE3 y PaE�3 LcC ,LeE LdC� m PaE�3 PaE33 L DoB LcB ry LdC�2 CoA M PaE�3 LcC - �, LcB CaB PaE3 P`3 iR�+ CaB _ -LtlCl2 LcC LcB �E * E t D' OB L -B LdC�-2 iF 4 W'd 2 \MkF4 aC B PaE}3 LdC-2 LcC*,,,, ra LcC - LcD`f' DoB d 2 x r LcB LdC►-2 P LcC A LcC - Ch LcB `'' PaE�3- PaE3 PaE3 dC2 L�cC Kc-E �L ••2 Lc� Ld"Lon 2 LcC Co Lc6 CaB M� hE�2 PaEM LdC2 LcC PaE3 LcD PaE� \ cB CaB CaB ` ; 2 LdC�LdC - PaE3i LcC PaE�3 LcCP E3A I' -MhE2 LcB cB �. _ gyp► -ChA LdCK2 LdC2 -} L�LcC L-dC2L-dC»2RL`eD Y a 2 W O W -j CL « � _ o ] cu _ { /«=- � u @ R 2 E _ k CL § (au)- -0 \ / � ��§ / p t / & m _ / CO) CL��° ° < \ / \�_® j�\ / > ILG \§ o G \ E \ /\ CL 6 _ §{#� - \\ j/{\ /$ § 2 0 /\ \ /ƒ\\ - / /t/ƒf o ]Ea) E § u \ ) Q § :) _ / Zmo 0 ( / 2 0 t . \ � \ )\6 cL ���� �� _ - Q a 4g2§# & of k § _ § .. In \ °3 2 /CL / ƒ! /�/ /\��) o /m -- 2 &§_ E �mg E�§[e \ /\ -v§ \ \ ) S) § \ \ / /E/ / o/ o§ §=o =k2 (o =a =$ 7� 0E 15 &w ƒ[ $/3 ]\]$§ (§ $2 $- 3\ &Sf§ \CL / / § a 0 k J& & ) F & 7 c o d c ) |6 )) / g § \ =J ■ \ \ (ƒ ! § k | \ § k � « ( a.« \ }« 2 = 2 0 § c 20 q q❑ q q❑❑ q 0 J � � ! § 2= 2 0§ o) �« 2= 2 I IL �.... k O E 13 13 $ 2 /§ 0 § \ // 2 Hydrologic Soil Group -Catawba County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BuB Buncombe loamy sand, A 2.8 0.2% 0 to 5 percent slopes, frequently flooded CaB Cecil sandy loam, 2 to 6 A 21.5 1.7% percent slopes CaC Cecil sandy loam, 6 to A 1.6 0.1 % 10 percent slopes ChA Chewacla loam, 0 to 2 B/D 116.3 9.1 % percent slopes, frequently flooded CoA Congaree loam, 0 to 2 C 114.8 9.0% percent slopes, frequently flooded DoB Dorian fine sandy loam, C 28.8 2.3% 0 to 6 percent slopes, rarely flooded LcB Lloyd loam, 2 to 6 B 297.9 23.4% percent slopes LcC Lloyd loam, 6 to 10 B 252.6 19.8% percent slopes LcD Lloyd loam, 10 to 15 B 22.7 1.8% percent slopes LcE Lloyd loam, 15 to 25 B 10.3 0.8% percent slopes LdB2 Lloyd clay loam, 2 to 6 B 13.4 1.0% percent slopes, moderately eroded LdC2 Lloyd clay loam, 6 to 10 B 109.8 8.6% percent slopes, moderately eroded MhE2 Madison -Bethlehem B 19.9 1.6% complex, 10 to 25 percent slopes, moderately eroded MkF4 Madison-Lldorthents B 0.1 0.0% complex, 25 to 45 percent slopes, gullied PaE3 Pacolet clay loam, 10 to B 243.7 19.1 % 25 percent slopes, severely eroded PeE Pacolet soils, 10 to 25 B 13.5 1.1 % percent slopes RkA Roanoke loam, 0 to 2 C/D 5.3 0.4% percent slopes, occasionally flooded USDA Natural Resources Web Soil Survey 3/8/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Catawba County, North Carolina Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Totals for Area of Interest 1,276.2 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 3/8/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 RAINFALL DATA 2/21/23, 3:06 PM Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 (D Location name: Maiden, North Carolina, USA*�' Latitude: 35.5913°, Longitude:-81.2318° v� Elevation: 892.48 ft** 'source: ESRI Maps "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 ���������� 2 5 10 25 50 100 200 500 1000 0.379 0.449 0.528 0.588 0.660 0.712 0.764 0.813 0.873 0.920 5-min (0.349-0.413) (0.413-0.489) (0.485-0.576) (0.538-0.640) (0.600-0.719) (0.643-0.777) (0.684-0.835) (0.721-0.892) (0.763-0.965) (0.794-1.02) 0.606 0.717 0.846 0.940 1.05 1.14 1.21 1.29 1.38 1.45 10-min (0.557-0.659) (0.661-0.782) (0.776-0.923) (0.860-1.02) (0.956-1.15) (1.02-1.24) 11 (1.09-1.33) 1 (1.14-1.42) 1 (1.21-1.53) (1.25-1.61) 0.757 0.902 1.07 1.19 1.33 1.44 1.53 1.63 1.74 1.82 15-min (0.697-0.824) (0.830-0.983) (0.982-1.17) 1 (1.09-1.30) 1 (1.21-1.45) 11 (1.30-1.57) 11 (1.37-1.68) 1 (1.44-1.79) 1 (1.52-1.92) (1.57-2.02) 1.04 1.25 1.52 1.72 1.98 2.16 2.35 2.53 2.77 2.94 30-min (0.955-1.13) 1 (1.15-1.36) 11 (1.40-1.66) 1 (1.58-1.88) 1 (1.80-2.15) 11 (1.95-2.36) (2.11-2.57) (2.24-2.78) (2.42-3.06) 11 (2.54-3.28) 1.29 1.56 1.95 2.24 2.63 2.93 3.24 3.55 3.97 4.30 60-min (1.19-1.41) 1 (1.44-1.70) 11 (1.79-2.13) 1 (2.05-2.44) (2.39-2.87) (2.65-3.20) (2.90-3.54) (3.15-3.90) (3.47-4.39) (3.71-4.78) 1.50 1.82 2.29 2.66 3.16 3.56 3.96 4.39 4.97 5.44 2-hr (1.38-1.64) 1 (1.67-2.00) 11 (2.10-2.51) 1 (2.42-2.90) (2.86-3.45) (3.20-3.89) (3.53-4.35) 1 (3.87-4.84) 1 (4.32-5.52) (4.66-6.08) 1.61 1.95 2.45 2.86 3.42 3.88 4.35 4.86 5.58 6.16 3-hr (1.48-1.77) 1 (1.79-2.14) 11 (2.24-2.69) 1 (2.60-3.13) 1 (3.09-3.75) 11 (3.48-4.26) 11 (3.87-4.80) 1 (4.27-5.38) 1 (4.81-6.22) 11 (5.24-6.91) 1.98 2.38 3.00 3.48 4.17 4.73 5.31 5.93 6.81 7.52 6-hr (1.82-2.16) 1 (2.20-2.61) 11 (2.75-3.27) 1 (3.19-3.80) 1 (3.79-4.54) 11 (4.26-5.16) 11 (4.74-5.81) 1 (5.23-6.52) 1 (5.90-7.52) 11 (6.42-8.35) 2.42 2.92 3.66 4.25 5.08 5.74 6.44 7.17 8.20 9.03 12-hr (2.23-2.63) 1 (2.69-3.18) 11 (3.37-3.99) 1 (3.90-4.63) 1 (4.62-5.52) 11 (5.19-6.24) 11 (5.77-7.00) 1 (6.35-7.81) 1 (7.15-8.95) 11 (7.76-9.89) 2.94 3.56 4.50 5.24 6.26 7.06 7.90 8.75 9.93 10.9 24-hr (2.74-3.18) (3.31-3.85) (4.18-4.86) (4.85-5.65) (5.77-6.74) (6.50-7.61) (7.23-8.51) 1 (7.98-9.44) 1 (9.01-10.7) 11 (9.82-11.8) 3.50 4.22 5.29 6.12 7.25 8.15 9.05 9.99 11.3 12.3 2-day (3.24-3.78) (3.92-4.57) (4.91-5.72) (5.67-6.61) (6.69-7.82) (7.49-8.79) (8.30-9.77) 1 (9.13-10.8) 1 (10.2-12.2) 11 (11.1-13.3) 3.72 4.47 5.57 6.43 7.59 8.51 9.45 10.4 11.7 12.8 3-day (3.45-4.00) (4.16-4.82) (5.17-6.00) (5.96-6.92) (7.01-8.17) (7.83-9.16) (8.67-10.2) 1 (9.52-11.2) 1 (10.7-12.7) 11 (11.6-13.8) 3.93 4.73 5.86 6.74 7.93 8.88 9.84 10.8 12.2 13.2 4-day (3.67-4.22) (4.40-5.08) (5.44-6.29) (6.25-7.23) (7.33-8.52) (8.18-9.54) (9.04-10.6) 1 (9.92-11.7) 1 (11.1-13.1) 11 (12.0-14.3) 4.54 5.43 6.62 7.54 8.78 9.75 10.7 11.7 13.1 14.2 7-day (4.26-4.85) (5.09-5.80) (6.19-7.06) (7.04-8.05) (8.18-9.37) (9.06-10.4) (9.95-11.5) 1 (10.8-12.6) 1 (12.0-14.1) 11 (13.0-15.2) 5.20 6.19 7.44 8.40 9.67 10.7 11.6 12.6 14.0 15.0 10tlay (4.89-5.53) (5.83-6.58) (6.99-7.91) (7.88-8.93) (9.06-10.3) (9.95-11.3) (10.8-12.4) 1 (11.7-13.5) 1 (12.9-14.9) 11 (13.9-16.0) 6.95 8.21 9.70 10.9 12.4 13.6 14.8 16.0 17.6 18.9 20tlay (6.57-7.34) (7.77-8.68) (9.17-10.2) (10.2-11.5) (11.7-13.1) (12.8-14.4) (13.8-15.6) 1 (14.9-16.9) 1 (16.4-18.7) 11 (17.5-20.0) 8.56 10.1 11.6 12.8 14.3 15.5 16.6 17.7 19.2 20.3 30tlay (8.17-8.98) (9.61-10.6) (11.1-12.2) (12.2-13.4) (13.6-15.0) (14.7-16.3) (15.7-17.4) 1 (16.8-18.6) 1 (18.1-20.2) 11 (19.1-21.4) 10.8 12.6 14.3 15.6 17.2 18.4 19.6 20.7 22.2 23.3 45tlay (10.3-11.3) (12.1-13.2) (13.7-15.0) (14.9-16.3) (16.5-18.0) (17.6-19.3) (18.7-20.5) 1 (19.7-21.7) 1 (21.1-23.3) 11 (22.1-24.5) 12.8 15.0 16.8 18.2 20.0 21.4 22.7 23.9 25.5 26.7 60tlay (12.3-13.4) (14.4-15.6) (16.2-17.5) (17.5-19.0) (19.2-20.9) (20.5-22.3) (21.7-23.6) (22.8-25.0) (24.3-26.7) J1 (25.4-27.9) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.5913&Ion=-81.23l8&data=depth&units=english&series=pds 1 /4 2/21/23, 3:06 PM Precipitation Frequency Data Server PD5-based dep-h-duratio n-frequency {DDF} curves Latitude- 35-5913 Longitude:-81.2318' 3D 25 1- ........ . t 20 a 4 15 9 OL Ia. IL I cC 0 c c_ >1 >, }4 }y >, >, >, �, >, rtrt rr r r L r L L N N M N M M M N M � N Y'V f r+ O 0 0 U1 CD rn to .•� N rn CZl4 Duration 30 25 c t 20 rz m O 15 a 10 EL 5 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAAAtlas 14, Volume 2, Version 3 Created {GMT}. The Fet 21 20:O6:20 2023 Back to Top Maps & aerials Small scale terrain Average recurrence ml erva I {years} — 1 2 — 5 — 14 — 25 64 100 200 500 1000 Du ration 5--mkn — 2-day — 1 Wsun 3-stay 15-min — 4-day — 30-,min — T-aay — 60anin — 14-day — 2fir — 20-day — 341r — 3"ay 4"ay C;"By — 24-lir https://hdsc.nws.noaa.gov/hdsc/pfds/pfds—printpage.htmI?lat=35.5913&Ion=-81.2318&data=depth&units=engIish&series=pds 2/4 2/21/23, 3:06 PM Precipitation Frequency Data Server Large scale terrain r• Kingsp41"t• Bristol • J411n54n City Winston-Salem r�4 • • Durh Greensboro 3' I.At Mit-:hall ei k •Asheville h0RTH C A R 0 L I N A 'Charlotte + evill - reenville �` — 100km s mi UTH CAROLINA Large scale map Kin9$Pi__ Bristol Johnson City inston-6 lem Greensboro f Ashevil'Ie,-- _++ North ICarolina arlotte irk le — 100km Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.5913&Ion=-81.23l8&data=depth&units=english&series=pds 3/4 2/21/23, 3:06 PM Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.5913&Ion=-81.23l8&data=depth&units=english&series=pds 4/4 APPENDIX B PERMANENT STORMWATER CALCULATIONS DRAINAGE AREAS Il/ \ - J �� 1 I \I ISM �°( ,'ti 1 \ � 1 - / / I A \ _ / � / / \ • � I I ( ��- \ 3 \���yN�. 1 �---.,_ �� � �� ter,•..-.` �/ ( / ' ( \ I (/ //I1 \,y`�?Q,.t\ \\--``�\r/�)1 \\�.-ram' �--,• r/ i\�1 \\\\\/) 1 / //i � I / • � ---� 1 \ \ \ ///// 11 t 1, Jr` /,) `>/ ( \\_�\ / / / ( 1 Itl ■■ • / � -mil ^�/ ■ • •�1 \\ \\\\\ \ \\\ /�//- • .. • lit/ 0 I If \ \ /- I I11 • .° . A / CO �, Il)1 1 ��`� �p�• ^ -�"� ,\�� �� �—ice // / � • \\ \ / / I \ 1 / //�---� �_—�/�\ III � / .f r,/✓ \ \ S ■ / / •' [ ( �� Vi �Im 1 \ \ ■� -� 1 I f � Al �y��� • •r+\ \\ �// /%IIIIII 4l �' i\y\ L\�._ \. - �� �/� / / j 1 I I I_\_�/ \ < \ •'i — _ — �.i.`/, � /., 1 1 .�i[.^) I I / 11 I. S �� 1 WEIGHTED CURVE NUMBER CALCULATIONS COMPOSITE CURVE NUMBERS WN) Pre -Construction Conditions: POI 41 Cover Type/Condition Soil Type CN Area SF Area AC Residential; 1/2 acre lot B 70 150,994 3.47 Woods (Good) B 55 1,171,317 26.89 Woods (Good) C 70 22,075 0.51 Open Space, Grassed areas (Good) B 61 75,478 1.73 Road; Paved; Open Ditches B 89 35,818 0.82 TOTAL: 57.9 1,455,682 33.42 POI 42 Cover Type/Condition Soil Type CN Area SF Area AC Residential; 1/2 acre lot B 70 904,644 20.77 Farmsteads B 74 699,530 16.06 Woods (Good) B 55 3,473,039 79.73 Woods (Good) C 70 34,899 0.80 Woods (Good) D 77 363,662 8.35 Open Space, Grassed areas (Good) B 61 1,254,328 28.80 Open Space, Grassed areas (Good) D 61 24,615 0.57 Road; Paved; Open Ditches B 89 141,225 3.24 TOTAL: 61.9 6,895,942 158.31 Post -Construction Conditions: BMP 41 Cover Type/Condition Soil Type CN Area SF Area AC Impervious B 98 70,677 1.62 Residential; 1/2 acre lot B 70 9,046 0.21 Open Space, Grassed areas (Good) B 61 333,827 7.66 TOTAL: 1 67.5 1 413,550 1 9.49 BMP 42A Cover Type/Condition Soil Type CN Area SF Area AC Impervious B 98 1,802,851 41.39 O pen Space, Grassed areas (Good) B 61 515,232 11.83 Open Space, Grassed areas (Good) D 80 10,728 0.25 TOTAL: 89.7 2,328,811 1 53.46 BMP 42B Cover Type/Condition Soil Type CN Area SF Area AC Impervious B 98 1,203,698 27.63 O pen Space, Grassed areas (Good) B 61 582,950 13.38 TOTAL: 85.9 1,786,648 41.02 MEMEMEMMMI BMP 42C Cover Type/Condition Soil Type CN Area SF Area AC Impervious B 98 407,174 9.35 O pen Space, Grassed areas (Good) B 61 972,379 22.32 TOTAL: 71.9 1,379,553 31.67 EMEMEMMEMI POI 41 BYPASS Cover Type/Condition Soil Type CN Area SF Area AC Residential; 1/2 acre lot B 70 141,948 3.26 Woods (Good) B 55 265,716 6.10 Woods (Good) C 70 22,075 0.51 Open Space, Grassed areas (Good) B 61 193,865 4.45 Road; Paved; Open Ditches B 89 35,347 0.81 TOTAL: 62.3 658,951 15.13 POI 42 BYPASS Cover Type/Condition Soil Type CN Area SF Area AC Residential; 1/2 acre lot B 70 904,644 20.77 Farmsteads B 74 699,530 16.06 Woods (Good) B 55 3,587,943 82.37 Woods (Good) C 70 34,899 0.80 Woods (Good) D 77 289,371 6.64 Open Space, Grassed areas (Good) B 61 483,470 11.10 Open Space, Grassed areas (Good) D 61 1 83,093 1.91 Road; Paved; Open Ditches B 89 141,225 3.24 TOTAL: 61.7 6,224,175 142.89 TIME OF CONCENTRATION CALCULATIONS N BASIN I.D. n oo D o = MANNING'S N 0 4�- 0 0 FLOW LENGTH N W I, m 0 0 SLOPE 0 0 im w rn w rn z 2-YR, 24-H R RAINFALL m TRAVELTIME w ifl z n O 0 o z 0 0 3 MANNING'S N m w w N z W FLOW LENGTH m m m m 2 �p n n n n 0 0 0 z m U') ul ul ul ul ul ul ulo I� N o SLOPE 0 c m m m f7 m 0 D 0 D 0 D 0 D 00 �_ TRAVELTIME D N 0 0 0 0 0 K No 3 MANNING'S N 0 z z z z N cn Ln c c c = v c m m m m rwv T' FLOW LENGTH r-< un ul ul ul 00 Sp c3) o m T SLOPE ` 0 z n 0 00 -Z TRAVELTIME o :P:. z N Lu I� FLOW LENGTH O m z w w VELOCITY (AVG) _ D z U-' TRAVELTIME z z zTIME OF CONCENTRATION N BASIN I.D. o = MANNING'S N 0 4�- 0 0 FLOW LENGTH _ W I� -n 0 0 SLOPE m 0 0 w w z 2-YR, 24-H R RAINFALL rn rn m O TRAVELTIME cu ifl Z n 0 0 O z 0 0 MANNING'S N m w w cn 2 z -4 N o FLOW LENGTH O O 0 T SLOPE p L' o z n C � D 00 TRAVELTIME w z � o No = MANNING'S N ' m = m -n FLOW LENGTH 00 SO � o m -n SLOPE ` 0 z n 0 00 TRAVELTIME o � z � w FLOW LENGTH O N l0 m m z w w N VELOCITY (AVG) D z z r- TRAVELTIME 00 z zTIME OF CONCENTRATION STORMWATER PIPE CALCULATIONS 0 CD 0 m m� W 0 Q TI N 3 m m 3 i C CD N O A 3 � o h W A W 0 A M m O A O A A T W J A T O C N O O J � W O O C N� W N V N O N N W W O � N N O C Z N C 3 W o s 0 C N i U1 A N A V (J� 10 m N fD W W N O N W CL h sO Vr O SD G N m xii �T IL VI O� O O CL CD US I lAO] I W v O zr N N N s s O W J W (S) A W N 0 3 .0W N O CO OD J O) A W N O N (D n TI N N N M OD V N U) A W N z r v N) O cp 3 J A (J A W O 3 0 3 N W O_ O_ (D O Q TI M r N N N A N W V N A N W N V N m' OD v N 3 OD N I) O) A Lrl O -AOD V W OD V V O) A A OD O IV W OD N O) N N V 7 N (Q D N Lrl O OD N O (T O Ln O N OD Ln O OD (T O (D v (O V Lrl A W Lrl O (O v OD A (D Lrl O N N C)N O S C) (.3) N W m (.3) W O C) O OD (D C) O (D O A V V W M N ' N N N O N V W Ln N A J O) N ' O O O O W O ' CD (Q_ D Cl) W O CO O V O O (T O V (S) (.3) W m O O V O O O m O O Da O (T O) W O 6 (T A (O N A O O OD O O O (D -91 O " V N co Ln Ln 0 O O N O O � O O O N 3 A ' V O N A OD A ' OD AO OD OD CD 3 3 O O O O O O O O O O O O O O O O O O O O O O O N A O O O O O O O O O O O O O O O O O O O O O O O ...O O O O O O O O O O O O O O O O O O O O O O O O 3 O O O O O O O O) O O O O O O A O Cl — O O O O D v A A O O O OD OD A O O O m O O O O O O O O O TI (D 0 O O O O O O O O O O O O A O O NO AO O O O O O 0 a v °: 0 (O 0 (O 0 O 0 O 0 O 0 (O 0 (O 0 (O 0 O 0 O 0 O 0 U) 0 O 0 O 0 U) 0 O 0 O 0 W 0 (O 0 O 0 O 0 O o O n (D 3 D) (T (T O O O (T (T (T O O O O O O O O O (T O O O O O o � 3 3 u) 0 cs) 0 O 0 O 0 O 0 u) 0 cs, 0 cs, 0 o 0 Cl 0 o 0 O o Cl o O o Cl o cs, o o 0 0 0 0 0 0 o 3 v m O o 0 OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD IT1 3 C" A W N N A W (T (T N V O) O) V V V_ co co V V_ (T C" < W OD U) A O O) N O (O (O (.3) (.3) V (.3) A O V OD W v (D cn N M Ln O N V V OD (.3) (.3) O m O N O W O O Ln (D co N OD O (T co V N W O V O A W (T (O N c" c" A O A A A— O W O 3 ...'a (O (.3) (.3) C)O O O O (O J O O m O N N N (O (D N (O (.3) O CD co O O 0 N O O OD O O N A Ln O) V (O O (D O O (D OD OD OD OD OD OD OD OD OD OD OD OD W OD W W OD W OD W OD OD OD M m 3 A A PO O co co Ln v W V A (WO W N W (O V (On OVD P (VS) Un O W N p A C (CD OD m o (O (D W OD Cn o o (O OD Ln W Ln OD a M OD o W OD uO a V co co N co A (T O O O co N O A W W O V V V OD to r z 3 N 3 ...- O CD (D S 3 6 OD W O W O W O) W O) N A N A W O W O) W O) W O) OD OD OD OD OD OD N A W O) W O) W O) W O) A N K N (D n d O to r a) S 3 N tfD/� Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci � m Ln N A O O O O O O O O O O O O O O O O O O O O O O O 7< z O O O O O O O O O O O O O O O O O O O O O O O W W W W W W W W W W W W W W W W W W W W W W W (D n� O O O O O O O O O O O O O O O CD r O A V OD Ln O U) O V OD Ln O A O O (O (O M N O 0 O 0 O) O O O m (D N O co Ln O (T (T O (T (T (T W (T N OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M Z1 3 O) O) O) O) W A A (T O) O) N co (O V OD OD OD OD (D 0 (O V O) v D) O W O W A m A N W OD V V V V O) OD — (.3) — (.3) OD OD OD Ln O) O O OD (n O (n (O (n (D OD W N V O A O A V (O W OD (p .. V V (T co W Ln Ln W W N N — O A CO A A 0 (D 0 W W N in co in co in co in -0 -0 in co C-- coin iA iA in iA in iA in iA in W O 0 CD L- N W W W O) (T A W N W (Ji A W N W N � r 3 (D v rl O V SD \V m rF O O m (D m zr T 0 3 A A A A A A A w w w w w w w w w W N N N N N N N O O) (T A w N — O CO w V m 0 A W N — O (O w V m 0 A (D n T A A A A A A m W W W W m W N W W N N N N m N N z r v .. A co N O O OD V M (T O w (O O W OD V M O A O 0 3 N W O O O (D O Q T r N V N N N A W W W W N W N W N N A V N v (D 3 OD Cn OD Cn W OD � V V V W U) O) (O O OD W V N OD 7 CD D (1)U) 6 6 A U) O O U) U) U) U) O W w IV A 6 O 6 A cn (Q m O (3)O O) U) OD O � O O O O OD PI) W V_ � O N O OD O S O O O m V O O OD O O) U) O O O O O O O O O O N (.Si OD V O A N O N CD N T O w m — N 0 N (0 N ' N N (D 0 (1) (n (T O O O W (T O) O m mU) (T O O) (O (S) U) V -1 W O (O (O — O O 6 O OD O (O N V O CO N W O) `-' (D 00 O OD W OD V O A O) 0) (0 W N O PI)cri 0) 3 m o m w W cw (D m (0 O V (D I 2 O 2 2 2 K C CD 3 3 O O O O O O O O O O O O O O O O O O O O O O O N A O O O O O O O C. O C. O O O O O O O O O O O O O ...O O O O O O O O O O O O O O O O O O O O O O O O 3 o rn Cl - o 0 0 0 0 0 - o O N O O O O O O O O O O A O N O O O O O O A O O VO O O O O O O O O O O O O VO O O O O O O V O O 0 r v 0 O 0 (0 0 O 0 O 0 O 0 O 0 O 0 co 0 O 0 O 0 O 0 O 0 (O 0 O 0 (O 0 O 0 O 0 O 0 O 0 O 0 O 0 cn CDn O (D 3 O (T O O O O O O O O O O (T O (T O O O O O O 0) O o � 3 3 V o 3 F 0 0 0 0 0 0 0 0 0 0 0 0 0 C. 0 0 C. 0 0 0 0 (n o v m M OD OD OD OD OD OD OD w w w OD OD w w w w w w w w w w w (Il 3 CA) CA) O v (WS) W rn (0 V awD A O V O) (WO (WO V A rn rn A W (WO W v m V N V OD U) A U) cn U) O W U) N A V N m U) cn 0) A 0) OD W OD O (T O cn O 0) (T W cn OD O N co O A N O O W W O U) A O A O O 3 ...'O (0 O (O O O W O O O O A O O (O O W U) (O U) O (O O CD co O co O O 00 O O O PO O co O O co OD co W V N (D OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M (il 3 PO PO N CA) w CA) O w CA) PO O v ( n V q> O OD q> V A V (WO (WO (WO V W q> ( n W OODD C (CD O O O V W (O CD. N W co W O) m OD O N W U) U) (0 N A a �, A O A co OD W co O (T O cn 0) 0 W (T (T O N co A (n r z 3 N 3 ...- T O CD (D S 3 A A A A A U) W N N N N N co co A A A Cl) W A A Cl) W K 6 IU IN K) co OD A O A A A A A O 0) m m co 0) 0) m co 0) 0) N (D n d O — (n r S 3 N (O/i Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci Ci (D U) - - - - - - - - - - - - - - - - - - - - - - - N A O O O O O O O O O O O O O O O O O O O O O O O 7< z O O O O O O O O O O O O O O O O O O O O O O O W W co W co W co co W W W W W Cl) Cl) Cl) Cl) Cl) Cl) Cl) Cl) co co (D n O O O O O O O O O O O O O O O O CD r V O V O w m O (O cn O cn O A m O (O A V O V M N (T O (T O (T — W O V (T (T O O O O 0 — O (T 0 V O 0) N OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M 3 (T A 0) (T 0) 0) N A (T A co N A M A O) M O) M 0) W A 0) v w O) O W N N (O N O O) O O) OD OD OD O O) N V A OD (O A U) W U) A N OD V V W W m A m A W W m A m W m 3 (p .. (T co cn 0) W N W O A W co A W co V cn w 0 W m W W N N (7 C) C) C) C) C) C) m m m m m W N W W W cn A W N cn A w N — A A N A W N N W 3 (D v m (D m zr N W J 0 3 (D O A w N O (D n 7"I cri W j j j N OODD W M o r v 3 CD N 03 O 0 Q TI m N N W V N V err v (D 3 rn m -A cri co w w cn cc D � cw O U rn S C/) O) A OD (D O V O (T O O 3 (O o O CO O O A CD �_ 0 M O O O N cn p O _ (D O O O O O N A 0 O O O O O 13 c CD 2 2 2 2 0- _ = 0- 3 O O O O O O O O N A 3 O O O O O O O O ...- O 3 n v 0 o w o rn o o O O O O O O O N y (C T_ O O 0 a v 0 0 0 0 0 0 0 o n N (OJT (OJT (OJT O (OJT O O (OJT m 3 M o 3 � 3 u) cs) cs, o u, o o u, 3 m 0 0 0 0 0 0 0 o v m M CD OD CD OD CD OD CD OD ITl 7 O N co . P W cri v v N N A U) O U) N V N 3 4 N N O (T O) W A w O 3 v-O O O O O O O O (D POC" O O O O O CD OD OD OD OD OD OD OD OD M m 3 v O O A !laV (n W M C (CD is o aD is w o o a 4 POOD O (4 (T O) O cn r z 3 N 3 ...- O N CD CD S N 6 A A O O O m m (D n d O — cn r a) CD Ci Ci Ci Ci Ci Ci Ci Ci S 3 m N/ U) - - - - - - - - N A O O O O O O O O 3< z W W W W W W W W CD n� r p N O O O O O O (T O �' N N OD OD OD OD O O OD OD M 3 0VVNNo p O ...3 0 PO PO A O) POm W N PO D D D D 0 W W N N W N r 3 (D v rl O V \V m rF O a m (D m N N s s s O O J W 0 A w N i r Ue 0) 0 0 N O O OD J O) O A W N O 3 (D m CD 0 N N m OD J N cn A w N m r 3 7"I O (O 3 J A O A W 3 O 3 3 5.0 3 (D (D N W N W cn A N J N A O) w N W V N m N O M r O O) A O -AOo V W Oo V V A V A Oo N V OD N p N (D <CL OD N O cn cn N (n OD cnO O V A (n O O A (n N O O 3 II TI ci w ci O O O O O OD (DO O O O A V (.Si M j O j N (O N O O N N V N O N M w OD (DO V W cri W II� D) O O O O O O O O O O O O O A O O 8 O O O O 01 3 0 (p A O O O OD OD A O O O M O O s O O O O O O O v o (O O O O O O O O O O O O O A O O NO AO O O O O m co O O O O O O O O O O O O O O O O O O O O O O p� N O O O O O O O O O O O O O O O O O O O O O O (n O O O O O O O O O O O O O O O O O O O O O O O1 O (D + 3 1 O O O O O O O O O O O O O O O O O O O O O O Ci O: ;n iD o 6 o io 6 6 o 0 o 6 o o 6 o o ij 6 o 0 6 0 (D O rn (D (n O O O (n (n (n O O O O O O O O O (n O O O O O 6 < u) o A O O O V V O O O O co O O O O O Cl) Cl) O O O O 0 V O O O O) O) OD O O O O O O V O O N m O O O O N k O O O O O O O O O O O O O O O O O O O O O O 0 0 (D O C. O O O O O O O O O O O O O O O O O O O O C 3 O O O O O O O O O O O O O O O O O O O O O O fn O O O Un (n (n O O O O O — O O — U) O O O O _ 3 O O O O O O O O O O O O O O O O O O O O O 3 M Q O O O n I I (n o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (n O O O O O O O O O O O O O O O O O O O O O O 3 y 0 O O O O O O O O O O O O O O O O O O O O O O 5 3 N p (n (n O N N A W O O O O O V N N O p OD V O OD O N P A O < (UA N O OD m (D O A (O m m m m W A p O) O 0) (O (n A N O) N A OD (n N A M O OD W m m V 3. CS) 0� O) N N A 0')� O) � N � N N N N m (O OD � 0 C � Q O O O V N N O p OD V O OD O N P A O v — a N O O OD m 66 A (O m m m m co A 6 O (O (n A N M N A OD O N A O) O OD W W W V C OD O OD A N O N O N N W A N N W A N A V O V OD O O A O W O O W W O CO 0') O N O O W A (0(0 O A O m (O M (n W n (n 0 D) W W W W N N W W W W N W W W W A N n O O 0')O) A A O 0')O) 0')OD OD OD OD OD OD A O) 0')M O) N -� C' CD N . — U) O J — V A A A O O W — — — '� e Ln n U) U) O O O O O (O V O O m O N N N 6 6 N 66 O O II O O 0 N O O OD O O N A O M V (.00 CD O O N _n OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M 3 (D Z A W N N A W O O N V m m V V V OD OD V V O O L r_ — OD (n A O p N — O (O (O (n (n V (n A O V OD W (D II 3 N m (n O N V V w (n (n O m O N O W O O (n (D — 6 OD N OD O O OD V N W O V — O A W O O N O O A O m 6 (D (D OT 00 OD OD OD OD OD OD OD OD OD OD w w w w w w w w w w w w M C < II A A A W V N A A O W pW O O N W W PV OD V M U) V OD V O) V U) OD U) OD O V OD V N O (O O A - 6 (D m O (O (D W w (n O O (O OD (n W (n w A m w O W w W O N OD OD N OD A O O O O OD — N — O A W W O V V V OD X (n A OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M _ O A N N O A O O N N OD O) O) V V V OD OD V V O) O G) OD p V O O) A A A W O P P OD O) N U) N (O W O O) r OD N N W N O (O A OD CD W OD N OD W O) O A O V A A N CO N (O N OD (O W A OD OD U) (n O OD O m N OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M C < O O A N O A O O W N OD V O) V V V OD OD OD V m O .- U) O OD (O (n A P W W p P p OD P V W (n N V N m (O A O) O) O) (n O) O O (n (O W (O W A O N m A W (D O N O O O W W O O) OD N N A O O OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M �J O) O) W N A O) O) O) N N (D V M OD OD V (O (O O V O) O "' 3 3 C A A W OD V OD W O) O V U) U) V N O O V W V 3 O) N OD (D V 6 6 6 OD (O O OD (D (O (O (D V A A (D OD N �" O OD co N O — — — W N N — O A W (D A (D 0 (D W (D 0 � 3 W OD O) OD O) OD O) OD W OD A OD A OD O OD O) OD O) OD N OD OD OD (O OD V OD OD OD OD OD OD OD OD OD (D OD 0 OD (O OD V OD O) -a IT1 O A A W V V O) OD OD O) O (n (n (n OD N O O V W Cl)CD V m O N OD OD W V O V O OD co U) U) OD CO (n N O N OD — O O (O A (D CO CO A V A A 0 A (D (O 0 OD W C N O W in in in in in in -0 -0 cn co L co cn iA iA cn iA cn iA cn iA cn i � � � -I -i -I W � � � � � � � � � � � r, m 0 0 O 0 0 C- N W W W O) O A W N A W N W N (D v T m m Z A A A A A W W W W W W W W W W N N N N N N N r � A W N — O (D OD V M (JT A W N — O (D W V W (.Si A W N M 0 N O m CD A ' 7'I co N O W V O) (JT W (D — O W W V W j A O N 5.0 Q Q Q N (D N 07 PI) A N m N N A V N N M r (D O OD A cn O Oo Uri UVi UVi UVi (31 _ W O N A W (WO V N W W QO (3 O) W IVT 3 II - O O O M O O O O NW U jM W O ONO A O W N O CD O O V O () O O O O V O O O O p O O O O p O O O O O O O O O 01 7 0 (3p O O O O O O O O O O A O N O O O O O O A O A v O m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PI) o o CO D O O O O O O O O O O O O O O O O O O O O O O v m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v 0 cn o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v o CD + 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O O: n o 0 0 0 o w o 0 0 o (D o (D o 0 0 0 0 o in o 6 (D O rn (D O o O o O o o O o O (n O (n O O o O o O rn O (n v, < rn o 0 0 0 0 0 o 0 o O m O O O O O O O V O O 7 D 3 O O O O O W O O O O O O IV O O O O O O (O O A 0 O O O O O O O O O O W O O O O O O O O (D O V N V k O O O O O O O O O O O O O O O O O O O O O O 0 0 (D O O O O O O O O O O O O O O O O O O O O O O C 3 O O O O O O O O O O O O O O O O O O O O O O o' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o in o o v Q � u o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O 3 m o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N (J) O O O O O O O O O O O O O O O O O O O O O O 3 y 0 O O O O O O O O O O O O O O O O O O O O O O 5 3 N p (fl W N N N N A N A D7 N N W D7 N_ O O_ O A A - W N N N N W O W (D W W A ci V O U) V W W N O W W W co W O O W CO A A 6 N A Ot N V A — (JI — N N (J) Cn A Cn V W N A A V 3. (0 W N N N N A N A O) N N W m N_ s m m C Q (0 A A m W N N N N W O Cl) (0 W W A (Ji V V W W N O W W W W W O O W O A A 6 N A O N V A Cn N N (J) Cn A (T V W N A A V C W W V A W W p O A W (fl N (fl (fl U) N O W A A V N O O W N O W W A O W W W N A N U) W V A V V (.0 CO cn (O CD W O) W V V V (r M (0 V N (O n N (n N A A A CS) O) N N N N N W W A A A W W A A W W N n N W W A O A A A A A O 0') N N W O) 0') N W O) 0') OD -� CD CD N A — O A — ' ' Ln n (0 O O W O O O O A O O (o O W U) (o cnO (O O (O o O 0 II W O O (D O O O O N O O W O O W W W W V N W N _n W W W W W W W W W W W W W W W W W W W W W OD M 3 (D Z W N N W W W A W W co N co co N N co W L" < r_ (J7 W W (O V W A O V W O p (O V A W W A W (O W W (D II 3 V W Cn A Cn CnU) O W CnN A V N W Cn Cn Cn4 (D — 6 m W W W O L" O L" O M L" W L" W O N W O A N (D m 6 (D (D s W W W W W W W W W W W W W W W W W W W W W OD M C < II W W W O N W N W V A N W W W A W O V A O W p W (O W p W V W W W W W (J) N W A O W W (T W ..- 6 (D O V 6— W (0 O N W W W W W W O N W cn cn (0 N A W O (� A W W W W O L" O L" O) (D W L" L" O N W A V X (J) A W W W W W W W W W W W W W W W W W W W W W W M _ A A W N N A W W (r (r (r A W A A W N A A L" U) (fl U) W O W N (O V O O U) (fl O W A O V (O W V r W W N A (J) O (O O L" O (D A W — L" W A W W O A (O L" (o m O O (O W N O O (o A (J) (O N W W L" m N W W W W W W W W W W W W W W W W W W W W W W M C A A A W N A W W W (r (r (r (r A A A A N (r A (r "O W W O W W W (O (J) N (O O W W V A O W O W V V (D O W W (O (0 W O O W U) O W (0 W A N (J) (O (D A O) W (D A (0 — O W L" A W L" O L" N (O N W W W W W W W W W W W W W W W W W W W W W W W M C) 6) �J L" O) 0') N N L" A W N O) O) M O) co M O) co N M O) O) O C (fl O O W W W V W (O (fl W W W V W A A W W N W W W (0 N A A (J) W V CO W W CO W (0 W N W O) W N W N A W W A N W W L" — W — (0 W N W W V 0 � m 3 W W O) W L" W O) W O) W N W A W L" W A W W W N W A W O) W A W O) W O) W O) W O) W O) W W W A W O) W O) N (O O O W W W V W (fl A W A W V W A A W A W O CD N L" N M W co W N W W O O N A A W W A U) W U) W N V V L" W W W W W (D W W W O) W co W V < N O co N in in in in in in in in in in in in -u -u in in in in in in in in r m m Cn A W N A W N A A N A W N N W Cn N T m m r vi Z 01 0 o A W N O (D OD V D) (n 3 CD m CD O Ill 3 W j 7 W W M A A 7 0 CD (D' CAD O N (D (n W N Cl) V N3 ' V N V M r O OD N J CD w p OD (n ... (D `< Q (n i, O (n jV W (n D) 3 II O O (D W O O) I O W A N O 0 N O O O IN N 2 O O W O O O O O 01 7 v O N N N W O A O O N O N v 0 j 0 00 0OOO 0 0 m o CO D O O O 0000 O O o v m u O O O 0000 O O O v cn 0 00 00OO o 0 o v o CD + 13 0 0 0 0000 0 o O O: (D (D (D O (D 0 0 (D O (D 0 0 rn (D cn cn cn o cn 00 cn 0 cn v, < o 3 O O W O O O CD CD 3 D CD CD N O OD O O O O O N V V k O O O O O O O O O O 0 n 70 O O O O O O O O O O O C 3 in in in O in 0 0 in O cn 3 3 o' O O O o 0 0 o O CD O v Q u cn o 0 0 0 0 0 0 0 0 0 N (n O O O O O O O O O O 3 y O � O O O O O O O O O O 5 3 N O� A O O N N O O M M O CD O OD CD O O) O) V N A (n — N V W OD N OD N O O - A M M N C O Q O COD O a OD 0 O O) O) V O `' O N A (n — N V W OD N W C M V W O (D OD O O O O O _ N O (D W co co A A N VO N W OD co co OD V OD n N (n N N N W W W W W A A A N n A A O O O D) D) N N N CD-� CD CD N ' Ln O o O O- 0 0 O O O PO cn W N _n OD OD OD OD OD OD OD OD OD OD M v 3 (D Z W N W PO W W W W W W ...- 7 < D O N A P W— (n A O) (p II 3 N A (n O (n N V N V N (D 6 N — N O (n D) CO A D) A in 6 (D OT OD OD OD OD OD OD OD OD OD OD M C < W ...- II �' O O A N V (n W P (n V 6 CD O OD 8 W OD O O O O O X N j N OD O co (n D) O A O (n A OD OD OD OD OD OD OD OD OD OD M v = N W N (n A A A co A O A N O) 66 W(n co W OD (0 6 V W r V (n V (n A D) W N CD D) m N OD OD OD OD OD OD OD OD OD OD M C < W !� W N cn A A A W A - 'O N V ANOV O OD N (D O N — (D — OD OD V co (n N cn D) OD V N OD OD OD OD O OD OD OD OD OD M p L) V N N PO O cn O 0-) "' 3 W O . (�D (�D Q 0 N A A N D) D) (n N cn 3 W w w 4, p. o o w � w - C V V N N 5 o p O P CD N N O A D) N cn OD N O W i � � � � � � r W N N W W D) N PO v cn rf O Y cr lw O C4 Z N N � PI)s i O W J W Ui A W PI)s 0 S. 0 0 W N O CO OD J W A W N O CD CD Iit = 2 � V W 0 A W W (T A W N 3 W (T A W N N W N W jV J M Z 0 G a v v w 3 o m CO `n O O O O O O O O CD O CD CD CD CD O O O O O O O O o �, D II o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD co o O o o O o O o O o O o o O o O o O o O O o O � o w 13 O O O O O O O O O O O O O O O O O O O O O O O d A O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N II G N O N 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O ci A a� o 0 0 0 0 0 0 C. 0 C. 0 0 0 0 0 0 0 0 0 0 0 0 6 o O o o O o O o O o O o o O o O o O o O O o O O O O O O O O C. O C. O O O O O O O O O O O O O ci Oo fJ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 m d7 6 6 6 6 6 6 fD 0 Cif O ^• 2 0 W W O O O W W O O O O W O O W O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a N 3 N N — — — N N O W N N N O O O O O O y r M NO O 6 0 6 O O O O O O O 6 6 O 6 6 O O O O O O C O O O O O CD 00 O O O O 00 O O 00 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O C; D O O O O O O O O O O O C. O O O O O O O O O O O Q N p' O O O O O O O O O O O O O O O O O O O O O O O v N Q I I N O O O O O W N O O O O O O O O M r M N U1 O O 6 O 6 O O O O O O O 6 6 O 6 6 O O O O O O "' 3 O O O O O O O O O O O O O O O O O O O O O O O N O O O O O O O N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 CD CD (D O O O O O O O O O O O O O O O O O O O p O O O (a (a (aO O O O O O O O 7 O O O O O O O O O O ... O 7 O O O O O O O O O O O O O O O O O O O O O O O M O O O O O O O O O O O O O O O O O O O O O C. O .. p o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v n Q Z O O O O O O O O O O O O O O O O O O O O O O O 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a o o O o O o O o O O o O o O O o O D m O O O O O O O C. O C. O O C. O O O C. O C. O O C. O O O O O O O O O O O O O O O O O O O O O O O O cn s 0 0 C. C. 0 C. 0 C. 0 C. 0 C. C. 0 0 0 0 0 0 0 0 0 0 k CD o o O o O o O o O O o O o 0 0 o O N O O O O O o o O O O O o O O o O O O O O O O O m En4, O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 v o o O O O o 0 o O O O o O O o O O o 0 0 0 0 0 m w w 0 o 00 0 o w w w O o o 0 0 o w o o O o w O o o o w w w w w Cl) �v o O O O O O O O O O O O O O O O O O O O O O O CDcD v 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 0 0 0 6 a o O o o O o O o O o O o o O o O o O o O O o O s �(n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 o O o o O o O o O o O o o O o O o O o O O o O v a �v 0 O O O O O O O O O O O O O O O O O O O O O O O BCD ,v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C. 0 C. 0 0 0 6 a o O o o O o O o O o O o o O o O o O o O O o O s '' O O O O O O O O O O O O O O O O O O O O O O CD�-a m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 CD N O O O O O O O O O O O O O O O O O O O O O O O D1 O O N W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 " a z CD a 10 O Z A A A A A A A W W W W W W W W W W N N N N N N 0 S. 0 0 M cn A W N O O W J M (T A W N O (O OD V W (n A (p CD Iit ' m - n n n n n n 0 m m m m m o m oo J O) (T A W N (T A W N Gi N A W N Z 0 (T W G Q N v fll -n C N w 3 o m CO `n O O O O O O O O O O CD O CD CD CD CD O O O O O O o �, D II o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v C0 o O o o O o O o O o O o o O o O o O o O O o O � o w 13 0.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d A O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N II G N O N 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O ci A 0 0 0 0 C. 0 C. 0 C. 0 C. 0 C. 0 0 0 0 0 0 0 0 0 0 0 o O o o O o O o O o O o o O o O o O o O O o O 0 0 0 0 0 0 0 C. 0 C. 0 C. 0 0 0 0 0 0 0 0 0 0 0 ci Oo fJ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 m + 2 0 2 2 2 1 L s m0 in 0 ^• 2 0 o 0 0 0 0 0 o rn o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 00 0 0 0 0 0 0 0 0 0 C. 0 C. C. 0 C. 0 0 0 0 0 0 0 o a N 3 O O O O N O O N O v r M O O O O O O U1 U1 U1 U1 U1 O U1 O U1 O U1 O O O O O O O O O O O O 00 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N D O O O O O O O O O O O O O O O O O O O O O O O Q N 0' O O O O O O O O O O O O O O O O O O O O O O O v Gl Q II O O O O O O O N O M r ID (n O O O O O O U1 O U1 U1 U1 U1 O U1 O U1 O U1 O O O O O _ 3 O O O O O O O O O O O O O O O O O O O O O O O N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O_ N O 0) O O 0) O 0) O 0) O O 0) O O O O O O O 0) O O O O O O O m O O p (n O O O O O O O O O O O O O O O 7 O O O O O O O O O O O O O O O ... 0 7 O O O O O O O O O O O O O O O O O O O O O O O M O O O O O O O O O O O O O O O O O O O O O O O .. p o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CL Q Z o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD � a o O o o O o O O o O o o O o O o O o O O o O D m O O O O O C. O O O O O O O O O O O O O O O O O 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 k s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD m o O o o O o O C) O o O o o O o O o O o O O o O � rn o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m Nul . o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . 0 0 0 3 !v O o O o 0 o O o O O O O o O o O O O O O O o O m 0 o w 0 o w w w o o w O o o 0 O 0 o o w O o w O o o 0 O 0 o 0 O 0 O o w O o �v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o s 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (p o O o o O o O o O o O o o O o O o O o O O o O sv a �v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � m ,v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06 a o O o o O o O o O o O o o O o O o O o O O o O s 0 �-a rn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD -' N O O O O O O O O O O O O O O O O O O O O O O O pt O N W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 z (D a CD 10 O i zr z 0 CD O oCD A w N O O OD v CD Iit N N O (O OD (7 W W M z O N G n 0 v w 3 o m CO `n O o O 6 O 6 O 6 O 6 O 6 O 6 o o �, v D II O o O o O O o O � o w 13 0 0 0 0 0 0 0 0 d A C O O O O O O OCD O N I I N O N 3 0 0 0 0 0 0 o O ci 2 A a� o 0 0 0 0 0 0 6 ic O o O o O O o O O O O O O O O O ci Oo fJ 0 = a 0 0 0 0 0 0 0 3 CD + 2 2 L in 0 o 0 0 0 0 0 0 0 O 00 O O O O O O O O a N 3 CD 0 0 0 0 0 0 0 0 c 3 O O O O O O O O N D Q 0' O O O O O O O O v D) Q I I M U1 O O O O O O O O "' 3 O O O O O O O O N O O O O O O O O O O O O O O O O O_ CD cNn cn cn cn cn cn cn cn O .. ;rs O O O O O N N N O 7 O O O O O O O O .. p O o O o O O O O v n Q Z o 0 0 0 0 0 0 0 m 3 O O O O O O O O D o 0 0 0 0 0 0 0 C O O O O O O O O k O O O O O O O O N 6 CDO O O O PI) PI) PI)O _ N O O O O O O O O O V A O O O O O O O O 3 fD co Cl) Cl) Cl) Cl) Cl) Cl) Cl) 3 M O O O O O O O O O .', CD O O O O O O O O s O O O O O O O O pOj G �J �CD 0 0 0 0 0 0 0 0 0 �m v 0 0 0 0 0 0 0 0 a s O O O O O O O O -a rn O O O O O O O O CD .' N O O O O O O O O D) O N w O O O O O O O z o Oo w z r W CD CD U a m N W Z 0 N 3 N . N ur 0 iA .n. N W W W W N N W W W W N W W W W A N Q CD O O W W A A O W W W OD OD OD OD OD OD A W W W W N 3 W N (S) U) W N N A W W N N N N N W (O OD n A N a O O (T V N N O W OD V O OD O N P 8 A — O C -n N O OD 2) (D O A (O W W W W W A 6 O 3 CD 2) O U) A N M N A OD Ui — N A m O OD W m m V V3i OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M 3 A W N N A W (T (T N V m m V V V OD OD V V (T Ln �- CD < OD U) A O O) N O (O (O U) U) V U) A O V OD W < (D C� C OD N OD O (T OD V N W O V O A W (T (O N Ln Ln A O CO OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M a = O_ (T A N N Ln A (T (T N N OD O) m V V V OD OD V V m (T G) (p 3 OD p V O O) A A A W O O) O) OD O) N U) N (O W O O) < r I� OD N N (0 OD O OD W � A V A W (O N (O A OD U) U) OD N W O A— W N OD M (T O A N N OD W OD O (T ' (D 0 G N N N W W N N N N W W N N N N W v CD II 3 6 O O O O O A O O N N N K) jV N a> A A A A W 'a 0 O O O O O O U) W O O W W W OD OD W A W W W M (T A A J J W W A O) J J N O) O) O) O) W y D II (p (p O O W N O O U) U) U) O) O) U) V N N N N (O N 3 (p V V A A O V V (T (T (T O O (T (3) O O O O Ln M D) M � N OT O V V (O N (O W W OD N 3 II O O A N N U) O O) V OD W W W W O O CO (T W O N 6 N N W (D O) O m N 0 m m A Ln (T O O V N O) 0 X W W O (3) OD O V N A OD V N J O O O A O N N N O A N N M S C O) O) O A OD OD W O) A V V W W W (O O) A OD N (O CD �" Dat W W (T O N — O O m O O OD A U) U) V N O) U) N M Q OD OD OD A OD OD N OD OD A OD OD OD OD N OD OD OD OD OD OD OD OD OD OD OD OD M m m Gi (T W (O W O) (O Ln O) (T O) (T U) W U) A OD V O M V OD O V (O V A OD O) OD A OD A V O) O) N Ln OD CD < r A OD N W O) OD V O U) (O M N M (O N W V OD (T (T O) A W A OD A (T O N W O) (T W O O V Ln U) O O J O O O O O O O O O O O O e " A A O O O_ O O O V_ O O O O O O O O O O O O O ... (O (D (O O O O O O O O O O O O O O O O (O (D V OD O O O U) O O O O O O O O O O O O N � N A N W V N N O) U) V Oo - W Oo V O) A Oo O W OD N m N V �- 3 O) A O (T U) V U) V (T A v V A U) IV v A U) N IV O OD N O O O N OD O OD O (D (O U) W O (D OD (D O N O N U) W U) O O O (D O O O A V O) N N N O N V (T W OD OD OD OD OD OD OD OD W OD OD OD OD OD OD OD OD OD OD OD OD M 3 A A W N A W (T (T W OD V O) V V V OD OD V V (T Ln CD < A V A O (O W N W (O V U) OD P U) U) O OD N p A < CD O) O (O (0 W OD U) O O (O OD U) W U) OD A M OD O W OD W OD OD N OD A (T O O O OD — N — O A W W O V V V OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M a 2 (T Ln A N A (T (T W N OD V O) V V V OD OD OD V O) Ln �'�,. CD G) U) O OD (O U) A P W W p P p OD O) V W U) N V < r N M (O A O) m m U) m O O U) (O W (O W A O N O) A W (D Ln N O (T O W W Ln O) OD N N A (T (T N N W W N N N N W W — — — — — — — N N N N W v CD Ln Ln O O O O U) O) O O O O N A A 0 N Ln A OD A OD A OD O) OD m 0 U) OD V V OD O V -a Z O O O O O O » » » » » O » » » » » » » » » s ` 3 A A V V W W A O) V V N O) V p O) Oo N D s m ifl o o a cn o o is is V V V OD (n o (D OD (o m C (D V V A A CO• V V J J J W W W N N A m A Ln v D) N O O V J (D N (O m — m V N CD O O A N N O p A W p V N N N O O M W N 3 M N W N W W O OD O) O W O) N O OD (O W (O A N OD N (O W O O N O 6 U) 6 W O A N A U) A V O O O A O N N N O A N N � O) O) O A OD OD W O) A V V W W W (O O) A OD N (O CD " W W Ln O N — O O m O O OD — A U) U) V N m U) N W Q V OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M m m (T (T A N Ln Ln Ln Ln A N OD OD O) OD OD V OD OD OD V O) Ln "" cD G) O) N (O (O O O) O) V U) W W V N O (O OD U) U) OD A p < r OD Ln W O O OD N (O N A (0 A N O N O W V (T O N V W N M M N M N OD O N A OD O OD OD V A N U) — — O O O J — O O O O O O O O O O O O e A A O O O (O O O J O O O O O O O O O O O O O .- (O (D (O (O O O O O O O O O O O O O O O 7 (O OD U) OD (D O O N O O O O O O O O O O O O 0 U) O O V O O O O O O O O O O O O o L A A O O O O O O V O O O O O O O O O O O O O ... (D S (D (O (D (O O O O O O O O O O O O O O O O N W (O OD m OD O CD CD O O O O O O O O O O O O (D X, W N s O O W J J i O J 7 J J J 7 J J 7 J J 7 a m N A O O V 00 O `G W O O O O O O O O O O O O O O O _ 0 L. i V OD Ln O U) O V OD Ln O A O O i0 i0 (D (O O (O O) O O O O) (D N O OD Ln O (T (T O (T (T (T W C" N ' O) O O 7 7 (D O 7 N 7 7 O 7 7 O A 7 7 O M a A N V OD N N N U) V N O N N W N N N N N N N v N 3 N N A OD OD N O W (T A A CO• O N (D (D r A A A A A W W W W W W W W W W N N N N N N N 0 O A W N O O OD J O) L1 A W N O (O OD V O) U) A W N (/ 0 ^ iA * N A A A ()> W N N N N N CO Cl) A A A CO Cl) A A CO Cl) _ (D N OD OD A O A A A A A O W N N OD W W N OD W W OD CD 3 W fl) l< (O co N N N N A N A 6) N N OD W N s 6> 6) n A N Q (O A A O) O) N N N N O) O Cl) (O co O) A ci J O v -n J W W N O O) O) O) co O) O O W O A A N A 3 D) N J A L7 N N (n L7 A L7 J W N A A J �- (n OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M Q 3 W N N W W W A W W W N W W N N co co L1 ...- CD < CO (n OD O) (O J OD A O J O) O (O (O J A O) O) A W (O OD W < (D n C J OD (n A (n (n U) O W (n N A J N m (n (n � (n C 0')OD W OD O (T O cn O O) (T W cn OD O N OD O A N (D CO OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD OD M Q = CO O_ A A W N N A W W cn cn cn A W A A W N A A cn CD G) (D 3 (n — O (n W O O) N (O J O O (n (O O O) A O J (O OD J < r I� OD N (n (O — O — W O) w O (O (O O — m O (O (n N O) 3 W A (O O (T (O A (T A W A (T O) O (D N O A (D W (T (D r G .N. Cl) A A A (n N W W W A W W W A W W CD (D m 3 00 0 0 0 0 ? ? rn ? ? o 0 00 0 0 0 0 0 0 0 0 s N N N L7 (O J J OD J J (O O O) O) N O O m N O O V (D 3 N N L, L, O O) O) O) A m m — J N N 6 J J N 6 J J V Y D) N O) m O Cl) m m 3 � N �- N OD OD J OD OD (O N N (O N (O (O U) M N D) �' O N W N j J N W W O A W — W N N 6 OD N 3 3 W A A V N O W O m m A O W OD En N A J N O J A V J (O W J J OD O) (O ' N N Oo N O O O N O O Oo N V N 1 Cl CD N n O) O O O J (O (O (O J (O O W O) O A W J O W A (n "' D) II J W N O) A (D (D (O (O (O (D O) (D O (O O) (n A A Q 0 (D OD A OD A OD A OD OD N OD A OD OD OD N OD OD W OD OD OD OD A OD A OD OD N OD OD A OD M m m Gi II J W W W (n W J W W _OD cn cn cn J cn OD W OD OD (n W J (O cn O (O cn OD CD < r (p (n N O) (O w O W (O m (O A m (O (n W (O J (O (O O) — O J — J 0 OD W O A W O A O) O (D OD O N W (D Oi O O W O O O O O O O U) A O A O O ^ (O O (O W O O O O O O O (O (O N U) (O (n O (O O_ 66 OD O (O (D O O O O O O O OD (D (O OD OD w W O) OD O X Cl) N J N O O O O O O O Am OD A Cl) W m OD W N N N_ A W W co W N W N W N N A J N N M r N OD (S) W OD L1 J J J W U) O) (O O OD W J N OD OD ...- Q (n A U) O U) U) U) U) O W OD N A U) O cn A (n (n O O) (n OD CD CD CD CDO _ OD N W J O N O OD O O O m O OD O O) O O O O O O N ci OD O A O N O O N N A A N A CD W O) W O OD O) J N W OD W A W O J O W (O W (O W (O W J W OD W O) W (n W O W OD cn W < < CD O J W (O CDN W W W O) m w O N W (n (n (O N A OD A W OD W OD O (T O cn O) (D co L, (T O N OD A — J OD OD OD OD OD OD OD co w OD OD OD OD OD OD OD OD OD OD OD OD OD OD A A A W N A W W cn cn cn cn A A A A N cn A cn ,,,. (D G) .m W O W W W (O . N (O O m Cl) J A O OD O OD J < r J (O O m O) (O O O W O O -- O) U) O OD (O OD A N 6 (O (O A O) W (D A O OD c A OD cn O (T N O N W v in o o in o (D (D (D (D o in in o 0 o in o 0 o in N a 0 0 0 0 0 * * * rn * * in O O o O O o O o O o O o s Z ` 3 (O � � N N N W N A J (O (O J J (O J J y D 6 O) N N L7 O OD OD OD OD (O O O) O) N O O m N O O V (D C (D N L1 L1 O O) A A A W A — J N N (n J J N (n J J V M D) N O J J O W J J N J J J J OD (O N N (O N (O (O Uh M C CD D) N p N W (O (O (O W (O W W O A W W N — N 6 OD N M W m A A A V V N J J J J W (O J (n m A W O O) W J OD J (n N O) A (O J N O (n A N N OD N O O O N O O OD N J N O _ S "' CD N O) J O W O N O O) J A (O (D (O (D (O 0 J (O (O 0 O (D W O) O) (D O O A (O (O W O) J O O (n W A A U) A Q OD OD OD OD OD OD OD OD OD OD OD Oo OD Oo Oo OD Oo OD Oo OD Oo OD M N m A J A (n A N A N O) A A A O W O) W (n (O (n N (n (n OD O) O (n — (n O A O) A OD W O (n — A O (n OD < G) J OD (O W m (O (O (O U) W (n 6 O N (n A O) (O A r OD co O) N J OD W OD O (O O) O A J A O) (n J N N J (O O (O W O O O O O O O (O (O N U) (O (n O (O O (O OD O CO CO O O O O O O O w (O 0 w OD w W O) OD 7 N O) O O O O O O O A (n m O A W m OD N 0 O O W O O O O O O O Un A O A O O ecn < (D S (D OD O 0 CO O O O O O O O OD (O 0 OD OD OD W O) OD N W W N J O O O O O O O A (n J A W N O) OD co (D 0 W N N N N N "' N N N OD (n U) W L, L, A w N (n a> O) w O (n N w OD A w J O N 0 N OD N D] N W O O N O O O O O J O O A O C. O O K O O O O O O O O O O O O O O O _ n L. i V O w w O (O in O in O A w O (O A V O V O (QD L, O L, W O J L, L, O O O O O O L, (O J O O) O N O O) N O O O O O O A O) N W O M Q N L1 O W W 0 L, co N J (O (D (O O) L1 A N A (O O (D O) 00 O) (D A — OD OD (O N (O J J U) OD W A O J U) A O N (D (D r O O OD O ( CD (/ 0 ^ iA * -n N N Cl) CO Cl) CO W A A A N CD CL N (D A A O O O W W N N N 3 W fll l< N A A j A O1 a) O n A N Q N O O W W O O O 3 N N A (OS) O— N -4 W OD N OD v �- (n OD OD OD OD OD OD OD OD OD OD W N W W W � W W W ...- (D < O N AM W Ui A a7 < CD CO C N — N O (n MW A O) A 0) �2 OD OD OD OD OD OD OD OD OD OD M O = Q N W N A A A W A (D G) (D -5 3 A O) W V (n p V < r I� (D N (n O Cl) CO OD (n CO 3 J (n J (n A O) co N (O O) (D r G N N N N W W W W W v CD 7 CD 3 (Cn w » �o » 0 0 0 0 0 o a s o 0 N W A A A J J (O (O (O N D F (n OD ON (n J J N N N Dt Vl 3 � �- V — (D (O OD (O (fl m D) 3 �' OD �D 6 it W a a o 0 o N 3 N N OD W W OD OD V OD C () O (n W W O W W j O) j C N II O V O O (O OD OD J Q 0 (D OD W OD N OD W OD N OD (n OD A OD A OD A OD A OD A M m m (D Gi II N p V A N OD V N (O < r O N CO W J � cn (Vn W J Oi II O O O O O O ^ e 6 O O O O O O O O O O O O (0 (D O O (0 OD O O X O O O O m O (D (n W (n N N W V N V N V M r N OD A O) O J (n CO W () (n OD (n ...- O 6 O O) O (D (n (D N O) O) ci O O) m O A OD O V (n O O O OD W W W OD W OD N CO W OD W OD co OD W CO W OD W M 3 CD < O O A N V (n Cl) m (n V < CD (n O OD W OD O O O O N OD O (4 (n O) O A O OD OD OD OD OD OD OD OD OD OD M O 2 W W N (n A A A (4 A .', CD G) N V A N p V p OD < r N (D O N (D OD OD J W (n N (n 0') OD J N N N N co W co W co v CD o » cn * (s » (n » in O O o O o 6 0 6 o 6 o Q s Z ` D s (D (°Dn N O CO J J N N N v Dt C N O o N m m aD 0 0 m 3 M N OD W A OD W it,o W A W A .. O) OD m OD (n A N M S C O (n W W O W W V O) V "' CD O V O O O OD OD JOD Q W W W OD N OD (n OD (n OD A OD A OD A OD A M m G) W A OD (n W < r N (n A W N (n (n N W A (n A (n (D 6 A OD W � O O O O O O O O O O (O (O 0 O O (fl co O 7 O O O O (n (O OD (n N (n 0 O O O O O O e< (D O O O O O O O O O O O O (D (O O O (D co O O (D S W O O O O M O OD (n W (n N 0 NOD (�O W O) OD O) N W CD O O O O K p O _ O r O O O O O O (n O (n O 7 7 O M O O O j j COO OD (Nn N (D (D CULVERT CALCULATIONS HY-8 Culvert Analysis Report Crossing Discharge Data Discharge Selection Method: Recurrence Table 1 - Summary of Culvert Flows at Crossing: Large Culvert Headwater Discharge Total Box Roadway Iterations Elevation Names Discharge Discharge Discharge (ft) (cfs) (cfs) (cfs) 809.88 1 year 74.09 74.09 0.00 1 810.32 2 year 121.44 121.44 0.00 1 810.97 5 year 202.11 202.11 0.00 1 811.45 10 year 270.84 270.84 0.00 1 812.08 25 year 369.63 369.63 0.00 1 812.57 50 year 451.73 451.73 0.00 1 813.05 100 year 537.91 537.91 0.00 1 847.75 Overtopping 2992.17 2992.17 0.00 Overtopping Rating Curve Plot for Crossing: Large Culvert Total Rating Curve Crossing: Large Culvert 85C 84: 84C v 83: 0 a m } °7 83C w a� m � 82: m aD z 82C ai: sic V .�VV IVVV IJVV tUuu C.'VV JVVV Total Discharge (cfs) Culvert Data: Box Table 1 - Culvert Summary Table: Box Disc harg e Nam es Total Disc harg a (cfs) Culy ert Disc harg a (cfs) Head water Eleva tion (ft) Inle t Con trol Dep th (ft) Out let Con trol Dep th (ft) Fl o w Ty pe Nor mal Dep th (ft) Crit ical De pth (ft) On tle t De pth (ft) Tail wate r Dept h (ft) Outl et Vel ocit y (ft/ s) Tail wate r Velo city (ft/s ) 1 74.09 74.09 809.8 1.13 1.14 3- 0.79 0.6 1.6 1.63 1.89 2.99 year cfs cfs 8 6 M 7 3 1t 2 121.4 121.4 810.3 1.57 1.59 3- 1.07 0.9 1.9 1.96 2.58 3.39 year 4 cfs 4 cfs 2 1 M 3 6 1t 5 202.1 202.1 810.9 2.21 2.23 3- 1.46 1.3 2.4 2.43 3.46 3.61 year 1 cfs 1 cfs 7 5 M 0 3 1t 10 270.8 270.8 811.4 2.68 2.72 3- 1.74 1.5 2.7 2.73 4.13 3.68 year 4 cfs 4 cfs 5 0 M 8 3 1t 25 369.6 369.6 812.0 3.29 3.35 3- 2.11 1.9 2.9 2.99 5.16 4.07 year 3 cfs 3 cfs 8 2 M 5 9 1t 50 451.7 451.7 812.5 3.75 3.83 3- 2.39 2.2 3.1 3.17 5.93 4.33 year 3 cfs 3 cfs 7 6 M 2 7 1t 100 537.9 537.9 813.0 4.20 4.31 3- 2.66 2.5 3.3 3.35 6.69 4.57 year 1 cfs 1 cfs 5 5 M 0 5 1t Culvert Barrel Data Culvert Barrel Type Straight Culvert Inlet Elevation (invert): 808.73 ft, Outlet Elevation (invert): 804.00 ft Culvert Length: 396.81 ft, Culvert Slope: 0.0119 Culvert Performance Curve Plot: Box 850 845 840 835 a } 830 w a� m 825 m aD z 820 815 810 Performance Curve Culvert: Box 0 Inlet Control Elev 0 Outlet Control Elev ■ i i 0 560 1000 1500 2000 2500 3000 Total Discharge (ds) Water Surface Profile Plot for Culvert: Box Crossing - Large Culvert, Design Discharge - 537.9 cfs Station (ft) Site Data - Box Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 807.33 ft Outlet Station: 396.78 ft Outlet Elevation: 802.60 ft Number of Barrels: 2 Culvert Data Summary - Box Barrel Shape: Concrete Box Barrel Span: 12.00 ft Barrel Rise: 7.00 ft Barrel Material: Concrete Embedment: 16.80 in Barrel Manning's n: 0.0120 (top and sides) Manning's n: 0.0350 (bottom) Culvert Type: Straight Inlet Configuration: Square Edge (902) Headwall (Ke=0.5) Inlet Depression: None Tailwater Data for Crossing: Large Culvert Table 2 - Downstream Channel Rating Curve (Crossing: Large Culvert) Flow (cfs) Water Velocity Depth (ft) Shear (psf) Froude Surface (ft/s) Number Elev (ft) 74.09 805.63 1.63 2.99 0.88 0.58 121.44 805.96 1.96 3.39 1.05 0.60 202.11 806.43 2.43 3.61 1.31 0.61 270.84 806.73 2.73 3.68 1.47 0.62 369.63 806.99 2.99 4.07 1.60 0.63 451.73 807.17 3.17 4.33 1.70 0.64 537.91 807.35 3.35 4.57 1.80 0.65 Tailwater Channel Data - Large Culvert Tailwater Channel Option: Irregular Channel Channel Slope: Irregular Channel User Defined Channel Cross -Section Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 824.00 0.0400 2 5.52 822.16 0.0400 3 22.39 818.84 0.0400 4 37.66 814.28 0.0400 5 54.58 810.00 0.0400 6 63.75 809.53 0.0400 7 94.17 804.00 0.0400 8 120.66 806.02 0.0400 9 124.26 806.24 0.0400 10 145.24 806.73 0.0400 11 154.52 807.54 0.0400 12 160.78 808.67 0.0400 13 174.67 809.52 0.0400 14 195.54 813.43 0.0400 15 i 227.25 824.00 0.0000 Roadway Data for Crossing: Large Culvert Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross -Section Coord No. Station (ft) Elevation (ft) 0 0.00 862.49 1 52.48 863.00 2 102.43 861.62 3 152.58 859.49 4 286.49 852.80 5 312.55 851.50 6 349.93 849.86 7 387.31 848.69 8 425.05 847.99 9 462.43 847.75 10 499.93 847.99 11 537.55 848.69 12 574.94 849.86 13 612.30 851.50 14 772.38 859.50 15 816.67 861.62 16 849.23 863.00 Roadway Surface: Paved Roadway Top Width: 90.00 ft HY-8 Culvert Analysis Report Crossing Discharge Data Discharge Selection Method: Recurrence Table 1 - Summary of Culvert Flows at Crossing: Small Culvert Headwater Discharge Total 5 ft Cir Roadway Iterations Elevation Names Discharge Discharge Discharge (ft) (cfs) (cfs) (cfs) 814.79 1 year 3.67 3.67 0.00 1 815.07 2 year 7.90 7.90 0.00 1 815.56 5 year 16.29 16.29 0.00 1 815.92 10 year 23.87 23.87 0.00 1 816.38 25 year 35.17 35.17 0.00 1 816.73 50 year 44.83 44.83 0.00 1 817.09 100 year 55.16 55.16 0.00 1 839.72 Overtopping 280.16 280.16 0.00 Overtopping Rating Curve Plot for Crossing: Small Culvert Total Rating Curve Crossing: Small Culver[ 835 830 0 a m } a) W 825 820 815 D 50 100 150 200 250 300 Total Discharge (cfs) Culvert Data: 5 ft Cir Table 1 - Culvert Summary Table: 5 ft Cir Disc Total Culy Head Inle Out Fl Nor Crit On Tail Outl Tail harg Disc ert water t let o mal ical tle wate et wate e harg Disc Eleva Con Con w Dep De t r Vel r Nam a harg tion trol trol Ty th pth De Dept ocit Velo es (cfs) a (ft) Dep Dep pe (ft) (ft) pth h (ft) y city (cfs) th th (ft) (ft/ (ft/s (ft) (ft) s) ) 1 3.67 3.67 814.7 0.54 0.50 2- 0.32 0.3 0.3 0.58 3.00 2.19 year cfs cfs 9 4 M 0 0 2c 2 7.90 7.90 815.0 0.79 0.82 2- 0.52 0.4 0.4 0.77 3.82 2.69 year cfs cfs 7 5 M 9 9 2c 5 16.29 16.29 815.5 1.24 1.30 2- 0.81 0.7 0.7 1.05 4.79 3.03 year cfs cfs 6 8 M 7 7 2c 10 23.87 23.87 815.9 1.60 1.66 2- 1.03 0.9 0.9 1.21 5.40 3.22 year cfs cfs 2 6 M 8 8 2c 25 35.17 35.17 816.3 2.06 2.12 2- 1.31 1.2 1.2 1.38 6.11 3.47 year cfs cfs 8 6 M 5 5 2c 50 44.83 44.83 816.7 2.41 2.48 2- 1.54 1.4 1.4 1.50 6.61 3.65 year cfs cfs 3 0 M 6 6 2c 100 55.16 55.16 817.0 2.75 2.83 2- 1.73 1.6 1.6 1.60 7.10 3.82 year cfs cfs 9 8 M 6 6 2c Culvert Barrel Data Culvert Barrel Type Straight Culvert Inlet Elevation (invert): 814.25 ft, Outlet Elevation (invert): 809.16 ft Culvert Length: 235.38 ft, Culvert Slope: 0.0216 Culvert Performance Curve Plot: 5 ft Cir 835 m LL1 m 825 CU CU 820 815 Performance Curve culvert: 5 tz Cir 0 Inlet Control Elev 0 Outlet Control Elev J i i i i i I 50 100 150 200 250 300 Total Discharge (ds) Water Surface Profile Plot for Culvert: 5 ft Cir Crossing - Small Culvert, Design Discharge - 55.2 cfs Culvert - 5 R Cir, Culvert Discharge - 552 cfs 82 840 835 830 0 } 825 w 820 815 810 1 1 1 1 1 1 1 � III III ,111 11 1 11 �1 4 — �1 -50 0 50 100 150 200 250 30( Station (ft) Site Data - 5 ft Cir Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 813.25 ft Outlet Station: 235.32 ft Outlet Elevation: 808.16 ft Number of Barrels: 1 Culvert Data Summary - 5 ft Cir Barrel Shape: Circular Barrel Diameter: 5.00 ft Barrel Material: Concrete Embedment: 12.00 in Barrel Manning's n: 0.0120 (top and sides) Manning's n: 0.0350 (bottom) Culvert Type: Straight Inlet Configuration: Square Edge with Headwall (Ke=0.5) Inlet Depression: None Tailwater Data for Crossing: Small Culvert Table 2 - Downstream Channel Rating Curve (Crossing: Small Culvert) Flow (cfs) Water Velocity Depth (ft) Shear (psf) Froude Surface (ft/s) Number Elev (ft) 3.67 809.31 0.58 2.19 0.67 0.71 7.90 809.50 0.77 2.69 0.90 0.74 16.29 809.78 1.05 3.03 1.22 0.77 23.87 809.94 1.21 3.22 1.41 0.78 35.17 810.11 1.38 3.47 1.61 0.80 44.83 810.23 1.50 3.65 1.75 0.81 55.16 810.33 1.60 3.82 1.87 0.82 Tailwater Channel Data - Small Culvert Tailwater Channel Option: Irregular Channel Channel Slope: Irregular Channel User Defined Channel Cross -Section Coord No. Station (ft) Elevation (ft) Manning's n 1 0.00 834.00 0.0400 2 4.04 833.55 0.0400 3 14.13 830.50 0.0400 4 33.14 827.35 0.0400 5 53.55 822.98 0.0400 6 64.77 821.52 0.0400 7 84.89 816.76 0.0400 8 96.34 813.20 0.0400 9 104.85 811.54 0.0400 10 105.78 811.56 0.0400 11 128.00 809.62 0.0400 12 128.76 808.73 0.0400 13 132.78 809.16 0.0400 14 165.53 813.56 0.0400 15 167.98 813.39 0.0400 16 187.73 815.56 0.0400 17 193.64 815.94 0.0400 18 215.27 819.18 0.0400 19 241.50 821.32 0.0400 20 263.17 825.45 0.0400 21 271.04 826.16 0.0400 22 278.77 827.82 0.0400 23 311.29 832.56 0.0400 24 325.69 834.00 0.0000 Roadway Data for Crossing: Small Culvert Roadway Profile Shape: Irregular Roadway Shape (coordinates) Irregular Roadway Cross -Section Coord No. Station (ft) Elevation (ft) 0 0.00 837.12 1 127.43 839.72 2 309.49 843.38 Roadway Surface: Paved Roadway Top Width: 70.00 ft WETPOND CALCULATIONS WK Dickson & Co., Inc. Project Name: CLT 10 CEC Project #: 2023006800CL Description: BMP #1 Calculations Wet Pond Water Quality Calculations Drainage Area 9.49 ac Impervious Area 1.62 ac Impervious % 17% Estimated Avg. Depth 5 ft SA/DA Ratio 0.54 SA Required 0.05 ac SA Required 2,234 sf SA Provided 27,775 sf SA Provided 0.64 ac Pool Depth Provided 7.00 ft Double Interpolated SA DA Ratio Imp % Pool Depth (ft) 4.00 5.00 6.00 10% 0.43 0.37 0.30 20% 0.69 0.61 0.51 30% 0.94 0.84 0.72 'C-3 Table 1 (Piedmont and Mountain Region) (NCDEQ BMP Design Manual revised 4-18-2017) Rv = 0.05 + 0.9 *IA SIMPLE METHOD PER NCDEQ BMP MANUAL SECTION 3.3.1 Rv = Runoff coefficient [storm runoff (in)/storm rainfall (in)], unitless Impervious fraction [impervious portion of drainage area IA = (ac)/drainage area (ac)], unitless **V = Volume of runoff that must be controlled for the design storm (ft3) RD = Design storm rainfall depth (in) (Typically, 1.0" or 1.5") A = Watershed area (ac) WQv = 3630 * Ro * Rv * A Rv 0.20 (finch) WQv 7,024 (1 inch) Permament Pool DMAX 0.5 ft Perimeterpp 709 ft WldthSUBMERGED 3.0 ft Provided Depth= 7.00 ft VSHELF 531.75 cf Calc Avg. Depth 5.42 OKAY Must be greater than Estimated ave. depth Volume Calculation Stage Area Inc. Vol. Acc Vol. 811 811.5 13765 0 0 812 14596 7090 7090 813 16308 15452 22542 814 18089 17199 39741 815 19936 19013 58753 816 21847 20892 79645 817 23820 22834 102478 818 25856 24838 127316 818.5 27775 13408 140724 Bottom of Sediment Removal Top of Sediment Removal Bottom of Shelf Permanent Pool Temporary Pool Volume Elevation 819.00 Vnhimc ('a Iridafinn Stage Area Inc. Vol. Acc Vol. 818.5 36559 0 0 819 39509 19017 19017 820 44214 41862 60879 821 46994 45604 106483 822 49836 48415 154898 8231 52740 1 51288 1 206186 8241 55705 1 54223 1 260408 8251 58731 1 57218 1 317626 Assumed Stage Interval for Treatment of WQv 818.5 Interpolate 0.10 area between even stages at WQv stage Vnhimc ('alrnlatinn Stage Area Inc. Vol. Acc Vol. 818.5 36559 0 0 818.6 36854 3671 3671 818.7 37149 3700 7371 818.8 37444 3730 11100 818.9 37739 3759 14860 819.0 38034 3789 18648 819.1 38329 3818 22466 819.2 38624 3848 26314 819.3 38919 3877 30191 819.4 39214 3907 34098 819.5 39509 3936 38034 Permanent Pool 818.50 Fop of Shelf 819.00 820.00 821.00 822.00 823.00 824.00 Fop of Dam (allow 1 ft FB) 825.00 Lower WQv stage 818.5 818.6 818.7 818.8 818.9 819.0 819.1 819.2 819.3 819.4 Higher WQv Stage <-- 819.5 Calc WQV Stage 819.0 Calculate Orifice Size in Treatment Vol 18,648 Draw Down Time 2 Draw Down Time 172,800 Flow (Q) 0.108 Cd 0.6 H/3 0.167 Area of orifice 0.055 Dia. 3.17 Orifice Size Used (Dia.) 2.00 Draw Down Time 4.94 FOREBAY VOLUME Vnhimc ('a Iridafinn CF 18,648 DAYS 5 (NCDEQ required time frame) sec 432,000 CFS 0.043 0.6 ft 0.167 sf 0.022 in 2.00 (Choose between two sizes) in JOKAY DAYS JOKAY Stage Area Inc. Vol. Acc Vol. 811 811.5 2243 0 0 812 2570 1203 1203 813 3276 2923 4126 814 4051 3664 7790 815 4897 4474 12264 816 5811 5354 17618 817 6796 6304 23921 818 7850 7323 31244 818.5 8784 4159 35403 819 9770 4639 40041 15% Permanent Pool 21109 REQUIRED VOLUME 20% Permanent Pool 28145 Provided 40041 Okay 28 /o Bottom of Sediment storage Bottom of calc storage volume WK Dickson & Co., Inc. Project Name: CLT 10 CEC Project #: 2023006800CL Description: BMP #2A Calculations Wet Pond Water Quality Calculations Drainage Area 53.46 ac Impervious Area 41.39 ac Impervious % 77% Estimated Avg. Depth 4 SA/DA Ratio 2.33 % SA Required 1.24 ac SA Required 54,198 sf Double Interpolated SA DA Ratio Imp % Pool Depth (ft) 3.00 4.00 5.00 60% 2.09 1.77 1.49 70% 2.51 2.09 1.80 80% 2.92 2.41 2.07 'C-3 Table 1 (Piedmont and Mountain Region) (NCDEQ BMP Design Manual revised 4-18-2011) SA Provided 86,718 sf SA Provided 1.99 ac Pool Depth Provided 4.50 ft Rv = 0.05 + 0.9 *IA SIMPLE METHOD PER NCDEQ BMP MANUAL SECTION 3.3.1 Rv = Runoff coefficient [storm runoff (in)/storm rainfall (in)], unitless Impervious fraction [impervious portion of drainage area IA = (ac)/drainage area (ac)], unitless **V = Volume of runoff that must be controlled for the design storm (ft) RD = Design storm rainfall depth (in) (Typically, 1.0" or 1.5") A = Watershed area (ac) WQv=3630* RD* Rv*A Rv 0.75 (1 inch) WQv 144,917 (1 inch) Permament Pool DMAX 0.5 ft Perimeterpp 1291.0 ft WidthSUBMERGED 3.0 ft Provided Depth= 4.50 VSH ELF 968.25 cf Calc Avg. Depth 4.14 OKAY Must be greater than Estimated ave. depth Volume Calculation Stage Area Inc. Vol. Acc Vol. 813.5 814 68690 0 0 815 72254 70472 70472 816 75887 74071 144543 817 79589 77738 222281 8181 83361 1 81475 1 303756 818.51 86718 1 42520 1 346275 Bottom of Sediment Removal Top of Sediment Removal Bottom of Shelf Permanent Pool Temporary Pool Volume Elevation 819.90 Vnlump Calculatinn Stage Area Inc. Vol. Acc Vol. 818.5 104015 0 0 819 107432 52862 52862 820 118153 112793 165654 821 122520 120337 285991 822 126964 124742 410733 8231 131486 1 129225 1 539958 8241 136084 1 133785 1 673743 8251 140760 1 138422 1 812165 Assumed Stage Interval for Treatment of WQv 819.0 Interpolate 0.10 area between even stages at WQv stage Volume Calculation Stage Area Inc. Vol. Acc Vol. 819.0 107432 0 52862 819.1 108504 10797 63659 819.2 109576 10904 74563 819.3 110648 11011 85574 819.4 111720 11118 96692 819.5 112793 11226 107918 819.6 113865 11333 119251 819.7 114937 11440 130691 819.8 116009 11547 142238 819.9 117081 11654 153893 820.0 118153 11762 165654 Permanent Pool 818.50 fop of Shelf 819.00 820.00 821.00 822.00 823.00 824.00 fop of Dam (allow 1 ft FB) 825.00 Lower WQv stage 819.0 819.1 819.2 819.3 819.4 819.5 819.6 819.7 819.8 819.9 Higher WQv Stage <-- 820.0 Calc WQV Stage 819.9 Calculate Orifice Size in Treatment Vol 153,893 Draw Down Time 2 Draw Down Time 172,800 Flow (Q) 0.891 Cd 0.6 H/3 0.467 Area of orifice 0.271 Dia. 7.05 Orifice Size Used (Dia.) 4.50 Draw Down Time 4.82 FOREBAY VOLUME Vnlump r'alridAtinn CF 153,893 DAYS 5 (NCDEQ required time frame) sec 432,000 CFS 0.356 0.6 ft 0.467 sf 0.108 in 4.46 (Choose between two sizes) in JOKAY DAYS OKAY Stage Area Inc. Vol. Acc Vol. 813.5 814 8309 0 0 815 10041 9175 9175 816 11852 10947 20122 817 13740 12796 32918 8181 15707 1 14724 1 47641 818.51 17297 1 8251 1 55892 8191 18941 1 9060 1 64952 15% Permanent Pool 51941 REQUIRED VOLUME 20% Permanent Pool 69255 Provided 649502 Okay 19 /o 3ottom of Sediment storage 3ottom of calc storage volume WK Dickson & Co., Inc. Project Name: CLT 10 CEC Project #: 2023006800CL Description: BMP #213 Calculations Wet Pond Water Quality Calculations Drainage Area 41.02 ac Impervious Area 27.63 ac Impervious % 67% Estimated Avg. Depth 5 SA/DA Ratio 1.72 % SA Required 0.70 ac SA Required 30,704 sf Double Interpolated SA DA Ratio Imp % Pool Depth (ft) 4.00 5.00 6.00 60% 1.77 1.49 1.31 70% 2.09 1.80 1.56 80% 2.41 2.07 1.82 'C-3 Table 1 (Piedmont and Mountain Region) (NCDEQ BMP Design Manual revised 4-18-2011) SA Provided 62,326 sf SA Provided 1.43 ac Pool Depth Provided 7.25 ft Rv = 0.05 + 0.9 *IA SIMPLE METHOD PER NCDEQ BMP MANUAL SECTION 3.3.1 Rv = Runoff coefficient [storm runoff (in)/storm rainfall (in)], unitless Impervious fraction [impervious portion of drainage area IA = (ac)/drainage area (ac)], unitless **V = Volume of runoff that must be controlled for the design storm (ft) RD = Design storm rainfall depth (in) (Typically, 1.0" or 1.5") A = Watershed area (ac) WQv=3630* RD* Rv*A Rv 0.66 (1 inch) WQv 97,722 (1 inch) Permament Pool DMAX 0.5 ft Perimeterpp 1153 ft WidthSUBMERGED 3.0 ft Provided Depth= 7.25 VSH ELF 864.75 cf Calc Avg. Depth 6.01 OKAY Must be greater than Estimated ave. depth Volume Calculation Stage Area Inc. Vol. Acc Vol. 815.75 816.25 38224 0 0 817 40406 29486 29486 818 43379 41893 71379 819 46427 44903 116282 820 49549 47988 164270 821 52747 51148 215418 822 56021 54384 269802 823 59371 57696 327498 823.5 62326 30424 357922 Bottom of Sediment Removal Top of Sediment Removal Bottom of Shelf Permanent Pool Temporary Pool Volume Elevation 824.70 Vnlump Calculatinn Stage Area Inc. Vol. Acc Vol. 823.5 77175 0 0 824 81934 39777 39777 825 90646 86290 126067 826 94852 92749 218816 827 99131 96992 315808 8281 103483 1 101307 1 417115 8291 107907 1 105695 1 522810 8301 112405 1 110156 1 632966 Assumed Stage Interval for Treatment of WQv 824.0 Interpolate 0.10 area between even stages at WQv stage Volume Calculation Stage Area Inc. Vol. Acc Vol. 824.0 81934 0 39777 824.1 82805 8237 48014 824.2 83676 8324 56338 824.3 84548 8411 64749 824.4 85419 8498 73248 824.5 86290 8585 81833 824.6 87161 8673 90506 824.7 88032 8760 99265 824.8 88904 8847 108112 824.9 89775 8934 117046 825.0 90646 9021 126067 Permanent Pool 823.50 fop of Shelf 824.00 825.00 826.00 827.00 828.00 829.00 fop of Dam (allow 1 ft FB) Lower WQv stage 824.0 824.1 824.2 824.3 824.4 824.5 824.6 824.7 824.8 824.9 Higher WQv Stage <-- 825.0 Calc WQV Stage 824.7 Calculate Orifice Size in Treatment Vol 99,265 Draw Down Time 2 Draw Down Time 172,800 Flow (Q) 0.574 Cd 0.6 H/3 0.400 Area of orifice 0.189 Dia. 5.88 Orifice Size Used (Dia.) 3.75 Draw Down Time 4.83 FOREBAY VOLUME Vnlump r'alridAtinn CF 99,265 DAYS 5 (NCDEQ required time frame) sec 432,000 CFS 0.230 0.6 ft 0.400 sf 0.075 in 3.72 (Choose between two sizes) in JOKAY DAYS OKAY Stage Area Inc. Vol. Acc Vol. 815.75 816.25 2957 0 0 817 3766 2521 2521 818 4977 4372 6893 819 6333 5655 12548 820 7833 7083 19631 821 9476 8655 28285 822 11261 10369 38654 823 13188 12225 50878 823.5 14849 7009 57887 824 16596 7861 65749 15% Permanent Pool 53688 REQUIRED VOLUME 20% Permanent Pool 71584 Provided 657409 Okay 18 /o Bottom of Sediment storage Bottom of calc storage volume WK Dickson & Co., Inc. Project Name: CLT 10 CEC Project #: 2023006800CL Description: BMP #2C Calculations Wet Pond Water Quality Calculations Drainage Area 31.67 ac Impervious Area 9.35 ac Impervious % 30% Estimated Avg. Depth 3 SA/DA Ratio 1.15 % SA Required 0.37 ac SA Required 15,913 sf Double Interpolated SA DA Ratio Imp % Pool Depth (ft) 3.00 4.00 5.00 20% 0.84 0.69 0.61 30% 1.17 0.94 0.84 40% 1.51 1.24 1.09 'C-3 Table 1 (Piedmont and Mountain Region) (NCDEQ BMP Design Manual revised 4-18-2011) SA Provided 42,317 sf SA Provided 0.97 ac Pool Depth Provided 4.00 ft Rv = 0.05 + 0.9 *IA SIMPLE METHOD PER NCDEQ BMP MANUAL SECTION 3.3.1 Rv = Runoff coefficient [storm runoff (in)/storm rainfall (in)], unitless Impervious fraction [impervious portion of drainage area IA = (ac)/drainage area (ac)], unitless **V = Volume of runoff that must be controlled for the design storm (ft) RD = Design storm rainfall depth (in) (Typically, 1.0" or 1.5") A = Watershed area (ac) WQv=3630* RD* Rv*A Rv 0.32 (1 inch) WQv 36,286 (1 inch) Permament Pool DMAX 0.5 ft Perimeterpp 893 ft WidthSUBMERGED 3.0 ft Provided Depth= 4.00 VSH ELF 669.75 cf Calc Avg. Depth 3.25 OKAY Must be greater than Estimated ave. depth Volume Calculation Stage Area Inc. Vol. Acc Vol. 849.5 850 35397 0 0 851 34815 35106 35106 852 37310 36063 71169 853 39881 38596 109764 853.51 42317 1 20550 1 130314 Bottom of Sediment Removal Top of Sediment Removal Bottom of Shelf Permanent Pool Temporary Pool Volume Elevation 854.20 Vnlump Calculatinn Stage Area Inc. Vol. Acc Vol. 853.5 50688 0 0 854 54204 26223 26223 855 59566 56885 83108 856 62942 61254 144362 857 66398 64670 209032 8581 69936 1 68167 1 277199 8591 73554 1 71745 1 348944 8601 77253 1 75404 1 424348 Assumed Stage Interval for Treatment of WQv 854.0 Interpolate 0.10 area between even stages at WQv stage Volume Calculation Stage Area Inc. Vol. Acc Vol. 854.0 54204 0 26223 854.1 54740 5447 31670 854.2 55276 5501 37171 854.3 55813 5554 42725 854.4 56349 5608 48334 854.5 56885 5662 53995 854.6 57421 5715 59711 854.7 57957 5769 65479 854.8 58494 5823 71302 854.9 59030 5876 77178 855.0 59566 5930 83108 Permanent Pool 853.50 fop of Shelf 854.00 855.00 856.00 857.00 858.00 859.00 fop of Dam (allow 1 ft FB) Lower WQv stage 854.0 854.1 854.2 854.3 854.4 854.5 854.6 854.7 854.8 854.9 Higher WQv Stage <-- 855.0 Calc WQV Stage 854.2 Calculate Orifice Size in Treatment Vol 37,171 Draw Down Time 2 Draw Down Time 172,800 Flow (Q) 0.215 Cd 0.6 H/3 0.233 Area of orifice 0.092 Dia. 4.12 Orifice Size Used (Dia.) 2.75 Draw Down Time 4.40 FOREBAY VOLUME Vnlump r'alridAtinn C F 37,171 DAYS 5 (NCDEQ required time frame) sec 432,000 CFS 0.086 0.6 ft 0.233 sf 0.037 in 2.61 (Choose between two sizes) in JOKAY DAYS OKAY Stage Area Inc. Vol. Acc Vol. 849.5 850 4453 0 0 851 5358 4906 4906 852 6343 5851 10756 853 7410 6877 17633 853.51 8371 1 3945 1 21578 8541 9388 1 4440 1 26018 15% Permanent Pool 20% Permanent Pool Provided 19547 REQUIRED VOLUME 26063 260108 Okay 20 /o 3ottom of Sediment storage 3ottom of calc storage volume Table 7: Piedmont and Mounfain SAIDA Table (Adapted from Drisco;), 1986) 10% 0,51 0.43 0.37 0.30 0.27 0.25 20% 0,A4 0 89 0.61 0.51 0.44 0.40 30% 1.17 0.94 Q.�14 0.72 0.1�1 0-56 40% 1.51 1.24 1.419 F1.91 U.7B U_71 50% 1.79 1.51 1.31 1.13 0.95 0.87 60% 2.09 1.77 1.49 1.31 1.12 1_01 70% 2.51 2 09 1,b4 1.56 1.34 1.17 "% 2,Ia2 2-41 2.07 1,82 1.62 1AO 90% 3.25 2.04 2.31 2.04 1.84 1.59 1001% 3.55 2.79 2-52 2.34 2.04 1.75 Equation 3. Average depth when the shelfis submerged and the shell is being excluded from the avarage depth -calculation rip-VSftelf Dgyg Abottomo f r el f Where: Da4p - Average depth in feet VPP = Total volume of pefrmarie;nt pool {feel3) VOON = Volume over the shelf only (feet) - see below Anwm. flr:nru = Area of wet pond al the bottom of the shelf (feel-2) VSMII = 0.5 * Depthtmy*versherrPe}rimuterp4rm pao, * Widthouarnerigeu pare of eh.0 Where: DmeK 4wer811eIr = Depth of water at the deep side of the shelf as measured at permanent pool (feet) PerimeterpR"i nra wd = Perimeter of permanent pool all. the bottom of the shelf (feet) Widths bF ,rwd part hrgF Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) C-3. 4Vet pond 8 RL%vised' 4-18-2017 WETPOND DETAILS g� 1 T �m a� �o s o� p s,Q e L � g^ o�� m 9 gg m§ �O 'o o�m g €gm IN r - FAI 1`7 "r-1—� D 11 O O — jz O >m D W, �m z O Z M g� 1 `a r a �o g �g gaa za m oP a s �m o o> p non e � l y H 1, a 1,gy, /n —�— -------- — —,_ -- 'f _,=_�=='�,�,__:_—goo<_ o --- --- 1 / I nCD F1 A7 "r-1—� D $qo 3 mIQ O ■ - a ILI 2 ag mm R g a €gm s �m n > j y -- A -P a: a'ma i 7 7sF 5 s � G � � i_ i LL W m ! 0 g g e� s �v �ma Q ng o s WETPOND HYDROGRAPH CALCULATIONS Watershed Model Schematic 1 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 CD 4 oleo 1 3 1 Leaend Hyd. Origin Description 1 SCS Runoff PRE POI #1 6 2 SCS Runoff PRE POI #2 4 SCS Runoff BMP #1 5 Reservoir BMP #1 ROUTE 6 Reach BMP #1 REACH { 7 SCS Runoff BMP #1 BYPASS' 19 8 SCS Runoff BMP #2A 9 Reservoir BMP #2A ROUTE 10 Reach BMP #2A REACH 11 SCS Runoff BMP #213 12 Reservoir BMP #213 ROUTE 20 13 Reach BMP #213 REACH 14 SCS Runoff BMP #2C 15 Reservoir BMP #2C ROUTE 16 Reach BMP #2C REACH 17 SCS Runoff BMP #2 BYPASS 19 Combine POST POI #1 20 Combine POST POI #2 Project: Model.gpw Sunday, 03 / 12 / 2023 Hydrograph Return Period ReC"draflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 2.666 7.016 ------- 16.93 26.81 42.33 55.91 70.88 PRE POI #1 2 SCS Runoff ------ 18.06 37.55 ------- 77.22 114.66 171.42 220.34 273.46 PRE POI #2 4 SCS Runoff ------ 7.726 13.16 ------- 22.51 30.54 42.14 51.89 62.31 BMP #1 5 Reservoir 4 0.064 0.187 ------- 0.490 0.853 1.529 2.205 3.008 BMP #1 ROUTE 6 Reach 5 0.064 0.187 ------- 0.490 0.853 1.529 2.205 3.008 BMP #1 REACH 7 SCS Runoff ------ 2.551 5.372 ------- 11.00 16.20 24.00 30.71 37.98 BMP #1 BYPASS 8 SCS Runoff ------ 160.37 206.13 ------- 275.50 329.88 403.70 462.58 523.38 BMP #2A 9 Reservoir 8 1.302 1.559 ------- 7.058 22.00 90.00 188.09 291.74 BMP #2A ROUTE 10 Reach 9 1.302 1.559 ------- 7.058 21.99 90.04 188.25 292.49 BMP #2A REACH 11 SCS Runoff ------ 105.29 139.72 ------- 192.72 234.66 291.86 337.59 384.85 BMP #213 12 Reservoir 11 0.946 1.168 ------- 2.415 8.161 28.77 68.71 129.27 BMP #213 ROUTE 13 Reach 12 0.946 1.168 ------- 2.411 8.130 28.37 64.72 120.71 BMP #213 REACH 14 SCS Runoff ------ 37.22 57.74 ------- 91.99 120.72 162.01 196.09 231.99 BMP #2C 15 Reservoir 14 0.484 1.363 ------- 5.125 11.20 23.91 37.86 53.93 BMP #2C ROUTE 16 Reach 15 0.484 1.361 ------- 5.092 10.96 23.06 35.54 50.24 BMP #2C REACH 17 SCS Runoff ------ 15.85 33.19 ------- 68.66 102.23 153.23 197.22 245.01 BMP #2 BYPASS 19 Combine 6, 7, 2.584 5.424 ------- 11.12 16.61 25.03 32.42 40.49 POST POI #1 20 Combine 10, 13, 16, 17.73 35.78 ------- 74.92 135.93 253.00 360.13 539.62 POST POI #2 17, Proj. file: Model.gpw Sunday, 03 / 12 / 2023 Hydrograph Summary Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.666 1 752 30,733 ------ ------ ------ PRE POI #1 2 SCS Runoff 18.06 1 767 212,758 ------ ------ ------ PRE POI #2 4 SCS Runoff 7.726 1 720 19,825 ------ ------ ------ BMP #1 5 Reservoir 0.064 1 1447 7,407 4 818.96 196,089 BMP #1 ROUTE 6 Reach 0.064 1 1451 7,396 5 ------ ------ BMP #1 REACH 7 SCS Runoff 2.551 1 743 21,181 ------ ------ ------ BMP #1 BYPASS 8 SCS Runoff 160.37 1 719 369,448 ------ ------ ------ BMP #2A 9 Reservoir 1.302 1 1444 151,945 8 821.23 729,769 BMP #2A ROUTE 10 Reach 1.302 1 1445 151,846 9 ------ ------ BMP #2A REACH 11 SCS Runoff 105.29 1 719 238,804 ------ ------ ------ BMP #213 12 Reservoir 0.946 1 1444 106,606 11 825.80 622,669 BMP #213 ROUTE 13 Reach 0.946 1 1448 106,257 12 ------ ------ BMP #213 REACH 14 SCS Runoff 37.22 1 720 88,279 ------ ------ ------ BMP #2C 15 Reservoir 0.484 1 1444 45,496 14 854.78 229,113 BMP #2C ROUTE 16 Reach 0.484 1 1451 45,295 15 ------ ------ BMP #2C REACH 17 SCS Runoff 15.85 1 767 188,650 ------ ------ ------ BMP #2 BYPASS 19 Combine 2.584 1 743 28,578 6, 7, ------ ------ POST POI #1 20 Combine 17.73 1 768 492,049 10, 13, 16, ------ ------ POST POI #2 17, Model.gpw Return Period: 1 Year Sunday, 03 / 12 / 2023 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 1 PRE POI #1 Hydrograph type = SCS Runoff Peak discharge = 2.666 cfs Storm frequency = 1 yrs Time to peak = 752 min Time interval = 1 min Hyd. volume = 30,733 cuft Drainage area = 33.420 ac Curve number = 57.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 41.80 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE POI #1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report I- Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 2 PRE POI #2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 158.310 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.94 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 • Me 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI #2 Hyd. No. 2 -- 1 Year Sunday, 03 / 12 / 2023 = 18.06 cfs = 767 min = 212,758 cuft = 61.9 = 0 ft = 69.40 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 0.00 11 1 1 1 1 I .J I I I I I I u 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 6 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 4 BMP #1 Hydrograph type = SCS Runoff Peak discharge = 7.726 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 19,825 cuft Drainage area = 9.490 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP #1 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 5 BMP #1 ROUTE Hydrograph type = Reservoir Peak discharge = 0.064 cfs Storm frequency = 1 yrs Time to peak = 1447 min Time interval = 1 min Hyd. volume = 7,407 cuft Inflow hyd. No. = 4 - BMP #1 Max. Elevation = 818.96 ft Reservoir name = BMP #1 Max. Storage = 196,089 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft Q (cfs) 8.00 M 4.00 2.00 0.00 0 300 — Hyd No. 5 BMP #1 ROUTE Hyd. No. 5 -- 1 Year 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 4 Total storage used = 196,089 cuft Q (cfs) 8.00 WE 4.00 2.00 0.00 3000 Time (min) Pond Report 8 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Pond No. 1 - BMP #1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 811.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 811.00 00 0 0 0.50 811.50 16,008 2,668 2,668 1.00 812.00 17,166 8,291 10,959 2.00 813.00 19,584 18,360 29,319 3.00 814.00 22,140 20,847 50,165 4.00 815.00 24,833 23,471 73,637 5.00 816.00 27,658 26,230 99,867 6.00 817.00 30,616 29,122 128,989 7.00 818.00 33,706 32,145 161,134 7.50 818.50 36,559 17,560 178,694 8.00 819.00 39,509 19,010 197,704 9.00 820.00 44,214 41,835 239,539 10.00 821.00 46,994 45,592 285,132 11.00 822.00 49,836 48,403 333,535 12.00 823.00 52,740 51,276 384,811 13.00 824.00 55,705 54,210 439,021 14.00 825.00 58,731 57,206 496,227 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) = 24.00 2.00 0.00 0.00 Crest Len (ft) = 23.50 0.50 15.00 Inactive Span (in) = 24.00 2.00 0.00 0.00 Crest El. (ft) = 822.50 819.00 823.50 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 810.50 818.50 0.00 0.00 Weir Type = 1 Rect Ciplti Ciplti Length (ft) = 84.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: CulverlJOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 811.00 0.00 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 0.50 2,668 811.50 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 1.00 10,959 812.00 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 2.00 29,319 813.00 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 3.00 50,165 814.00 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 4.00 73,637 815.00 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 5.00 99,867 816.00 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 6.00 128,989 817.00 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 7.00 161,134 818.00 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 7.50 178,694 818.50 1.50 is 0.00 --- --- 0.00 0.00 0.00 --- --- --- 0.000 8.00 197,704 819.00 1.50 is 0.07 is --- --- 0.00 0.00 0.00 --- --- --- 0.068 9.00 239,539 820.00 1.81 is 0.13 is --- --- 0.00 1.66 0.00 --- --- --- 1.790 10.00 285,132 821.00 4.87 is 0.16 is --- --- 0.00 4.71 0.00 --- --- --- 4.873 11.00 333,535 822.00 8.91 is 0.19 is --- --- 0.00 8.65 0.00 --- --- --- 8.846 12.00 384,811 823.00 41.20 is 0.21 is --- --- 27.67 13.32 0.00 --- --- --- 41.20 13.00 439,021 824.00 53.34 is 0.03 is --- --- 49.28 s 4.03 s 17.66 --- --- --- 70.99 14.00 496,227 825.00 55.54 is 0.01 is --- --- 52.53 s 2.97 s 91.76 --- --- --- 147.28 Hydrograph Report 9 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 6 BMP #1 REACH Hydrograph type = Reach Peak discharge = 0.064 cfs Storm frequency = 1 yrs Time to peak = 1451 min Time interval = 1 min Hyd. volume = 7,396 cuft Inflow hyd. No. = 5 - BMP #1 ROUTE Section type = Triangular Reach length = 350.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.3048 Modified Att-Kin routing method used 0 300 — Hyd No. 6 BMP #1 REACH Hyd. No. 6 -- 1 Year 600 900 1200 — Hyd No. 5 1500 1800 2100 2400 2700 3000v vv Time (min) Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 7 BMP #1 BYPASS Hydrograph type = SCS Runoff Peak discharge = 2.551 cfs Storm frequency = 1 yrs Time to peak = 743 min Time interval = 1 min Hyd. volume = 21,181 cuft Drainage area = 15.100 ac Curve number = 62.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 41.70 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP #1 BYPASS Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 8 B M P #2A Hydrograph type = SCS Runoff Peak discharge = 160.37 cfs Storm frequency = 1 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 369,448 cuft Drainage area = 53.460 ac Curve number = 89.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 1 1 MI ppi •1 :1 •11 1 1 •.1 1:1 11 1 1 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 9 BMP #2A ROUTE Hydrograph type = Reservoir Peak discharge = 1.302 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 1 min Hyd. volume = 151,945 cuft Inflow hyd. No. = 8 - BMP #2A Max. Elevation = 821.23 ft Reservoir name = BMP #2A Max. Storage = 729,769 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 300 — Hyd No. 9 BMP #2A ROUTE Hyd. No. 9 -- 1 Year 600 900 1200 1500 1800 2100 2400 2700 3000v vv Time (min) Hyd No. 8 Total storage used = 729,769 cult Pond Report 13 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Pond No. 2 - BMP #2A Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 813.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 813.50 00 0 0 0.50 814.00 76,999 12,832 12,832 1.50 815.00 82,295 79,624 92,456 2.50 816.00 87,739 84,994 177,450 3.50 817.00 93,329 90,511 267,961 4.50 818.00 99,068 96,175 364,135 5.00 818.50 104,015 50,761 414,896 5.50 819.00 107,432 52,854 467,750 6.50 820.00 118,153 112,739 580,489 7.50 821.00 122,520 120,318 700,807 8.50 822.00 126,964 124,723 825,530 9.50 823.00 131,486 129,206 954,735 10.50 824.00 136,084 133,765 1,088,500 11.50 825.00 140,760 138,402 1,226,902 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) = 72.00 4.50 4.00 0.00 Crest Len (ft) = 48.00 25.00 Inactive Inactive Span (in) = 72.00 4.50 4.00 0.00 Crest El. (ft) = 822.50 823.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 813.00 818.50 819.90 0.00 Weir Type = 1 Ciplti Rect Rect Length (ft) = 78.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: CulverlJOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 813.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 12,832 814.00 2.86 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 1.50 92,456 815.00 2.86 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 2.50 177,450 816.00 2.86 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 3.50 267,961 817.00 2.86 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 4.50 364,135 818.00 2.86 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 5.00 414,896 818.50 2.86 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 5.50 467,750 819.00 2.86 is 0.30 is 0.00 --- 0.00 0.00 --- --- --- --- 0.297 6.50 580,489 820.00 2.86 is 0.61 is 0.02 is --- 0.00 0.00 --- --- --- --- 0.633 7.50 700,807 821.00 2.86 is 0.81 is 0.41 is --- 0.00 0.00 --- --- --- --- 1.214 8.50 825,530 822.00 2.86 is 0.97 is 0.58 is --- 0.00 0.00 --- --- --- --- 1.552 9.50 954,735 823.00 58.78 is 1.10 is 0.72 is --- 56.51 0.00 --- --- --- --- 58.34 10.50 1,088,500 824.00 295.26 oc 0.90 is 0.71 is --- 293.64 83.25 --- --- --- --- 378.51 11.50 1,226,902 825.00 396.34 is 0.38 is 0.30 is --- 395.65 s 235.47 --- --- --- --- 631.80 Hydrograph Report 14 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 10 BMP #2A REACH Hydrograph type = Reach Peak discharge = 1.302 cfs Storm frequency = 1 yrs Time to peak = 1445 min Time interval = 1 min Hyd. volume = 151,846 cuft Inflow hyd. No. = 9 - BMP #2A ROUTE Section type = Triangular Reach length = 325.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.5825 Modified Att-Kin routing method used Q (cfs) 2.00 1.00 e 300 Hyd No. 10 Me BMP #2A REACH Hyd. No. 10 -- 1 Year 900 1200 Hyd No. 9 1500 1800 2100 2400 2700 Q (cfs) 2.00 1.00 1 0.00 3000 Time (min) Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 11 BMP #2B Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 41.020 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.94 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2B Hyd. No. 11 -- 1 Year 0.00 ' 1 1' 0 120 240 360 480 600 720 — Hyd No. 11 840 Sunday, 03 / 12 / 2023 = 105.29 cfs = 719 min = 238,804 cuft = 85.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 T " ' 0.00 960 1080 1200 1320 1440 1560 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 12 BMP #213 ROUTE Hydrograph type = Reservoir Peak discharge = 0.946 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 1 min Hyd. volume = 106,606 cuft Inflow hyd. No. = 11 - BMP #2B Max. Elevation = 825.80 ft Reservoir name = BMP #213 Max. Storage = 622,669 cuft Storage Indication method used. Wet pond routing start elevation = 823.50 ft. Q (cfs) 120.00 100.00 40.00 20.00 0.00 0 300 — Hyd No. 12 BMP #2113 ROUTE Hyd. No. 12 -- 1 Year Q (cfs) 120.00 100.00 40.00 20.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 11 Total storage used = 622,669 cult Pond Report 17 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Pond No. 3 - BMP #213 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 815.75 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 815.75 00 0 0 0.50 816.25 41,181 6,863 6,863 1.25 817.00 44,172 31,998 38,860 2.25 818.00 48,356 46,244 85,104 3.25 819.00 52,760 50,537 135,641 4.25 820.00 57,382 55,049 190,690 5.25 821.00 62,223 59,780 250,471 6.25 822.00 67,282 64,730 315,200 7.25 823.00 72,559 69,897 385,097 7.75 823.50 77,175 37,424 422,521 8.25 824.00 81,934 39,767 462,288 9.25 825.00 90,646 86,245 548,533 10.25 826.00 94,852 92,732 641,265 11.25 827.00 99,131 96,974 738,239 12.25 828.00 103,483 101,289 839,528 13.25 829.00 107,907 105,677 945,204 14.25 830.00 112,405 110,138 1,055,342 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) = 72.00 3.75 4.00 0.00 Crest Len (ft) = 28.00 15.00 Inactive Inactive Span (in) = 72.00 3.75 4.00 0.00 Crest El. (ft) = 827.50 828.50 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 813.00 823.50 824.70 0.00 Weir Type = 1 Ciplti Rect Ciplti Length (ft) = 78.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: CulverlJOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 815.75 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 6,863 816.25 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 1.25 38,860 817.00 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 2.25 85,104 818.00 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 3.25 135,641 819.00 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 4.25 190,690 820.00 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 5.25 250,471 821.00 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 6.25 315,200 822.00 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 7.25 385,097 823.00 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 7.75 422,521 823.50 68.39 oc 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 8.25 462,288 824.00 68.39 oc 0.22 is 0.00 --- 0.00 0.00 --- --- --- --- 0.216 9.25 548,533 825.00 68.39 oc 0.43 is 0.15 is --- 0.00 0.00 --- --- --- --- 0.583 10.25 641,265 826.00 68.39 oc 0.57 is 0.45 is --- 0.00 0.00 --- --- --- --- 1.013 11.25 738,239 827.00 68.39 oc 0.68 is 0.61 is --- 0.00 0.00 --- --- --- --- 1.289 12.25 839,528 828.00 68.39 oc 0.77 is 0.74 is --- 32.97 0.00 --- --- --- --- 34.48 13.25 945,204 829.00 173.01 oc 0.85 is 0.85 is --- 171.29 17.66 --- --- --- --- 190.66 14.25 1,055,342 830.00 370.45 is 0.93 is 0.95 is --- 368.56 91.76 --- --- --- --- 462.21 Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 13 BMP #2B REACH Hydrograph type = Reach Peak discharge = 0.946 cfs Storm frequency = 1 yrs Time to peak = 1448 min Time interval = 1 min Hyd. volume = 106,257 cuft Inflow hyd. No. = 12 - BMP #2B ROUTE Section type = Triangular Reach length = 1350.0 ft Channel slope = 1.7 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.432 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.1077 Modified Att-Kin routing method used 600 900 1200 — Hyd No. 12 1500 1800 2100 2400 2700 3000v vv Time (min) Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 14 BMP #2C Hydrograph type = SCS Runoff Peak discharge = 37.22 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 88,279 cuft Drainage area = 31.670 ac Curve number = 71.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 2.94 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP #2C Q (cfs) Hyd. No. 14 -- 1 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 15 BMP #2C ROUTE Hydrograph type = Reservoir Peak discharge = 0.484 cfs Storm frequency = 1 yrs Time to peak = 1444 min Time interval = 1 min Hyd. volume = 45,496 cuft Inflow hyd. No. = 14 - BMP #2C Max. Elevation = 854.78 ft Reservoir name = BMP #2C Max. Storage = 229,113 cuft Storage Indication method used. Wet pond routing start elevation = 853.50 ft Q (cfs) 40.00 20.00 10.00 BMP #2C ROUTE Hyd. No. 15 -- 1 Year 0.00 ' 0 300 600 900 1200 1500 1800 2100 2400 2700 — Hyd No. 15 — Hyd No. 14 Total storage used = 229,113 cuft Q (cfs) 40.00 30.00 20.00 10.00 1 0.00 3000 Time (min) Pond Report 21 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Pond No. 4 - BMP #2C Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 849.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 849.50 00 0 0 0.50 850.00 39,850 6,641 6,641 1.50 851.00 40,173 40,007 46,648 2.50 852.00 43,653 41,897 88,545 3.50 853.00 47,291 45,455 134,001 4.00 853.50 50,688 24,487 158,488 4.50 854.00 54,204 26,215 184,703 5.50 855.00 59,566 56,858 241,562 6.50 856.00 62,942 61,240 302,802 7.50 857.00 66,398 64,656 367,458 8.50 858.00 69,936 68,153 435,610 9.50 859.00 73,554 71,730 507,340 10.50 860.00 77,253 75,388 582,729 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) = 60.00 2.75 4.00 0.00 Crest Len (ft) = 16.00 4.00 Inactive Inactive Span (in) = 60.00 2.75 4.00 0.00 Crest El. (ft) = 857.50 855.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 849.00 853.50 854.20 0.00 Weir Type = 1 Rect Rect --- Length (ft) = 133.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: CulverlJOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 849.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 6,641 850.00 2.47 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 1.50 46,648 851.00 2.47 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 2.50 88,545 852.00 2.47 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 3.50 134,001 853.00 2.47 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 4.00 158,488 853.50 2.47 is 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 4.50 184,703 854.00 2.47 is 0.12 is 0.00 --- 0.00 0.00 --- --- --- --- 0.123 5.50 241,562 855.00 2.47 is 0.23 is 0.33 is --- 0.00 0.00 --- --- --- --- 0.568 6.50 302,802 856.00 14.67 is 0.31 is 0.54 is --- 0.00 13.32 --- --- --- --- 14.16 7.50 367,458 857.00 38.72 is 0.37 is 0.68 is --- 0.00 37.67 --- --- --- --- 38.72 8.50 435,610 858.00 89.64 is 0.42 is 0.80 is --- 18.84 69.21 --- --- --- --- 89.27 9.50 507,340 859.00 200.27 is 0.34 is 0.73 is --- 97.88 101.32 s --- --- --- --- 200.27 10.50 582,729 860.00 258.73 is 0.20 is 0.42 is --- 166.04 s 92.07 s --- --- --- --- 258.73 Hydrograph Report 22 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 16 BMP #2C REACH Hydrograph type = Reach Peak discharge = 0.484 cfs Storm frequency = 1 yrs Time to peak = 1451 min Time interval = 1 min Hyd. volume = 45,295 cuft Inflow hyd. No. = 15 - BMP #2C ROUTE Section type = Triangular Reach length = 2500.0 ft Channel slope = 2.2 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.767 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.0557 Modified Att-Kin routing method used 600 900 1200 — Hyd No. 15 1500 1800 2100 2400 2700 3000v vv Time (min) Hydrograph Report 23 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 17 BMP #2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 142.890 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.94 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2 BYPASS Hyd. No. 17 -- 1 Year 120 240 360 480 600 720 840 Hyd No. 17 Sunday, 03 / 12 / 2023 = 15.85 cfs = 767 min = 188,650 cuft = 61.7 = 0 ft = 68.90 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 19 POST POI #1 Hydrograph type = Combine Peak discharge = 2.584 cfs Storm frequency = 1 yrs Time to peak = 743 min Time interval = 1 min Hyd. volume = 28,578 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 15.100 ac Q (cfs) 3.00 2.00 1.00 e POST POI #1 Hyd. No. 19 -- 1 Year Q (cfs) 3.00 2.00 1.00 • 0.00 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 19 Hyd No. 6 Hyd No. 7 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 20 POST POI #2 Hydrograph type = Combine Peak discharge = 17.73 cfs Storm frequency = 1 yrs Time to peak = 768 min Time interval = 1 min Hyd. volume = 492,049 cuft Inflow hyds. = 10, 13, 16, 17 Contrib. drain. area = 142.890 ac Q (cfs) 18.00 15.00 12.00 M M 3.00 POST POI #2 Hyd. No. 20 -- 1 Year 300 600 900 1200 Hyd No. 20 Hyd No. 10 Hyd No. 17 1500 1800 2100 2400 2700 Hyd No. 13 Hyd No. 16 Q (cfs) 18.00 15.00 12.00 M M 3.00 0.00 3000 Time (min) Hydrograph Summary Report 26 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 7.016 1 743 57,648 ------ ------ ------ PRE POI #1 2 SCS Runoff 37.55 1 759 366,282 ------ ------ ------ PRE POI #2 4 SCS Runoff 13.16 1 720 31,347 ------ ------ ------ BMP #1 5 Reservoir 0.187 1 1443 14,084 4 819.16 204,271 BMP #1 ROUTE 6 Reach 0.187 1 1445 14,074 5 ------ ------ BMP #1 REACH 7 SCS Runoff 5.372 1 742 36,201 ------ ------ ------ BMP #1 BYPASS 8 SCS Runoff 206.13 1 719 480,585 ------ ------ ------ BMP #2A 9 Reservoir 1.559 1 1444 186,958 8 822.03 828,833 BMP #2A ROUTE 10 Reach 1.559 1 1446 186,834 9 ------ ------ BMP #2A REACH 11 SCS Runoff 139.72 1 719 319,122 ------ ------ ------ BMP #213 12 Reservoir 1.168 1 1444 136,999 11 826.53 692,720 BMP #213 ROUTE 13 Reach 1.168 1 1449 136,534 12 ------ ------ BMP #213 REACH 14 SCS Runoff 57.74 1 720 132,718 ------ ------ ------ BMP #2C 15 Reservoir 1.363 1 1058 83,154 14 855.14 250,282 BMP #2C ROUTE 16 Reach 1.361 1 1072 82,926 15 ------ ------ BMP #2C REACH 17 SCS Runoff 33.19 1 760 326,014 ------ ------ ------ BMP #2 BYPASS 19 Combine 5.424 1 742 50,275 6, 7, ------ ------ POST POI #1 20 Combine 35.78 1 760 732,308 10, 13, 16, ------ ------ POST POI #2 17, Model.gpw Return Period: 2 Year Sunday, 03 / 12 / 2023 Hydrograph Report 27 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 1 PRE POI #1 Hydrograph type = SCS Runoff Peak discharge = 7.016 cfs Storm frequency = 2 yrs Time to peak = 743 min Time interval = 1 min Hyd. volume = 57,648 cuft Drainage area = 33.420 ac Curve number = 57.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 41.80 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE POI #1 Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 28 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 2 PRE POI #2 Hydrograph type = SCS Runoff Peak discharge = 37.55 cfs Storm frequency = 2 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 366,282 cuft Drainage area = 158.310 ac Curve number = 61.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 69.40 min Total precip. = 3.56 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE POI #2 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 29 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 4 BMP #1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 9.490 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 M Mere 4.00 W IM Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #1 Hyd. No. 4 -- 2 Year Sunday, 03 / 12 / 2023 = 13.16 cfs = 720 min = 31,347 cuft = 67.5 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 M . �� 4.00 Weill 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 5 BMP #1 ROUTE Hydrograph type = Reservoir Peak discharge = 0.187 cfs Storm frequency = 2 yrs Time to peak = 1443 min Time interval = 1 min Hyd. volume = 14,084 cuft Inflow hyd. No. = 4 - BMP #1 Max. Elevation = 819.16 ft Reservoir name = BMP #1 Max. Storage = 204,271 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. Q (cfs) 14.00 12.00 10.00 M Mere 4.00 W IX BMP #1 ROUTE Hyd. No. 5 -- 2 Year Q (cfs) 14.00 12.00 10.00 4.00 2.00 0.00 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 5 Hyd No. 4 Total storage used = 204,271 cult Hydrograph Report 31 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 6 BMP #1 REACH Hydrograph type = Reach Peak discharge = 0.187 cfs Storm frequency = 2 yrs Time to peak = 1445 min Time interval = 1 min Hyd. volume = 14,074 cuft Inflow hyd. No. = 5 - BMP #1 ROUTE Section type = Triangular Reach length = 350.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.3804 Modified Att-Kin routing method used 0 300 — Hyd No. 6 BMP #1 REACH Hyd. No. 6 -- 2 Year 600 900 1200 — Hyd No. 5 1500 1800 2100 2400 2700 3000v vv Time (min) Hydrograph Report 32 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 7 BMP #1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 15.100 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #1 BYPASS Hyd. No. 7 -- 2 Year 0 120 240 360 480 600 720 — Hyd No. 7 840 Sunday, 03 / 12 / 2023 = 5.372 cfs = 742 min = 36,201 cuft = 62.3 = 0 ft = 41.70 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 33 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 8 B M P #2A Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 53.460 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 210.00 180.00 150.00 120.00 f WITH Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2A Hyd. No. 8 -- 2 Year 0 120 240 360 480 600 720 840 — Hyd No. 8 Sunday, 03 / 12 / 2023 = 206.13 cfs = 719 min = 480,585 cuft = 89.7 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 210.00 180.00 150.00 120.00 30.00 WITiTil 960 1080 1200 1320 1440 Time (min) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 9 BMP #2A ROUTE Hydrograph type = Reservoir Peak discharge = 1.559 cfs Storm frequency = 2 yrs Time to peak = 1444 min Time interval = 1 min Hyd. volume = 186,958 cuft Inflow hyd. No. = 8 - BMP #2A Max. Elevation = 822.03 ft Reservoir name = BMP #2A Max. Storage = 828,833 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. BMP #2A ROUTE Q (cfs) Hyd. No. 9 -- 2 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 9 Hyd No. 8 Total storage used = 828,833 cult Hydrograph Report 35 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 10 BMP #2A REACH Hydrograph type = Reach Peak discharge = 1.559 cfs Storm frequency = 2 yrs Time to peak = 1446 min Time interval = 1 min Hyd. volume = 186,834 cuft Inflow hyd. No. = 9 - BMP #2A ROUTE Section type = Triangular Reach length = 325.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.6013 Modified Att-Kin routing method used Q (cfs) 2.00 1.00 e 300 Hyd No. 10 Me BMP #2A REACH Hyd. No. 10 -- 2 Year 900 1200 Hyd No. 9 1500 1800 2100 2400 2700 Q (cfs) 2.00 1.00 1 0.00 3000 Time (min) Hydrograph Report 36 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 11 BMP #2B Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 41.020 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2B Hyd. No. 11 -- 2 Year Sunday, 03 / 12 / 2023 = 139.72 cfs = 719 min = 319,122 cuft = 85.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 11 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 12 BMP #213 ROUTE Hydrograph type = Reservoir Peak discharge = 1.168 cfs Storm frequency = 2 yrs Time to peak = 1444 min Time interval = 1 min Hyd. volume = 136,999 cuft Inflow hyd. No. = 11 - BMP #2B Max. Elevation = 826.53 ft Reservoir name = BMP #213 Max. Storage = 692,720 cuft Storage Indication method used. Wet pond routing start elevation = 823.50 ft. BMP #2113 ROUTE Hydrograph Report 38 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 13 BMP #2B REACH Hydrograph type = Reach Peak discharge = 1.168 cfs Storm frequency = 2 yrs Time to peak = 1449 min Time interval = 1 min Hyd. volume = 136,534 cuft Inflow hyd. No. = 12 - BMP #2B ROUTE Section type = Triangular Reach length = 1350.0 ft Channel slope = 1.7 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.432 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.1132 Modified Att-Kin routing method used Q (cfs) 2.00 1.00 e 300 Hyd No. 13 Me BMP #2113 REACH Hyd. No. 13 -- 2 Year 900 1200 Hyd No. 12 1500 1800 2100 2400 2700 Q (cfs) 2.00 1.00 1 0.00 3000 Time (min) Hydrograph Report 39 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 14 BMP #2C Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 31.670 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2C Hyd. No. 14 -- 2 Year 0.00 ' 1 1' 0 120 240 360 480 600 720 — Hyd No. 14 840 Sunday, 03 / 12 / 2023 = 57.74 cfs = 720 min = 132,718 cuft = 71.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 15 BMP #2C ROUTE Hydrograph type = Reservoir Peak discharge = 1.363 cfs Storm frequency = 2 yrs Time to peak = 1058 min Time interval = 1 min Hyd. volume = 83,154 cuft Inflow hyd. No. = 14 - BMP #2C Max. Elevation = 855.14 ft Reservoir name = BMP #2C Max. Storage = 250,282 cuft Storage Indication method used. Wet pond routing start elevation = 853.50 ft. Q (cfs) 60.00 50.00 40.00 20.00 10.00 0.00 0 300 — Hyd No. 15 BMP #2C ROUTE Hyd. No. 15 -- 2 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 14 Total storage used = 250,282 cult Hydrograph Report 41 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 16 BMP #2C REACH Hydrograph type = Reach Peak discharge = 1.361 cfs Storm frequency = 2 yrs Time to peak = 1072 min Time interval = 1 min Hyd. volume = 82,926 cuft Inflow hyd. No. = 15 - BMP #2C ROUTE Section type = Triangular Reach length = 2500.0 ft Channel slope = 2.2 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.767 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.0715 Modified Att-Kin routing method used Q (cfs) 2.00 1.00 e 300 Hyd No. 16 Me BMP #2C REACH Hyd. No. 16 -- 2 Year 900 1200 Hyd No. 15 1500 1800 2100 2400 2700 Q (cfs) 2.00 1.00 1 0.00 3000 Time (min) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 17 BMP #2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 142.890 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.56 in Storm duration = 24 hrs Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2 BYPASS Hyd. No. 17 -- 2 Year Sunday, 03 / 12 / 2023 = 33.19 cfs = 760 min = 326,014 cuft = 61.7 = 0 ft = 68.90 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1 1 1 1 1 ,l I I I I I I —' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 17 Time (min) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 19 POST POI #1 Hydrograph type = Combine Peak discharge = 5.424 cfs Storm frequency = 2 yrs Time to peak = 742 min Time interval = 1 min Hyd. volume = 50,275 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 15.100 ac Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 300 — Hyd No. 19 POST POI #1 Hyd. No. 19 -- 2 Year 600 900 1200 — Hyd No. 6 1500 1800 2100 Hyd No. 7 2400 2700 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 1 0.00 3000 Time (min) Hydrograph Report 44 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 20 POST POI #2 Hydrograph type = Combine Peak discharge = 35.78 cfs Storm frequency = 2 yrs Time to peak = 760 min Time interval = 1 min Hyd. volume = 732,308 cuft Inflow hyds. = 10, 13, 16, 17 Contrib. drain. area = 142.890 ac Q (cfs) 40.00 20.00 10.00 POST POI #2 Hyd. No. 20 -- 2 Year 0.00 ' 0 300 600 900 1200 — Hyd No. 20 Hyd No. 10 Hyd No. 17 1500 1800 Hyd No. 13 2100 2400 2700 Hyd No. 16 Q (cfs) 40.00 30.00 20.00 10.00 1 0.00 3000 Time (min) Hydrograph Summary Report 45 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 26.81 1 741 158,035 ------ ------ ------ PRE POI #1 2 SCS Runoff 114.66 1 757 905,920 ------ ------ ------ PRE POI #2 4 SCS Runoff 30.54 1 720 69,312 ------ ------ ------ BMP #1 5 Reservoir 0.853 1 947 49,623 4 819.59 222,215 BMP #1 ROUTE 6 Reach 0.853 1 949 49,614 5 ------ ------ BMP #1 REACH 7 SCS Runoff 16.20 1 740 88,735 ------ ------ ------ BMP #1 BYPASS 8 SCS Runoff 329.88 1 719 791,020 ------ ------ ------ BMP#2A 9 Reservoir 22.00 1 762 446,004 8 822.75 922,409 BMP #2A ROUTE 10 Reach 21.99 1 763 445,912 9 ------ ------ BMP #2A REACH 11 SCS Runoff 234.66 1 719 548,173 ------ ------ ------ BMP #213 12 Reservoir 8.161 1 834 289,079 11 827.67 806,110 BMP #213 ROUTE 13 Reach 8.130 1 840 288,695 12 ------ ------ BMP #213 REACH 14 SCS Runoff 120.72 1 720 273,123 ------ ------ ------ BMP #2C 15 Reservoir 11.20 1 754 222,335 14 855.85 293,441 BMP #2C ROUTE 16 Reach 10.96 1 766 222,189 15 ------ ------ BMP #2C REACH 17 SCS Runoff 102.23 1 757 810,073 ------ ------ ------ BMP #2 BYPASS 19 Combine 16.61 1 740 138,348 6, 7, ------ ------ POST POI #1 20 Combine 135.93 1 758 1,766,871 10, 13, 16, ------ ------ POST POI #2 17, Model.gpw Return Period: 10 Year Sunday, 03 / 12 / 2023 Hydrograph Report 46 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 1 PRE POI #1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 33.420 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.24 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI #1 Hyd. No. 1 -- 10 Year Sunday, 03 / 12 / 2023 = 26.81 cfs = 741 min = 158,035 cuft = 57.9 = Oft = 41.80 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 ' 1 1 1 1 1 1 " ' ' ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 47 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 2 PRE POI #2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 158.310 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.24 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI #2 Hyd. No. 2 -- 10 Year 0.00 ' 1 1' 0 120 240 360 480 600 720 — Hyd No. 2 840 Sunday, 03 / 12 / 2023 = 114.66 cfs = 757 min = 905,920 cuft = 61.9 = 0 ft = 69.40 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 '!�b-1 0.00 960 1080 1200 1320 1440 1560 Time (min) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 4 BMP #1 Hydrograph type = SCS Runoff Peak discharge = 30.54 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 69,312 cuft Drainage area = 9.490 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 BMP #1 Hyd. No. 4 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' 1 1 11 — ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 5 BMP #1 ROUTE Hydrograph type = Reservoir Peak discharge = 0.853 cfs Storm frequency = 10 yrs Time to peak = 947 min Time interval = 1 min Hyd. volume = 49,623 cuft Inflow hyd. No. = 4 - BMP #1 Max. Elevation = 819.59 ft Reservoir name = BMP #1 Max. Storage = 222,215 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. BMP #1 ROUTE Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 5 Hyd No. 4 Total storage used = 222,215 cult Hydrograph Report 50 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 6 BMP #1 REACH Hydrograph type = Reach Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 5 - BMP #1 ROUTE Reach length = 350.0 ft Manning's n = 0.040 Side slope = 2.0.1 Rating curve x = 4.570 Ave. velocity = 0.00 ft/s Modified Att-Kin routing method used. 0 300 — Hyd No. 6 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. BMP #1 REACH Hyd. No. 6 -- 10 Year 600 900 1200 Hyd No. 5 Sunday, 03 / 12 / 2023 = 0.853 cfs = 949 min = 49,614 cuft = Triangular = 6.0 % = 0.0 ft = 0.0 ft = 1.333 = 0.5111 1500 1800 2100 2400 2700 3000v vv Time (min) Hydrograph Report 51 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 7 BMP #1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 15.100 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.24 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 M M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #1 BYPASS Hyd. No. 7 -- 10 Year 120 240 360 480 600 720 840 Hyd No. 7 Sunday, 03 / 12 / 2023 = 16.20 cfs = 740 min = 88,735 cuft = 62.3 = 0 ft = 41.70 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 8 B M P #2A Hydrograph type = SCS Runoff Peak discharge = 329.88 cfs Storm frequency = 10 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 791,020 cuft Drainage area = 53.460 ac Curve number = 89.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 BMP #2A Hyd. No. 8 -- 10 Year Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 ' 1 1'- ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 8 Time (min) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 9 BMP #2A ROUTE Hydrograph type = Reservoir Peak discharge = 22.00 cfs Storm frequency = 10 yrs Time to peak = 762 min Time interval = 1 min Hyd. volume = 446,004 cuft Inflow hyd. No. = 8 - BMP #2A Max. Elevation = 822.75 ft Reservoir name = BMP #2A Max. Storage = 922,409 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. BMP #2A ROUTE SPECIMEN Hydrograph Report 54 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 10 BMP #2A REACH Hydrograph type = Reach Peak discharge = 21.99 cfs Storm frequency = 10 yrs Time to peak = 763 min Time interval = 1 min Hyd. volume = 445,912 cuft Inflow hyd. No. = 9 - BMP #2A ROUTE Section type = Triangular Reach length = 325.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.9089 Modified Att-Kin routing method used Q (cfs) 24.00 20.00 16.00 12.00 91011111 4.00 0.00 ' - 0 300 — Hyd No. 10 BMP #2A REACH Hyd. No. 10 -- 10 Year Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 9 Time (min) Hydrograph Report 55 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 11 BMP #2B Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 41.020 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.24 in Storm duration = 24 hrs Q (cfs) 240.00 210.00 180.00 150.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2B Hyd. No. 11 -- 10 Year Sunday, 03 / 12 / 2023 = 234.66 cfs = 719 min = 548,173 cuft = 85.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 11 Time (min) 56 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 12 BMP #213 ROUTE Hydrograph type = Reservoir Peak discharge = 8.161 cfs Storm frequency = 10 yrs Time to peak = 834 min Time interval = 1 min Hyd. volume = 289,079 cuft Inflow hyd. No. = 11 - BMP #2B Max. Elevation = 827.67 ft Reservoir name = BMP #213 Max. Storage = 806,110 cuft Storage Indication method used. Wet pond routing start elevation = 823.50 ft. BMP #2113 ROUTE • •• SM ••• •• •• Ms •• •• •• ••• Hydrograph Report 57 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 13 BMP #2B REACH Hydrograph type = Reach Peak discharge = 8.130 cfs Storm frequency = 10 yrs Time to peak = 840 min Time interval = 1 min Hyd. volume = 288,695 cuft Inflow hyd. No. = 12 - BMP #2B ROUTE Section type = Triangular Reach length = 1350.0 ft Channel slope = 1.7 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.432 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.1778 Modified Att-Kin routing method used Q (cfs) 10.00 4.00 e 300 Hyd No. 13 BMP #2113 REACH Hyd. No. 13 -- 10 Year Q (cfs) 10.00 . 11 4.00 2.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 12 Time (min) Hydrograph Report 58 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 14 BMP #2C Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 31.670 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.24 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2C Hyd. No. 14 -- 10 Year Sunday, 03 / 12 / 2023 = 120.72 cfs = 720 min = 273,123 cuft = 71.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' 1 1 1-J- ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 15 BMP #2C ROUTE Hydrograph type = Reservoir Peak discharge = 11.20 cfs Storm frequency = 10 yrs Time to peak = 754 min Time interval = 1 min Hyd. volume = 222,335 cuft Inflow hyd. No. = 14 - BMP #2C Max. Elevation = 855.85 ft Reservoir name = BMP #2C Max. Storage = 293,441 cuft Storage Indication method used. Wet pond routing start elevation = 853.50 ft. BMP #2C ROUTE Q (cfs) Hyd. No. 15 -- 10 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 15 — Hyd No. 14 Total storage used = 293,441 cult Hydrograph Report 60 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 16 BMP #2C REACH Hydrograph type = Reach Peak discharge = 10.96 cfs Storm frequency = 10 yrs Time to peak = 766 min Time interval = 1 min Hyd. volume = 222,189 cuft Inflow hyd. No. = 15 - BMP #2C ROUTE Section type = Triangular Reach length = 2500.0 ft Channel slope = 2.2 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.767 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.1182 Modified Att-Kin routing method used BMP #2C REACH Q (cfs) Hyd. No. 16 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 INS 2.00 2.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 16 Hyd No. 15 Hydrograph Report 61 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 17 BMP #2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 142.890 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.24 in Storm duration = 24 hrs Q (cfs) 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2 BYPASS Hyd. No. 17 -- 10 Year Sunday, 03 / 12 / 2023 = 102.23 cfs = 757 min = 810,073 cuft = 61.7 = 0 ft = 68.90 min = Type II = 484 0.00 I i i i i / I I I I I I I \, 0 120 240 360 480 600 720 — Hyd No. 17 Q (cfs) 120.00 100.00 40.00 20.00 WITiTil 840 960 1080 1200 1320 1440 1560 Time (min) 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 19 POST POI #1 Hydrograph type = Combine Peak discharge = 16.61 cfs Storm frequency = 10 yrs Time to peak = 740 min Time interval = 1 min Hyd. volume = 138,348 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 15.100 ac Q (cfs) 18.00 15.00 12.00 M M 3.00 POST POI #1 Hyd. No. 19 -- 10 Year 240 480 720 960 1200 1440 1680 Hyd No. 19 — Hyd No. 6 Hyd No. 7 Q (cfs) 18.00 15.00 12.00 M . �� 3.00 0.00 1920 2160 Time (min) 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 20 POST POI #2 Hydrograph type = Combine Peak discharge = 135.93 cfs Storm frequency = 10 yrs Time to peak = 758 min Time interval = 1 min Hyd. volume = 1,766,871 cuft Inflow hyds. = 10, 13, 16, 17 Contrib. drain. area = 142.890 ac POST POI #2 11 SM •il 11 11 Ms 11 II 11 ��� Hydrograph Summary Report 64 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 42.33 1 740 232,380 ------ ------ ------ PRE POI #1 2 SCS Runoff 171.42 1 756 1,291,542 ------ ------ ------ PRE POI #2 4 SCS Runoff 42.14 1 720 95,323 ------ ------ ------ BMP #1 5 Reservoir 1.529 1 857 75,032 4 819.89 235,132 BMP #1 ROUTE 6 Reach 1.529 1 859 75,023 5 ------ ------ BMP #1 REACH 7 SCS Runoff 24.00 1 739 126,151 ------ ------ ------ BMP #1 BYPASS 8 SCS Runoff 403.70 1 719 981,167 ------ ------ ------ BMP#2A 9 Reservoir 90.00 1 730 635,494 8 823.15 974,329 BMP #2A ROUTE 10 Reach 90.04 1 731 635,417 9 ------ ------ BMP #2A REACH 11 SCS Runoff 291.86 1 719 690,389 ------ ------ ------ BMP #213 12 Reservoir 28.77 1 748 430,546 11 827.94 833,390 BMP #213 ROUTE 13 Reach 28.37 1 753 430,256 12 ------ ------ BMP #213 REACH 14 SCS Runoff 162.01 1 719 366,628 ------ ------ ------ BMP #2C 15 Reservoir 23.91 1 736 315,417 14 856.44 331,105 BMP #2C ROUTE 16 Reach 23.06 1 749 315,292 15 ------ ------ BMP #2C REACH 17 SCS Runoff 153.23 1 756 1,156,545 ------ ------ ------ BMP #2 BYPASS 19 Combine 25.03 1 739 201,173 6, 7, ------ ------ POST POI #1 20 Combine 253.00 1 753 2,537,509 10, 13, 16, ------ ------ POST POI #2 17, Model.gpw Return Period: 25 Year Sunday, 03 / 12 / 2023 Hydrograph Report 65 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 1 PRE POI #1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 33.420 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.25 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI #1 Hyd. No. 1 -- 25 Year Sunday, 03 / 12 / 2023 = 42.33 cfs = 740 min = 232,380 cuft = 57.9 = 0 ft = 41.80 min = Type II = 484 0.00 i i i i i I I I I I I � i 0 120 240 360 480 600 720 — Hyd No. 1 Q (cfs) 50.00 40.00 30.00 20.00 10.00 WITiTil 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 2 PRE POI #2 Hydrograph type = SCS Runoff Peak discharge = 171.42 cfs Storm frequency = 25 yrs Time to peak = 756 min Time interval = 1 min Hyd. volume = 1,291,542 cuft Drainage area = 158.310 ac Curve number = 61.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 69.40 min Total precip. = 6.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 PRE POI #2 Hyd. No. 2 -- 25 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report 67 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 4 BMP #1 Hydrograph type = SCS Runoff Peak discharge = 42.14 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 95,323 cuft Drainage area = 9.490 ac Curve number = 67.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 6.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP #1 Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 5 BMP #1 ROUTE Hydrograph type = Reservoir Peak discharge = 1.529 cfs Storm frequency = 25 yrs Time to peak = 857 min Time interval = 1 min Hyd. volume = 75,032 cuft Inflow hyd. No. = 4 - BMP #1 Max. Elevation = 819.89 ft Reservoir name = BMP #1 Max. Storage = 235,132 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. BMP #1 ROUTE Q (cfs) Hyd. No. 5 -- 25 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 5 - Hyd No. 4 Total storage used = 235,132 cult Hydrograph Report 69 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 6 BMP #1 REACH Hydrograph type = Reach Peak discharge = 1.529 cfs Storm frequency = 25 yrs Time to peak = 859 min Time interval = 1 min Hyd. volume = 75,023 cuft Inflow hyd. No. = 5 - BMP #1 ROUTE Section type = Triangular Reach length = 350.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.5686 Modified Att-Kin routing method used Q (cfs) 2.00 1.00 BMP #1 REACH Hyd. No. 6 -- 25 Year 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 6 — Hyd No. 5 Q (cfs) 2.00 1.00 0.00 3000 Time (min) Hydrograph Report 70 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 7 BMP #1 BYPASS Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 15.100 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.25 in Storm duration = 24 hrs Q (cfs) 28.00 24.00 20.00 16.00 12.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #1 BYPASS Hyd. No. 7 -- 25 Year Sunday, 03 / 12 / 2023 = 24.00 cfs = 739 min = 126,151 cuft = 62.3 = Oft = 41.70 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 ' ' J ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 8 B M P #2A Hydrograph type = SCS Runoff Peak discharge = 403.70 cfs Storm frequency = 25 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 981,167 cuft Drainage area = 53.460 ac Curve number = 89.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 6.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 0.00 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 8 Time (min) 72 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 9 BMP #2A ROUTE Hydrograph type = Reservoir Peak discharge = 90.00 cfs Storm frequency = 25 yrs Time to peak = 730 min Time interval = 1 min Hyd. volume = 635,494 cuft Inflow hyd. No. = 8 - BMP #2A Max. Elevation = 823.15 ft Reservoir name = BMP #2A Max. Storage = 974,329 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. BMP #2A ROUTE Q (cfs) Hyd. No. 9 -- 25 Year Q (cfs) 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00 60.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 9 Hyd No. 8 Total storage used = 974,329 cult Hydrograph Report 73 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 10 BMP #2A REACH Hydrograph type = Reach Peak discharge = 90.04 cfs Storm frequency = 25 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 635,417 cuft Inflow hyd. No. = 9 - BMP #2A ROUTE Section type = Triangular Reach length = 325.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 1.0846 Modified Att-Kin routing method used Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 300 — Hyd No. 10 BMP #2A REACH Hyd. No. 10 -- 25 Year 600 900 1200 1500 1800 2100 2400 2700 3000v vv Hyd No. 9 Time (min) Hydrograph Report 74 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 11 BMP #2B Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 41.020 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.25 in Storm duration = 24 hrs Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2B Hyd. No. 11 -- 25 Year Sunday, 03 / 12 / 2023 = 291.86 cfs = 719 min = 690,389 cuft = 85.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 11 Time (min) 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 12 BMP #213 ROUTE Hydrograph type = Reservoir Peak discharge = 28.77 cfs Storm frequency = 25 yrs Time to peak = 748 min Time interval = 1 min Hyd. volume = 430,546 cuft Inflow hyd. No. = 11 - BMP #2B Max. Elevation = 827.94 ft Reservoir name = BMP #213 Max. Storage = 833,390 cuft Storage Indication method used. Wet pond routing start elevation = 823.50 ft. 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 12 Hyd No. 11 Total storage used = 833,390 cult Hydrograph Report 76 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 13 BMP #2B REACH Hydrograph type = Reach Peak discharge = 28.37 cfs Storm frequency = 25 yrs Time to peak = 753 min Time interval = 1 min Hyd. volume = 430,256 cuft Inflow hyd. No. = 12 - BMP #2B ROUTE Section type = Triangular Reach length = 1350.0 ft Channel slope = 1.7 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.432 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.2358 Modified Att-Kin routing method used Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 300 — Hyd No. 13 BMP #2113 REACH Hyd. No. 13 -- 25 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 900 1200 1500 1800 2100 2400 2700 3000 — Hyd No. 12 Time (min) 77 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 14 BMP #2C Hydrograph type = SCS Runoff Peak discharge = 162.01 cfs Storm frequency = 25 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 366,628 cuft Drainage area = 31.670 ac Curve number = 71.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 6.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 BMP #2C Hyd. No. 14 -- 25 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) 78 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 15 BMP #2C ROUTE Hydrograph type = Reservoir Peak discharge = 23.91 cfs Storm frequency = 25 yrs Time to peak = 736 min Time interval = 1 min Hyd. volume = 315,417 cuft Inflow hyd. No. = 14 - BMP #2C Max. Elevation = 856.44 ft Reservoir name = BMP #2C Max. Storage = 331,105 cuft Storage Indication method used. Wet pond routing start elevation = 853.50 ft. Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 300 — Hyd No. 15 BMP #2C ROUTE Hyd. No. 15 -- 25 Year 600 900 1200 1500 1800 2100 2400 2700 3000v vv Time (min) Hyd No. 14 Total storage used = 331,105 cult Hydrograph Report 79 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 16 BMP #2C REACH Hydrograph type = Reach Peak discharge = 23.06 cfs Storm frequency = 25 yrs Time to peak = 749 min Time interval = 1 min Hyd. volume = 315,292 cuft Inflow hyd. No. = 15 - BMP #2C ROUTE Section type = Triangular Reach length = 2500.0 ft Channel slope = 2.2 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.767 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.1411 Modified Att-Kin routing method used BMP #2C REACH Q (cfs) Hyd. No. 16 -- 25 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 16 — Hyd No. 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 17 BMP #2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 142.890 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.25 in Storm duration = 24 hrs Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2 BYPASS Hyd. No. 17 -- 25 Year Sunday, 03 / 12 / 2023 = 153.23 cfs = 756 min = 1,156, 545 cuft = 61.7 = 0 ft = 68.90 min = Type II = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 1 1 1 1 1 i I I I I I I I � 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 17 Time (min) 81 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 19 POST POI #1 Hydrograph type = Combine Peak discharge = 25.03 cfs Storm frequency = 25 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 201,173 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 15.100 ac Q (cfs) 28.00 24.00 20.00 16.00 12.00 0.00 1 ---J— 0 180 360 — Hyd No. 19 540 POST POI #1 Hyd. No. 19 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 v ' ' ' " ' 0.00 720 900 1080 1260 1440 1620 1800 1980 2160 Time (min) Hyd No. 6 Hyd No. 7 82 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 112 12023 Hyd. No. 20 POST POI #2 Hydrograph type = Combine Peak discharge = 253.00 cfs Storm frequency = 25 yrs Time to peak = 753 min Time interval = 1 min Hyd. volume = 2,537,509 cuft Inflow hyds. = 10, 13, 16, 17 Contrib. drain. area = 142.890 ac POST POI #2 see • I SM ••1 •• •• :•• •• •• •• ••• Hydrograph Summary Report 83 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2022 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 70.88 1 739 369,294 ------ ------ ------ PRE POI #1 2 SCS Runoff 273.46 1 755 1,986,929 ------ ------ ------ PRE POI #2 4 SCS Runoff 62.31 1 719 141,064 ------ ------ ------ BMP #1 5 Reservoir 3.008 1 807 120,113 4 820.44 259,398 BMP #1 ROUTE 6 Reach 3.008 1 809 120,103 5 ------ ------ BMP #1 REACH 7 SCS Runoff 37.98 1 739 193,491 ------ ------ ------ BMP #1 BYPASS 8 SCS Runoff 523.38 1 719 1,294,687 ------ ------ ------ BMP#2A 9 Reservoir 291.74 1 725 948,153 8 823.78 1,059,432 BMP #2A ROUTE 10 Reach 292.49 1 726 948,085 9 ------ ------ BMP #2A REACH 11 SCS Runoff 384.85 1 719 926,577 ------ ------ ------ BMP #213 12 Reservoir 129.27 1 728 665,765 11 828.70 913,836 BMP #213 ROUTE 13 Reach 120.71 1 731 665,555 12 ------ ------ BMP #213 REACH 14 SCS Runoff 231.99 1 719 528,292 ------ ------ ------ BMP #2C 15 Reservoir 53.93 1 730 476,584 14 857.50 401,733 BMP #2C ROUTE 16 Reach 50.24 1 739 476,478 15 ------ ------ BMP #2C REACH 17 SCS Runoff 245.01 1 756 1,781,946 ------ ------ ------ BMP #2 BYPASS 19 Combine 40.49 1 739 313,593 6, 7, ------ ------ POST POI #1 20 Combine 539.62 1 729 3,872,066 10, 13, 16, ------ ------ POST POI #2 17, Model.gpw Return Period: 100 Year Sunday, 03 / 12 / 2023 Hydrograph Report 84 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 1 PRE POI #1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 33.420 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.90 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 50.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI #1 Hyd. No. 1 -- 100 Year Sunday, 03 / 12 / 2023 = 70.88 cfs = 739 min = 369,294 cuft = 57.9 = 0 ft = 41.80 min = Type II = 484 Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 11 ' ' ' ' ' ' ' � ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) Hydrograph Report 85 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 2 PRE POI #2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 158.310 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.90 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor PRE POI #2 Hyd. No. 2 -- 100 Year Sunday, 03 / 12 / 2023 = 273.46 cfs = 755 min = 1,986,929 cuft = 61.9 = 0 ft = 69.40 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 1 1 11� ' ' ' ' ' ' ' -11 i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 4 BMP #1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 9.490 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.90 in Storm duration = 24 hrs Q (cfs) 70.00 50.00 40.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #1 Hyd. No. 4 -- 100 Year Sunday, 03 / 12 / 2023 = 62.31 cfs = 719 min = 141,064 cuft = 67.5 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1 1 1 ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) 87 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 5 BMP #1 ROUTE Hydrograph type = Reservoir Peak discharge = 3.008 cfs Storm frequency = 100 yrs Time to peak = 807 min Time interval = 1 min Hyd. volume = 120,113 cuft Inflow hyd. No. = 4 - BMP #1 Max. Elevation = 820.44 ft Reservoir name = BMP #1 Max. Storage = 259,398 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. Q (cfs) 70.00 50.00 40.00 20.00 10.00 BMP #1 ROUTE Hyd. No. 5 -- 100 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 1 1 F I I I 1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 5 — Hyd No. 4 Total storage used = 259,398 cult Hydrograph Report 88 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 6 BMP #1 REACH Hydrograph type = Reach Peak discharge = 3.008 cfs Storm frequency = 100 yrs Time to peak = 809 min Time interval = 1 min Hyd. volume = 120,103 cuft Inflow hyd. No. = 5 - BMP #1 ROUTE Section type = Triangular Reach length = 350.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.6398 Modified Att-Kin routing method used Q (cfs) 4.00 3.00 2.00 1.00 0.00 ' 0 300 — Hyd No. 6 BMP #1 REACH Hyd. No. 6 -- 100 Year Q (cfs) 4.00 3.00 2.00 1.00 I I I I I I I 1 0.00 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 5 Time (min) Hydrograph Report 89 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 7 BMP #1 BYPASS Hydrograph type = SCS Runoff Peak discharge = 37.98 cfs Storm frequency = 100 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 193,491 cuft Drainage area = 15.100 ac Curve number = 62.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 41.70 min Total precip. = 7.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP #1 BYPASS Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 7 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 8 B M P #2A Hydrograph type = SCS Runoff Peak discharge = 523.38 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 1,294,687 cuft Drainage area = 53.460 ac Curve number = 89.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 8 Time (min) 91 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 9 BMP #2A ROUTE Hydrograph type = Reservoir Peak discharge = 291.74 cfs Storm frequency = 100 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 948,153 cuft Inflow hyd. No. = 8 - BMP #2A Max. Elevation = 823.78 ft Reservoir name = BMP #2A Max. Storage = 1,059,432 cuft Storage Indication method used. Wet pond routing start elevation = 818.50 ft. Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 0.00 1 1— 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 9 — Hyd No. 8 Total storage used = 1,059,432 cult Hydrograph Report 92 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 10 BMP #2A REACH Hydrograph type = Reach Peak discharge = 292.49 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 948,085 cuft Inflow hyd. No. = 9 - BMP #2A ROUTE Section type = Triangular Reach length = 325.0 ft Channel slope = 6.0 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 4.570 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 1.2277 Modified Att-Kin routing method used BMP #2A REACH Q (cfs) Hyd. No. 10 -- 100 Year Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0 00 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 10 Hyd No. 9 93 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 11 BMP #2B Hydrograph type = SCS Runoff Peak discharge = 384.85 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 926,577 cuft Drainage area = 41.020 ac Curve number = 85.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 7.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 BMP #2B Hyd. No. 11 -- 100 Year Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 0.00 ' 1 1-'- ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 11 Time (min) 94 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 12 BMP #213 ROUTE Hydrograph type = Reservoir Peak discharge = 129.27 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 1 min Hyd. volume = 665,765 cuft Inflow hyd. No. = 11 - BMP #2B Max. Elevation = 828.70 ft Reservoir name = BMP #213 Max. Storage = 913,836 cuft Storage Indication method used. Wet pond routing start elevation = 823.50 ft. BMP #2113 ROUTE Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 420.00 420.00 360.00 360.00 300.00 300.00 240.00 240.00 180.00 180.00 120.00 120.00 60.00Lou ------ 60.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) — Hyd No. 12 Hyd No. 11 Total storage used = 913,836 cult Hydrograph Report 95 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 13 BMP #2B REACH Hydrograph type = Reach Peak discharge = 120.71 cfs Storm frequency = 100 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 665,555 cuft Inflow hyd. No. = 12 - BMP #2B ROUTE Section type = Triangular Reach length = 1350.0 ft Channel slope = 1.7 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.432 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.3258 Modified Att-Kin routing method used BMP #2113 REACH Q (cfs) Hyd. No. 13 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) — Hyd No. 13 Hyd No. 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 14 BMP #2C Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 31.670 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.90 in Storm duration = 24 hrs Q (cfs) 240.00 210.00 180.00 150.00 120.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2C Hyd. No. 14 -- 100 Year Sunday, 03 / 12 / 2023 = 231.99 cfs = 719 min = 528,292 cuft = 71.9 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 ' 1 1 1 1 ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 Time (min) 97 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 15 BMP #2C ROUTE Hydrograph type = Reservoir Peak discharge = 53.93 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 1 min Hyd. volume = 476,584 cuft Inflow hyd. No. = 14 - BMP #2C Max. Elevation = 857.50 ft Reservoir name = BMP #2C Max. Storage = 401,733 cuft Storage Indication method used. Wet pond routing start elevation = 853.50 ft. BMP #2C ROUTE 11 • 1 1 1 --- ------ • 1 1 1 1 :1 •1 �1 1 •11 1:1 •1 ��1 • 1 :11 •:1 Hydrograph Report 98 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 16 BMP #2C REACH Hydrograph type = Reach Peak discharge = 50.24 cfs Storm frequency = 100 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 476,478 cuft Inflow hyd. No. = 15 - BMP #2C ROUTE Section type = Triangular Reach length = 2500.0 ft Channel slope = 2.2 % Manning's n = 0.040 Bottom width = 0.0 ft Side slope = 2.0.1 Max. depth = 0.0 ft Rating curve x = 2.767 Rating curve m = 1.333 Ave. velocity = 0.00 ft/s Routing coeff. = 0.1702 Modified Att-Kin routing method used BMP #2C REACH Q (cfs) Hyd. No. 16 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 1800 1980 2160 Time (min) — Hyd No. 16 Hyd No. 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Hyd. No. 17 BMP #2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 142.890 ac Basin Slope = 0.0 % Tc method = User Total precip. = 7.90 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor BMP #2 BYPASS Hyd. No. 17 -- 100 Year Sunday, 03 / 12 / 2023 = 245.01 cfs = 756 min = 1,781,946 cuft = 61.7 = 0 ft = 68.90 min = Type II = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 1 1 11� ' ' ' ' ' ' ' � i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 17 Time (min) 100 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 19 POST POI #1 Hydrograph type = Combine Peak discharge = 40.49 cfs Storm frequency = 100 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 313,593 cuft Inflow hyds. = 6, 7 Contrib. drain. area = 15.100 ac Q (cfs) 50.00 40.00 20.00 10.00 0.00 ' ---L� 0 180 360 — Hyd No. 19 POST POI #1 Hyd. No. 19 -- 100 Year 540 720 Hyd No. 6 900 1080 1260 1440 Hyd No. 7 1620 1800 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 1980 Time (min) Hydrograph Report 101 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2022 Sunday, 03 / 12 / 2023 Hyd. No. 20 POST POI #2 Hydrograph type = Combine Peak discharge = 539.62 cfs Storm frequency = 100 yrs Time to peak = 729 min Time interval = 1 min Hyd. volume = 3,872,066 cuft Inflow hyds. = 10, 13, 16, 17 Contrib. drain. area = 142.890 ac Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 rraa 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 16 Hydraflow Rainfall Report 102 Hydraflow Hydrographs Extension for Autodesk@ Civil 3DO by Autodesk, Inc. v2022 Return Period I ntensity-Du ration -F req uency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 29.1632 6.1000 0.7403 -------- 2 35.6474 6.6000 0.7530 -------- 3 0.0000 0.0000 0.0000 -------- 5 44.3653 6.7000 0.7590 -------- 10 51.4760 6.8000 0.7603 -------- 25 57.8161 6.5000 0.7474 -------- 50 58.9009 5.8000 0.7251 -------- 100 63.2060 5.7000 0.7158 -------- File name: CLT10 IDF.IDF Intensity = B / (Tc + D)^E Sunday, 03 / 12 / 2023 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.91 3.73 3.05 2.61 2.29 2.05 1.86 1.71 1.58 1.48 1.39 1.31 2 5.63 4.30 3.53 3.01 2.65 2.37 2.15 1.98 1.83 1.71 1.60 1.51 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.86 5.24 4.29 3.67 3.22 2.88 2.61 2.40 2.22 2.07 1.94 1.83 10 7.88 6.03 4.94 4.23 3.71 3.32 3.01 2.77 2.56 2.39 2.24 2.11 25 9.32 7.11 5.84 4.99 4.39 3.93 3.57 3.28 3.04 2.84 2.66 2.51 50 10.49 7.96 6.52 5.58 4.91 4.40 4.00 3.68 3.41 3.19 3.00 2.83 100 11.58 8.80 7.22 6.19 5.45 4.89 4.45 4.10 3.80 3.56 3.34 3.16 Tc = time in minutes. Values may exceed 60. i06800CL - CLT10 Bovd Farm Site\Documents\G Desian Calculations\Hvdraflow Hvdroaraohs\CLT10 PreciDitation.DcD Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.94 3.56 1.20 4.50 5.24 6.25 7.06 7.90 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 APPENDIX C EROSION CONTROL CALCULATIONS SUPPLEMENTAL DOCUMENTS PHASE ONE WK Dickson & Co. Inc. Project Name: WKD Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PH1 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 19.99 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) Description of surface Impervious Area Wooded Area Grassed Area (Lawns w/ slopes > Disturbed area 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Area (acres) 8.03b 0.90 0.0000 0.15 0.0000 0.20 0.0000 0.60 19.9900 of Area I 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 1- PH1(10-yr Rational Runoff) 19.99 0.6000 5.0 7.06 84.68 Total 10 yr Flow to Sediment Basin (cfs) 84.68 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 1- PHl(2-yr Rational Runoff) 19.99 0.6000 5.0 5.39 64.65 Total 2 yr Flow to Sediment Basin (cfs) 64.65 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 1- PH1(10-yr Rational Runoff) 19.99 435 36,834.77 Total REQUIRED Sediment Basin Area (sf) 36,835 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 1- PH1(10-yr Rational Runoff) 19.99 1,800 35,982.00 Total REQUIRED Sediment Basin Volume (cubic feet) 35,982 1 OF 5 of Area I 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 1- PH1(10-yr Rational Runoff) 19.99 0.6000 5.0 7.06 84.68 Total 10 yr Flow to Sediment Basin (cfs) 84.68 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 1- PHl(2-yr Rational Runoff) 19.99 0.6000 5.0 5.39 64.65 Total 2 yr Flow to Sediment Basin (cfs) 64.65 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 1- PH1(10-yr Rational Runoff) 19.99 435 36,834.77 Total REQUIRED Sediment Basin Area (sf) 36,835 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 1- PH1(10-yr Rational Runoff) 19.99 1,800 35,982.00 Total REQUIRED Sediment Basin Volume (cubic feet) 35,982 1 OF 5 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: PERM. SEDIMENT BASIN 1- PH1 Calculation 1 PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 819.00 44,234 0 0 820.00 46,548 45,386 45,386 821.00 48,906 47,722 93,108 822.00 51,306 50,101 143,209 822.50 52,523 25,957 169,166 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 823.00 53,750 26,568 195,734 Emergency Spillway 823.50 54,988 27,184 222,918 824.00 56,236 27,805 250,723 Top of Dam 825.00 58,766 57,496 308,219 Total PROVIDED Sediment Basin Volume (cubic feet) 169,166 Total PROVIDED Sediment Basin Area (square feet 52,523 OKAY OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C 3 Ccmp=3.1 3.0 for Concrete weir Riser circumference, L (ft) 24 6x6 Box Head above riser crest, H (ft) 1 QP (cfs) 72.00 cfs Must exceed 2-year flow OKAY Step 5. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak flow for the entire watershed of the basin. • The principal spillway is analyzed for three possible limiting flow types: Weir flow, Orifice flow, and Pipe flog- The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a slimmer should be disregarded during this computation. Weir, orifice and pipe flow may be deterred by the following equations: 1_ Weir Flow_ Q=CLHtS where: Q = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for comrgated mew pipe nsers. L = circumference of the riser in feet H = head above riser crest in feet 20F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PH1 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 C,p=0.6 Riser cross -sectional area, A (ft2) 36 6x6 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1 Discharge, CIP (cfs) 173.34 Must exceed 2-year flow OKAY 2- Orifice Flow: Q = CA (2gHr 5 where: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe risers. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gravity; 32.2 ft/sec' H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 2.50 Table 8.07b Barrel cross -sectional area, a (ft2) 4.91 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 15 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 83.9 Mannings coeffienct of roughness, n 0.013 ncMp=0.025 nR,=0.013 Inside diameter of barrel, d; (in) 30.00 Pipe friction coefficient, KP 0.01 Table 8.07a Discharge, CIP (cfs) 91.61 Must exceed 2-year flow OKAY 3. Pipe Flow: Q = a I + iti + 1, L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity- 32.2 Wsee h = head above the centerline of the outlet end of the barrel Km = coefficient of minor losses. can be assumed to be 1-0 for most principal spilhvav systems L = barrel length in feet Ko = pipe friction coefficient: _ 5087n2 Table S.07a ' for K, values for 6413 common %im or pipe.) n = Martnrng's coefficient of roughness, tine n = 0.025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 times that of the barrel. Spillway hydraulics are improved by maximizing weir flow and mini+niZing orifice flow- See Table 8.07b for recommended riser/barrel proportions. 30F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PHI EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY PROVIDED SPILLWAY CAPACITY Q10 (Calculated) 84.68 Weir coefficient, C 3 (Controlling Flow rate for riser/barrel) 72.00 Bottom width of spillway crest, L (ft) 15 Required Emergency spillway capacity, Q. (cfs) 12.68 Depth of flow above spillway crest, H (ft) 0.5 Provided Emergency spillway capacity, Q. (cfs) 15.91 Total Spillway Capacity (Principal & Emergency must exceed 10 yr event) 87.91 YES, PROCEED Inside Dimensions (ft) - square conc structure only Inside Area (sf) Outside Dimensions (ft) - square conc structure only r Outside Area (sf) r Structure Height (ft) GHT DISPLACE BY RISER ANTI -FLOTATION ANCHOR 7.001 update area calculations for rectangular or circular riser structures Area of concrete (sf) - assume 6" wall thickness"15.768.00 Riser Structure Height (ft) Volume of Riser concrete (cf) Net Displaced by the Riser (Ibs/cf) WEIGHT OF THE CONCRETE RISER fibs) GHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER Density of concrete (Ibs/cf) Density of water (Ibs/cf) Anchor Dimension (n x n) (ft) Anchor Thickness (ft) Anchor Area (sf) Anchor Volume (cf) WEIGHT OF ANCHOR fibs) 40F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PH1 SKIMMER ORIFICE SIZE Required Volume Sizing 35,982.00 Required Volume (cfs) Orifice Equation: Q = CdA(2gh)1/2 3.00 Dewatering Time (days) Cd= 0.59 259,200.00 Dewaterin Time (sec) g = 32.2 0.139 Q = Flow (cfs) 4.0 Skimmer Size (In) 4.o h = Head on Skimmer (in) 7.31 A = Area of Orifice (in2) 1.53 r = Orifice radius (in) 3.05 d = Orifice Diameter (in) Using 4" Skimmer with 3" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watenighl anti -gip colhu (thickness may vary depending on barrel type) with a minimum projection of 15 feet around ilie barrel of principal spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A rrorerly designed drainage diaphragms installed around the barrel may he uwd instead Oran anti -seep collar when it is appn)priate. FMRANKMF14T 50F5 WK Dickson & Co. Inc. Project Name: WKD Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2A- PH1 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 43.53 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) Description of surface Impervious Area Wooded Area Grassed Area (Lawns w/ slopes > Disturbed area 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Area (acres) 8.03b 0.90 0.0000 0.15 0.0000 0.20 0.0000 0.60 43.5300 of Area 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH1(10-yr Rational Runoff) 43.53 0.6000 5.0 7.06 184.39 Total 10 yr Flow to Sediment Basin (cfs) 184.39 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH1(2-yr Rational Runoff) 43.53 0.6000 5.0 5.39 140.78 Total 2 yr Flow to Sediment Basin (cfs) 140.78 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 2A - PH1(10-yr Rational Runoff) 43.53 435 80,210.99 Total REQUIRED Sediment Basin Area 00 r 80,211 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 2A- PH1(10-yr Rational Runoff) 43.53 1,800 78,354.00 Total REQUIRED Sediment Basin Volume (cubic feet) 78,354 1 OF 5 of Area 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH1(10-yr Rational Runoff) 43.53 0.6000 5.0 7.06 184.39 Total 10 yr Flow to Sediment Basin (cfs) 184.39 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH1(2-yr Rational Runoff) 43.53 0.6000 5.0 5.39 140.78 Total 2 yr Flow to Sediment Basin (cfs) 140.78 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 2A - PH1(10-yr Rational Runoff) 43.53 435 80,210.99 Total REQUIRED Sediment Basin Area 00 r 80,211 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 2A- PH1(10-yr Rational Runoff) 43.53 1,800 78,354.00 Total REQUIRED Sediment Basin Volume (cubic feet) 78,354 1 OF 5 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: PERM. SEDIMENT BASIN 2A - PH1 Calculation l PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 819.00 118,166 0 0 820.00 121,801 119,979 119,979 821.00 125,490 123,641 243,620 822.00 129,232 127,356 370,976 822.50 131,123 65,088 436,064 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 823.00 133,028 66,037 502,102 Emergency Spillway Top of Dam 823.50 134,945 66,993 569,094 824.00 136,877 67,955 637,049 825.00 140,780 138,824 775,873 Total PROVIDED Sediment Basin Volume (cubic feet) 436,064 Total PROVIDED Sediment Basin Area (square feet 131,123 OKAY OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C M264.54 CAMP=3.1 3.0for Concrete weir Riser circumference, L (ft) 12x12 Box Head above riser crest, H (ft)QP (cfs) cfs Must exceed 2-year flow OKAY Step 5. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak flow- for the entire watershed of the basin. • The principal spillway is analyzed for three possible limiting flow types: Weir flow, Orifice flow, and Pipe flow- The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a skimmer should be disregarded dieing this computation. Weir, orifice and pipe floc' may be determined by the following equations: 1_ Weir Flo%r- Q = CLHt where: Q = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for conngated metal pipe nsers_ L = circumference of the riser in feet H = head above riser crest in feet 20F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2A- PHI PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 C,p=0.6 Riser cross -sectional area, A (ft2) 144 12x12 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1.5 Discharge, Clp (cfs) S49.18 Must exceed 2-year flow OKAY 2- Orifice Flow: Q = CA (2gHr 5 where: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe risers. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gravity; 32.2 ft/sec' H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 6.00 Table 8.07b Barrel cross -sectional area, a (ft2) 28.27 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 13 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 78.3 Mannings coeffienct of roughness, n 0.013 ncMp=0.025 nR,=0.013 Inside diameter of barrel, d; (in) 72.00 Pipe friction coefficient, Kp 0.00 Table 8.07a Discharge, Clp (cfs) 548.49 Must exceed 2-year flow OKAY 2gh o< 3. Pipe Flow : Q = a L l + Iti, + K L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity- 32.2 Wsee h = head above the centerline of the outlet end of the barrel Km = coefficient of minor losses. can be assumed to be 1-0 for most principal spilhvav systems L = barrel length in feet Ko = pipe friction coefficient: _ 5087n2 Table S.07a ' for K, values for 6413 COMMOn %2M Or pipe.) n = Manning 's coefficient of roughness, tine n = 0.025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 times that of the barrel. Spillway hydraulics are improved by maximizing weir flow and minimizing orifice flow- See Table 8.07b for recommended riser/barrel proportions. 30F5 Dickson & Co. Inc. ect Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2A- PH1 EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY PROVIDED SPILLWAY CAPACITY Q10 (Calculated) 184.39 Weir coefficient, C 3 (Controlling Flow rate for riser/barrel) 264.54 Bottom width of spillway crest, L (ft) 15 Required Emergency spillway capacity, Q. (cfs) -80.15 Depth of flow above spillway crest, H (ft) 0.5 Provided Emergency spillway capacity, Q. (cfs) 15.91 Total Spillway Capacity (Principal & Emergency must exceed 10 yr event) 280.45 YES, PROCEED ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 12.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 144.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 13.00 Riser Outside Area (sf) 169.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 11.50 WEIGHT DISPLACE BY RISER (Ibs) 103,334.40 Area of concrete (sf) - assume 6" wall thickness 25.00 Anchor Dimension (n x n) (ft) 14.50 Riser Structure Height (ft) 11.50 Anchor Thickness (ft) 3.00 Volume of Riser concrete (cf) 287.50 Anchor Area (sf) 210.25 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 630.75 WEIGHT OF THE CONCRETE RISER (Ibs) 25,185.00 WEIGHT OF ANCHOR (Ibs) 94,612.50 WEIGHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER OK 40F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2A- PH1 SKIMMER ORIFICE SIZE Required Volume Sizing 78,354.00 Required Volume (cf) Orifice Equation: Q = CdA(2gh)1/2 3.00 Dewatering Time (days) Cd= 0.59 259,200.00 Dewaterin Time (sec) g = 32.2 0.302 Q = Flow (cfs) 5.0 Skimmer Size (in) s.o h = Head on Skimmer (in) 14.24 A = Area of Orifice (in2) 2.13 r = Orifice radius (in) 4.26 d = Orifice Diameter (in) Using 5" Skimmer with 4.75" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watenighl anti -gip colhu (thickness may vary depending on barrel type) with a minimum projection of 15 feet around ilie barrel of principal spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A rrorerly designed drainage diaphragms installed around the barrel may he uwd instead Oran anti -seep collar when it is appn)priate. FMRANKMF14T 50F5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2B - PH1 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 10.77 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Description of surface Area (acres) % of Area 8.03b Impervious Area 0.90 0.0000 0% Wooded Area 0.15 0.0000 0% Grassed Area (Lawns w/ slopes > 7%) 0.20 0.0000 0% 10 Disturbed area 0.60 10.7700 0% Composite Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 0.6000 5.0 7.06 45.62 Total 10 yr Flow to Sediment Basin (cfs) 45.62 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2B - PH1(2-yr Rational Runoff) 10.77 0.6000 5.0 5.39 34.83 Total 2 yr Flow to Sediment Basin (cfs) 34.83 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 435 19,845.45 Total REQUIRED Sediment Basin Area (sf) 19,845 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 1,800 19,386.00 Total REQUIRED Sediment Basin Volume (cubic feet) 19,386 1 OF 5 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 0.6000 5.0 7.06 45.62 Total 10 yr Flow to Sediment Basin (cfs) 45.62 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2B - PH1(2-yr Rational Runoff) 10.77 0.6000 5.0 5.39 34.83 Total 2 yr Flow to Sediment Basin (cfs) 34.83 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 435 19,845.45 Total REQUIRED Sediment Basin Area (sf) 19,845 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 1,800 19,386.00 Total REQUIRED Sediment Basin Volume (cubic feet) 19,386 1 OF 5 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 435 19,845.45 Total REQUIRED Sediment Basin Area (sf) 19,845 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2B - PH1(10-yr Rational Runoff) 10.77 1,800 19,386.00 Total REQUIRED Sediment Basin Volume (cubic feet) 19,386 1 OF 5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2B - PH1 PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 824.00 90,646 0 0 825.00 94,146 92,390 92,390 826.00 97,697 95,916 188,306 827.00 101,298 99,492 287,799 827.50 103,118 51,103 338,902 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 828.00 104,950 52,016 390,918 Emergency Spillway Top of Dam 828.50 106,795 52,936 443,854 829.00 108,652 53,861 497,715 830.00 112,405 110,523 608,238 Total PROVIDED Sediment Basin Volume (cubic feet) Total PROVIDED Sediment Basin Area (square feet 338,902 OKAY 103,118 OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C 3 CAMP=3.1 3.0 for Concrete weir Riser circumference, L (ft) 32 8x8 Box Head above riser crest, H (ft) 1.5 QP (cfs) 176.36 cfs Must exceed 2-year flow OKAY Step 5. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways trust be at least the 14-rear peak flow for the entire watershed of the basin. • The principal spillwav is analyzed for three possible limiting flow apes: Weir flow; Orifice flow, and Pipe flow_ The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a skimmer should be disregarded dieing this computation- Weu- orifice and pipe flow may be determined by the following equations: 1 _ Weir Flow- Q = CLH' where: Q = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for corrugated metal pipe risers. L = circumference of the riser in feet H = head above riser crest in feet 2OF5 Dickson & Co. Inc. act Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 213 - PH1 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 CAMP=0.6 Riser cross -sectional area, A (ft2) 64 8x8 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1.5 Discharge, C. (cfs) 377.42 Must exceed 2-year flow OKAY 2- Ort$ce flow: Q = CA (2gHrs whem: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe nsen. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gravity, 32.2 ft/sec: H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 4.00 Table 8.07b Barrel cross -sectional area, a (ft2) 12.57 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 14.4 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 71.52 Mannings coeffienct of roughness, n 0.013 ncMP=0.025 nRCP=0.013 Inside diameter of barrel, d; (in) 48.00 Pipe friction coefficient, KP 0.005 Table 8.07a Discharge, C. (cfs) 249.50 Must exceed 2-year flow OKAY F 2gh 0? 3. Pipe Flow: Q = a L l + K. + 1{s L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity 32.2 ft/sec'- h = head above the centerline of the outlet end of the barrel Km = coefficient of minor losses. can be assumed to be 1-0 for most principal spillway systems L = barrel length in feet Kp = pipe friction coefficient: 5087n= Table 8.U7a : for Kp values for di413 common size or pipe.) n = Manning's coefficient of roughness, use n = 0-025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 tunes that of the barrel- Spillway hydraulics are improved by maximizing weir flow and minunizing orifice flow. See fable 8.07b for recommended riseubarrel proportions. 3OF5 Dickson & Co. Inc. act Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2B - PH1 EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY I PROVIDED SPILLWAY CAPACITY 45.62 Weir coefficient, C Flow rate for riser/barrel) 176.36 Bottom width of spillway crest, L -130.74 Depth of flow above spillway crest, H (ft) Provided Emergency spillway capacity, QQ (cfs) 21 Total Spillway Capacity (Principal & Emergency must exceed 10 yr event) 197 ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 8.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 64.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 9.00 Riser Outside Area (sf) 81.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 1200. WEIGHT DISPLACE BY RISER (Ibs) 47,923.20 Area of concrete (sf) - assume 6" wall thickness 17.00 Anchor Dimension (n x n) (ft) 11.00 Riser Structure Height (ft) 12.00 Anchor Thickness (ft) 2.00 Volume of Riser concrete (cf) 204.00 Anchor Area (sf) 121.00 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 242.00 WEIGHT OF THE CONCRETE RISER (Ibs) 17,870.40 WEIGHT OF ANCHOR (Ibs) 36,300.00 WEIGHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER OK 4OF5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2B - PH1 SKIMMER ORIFICE SIZE Required Volume Sizing 19,386.0o Required Volume (cf) 3.00 Dewatering Time (days) 259,200.00 Dewatering Time (sec) 0.075 Q — Flow (cfs) 4.0 Skimmer Size (in) 4.0 h = Head on Skimmer (in) 3.94 A = Area of Orifice (in2) 1.12 r = Orifice radius (in) 2.24 d = Orifice Diameter (in) Orifice Equation: Q = CdA(2gh)1/2 Cd= 0.59 g = 32.2 Using 4" Skimmer with 3.25" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watertight anti -gip colt (thickness may vary depending on barrel type) with a minimum projection of 15 feet around the barrel ofprincipat spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A prorerly designed drainage diaphragm installed around the• harm my he usod instead ❑fan anti -seep collar when it is appropriate. FMRANKMF14T 5OF5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2C - PH1 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 27.82 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Description of surface Area (acres) % of Area 8.03b Impervious Area 0.90 0.0000 0% Wooded Area 0.15 0.0000 0% Grassed Area (Lawns w/ slopes > 7%) 0.20 0.0000 0% 10 Disturbed area 0.60 27.8200 0% Composite Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 0.6000 5.0 7.06 117.85 Total 10 yr Flow to Sediment Basin (cfs) 117.85 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2C - PH1(2-yr Rational Runoff) 27.82 0.6000 5.0 5.39 89.97 Total 2 yr Flow to Sediment Basin (cfs) 89.97 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 435 51,262.80 Total REQUIRED Sediment Basin Area (sf) 51,263 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 1,800 50,076.00 Total REQUIRED Sediment Basin Volume (cubic feet) 50,076 1 OF 5 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 0.6000 5.0 7.06 117.85 Total 10 yr Flow to Sediment Basin (cfs) 117.85 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2C - PH1(2-yr Rational Runoff) 27.82 0.6000 5.0 5.39 89.97 Total 2 yr Flow to Sediment Basin (cfs) 89.97 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 435 51,262.80 Total REQUIRED Sediment Basin Area (sf) 51,263 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 1,800 50,076.00 Total REQUIRED Sediment Basin Volume (cubic feet) 50,076 1 OF 5 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 435 51,262.80 Total REQUIRED Sediment Basin Area (sf) 51,263 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2C - PH1(10-yr Rational Runoff) 27.82 1,800 50,076.00 Total REQUIRED Sediment Basin Volume (cubic feet) 50,076 1 OF 5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2C - PH1 PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 854.00 59,567 0 0 855.00 62,374 60,965 60,965 856.00 65,237 63,800 124,765 857.00 68,157 66,692 191,457 857.50 69,637 34,448 225,905 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 858.00 71,132 35,192 261,096 Emergency Spillway 858.50 72,641 35,943 297,039 859.00 74,164 36,701 333,740 860.00 77,252 75,703 409,442 Top of Dam Total PROVIDED Sediment Basin Volume (cubic feet) 225,905 Total PROVIDED Sediment Basin Area (square feet 69,637 OKAY OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C 3 CAMP=3.1 3.0 for Concrete weir Riser circumference, L (ft) 20 Sx5 Box Head above riser crest, H (ft) 1.5 QP (cfs) 110.23 cfs Must exceed 2-year flow OKAY Step 5. Determine the principal spillway discbarge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-rear peak flow for the entire watershed of the basin. • The principal spillway is analyzed for three possible limiting flow types: Weir flow, Orifice flow, and Pipe flow- The principal spffl way discharge capacity is the smallest of these three flow rates. Discharges through a skimmer should be disregarded during this computation- Weir- orifice and pipe flow may be determined by the following equations: I- Weir Flow: Q = CLH' where_ Q = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for corrugated tuetal pipe users. L = circumference of the riser m feet H = head above riser crest in feet 2OF5 Dickson & Co. Inc. act Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2C - PH1 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 CAMP=0.6 Riser cross -sectional area, A (ft2) 25 Sx5 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1.5 Discharge, C. (cfs) 147.43 Must exceed 2-year flow OKAY 2- Ort$ce flow: Q = CA (2gHrs whem: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe nsen. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gravity, 32.2 ft/sec: H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 4.00 Table 8.07b Barrel cross -sectional area, a (ft2) 12.57 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 11.6 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 132.5 Mannings coeffienct of roughness, n 0.013 ncMP=0.025 nRCP=0.013 Inside diameter of barrel, d; (in) 48.00 Pipe friction coefficient, KP 0.00 Table 8.07a Discharge, C. (cfs) 210.87 Must exceed 2-year flow OKAY F 2gh �, c 3. Pipe Flow: Q = a L l + K. + 1{s L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity 32.2 ft/sec'- h = head above the centerline of the outlet end of the barrel Km = coefficient of minor losses. can be assumed to be 1-0 for most principal spillway systems L = barrel length in feet Kp = pipe friction coefficient: 5087n= Table 8.U7a : for Kp values for di413 common size or pipe.) n = Manning's coefficient of roughness, use n = 0-025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 tunes that of the barrel- Spillway hydraulics are improved by maximizing weir flow and minunizing orifice flow. See fable 8.07b for recommended riseubarrel proportions. 3OF5 Dickson & Co. Inc. act Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2C - PH1 EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY I PROVIDED SPILLWAY CAPACITY (Q, (Controlling Flow rate for riser/barrel) Weir coefficient, C Bottom width of spillway crest, L Depth of flow above spillway crest, H (ft) Provided Emergency spillway capacity, QQ (cfs) Total Spillway Capacity (Principal & Emergency must exceed 10 yr eve ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 7.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 49.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 8.00 Riser Outside Area (sf) 64.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 9.50 WEIGHT DISPLACE BY RISER (Ibs) 29,047.20 Area of concrete (sf) - assume 6" wall thickness 15.00 Anchor Dimension (n x n) (ft) 9.00 Riser Structure Height (ft) 9.50 Anchor Thickness (ft) 1.50 Volume of Riser concrete (cf) 142.50 Anchor Area (sf) 81.00 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 121.50 WEIGHT OF THE CONCRETE RISER (Ibs) 12,483.00 WEIGHT OF ANCHOR (Ibs) 18,225.00 WEIGHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER Revise Anchor Dimensions 4OF5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2C - PH1 SKIMMER ORIFICE SIZE Required Volume Sizing 50,076.0o Required Volume (cf) 3.00 Dewatering Time (days) 259,200.00 Dewatering Time (sec) 0.193 Q — Flow (cfs) 5.0 Skimmer Size (in) 5.0 h = Head on Skimmer (in) 9.10 A = Area of Orifice (in2) 1.70 r = Orifice radius (in) 3.41 d = Orifice Diameter (in) Orifice Equation: Q = CdA(2gh)1/2 Cd= 0.59 g = 32.2 Using 5" Skimmer with 3.75" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watertight anti -gip colt (thickness may vary depending on barrel type) with a minimum projection of 15 feet around the barrel ofprincipat spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A prorerly designed drainage diaphragm installed around the• harm my he usod instead ❑fan anti -seep collar when it is appropriate. FMRANKMF14T 5OF5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL -ription: TEMP. SKIMMER BASIN 3 - PH1 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 10.00 Do Not Use Sediment Trap Okay Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Description of surface Area (acres) % of Area 8.03b Impervious Area 0.90 0.0000 0% Wooded Area 0.15 0.0000 0% Grassed Area (Lawns w/ slopes > 7%) 0.20 0.0000 0% Disturbed area 0.60 10.0000 100% Composite Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 0.6000 5.0 7.06 42.36 Total 10 yr Flow to Sediment Basin (cfs) 42.36 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SKIMMER BASIN 3 - PH1(2-yr Rational Runoff) 10.00 0.6000 5.0 5.39 32.34 Total 2 yr Flow to Sediment Basin (cfs) 32.34 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) (sf/cfs) (sf) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 325 13,767.00 Total REQUIRED Sediment Basin Area (sf) 13,767 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ft/acre) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 1,800 18,000.00 Total REQUIRED Sediment Basin Volume (cubic feet) 18,000 1 OF 4 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 0.6000 5.0 7.06 42.36 Total 10 yr Flow to Sediment Basin (cfs) 42.36 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SKIMMER BASIN 3 - PH1(2-yr Rational Runoff) 10.00 0.6000 5.0 5.39 32.34 Total 2 yr Flow to Sediment Basin (cfs) 32.34 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) (sf/cfs) (sf) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 325 13,767.00 Total REQUIRED Sediment Basin Area (sf) 13,767 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ft/acre) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 1,800 18,000.00 Total REQUIRED Sediment Basin Volume (cubic feet) 18,000 1 OF 4 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) (sf/cfs) (sf) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 325 13,767.00 Total REQUIRED Sediment Basin Area (sf) 13,767 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ft/acre) TEMP. SKIMMER BASIN 3 - PH1(10-yr Rational Runoff) 10.00 1,800 18,000.00 Total REQUIRED Sediment Basin Volume (cubic feet) 18,000 1 OF 4 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: TEMP. SKIMMER BASIN 3 - PH1 Input Calculation Reference PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 814.00 60,279 0 0 815.00 63,298 61,782 61,782 Sediment Storage Elev. (Surface area is set at Sediment Storage Elev.) 816.00 66,356 64,821 126,603 817.00 69,453 67,899 194,502 Emergency Spillway Top of Dam 818.00 72,589 71,015 265,517 819.00 75,765 74,171 339,689 820.00 78,980 77,367 417,055 Total PROVIDED Sediment Basin Volume (cubic feet) Total PROVIDED Sediment Basin Area (square feet 126,603 OKAY 66,356 OKAY 2OF4 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: TEMP. SKIMMER BASIN 3 - PH1 Input Calculation Reference EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY PROVIDED SPILLWAY CAPACITY Q10 (Calculated) 42.36 Weir coefficient, C 3 (Controlling Flow rate for riser/barrel) 0.00 Bottom width of spillway crest, L (ft) 15 Required Emergency spillway capacity, QQ (cfs) 42.36 Depth of flow above spillway crest, H (ft) 1 Provided Emergency spillway capacity, QQ (cfs) 45.00 Total Spillway Capacity (Emergency must exceed 10 yr event) 45.00 YES, PROCEED 3OF4 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: TEMP. SKIMMER BASIN 3 - PH1 Input Calculation Reference SKIMMER ORIFICE SIZE Required Volume Sizing 18,000.00 Required Volume (cf) 3.00 Dewatering Time (days) 259,200.00 Dewaterin Time (sec) 0.069 Q — Flow (cfs) 3.0 Skimmer Size (in) 3.0 h = Head on Skimmer (in) 4.22 A = Area of Orifice (in2) 1.16 r = Orifice radius (in) 2.32 d = Orifice Diameter (in) Orifice Equation: Q = CdA(2gh)1/2 Cd= 0.59 g = 32.2 Using 3" Skimmer with 2.25" Orifice 4OF4 WK Dickson & Co. Inc. Project Name: WKD Project No.: CLT10 - Boyd Farm Site 2023006800CL TEMP. SEDIMENT BASIN 4 - PH1 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 30.71 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) Description of surface Impervious Area Wooded Area Grassed Area (Lawns w/ slopes > Disturbed area 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Area (acres) 8.03b 0.90 0.0000 0.15 0.0000 0.20 0.0000 0.60 30.7100 of Area 1 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 0.6000 5.0 7.06 130.09 Total 10 yr Flow to Sediment Basin (cfs) 130.09 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SEDIMENT BASIN 4- PH1(2-yr Rational Runoff) 30.71 0.6000 5.0 5.39 99.32 Total 2 yr Flow to Sediment Basin (cfs) 99.32 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 435 56,588.09 Total REQUIRED Sediment Basin Area (sf) F 56,588 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 1,800 55,278.00 Total REQUIRED Sediment Basin Volume (cubic feet) 55,278 1 OF 5 of Area 1 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 0.6000 5.0 7.06 130.09 Total 10 yr Flow to Sediment Basin (cfs) 130.09 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SEDIMENT BASIN 4- PH1(2-yr Rational Runoff) 30.71 0.6000 5.0 5.39 99.32 Total 2 yr Flow to Sediment Basin (cfs) 99.32 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 435 56,588.09 Total REQUIRED Sediment Basin Area (sf) F 56,588 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 1,800 55,278.00 Total REQUIRED Sediment Basin Volume (cubic feet) 55,278 1 OF 5 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 435 56,588.09 Total REQUIRED Sediment Basin Area (sf) F 56,588 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) TEMP. SEDIMENT BASIN 4 - PH1(10-yr Rational Runoff) 30.71 1,800 55,278.00 Total REQUIRED Sediment Basin Volume (cubic feet) 55,278 1 OF 5 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: TEMP. SEDIMENT BASIN 4 - PH1 Calculation l PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 816.00 63,391 0 0 817.00 69,154 66,252 66,252 818.00 74,976 72,045 138,297 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 818.50 86,794 40,406 178,703 819.00 86,794 43,397 222,100 819.50 92,791 44,888 266,988 Emergency Spillway Top of Dam 820.00 92,791 46,396 313,384 821.00 98,845 95,802 409,186 Total PROVIDED Sediment Basin Volume (cubic feet) 178,703 Total PROVIDED Sediment Basin Area (square feet 86,794 OKAY OKAY PRINCIPAL SPILLWAY CAPACITY- WEIR FLOW Weir coefficient, C 3 CAMP=3.1 3.0 for Concrete weir Riser circumference, L (ft) 24 6x6 Box Head above riser crest, H (ft) 1.5 QP (cfs) 132.27 cfs Must exceed 2-year flow OKAY Step 5. Deterrinne the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak flow for the entire watershed of the basin_ • The principal spillway is analyzed for three possible limiting flow apes: Weir floc, Orifice flow, and Pipe flow. The principal spillway discharge capacity is the smallest of these three flow rates_ Discharges through a skimmer should be disregarded during this computation- Weir_ orifice and pipe flow may be determined by the following equations; I_ Weir Flow: Q = CLHts where: Q = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for corrugated metal pipe risers - L = circumference of the riser in feet H = head above riser crest is feet 20F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL TEMP. SEDIMENT BASIN 4 - PH1 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 C,p=0.6 Riser cross -sectional area, A (ft2) 36 6x6 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1.5 Discharge, Clp (cfs) 212.30 Must exceed 2-year flow OKAY 2- Orifice Flow: Q = CA (2gHr 5 where: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe risers. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gravity; 32.2 ft/sec' H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 3.50 Table 8.07b Barrel cross -sectional area, a (ft2) 9.62 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 6 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 41.4 Mannings coeffienct of roughness, n 0.013 ncMp=0.025 nR,=0.013 Inside diameter of barrel, d; (in) 42.00 Pipe friction coefficient, Kp 0.01 Table 8.07a Discharge, Clp (cfs) 126.26 Must exceed 2-year flow OKAY 2gh p5 3. Pipe Flow: Q= a L I+ K. + l r L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity. 32.2 ft/sec'- h = head above the centefline of the outlet end of the barrel Km = coefficient of minor losses_ can be assumed to be 1.0 for most principal spillway systems L = barrel length in feet Kp = pipe friction coefficient: _ 5087n2 Table a.07a : for Kp xalues for 6413 tounuou !aze of pipe.) n = Manning's coefficient of roughness. use n = 0.025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe dl = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 times that of the barrel. Spillway hydraulics are improved by maxina�ing weir flow and minimizing orifice flow- See Table 9_07b for recommended riseribarrel proportions_ 30F5 Dickson & Co. Inc. ect Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: TEMP. SEDIMENT BASIN 4 - PHI EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY PROVIDED SPILLWAY CAPACITY Q10 (Calculated) 130.09 Weir coefficient, C 3 (Controlling Flow rate for riser/barrel) 126.26 Bottom width of spillway crest, L (ft) 20 Required Emergency spillway capacity, Q. (cfs) 3.83 Depth of flow above spillway crest, H (ft) 0.5 Provided Emergency spillway capacity, Q. (cfs) 21.21 Total Spillway Capacity (Principal & Emergency must exceed 10 yr event) 147.47 YES, PROCEED ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 6.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 36.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 7.00 Riser Outside Area (sf) 49.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 5.00 WEIGHT DISPLACE BY RISER (Ibs) 11,232.00 Area of concrete (sf) - assume 6" wall thickness 13.00 Anchor Dimension (n x n) (ft) 8.00 Riser Structure Height (ft) 5.00 Anchor Thickness (ft) 1.00 Volume of Riser concrete (cf) 65.00 Anchor Area (sf) 64.00 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 64.00 WEIGHT OF THE CONCRETE RISER (Ibs) 5,694.00 WEIGHT OF ANCHOR (Ibs) 9,600.00 WEIGHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER OK 40F5 WK Dickson & Co. Inc. Project Name: WKD Project No.: CLT10 - Boyd Farm Site 2023006800CL TEMP. SEDIMENT BASIN 4 - PH1 Calculation I SKIMMER ORIFICE SIZE Required Volume Sizing 55,278.00 Required Volume (cf) Orifice Equation: Q = CdA(2gh)1/2 3.00 Dewatering Time (days) Cd= 0.59 259,200.00 Dewaterin Time (sec) g = 32.2 0.213 Q — Flow (cfs) 4.0 Skimmer Size (in) 4.o h = Head on Skimmer (in) 11.23 A = Area of Orifice (in2) 1.89 r = Orifice radius (in) 3.78 d = Orifice Diameter (in) Using 4" Skimmer with 3.75" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) F-7.001 Provide min. two (2)T xT anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel • Protection against piping- Install at least one watertight anti-r.wp colhu (thickness may vary depending on barrel type) with a minimum projection of 15 feet around ilie barrel of principal spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A prorerly designed drainage diaphragm installed around the• harm may he usod instead ❑fan anli-seep collar when it is appmpriate. FMRANKMF14T 50F5 Dickson & Co. Inc. ect Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: TEMP. SKIMMER BASIN 5 - PH1 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 4.71 Okay Sediment Trap Okay Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT Description of surface C-value (Table Area (acres) % of Area 8.03b Impervious Area 0.90 0.0000 0% Wooded Area 0.15 0.0000 0% Grassed Area (Lawns w/ slopes > 7%) 0.20 0.0000 0% Disturbed area 0.60 4.7100 100% Composite Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 0.6000 5.0 7.06 19.95 Total 10 yr Flow to Sediment Basin (cfs) 19.95 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SKIMMER BASIN 5 - PH1(2-yr Rational Runoff) 4.71 0.6000 5.0 5.39 15.23 Total 2 yr Flow to Sediment Basin (cfs) 15.23 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 325 6,484.26 Total REQUIRED Sediment Basin Area (sf) F-6,484 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (ff/acre) (cubic feet) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 1,800 8,478.00 Total REQUIRED Sediment Basin Volume (cubic feet) 8,478 1 OF 4 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 0.6000 5.0 7.06 19.95 Total 10 yr Flow to Sediment Basin (cfs) 19.95 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) TEMP. SKIMMER BASIN 5 - PH1(2-yr Rational Runoff) 4.71 0.6000 5.0 5.39 15.23 Total 2 yr Flow to Sediment Basin (cfs) 15.23 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 325 6,484.26 Total REQUIRED Sediment Basin Area (sf) F-6,484 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (ff/acre) (cubic feet) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 1,800 8,478.00 Total REQUIRED Sediment Basin Volume (cubic feet) 8,478 1 OF 4 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 325 6,484.26 Total REQUIRED Sediment Basin Area (sf) F-6,484 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (ff/acre) (cubic feet) EMP. SKIMMER BASIN 5 - PH1(10-yr Rational Runoff) 4.71 1,800 8,478.00 Total REQUIRED Sediment Basin Volume (cubic feet) 8,478 1 OF 4 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: TEMP. SKIMMER BASIN 5 - PH1 nput Calculation Reference PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. Sediment Storage Elev. (Surface area is set at Sediment Storage Elev.) Emergency Spillway Top of Dam 877.00 10,889 0 0 878.00 12,667 11,767 11,767 879.00 14,501 13,574 25,340 880.00 16,392 15,437 40,777 881.00 18,339 17,356 58,134 882.00 20,343 19,332 77,466 883.00 22,404 21,365 98,831 Total PROVIDED Sediment Basin Volume (cubic feet) 25,340 Total PROVIDED Sediment Basin Area (square feet 14,501 OKAY OKAY 2OF4 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: TEMP. SKIMMER BASIN 5 - PH1 nput Calculation Reference EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY I PROVIDED SPILLWAY CAPACITY (Controlling Flow rate for riser/barrel) 0.00 Bottom width of spillway crest, L (ft) iuired Emergency spillway capacity, QQ (cfs) 19.95 Depth of flow above spillway crest, H (ft) Provided Emergency spillway capacity, QQ (cfs) Total Spillway Capacity (Emergencv must exceed 10 PROCEED 3OF4 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: TEMP. SKIMMER BASIN 5 - PH1 nput Calculation Reference SKIMMER ORIFICE SIZE Reauired Volume Sizine 8,478.00 Required Volume (cf) 3.00 Dewatering Time (days) 259,200.00 Dewatering Time (sec) 0.033 Q — Flow (cfs) 2.0 Skimmer Size (in) 2.0 h = Head on Skimmer (in) 2.44 A = Area of Orifice (in2) 0.88 r = Orifice radius (in) 1.76 d = Orifice Diameter (in) Orifice Equation: Q = CdA(2gh)1/2 Cd= 0.59 g = 32.2 Using 2" Skimmer with 1.75" Orifice 4OF4 PHASE TWO WK Dickson & Co. Inc. Project Name: WKD Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PH2 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 9.49 Do Not Use Sediment Trap Okay Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) Description of surface Impervious Area Wooded Area Grassed Area (Lawns w/ slopes > Disturbed area 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Area (acres) 8.03b 0.90 0.15 0.0000 0.20 0.0000 0.60 17.2100 of Area I 181A Runoff Coefficient 1.09 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) M. SEDIMENT BASIN 1- PH2(10-yr Rational Runoff) 9.49 1.0881 5.0 7.06 72.90 Total 10 yr Flow to Sediment Basin (cfs) 72.90 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 1- PH2(2-yr Rational Runoff) 9.49 1.0881 5.0 5.39 55.66 Total 2 yr Flow to Sediment Basin (cfs) 55.66 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 1- PH2(10-yr Rational Runoff) 9.49 435 31,712.18 Total REQUIRED Sediment Basin Area (sf) 31,712 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 1- PH2(10-yr Rational Runoff) 17.21 1,800 30,978.00 Total REQUIRED Sediment Basin Volume (cubic feet) 30,978 1 OF 5 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: PERM. SEDIMENT BASIN 1- PH2 Calculation I PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 819.00 44,234 0 0 820.00 46,548 45,386 45,386 821.00 48,906 47,722 93,108 822.00 51,306 50,101 143,209 822.50 52,523 25,957 169,166 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 823.00 53,750 26,568 195,734 823.50 54,988 27,184 222,918 Emergency Spillway 824.00 56,236 27,805 250,723 Top of Dam 825.00 58,766 57,496 308,219 Total PROVIDED Sediment Basin Volume (cubic feet) 169,166 Total PROVIDED Sediment Basin Area (square feet 52,523 OKAY OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C 3 CcMP=3.1 3.0 for Concrete weir Riser circumference, L (ft) 24 6x6 Box Head above riser crest, H (ft) 1 QP (cfs) 72.00 cfs Must exceed 2-year flow OKAY Step 5. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak flow- for the entire watershed of the basin_ • The principal spillway is analyzed for three possible limiting flow types: Weir flow, Orifice flow, and Pipe flow. The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a slimmer should be disregarded during this computation. Weir, orifice and pipe flow may be determined by the following equations: 1_ Weir Flows Q = CLH' where: Q = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for corrugated metal pipe risers. L = circumference of the nser in feet H = head above riser crest in feet 20F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PH2 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 C,p=0.6 Riser cross -sectional area, A (ft2) 36 6x6 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1 Discharge, CIP (cfs) 173.34 Must exceed 2-year flow OKAY 2- Orifice Flow: Q = CA (2gHr 5 where: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe risers. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gratiiry; 32.2 ft/sec' H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 2.50 Table 8.07b Barrel cross -sectional area, a (ft2) 4.91 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 15 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 83.9 Mannings coeffienct of roughness, n 0.013 ncMp=0.025 nR,=0.013 Inside diameter of barrel, d; (in) 30.00 Pipe friction coefficient, KP 0.01 Table 8.07a Discharge, CIP (cfs) 91.61 Must exceed 2-year flow OKAY -)gh C 3 Pipe Flow- Q= a� 1+ g„ t K L] where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity, 32.2 ft/sec'- h = head above the centerline of the outlet end of the barrel Km = coefficient of minor losses, can be assumed to be 1.0 for most principal spillway systems l = barrel length in feet Kp = pipe friction coefficient: 5087n2 Table &.07a ' for KR values for 01 cvrrunun sue 42i pipe-) n = Maiming's coefficient of roughness, use n = 0.025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 times that of the barrel. Spilhvay hydraulics are improved by maxnmi2:ing weir flow and minimizing orifice flow_ See Table 8.07b for recommended riserrbarrel proportions. 30F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PH2 EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY PROVIDED SPILLWAY CAPACITY Q10 (Calculated) 72.90 Weir coefficient, C 3 (Controlling Flow rate for riser/barrel) 72.00 Bottom width of spillway crest, L (ft) 15 Required Emergency spillway capacity, Q. (cfs) 0.90 Depth of flow above spillway crest, H (ft) 0.5 Provided Emergency spillway capacity, Q. (cfs) 15.91 Total Spillway Capacity (Principal & Emergency must exceed 10 yr event) 87.91 YES, PROCEED Inside Dimensions (ft) - square conc structure only Inside Area (sf) Outside Dimensions (ft) - square conc structure only r Outside Area (sf) r Structure Height (ft) GHT DISPLACE BY RISER ANTI -FLOTATION ANCHOR 7.001 update area calculations for rectangular or circular riser structures Area of concrete (sf) - assume 6" wall thickness"15.768.00 Riser Structure Height (ft) Volume of Riser concrete (cf) Net Displaced by the Riser (Ibs/cf) WEIGHT OF THE CONCRETE RISER fibs) GHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER Density of concrete (Ibs/cf) Density of water (Ibs/cf) Anchor Dimension (n x n) (ft) Anchor Thickness (ft) Anchor Area (sf) Anchor Volume (cf) WEIGHT OF ANCHOR fibs) 40F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 1- PH2 SKIMMER ORIFICE SIZE Required Volume Sizing 30,978.00 Required Volume (cfs) Orifice Equation: Q = CdA(2gh)1/2 3.00 Dewatering Time (days) Cd= 0.59 259,200.00 Dewaterin Time (sec) g = 32.2 0.120 Q = Flow (cfs) 4.0 Skimmer Size (In) 4.o h = Head on Skimmer (in) 6.3o A = Area of Orifice (in2) 1.42 r = Orifice radius (in) 2.83 d = Orifice Diameter (in) Using 4" Skimmer with 3" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watenighl anti -gip colhu (thickness may vary depending on barrel type) with a minimum projection of 15 feet around ilie barrel of principal spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A rrorerly designed drainage diaphragms installed around the barrel may he uwd instead Oran anti -seep collar when it is appn)priate. FMRANKMF14T 50F5 WK Dickson & Co. Inc. Project Name: WKD Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2A- PH2 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 53.46 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) Description of surface Impervious Area Wooded Area Grassed Area (Lawns w/ slopes > Disturbed area 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Area (acres) 8.03b 0.90 0.0000 0.15 0.0000 0.20 0.0000 0.60 53.4600 of Area 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH2(10-yr Rational Runoff) 53.46 0.6000 5.0 7.06 226.46 Total 10 yr Flow to Sediment Basin (cfs) 226.46 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH2(2-yr Rational Runoff) 53.46 0.6000 5.0 5.39 172.89 Total 2 yr Flow to Sediment Basin (cfs) 172.89 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 2A - PH2(10-yr Rational Runoff) 53.46 435 98,508.60 Total REQUIRED Sediment Basin Area (sf) 98,509 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 2A- PH2(10-yr Rational Runoff) 53.46 1,800 96,228.00 Total REQUIRED Sediment Basin Volume (cubic feet) 96,228 1 OF 5 of Area 10051 Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH2(10-yr Rational Runoff) 53.46 0.6000 5.0 7.06 226.46 Total 10 yr Flow to Sediment Basin (cfs) 226.46 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2A - PH2(2-yr Rational Runoff) 53.46 0.6000 5.0 5.39 172.89 Total 2 yr Flow to Sediment Basin (cfs) 172.89 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 2A - PH2(10-yr Rational Runoff) 53.46 435 98,508.60 Total REQUIRED Sediment Basin Area (sf) 98,509 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 2A- PH2(10-yr Rational Runoff) 53.46 1,800 96,228.00 Total REQUIRED Sediment Basin Volume (cubic feet) 96,228 1 OF 5 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: PERM. SEDIMENT BASIN 2A - PH2 Calculation l PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 819.00 118,166 0 0 820.00 121,801 119,979 119,979 821.00 125,490 123,641 243,620 822.00 129,232 127,356 370,976 822.50 131,123 65,088 436,064 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 823.00 133,028 66,037 502,102 Emergency Spillway Top of Dam 823.50 134,945 66,993 569,094 824.00 136,877 67,955 637,049 825.00 140,780 138,824 775,873 Total PROVIDED Sediment Basin Volume (cubic feet) 436,064 Total PROVIDED Sediment Basin Area (square feet 131,123 OKAY 1 OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C M264.54 CAMP=3.1 3.0for Concrete weir Riser circumference, L (ft) 12x12 Box Head above riser crest, H (ft)QP (cfs) cfs Must exceed 2-year flow OKAY Step S. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak floc for the entire watershed of the basin. • The principal spillway is analyzed for three possible limiting flow types: Weir flow, Orifice flow, and Pipe flow. The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a Skimmer should be disregarded during tins computation- Weir orifice and pipe flow may be detemuned by the following equations: 1- Weir Flow: Q = CLH� 6 where: 0 = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for corrugated metal pipe risers. L = circumference of the riser in feet i-1= head above riser crest in feet 20F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2A- PH2 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 C,p=0.6 Riser cross -sectional area, A (ft2) 144 12x12 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1.5 Discharge, Clp (cfs) S49.18 Must exceed 2-year flow OKAY 2- Orifice Flow: Q = CA (2gHr 5 where: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe risers. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gravity; 32.2 ft/sec' H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 6.00 Table 8.07b Barrel cross -sectional area, a (ft2) 28.27 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 13 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 78.3 Mannings coeffienct of roughness, n 0.013 ncMp=0.025 nR,=0.013 Inside diameter of barrel, d; (in) 72.00 Pipe friction coefficient, Kp 0.00 Table 8.07a Discharge, Clp (cfs) 548.49 Must exceed 2-year flow OKAY 2gh o < 3. Pipe Flow: Q = a L I + K. + K, L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity. 32.2 ft/sec'- h = head above the centefline of the outlet end of the barrel Km = coefficient of minor losses_ can be assumed to be 1.0 for most principal spillway systems L = barrel length in feet Kp = pipe friction coefficient: _ 5087n2 Table a.07a : for Kp xalues for 6413 tounuou !aze 01 pipe.) n = IMAnniag's coefficient of roughness. use n = 0.025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe dl = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 times that of the barrel. Spillway hydraulics are improved by maxina�ing weir flow and mininizzi ,g orifice flow- See Table 9_07b for recommended riseribarrel proportions_ 30F5 Dickson & Co. Inc. ect Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2A- PH2 EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY PROVIDED SPILLWAY CAPACITY Q10 (Calculated) 226.46 Weir coefficient, C 3 (Controlling Flow rate for riser/barrel) 264.54 Bottom width of spillway crest, L (ft) 15 Required Emergency spillway capacity, Q. (cfs) -38.09 Depth of flow above spillway crest, H (ft) 0.5 Provided Emergency spillway capacity, Q. (cfs) 15.91 Total Spillway Capacity (Principal & Emergency must exceed 10 yr event) 280.45 YES, PROCEED ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 12.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 144.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 13.00 Riser Outside Area (sf) 169.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 11.50 WEIGHT DISPLACE BY RISER (Ibs) 103,334.40 Area of concrete (sf) - assume 6" wall thickness 25.00 Anchor Dimension (n x n) (ft) 14.50 Riser Structure Height (ft) 11.50 Anchor Thickness (ft) 3.00 Volume of Riser concrete (cf) 287.50 Anchor Area (sf) 210.25 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 630.75 WEIGHT OF THE CONCRETE RISER (Ibs) 25,185.00 WEIGHT OF ANCHOR (Ibs) 94,612.50 WEIGHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER OK 40F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2A- PH2 SKIMMER ORIFICE SIZE Required Volume Sizing 96,228.00 Required Volume (cf) Orifice Equation: Q = CdA(2gh)1/2 3.00 Dewatering Time (days) Cd= 0.59 259,200.00 Dewaterin Time (sec) g = 32.2 0.371 Q = Flow (cfs) 5.0 Skimmer Size (in) s.o h = Head on Skimmer (in) 17.49 A = Area of Orifice (in2) 2.36 r = Orifice radius (in) 4.72 d = Orifice Diameter (in) Using 5" Skimmer with 4.75" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watenighl anti -gip colhu (thickness may vary depending on barrel type) with a minimum projection of 15 feet around ilie barrel of principal spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A rrorerly designed drainage diaphragms installed around the barrel may he uwd instead Oran anti -seep collar when it is appn)priate. FMRANKMF14T 50F5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2B - PH2 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 41.02 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Description of surface Area (acres) % of Area 8.03b Impervious Area 0.90 0.0000 0% Wooded Area 0.15 0.0000 0% Grassed Area (Lawns w/ slopes > 7%) 0.20 0.0000 0% 10 Disturbed area 0.60 41.0200 0% Composite Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 0.6000 5.0 7.06 173.76 Total 10 yr Flow to Sediment Basin (cfs) 173.76 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2B - PH2(2-yr Rational Runoff) 41.02 0.6000 5.0 5.39 132.66 Total 2 yr Flow to Sediment Basin (cfs) 132.66 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 435 75,585.91 Total REQUIRED Sediment Basin Area (sf) 75,586 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 1,800 73,836.00 Total REQUIRED Sediment Basin Volume (cubic feet) 73,836 1 OF 5 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 0.6000 5.0 7.06 173.76 Total 10 yr Flow to Sediment Basin (cfs) 173.76 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2B - PH2(2-yr Rational Runoff) 41.02 0.6000 5.0 5.39 132.66 Total 2 yr Flow to Sediment Basin (cfs) 132.66 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 435 75,585.91 Total REQUIRED Sediment Basin Area (sf) 75,586 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 1,800 73,836.00 Total REQUIRED Sediment Basin Volume (cubic feet) 73,836 1 OF 5 REQUIRED SURFACE AREA Drainage Area Area Required Total Area Required Basin (acres) (sf/cfs) (sf) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 435 75,585.91 Total REQUIRED Sediment Basin Area (sf) 75,586 REQUIRED VOLUME Volume Basin Required Disturbed Area Total Volume Required (acres) (ft/acre) (cubic feet) ERM. SEDIMENT BASIN 2B - PH2(10-yr Rational Runoff) 41.02 1,800 73,836.00 Total REQUIRED Sediment Basin Volume (cubic feet) 73,836 1 OF 5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2B - PH2 PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 824.00 90,646 0 0 825.00 94,146 92,390 92,390 826.00 97,697 95,916 188,306 827.00 101,298 99,492 287,799 827.50 103,118 51,103 338,902 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 828.00 104,950 52,016 390,918 Emergency Spillway Top of Dam 828.50 106,795 52,936 443,854 829.00 108,652 53,861 497,715 830.00 112,405 110,523 608,238 Total PROVIDED Sediment Basin Volume (cubic feet) 338,902 Total PROVIDED Sediment Basin Area (square feet 103,118 OKAY OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C 3 CAMP=3.1 3.0 for Concrete weir Riser circumference, L (ft) 32 8x8 Box Head above riser crest, H (ft) 1.5 QP (cfs) 176.36 cfs Must exceed 2-year flow OKAY Step 5. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak flow for the entire watershed of the basin. • The principal spillway is analyzed for three possible limiting flow types: Weir flow, Orifice flow, and Pipe flow. The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a skimmer should be disregarded during this computation_ Weir, orifice and pipe flow may be determined by the follo%-Mg equations- 1- Weir Flow: Q = CLH' 5 where: Q = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for corrugated metal pipe nsers. L = circumference of the riser in feet H = head above nsef crest in feet 2OF5 Dickson & Co. Inc. act Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 213 - PH2 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 CAMP=0.6 Riser cross -sectional area, A (ft2) 64 8x8 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1.5 Discharge, C. (cfs) 377.42 Must exceed 2-year flow OKAY 2- Ort$ce flow: Q = CA (2gHrs whem: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe nsen. A = cross -sectional area of the riser pipe in square feet g = acceleration due to gravity, 32.2 ft/sec: H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 4.00 Table 8.07b Barrel cross -sectional area, a (ft2) 12.57 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 14.4 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 71.52 Mannings coeffienct of roughness, n 0.013 ncMP=0.025 nRCP=0.013 Inside diameter of barrel, d; (in) 48.00 Pipe friction coefficient, KP 0.005 Table 8.07a Discharge, C. (cfs) 249.50 Must exceed 2-year flow OKAY F 2gh 0? 3. Pipe Flow: Q = a L l + K. + 1{s L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity 32.2 ft/sec'- h = head above the centerline of the outlet end of the barrel Km = coefficient of minor losses. can be assumed to be 1-0 for most principal spillway systems L = barrel length in feet Kp = pipe friction coefficient: 5087n= Table 8.U7a : for Kp values for di413 common size or pipe.) n = Manning's coefficient of roughness, use n = 0-025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inches Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 tunes that of the barrel- Spillway hydraulics are improved by maximizing weir flow and minunizing orifice flow. See fable 8.07b for recommended riseubarrel proportions. 3OF5 Dickson & Co. Inc. act Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2B - PH2 EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY I PROVIDED SPILLWAY CAPACITY 173.76 Weir coefficient, C Flow rate for riser/barrel) 176.36 Bottom width of spillway crest, L Depth of flow above spillway crest, H (ft) Provided Emergency spillway capacity, QQ (cfs) Total Spillway Capacity (Principal & Emergency must exceed 10 yr eve ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 8.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 64.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 9.00 Riser Outside Area (sf) 81.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 1200. WEIGHT DISPLACE BY RISER (Ibs) 47,923.20 Area of concrete (sf) - assume 6" wall thickness 17.00 Anchor Dimension (n x n) (ft) 11.00 Riser Structure Height (ft) 12.00 Anchor Thickness (ft) 2.00 Volume of Riser concrete (cf) 204.00 Anchor Area (sf) 121.00 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 242.00 WEIGHT OF THE CONCRETE RISER (Ibs) 17,870.40 WEIGHT OF ANCHOR (Ibs) 36,300.00 WEIGHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER OK 4OF5 Dickson & Co. Inc. act Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2B - PH2 SKIMMER ORIFICE SIZE Required Volume Sizing 73,836.0o Required Volume (cf) 3.00 Dewatering Time (days) 259,200.00 Dewatering Time (sec) 0.285 Q — Flow (cfs) 5.0 Skimmer Size (in) 5.0 h = Head on Skimmer (in) 13.42 A = Area of Orifice (in2) 2.07 r = Orifice radius (in) 4.13 d = Orifice Diameter (in) Orifice Equation: Q = CdA(2gh)1/2 Cd= 0.59 g = 32.2 Using 5" Skimmer with 4.25" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watertight anti -gip colt (thickness may vary depending on barrel type) with a minimum projection of 15 feet around the barrel ofprincipat spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A prorerly designed drainage diaphragm installed around the• harm my he usod instead ❑fan anti -seep collar when it is appropriate. FMRANKMF14T 5OF5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2C - PH2 GOVERNING REVIEW AGENCY NCDEQ TOTAL DRAINAGE AREA 31.66 Do Not Use Sediment Trap Do Not Use Skimmer Basin Okay Sediment Basin RAINFALL INTENSITIES (in/hr) 7.06 10-yr Taken from NOAA Atlas 14, Volume 2, Version 3 for Newton, North Carolina, USA 5.39 2-yr RATIONAL RUNOFF COEFFICIENT C-value (Table Description of surface Area (acres) % of Area 8.03b Impervious Area 0.90 0.0000 0% Wooded Area 0.15 0.0000 0% Grassed Area (Lawns w/ slopes > 7%) 0.20 0.0000 0% Disturbed area 0.60 31.6600 100% Composite Runoff Coefficient 0.60 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 0.6000 5.0 7.06 134.11 Total 10 yr Flow to Sediment Basin (cfs) 134.11 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2C - PH2(2-yr Rational Runoff) 31.66 0.6000 5.0 5.39 102.39 Total 2 yr Flow to Sediment Basin (cfs) 102.39 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 435 58,338.62 Total REQUIRED Sediment Basin Area (sf) F 58,339 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 1,800 56,988.00 Total REQUIRED Sediment Basin Volume (cubic feet) 56,988 1 OF 5 10-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 0.6000 5.0 7.06 134.11 Total 10 yr Flow to Sediment Basin (cfs) 134.11 2-yr. RATIONAL RUNOFF Basin Composite C Area Time of Concentration, Tc Intensity, I Flow, Q (acres) (min) (in/hr) (cfs) PERM. SEDIMENT BASIN 2C - PH2(2-yr Rational Runoff) 31.66 0.6000 5.0 5.39 102.39 Total 2 yr Flow to Sediment Basin (cfs) 102.39 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 435 58,338.62 Total REQUIRED Sediment Basin Area (sf) F 58,339 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 1,800 56,988.00 Total REQUIRED Sediment Basin Volume (cubic feet) 56,988 1 OF 5 REQUIRED SURFACE AREA Basin Drainage Area Area Required Total Area Required (acres) MAN (A PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 435 58,338.62 Total REQUIRED Sediment Basin Area (sf) F 58,339 REQUIRED VOLUME Volume Disturbed Area Total Volume Required Basin Required (acres) (cubic feet) (ff/acre) PERM. SEDIMENT BASIN 2C - PH2(10-yr Rational Runoff) 31.66 1,800 56,988.00 Total REQUIRED Sediment Basin Volume (cubic feet) 56,988 1 OF 5 WK Dickson & Co. Inc. Project Name: CLT10 - Boyd Farm Site WKD Project No.: 2023006800CL Description: PERM. SEDIMENT BASIN 2C - PH2 Calculation l PROVIDED VOLUME Elevation Area Inc. Vol. Acc Vol. 854.00 59,567 0 0 855.00 62,374 60,965 60,965 856.00 65,237 63,800 124,765 857.00 68,157 66,692 191,457 857.50 69,637 34,448 225,905 Riser Weir Elev. (Surface area is set at Riser Weir Elev) 858.00 71,132 35,192 261,096 Emergency Spillway Top of Dam 858.50 72,641 35,943 297,039 859.00 74,164 36,701 333,740 860.00 77,252 75,703 409,442 Total PROVIDED Sediment Basin Volume (cubic feet) 225,905 Total PROVIDED Sediment Basin Area (square feet 69,637 OKAY OKAY PRINCIPAL SPILLWAY CAPACITY - WEIR FLOW Weir coefficient, C 3 CAMP=3.1 3.0 for Concrete weir Riser circumference, L (ft) 24 6x6 Box Head above riser crest, H (ft) 1.5 QP (cfs) 132.27 cfs Must exceed 2-year flow OKAY Step S. Determine the principal spillway discharge capacity. • The combined capacities of the principal and emergency spillways must be at least the 10-year peak floc for the entire watershed of the basin. • The principal spillway is analyzed for three possible !uniting flow types: Weir flow, Orifice flow, and Pipe flow. The principal spillway discharge capacity is the smallest of these three flow rates. Discharges through a Skimmer should be disregarded during tins computation- Weir orifice and pipe flow may be detemuned by the following equations: 1- Weir Flow: Q = CLH� 6 where: 0 = discharge in cubic feet per second (cfs) C = weir coefficient, use 3.1 for corrugated metal pipe risers. L = circumference of the riser in feet H = head above riser crest in feet 20F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2C - PH2 PRINCIPAL SPILLWAY CAPACITY - ORIFICE FLOW Orifice coefficient, Co 0.6 C,p=0.6 Riser cross -sectional area, A (ft2) 36 6x6 Box Can be either Round or Square Section Accleration due to gravity, g (ft/s2) 32.2 Head above riser crest, H (ft) 1.5 Discharge, Clp (cfs) 212.30 Must exceed 2-year flow OKAY 2- Orifice Flow: Q = CA (2gHr 5 where: Q = discharge in cubic feet per second (cfs) C = orifice coefficient. use C = 0.6 for corrugated metal pipe risers. A = cross -sectional area of the riser pipe in square feet g = acceleration due to graiity; 32.2 ft/sec' H = head above riser crest in feet PRINCIPAL SPILLWAY CAPACITY - PIPE FLOW Barrel diameter (ft) 4.00 Table 8.07b Barrel cross -sectional area, a (ft2) 12.57 Acceleration due to gravity, g (ft/s2) 32.2 Head above outlet end of barrel, h (ft) 11.6 Minor loss coefficieint, Km 1.0 Km 1.0 (typical) Barrel length, L (ft) 132.5 Mannings coeffienct of roughness, n 0.013 ncMp=0.025 nR,=0.013 Inside diameter of barrel, d; (in) 48.00 Pipe friction coefficient, Kp 0.00 Table 8.07a Discharge, Clp (cfs) 210.87 Must exceed 2-year flow OKAY 1..i. p 5 3. Pipe Flow: Q = a 1 + iti E++'I+r L where: Q = discharge in cubic feet per second (cfs) a = cross -sectional area of the barrel in square feet g = acceleration due to gravity- 32.2 Wsee h = head above the centerline of the outlet end of the barrel Km = coefficient of minor losses. can be assumed to be 1-0 for most principal spilhvay systems L = barrel length in feet Ko = pipe friction coefficient: _ 5087n2 Table S.07a ' for K, values for 6413 common %1ze or pipe.) n = Manning's coefficient of roughness, tine n = 0.025 for corrugated metal pipe n = 0.015 for reinforced concrete pipe di = inside diameter of the barrel in inclies Select riser and barrel dimensions so that the riser has a cross -sectional area at least 1.5 times that of the barrel. Spillway hydraulics are improved by maximizing weir flow and minimizing orifice flow- See Table 8.07b for recommended riser/barrel proportions. 30F5 Dickson & Co. Inc. ect Name: CLT10 - Boyd Farm Site ) Project No.: 2023006800CL :ription: PERM. SEDIMENT BASIN 2C - PH2 EMERGENCY SPILLWAY CAPACITY Q10 FLOW & REQUIRED EMERGENCY SPILLWAY CAPACITY PROVIDED SPILLWAY CAPACITY Q10 (Calculated) 134.11 Weir coefficient, C 3 (Controlling Flow rate for riser/barrel) 132.27 Bottom width of spillway crest, L (ft) 20 Required Emergency spillway capacity, Q. (cfs) 1.84 Depth of flow above spillway crest, H (ft) 0.5 Provided Emergency spillway capacity, Q. (cfs) 21.21 Total Spillway Capacity (Principal & Emergency must exceed 10 yr event) 153.49 YES, PROCEED ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 7.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 49.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 8.00 Riser Outside Area (sf) 64.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 9.50 WEIGHT DISPLACE BY RISER (Ibs) 29,047.20 Area of concrete (sf) - assume 6" wall thickness 15.00 Anchor Dimension (n x n) (ft) 9.00 Riser Structure Height (ft) 9.50 Anchor Thickness (ft) 1.50 Volume of Riser concrete (cf) 142.50 Anchor Area (sf) 81.00 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 121.50 WEIGHT OF THE CONCRETE RISER (Ibs) 12,483.00 WEIGHT OF ANCHOR (Ibs) 18,225.00 WEIGHT OF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER Revise Anchor Dimensions 40F5 Dickson & Co. Inc. ect Name: ) Project No.: CLT10 - Boyd Farm Site 2023006800CL PERM. SEDIMENT BASIN 2C - PH2 SKIMMER ORIFICE SIZE Required Volume Sizing 56,988.00 Required Volume (cf) Orifice Equation: Q = CdA(2gh)1/2 3.00 Dewatering Time (days) Cd= 0.59 259,200.00 Dewaterin Time (sec) g = 32.2 0.220 Q = Flow (cfs) 5.0 Skimmer Size (in) s.o h = Head on Skimmer (in) 10.36 A = Area of Orifice (in2) 1.82 r = Orifice radius (in) 3.63 d = Orifice Diameter (in) Using 5" Skimmer with 3.75" Orifice ANTI -SEEP COLLAR Anti -Seep Collar Size (ft x ft) 7.00 Provide min. two (2) Tx T anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel Protection against piping- Install at least one watenighl anti -gip colhu (thickness may vary depending on barrel type) with a minimum projection of 15 feet around ilie barrel of principal spillway conduits, 8 inches or larger in diameter. Locate the anti -seep collar slightly downstream from the dam rcntcr Iinc. A rrorerly designed drainage diaphragms installed around the barrel may he uwd instead Oran anti -seep collar when it is appn)priate. FMRANKMF14T 50F5 BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPENDIX 1- ENVIRONMENTAL JUSTICE EPA EJSCREEN ACS Summary Report Location: Blockgroup:370350117022 Ring (buffer): 0-mile radius Description: Summary of ACS Estimates Population Population Density (per sq. mile) People of Color Population % People of Color Population Households Housing Units Housing Units Built Before 1950 Per Capita Income Land Area (sq. miles) (Source: SF1) % Land Area Water Area (sq. miles) (source: SF1) % Water Area Population by Race Total Population Reporting One Race White Black American Indian Asian Pacific Islander Some Other Race Population Reporting Two or More Races Total Hispanic Population Total Non -Hispanic Population White Alone Black Alone American Indian Alone Non -Hispanic Asian Alone Pacific Islander Alone Other Race Alone Two or More Races Alone Populati Sex Male Female Population by Age Age 0-4 Age 0-17 Age 18+ Age 65+ 2016 - 2020 Percent ACS Estimates 2,461 100% 2,400 98% 2,077 84% 84 3% 16 1% 183 7% 0 0% 40 2% 61 2% 117 5% 2,344 2,077 84% 68 3% 16 1% 183 7% 0 0% 0 0% 0 0% Data Note: Detail may not sum to totals due to rounding. Hispanic population can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020 1,290 324 1,824 52% 48% 13% 26% 74% 17% 2016 - 2020 2,461 108 384 16% 806 845 11 26,297 22.88 99% 0.23 1% MOE (±) 538 886 476 98 28 205 13 66 101 145 476 96 28 205 13 13 13 307 - 2861 149 214 347 137 February 23, 2023 1/3 4ft EJSCREEN ACS Summary Report n.ircs �i r� MT1 a;�wif. VV axx, Location: Blockgroup:370350117022 Ring (buffer): 0-mile radius Description: Population 25+ by Educational Attainment Total Less than 9th Grade 9th - 12th Grade, No Diploma High School Graduate Some College, No Degree Associate Degree Bachelor's Degree or more Population Age 5+ Years by Ability to Speak English Total Speak only English Non -English at Home1+2+3+4 'Speak English "very well" 2Speak English "well" 'Speak English "not well" 4Speak English "not at all" 1+4Speak English "less than well" 2+3+4Speak English "less than very well" Linguistically Isolated Households* Total Speak Spanish Speak Other Indo-European Languages Speak Asian -Pacific Island Languages Speak Other Languages Households by Household Income Household Income Base < $15,000 $15,000 - $25,000 $25,000 - $50,000 $50,000 - $75,000 $75,000 + Occupied Housing Units by Tenure Total Owner Occupied Renter Occupied Employed Population Age 16+Years Total In Labor Force Civilian Unemployed in Labor Force Not In Labor Force 2016 - 2020 ACS Estimates 1,668 34 571 168 2,137 2,03' 98 51 22 25 0 25 47 22 0 0 22 0 Percent MOE (±) 100% 343 1% 30 2% 37 41% 210 34% 200 11% 116 10% 86 100% 441 1 95%�01 5% 104 2% 62 1% 43 1% 43 0% 13 1% 43 2% 59 100% 43 0% 0% 13 100% 41 0% 13 806 100% 159 2% 24 26 3% 45 20% 102 246 31% 121 44% 1� 806 100% 159 255 32% 128 Data Note: Datail may not sum to totals due to rounding. Hispanic population can be of anyrace. N/A means not available. Source: U.S. Census Bureau, American Community Survey (ACS) *Households in which no one 14 and over speaks English "very well" or speaks English only. 1,849 100% 348 1,342 10 1% 19 507 198 February 23,2023 2/3 r►A� EJSCREEN ACS Summary Report Location: Blockgroup:370350117022 Ring (buffer): 0-mile radius Description: 2016 - 2020 Percent ACS Estimates Population by Language Spoken at Home* Total (persons age S and above) English Spanish French, Haitian, or Cajun German or other West Germanic Russian, Polish, or Other Slavic Other Indo-European Korean Chinese (including Mandarin, Cantonese) Vietnamese Tagalog (including Filipino) Other Asian and Pacific Island Arabic Other and Unspecified Total Non -English Data Note: Detail may not sum to totals due to rounding. Hispanic popultion can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020. *Population by Language Spoken at Home is available at the census tract summary level and up. MOE (±) 6,811 100% 747 6,045 89% 702 630 9% 385 0 0% 18 17 0% 27 0 0% 19 11 0% 18 0 0% 19 0 0% 19 0 0% 19 0 0% 19 100 1% 107 0 0% 19 8 0% 15 766 11 % 1,025 February 23, 2023 3/3 EPA EJSCREEN ACS Summary Report Location: Blockgroup:370350117021 Ring (buffer): 0-mile radius Description: Summary of ACS Estimates Population Population Density (per sq. mile) People of Color Population % People of Color Population Households Housing Units Housing Units Built Before 1950 Per Capita Income Land Area (sq. miles) (Source: SF1) % Land Area Water Area (sq. miles) (source: SF1) % Water Area 2016 - 2020 ACS Estimates Population by Race Total Population Reporting One Race White Black American Indian Asian Pacific Islander Some Other Race Population Reporting Two or More Races Total Hispanic Population Total Non -Hispanic Population White Alone Black Alone American Indian Alone Non -Hispanic Asian Alone Pacific Islander Alone Other Race Alone Two or More Races Alone Populati Sex Male Female Population by Age Age 0-4 Age 0-17 Age 18+ Age 65+ Data Note: Detail may not sum to totals due to rounding. Hispanic population can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020 1,849 1,849 1,685 86 1 18 0 59 0 345 1,504 1,388 86 1 18 - 0 11 o L 813 22 268 1,581 T 435 2016 - 2020 1,849 382 461 25% 822 822 28 38,156 4.84 99% 0.04 1% Percent MOE (±) 100% 100% 91% 5% 0% 1% 0% 3% 0% 19% 44% 56% 1% 14% 86% 24% 520 ' 690 493 88 3 36 13 57 13 293 373 88 3 36 13 18 13 241 37 142 362 185 February 23, 2023 1/3 4ft EJSCREEN ACS Summary Report n.ircs �i r� MT1 a;�wif. VV axx, Location: Blockgroup:370350117021 Ring (buffer): 0-mile radius Description: Population 25+ by Educational Attainment Total Less than 9th Grade 9th - 12th Grade, No Diploma High School Graduate Some College, No Degree Associate Degree Bachelor's Degree or more Population Age 5+ Years by Ability to Speak English Total Speak only English Non -English at Home1+2+3+4 'Speak English "very well" 2Speak English "well" 'Speak English "not well" 4Speak English "not at all" 1+4Speak English "less than well" 2+3+4Speak English "less than very well" Linguistically Isolated Households* Total Speak Spanish Speak Other Indo-European Languages Speak Asian -Pacific Island Languages Speak Other Languages Households by Household Income Household Income Base < $15,000 $15,000 - $25,000 $25,000 - $50,000 $50,000 - $75,000 $75,000 + Occupied Housing Units by Tenure Total Owner Occupied Renter Occupied Employed Population Age 16+Years Total In Labor Force Civilian Unemployed in Labor Force Not In Labor Force 2016 - 2020 Percent MOE (±) ACS Estimates 1,334 100% 332 89 7% 71 182 14% 149 293 22% 112 266 20% 164 166 12% 78 338 25% 183 1,827 100% 514 1,485 81% 350 342 19% 235 236 13% 170 19 1% 33 87 5% 73 0 0% 13 87 5% 73 106 6% 79 18 100% 38 0 0% 0 0% 13 18 100% 36 0 0% 13 822 100% 258 37 5% 50 127 15% 145 100 12% 60 256 31% 165 302 37% 186M 822 100% 258 Data Note: Datail may not sum to totals due to rounding. Hispanic population can be of anyrace. N/A means not available. Source: U.S. Census Bureau, American Community Survey (ACS) *Households in which no one 14 and over speaks English "very well" or speaks English only. 52 6% 45 1,664 100% 482 327 83 5% 100 262 February 23,2023 2/3 r►A� EJSCREEN ACS Summary Report Location: Blockgroup:370350117021 Ring (buffer): 0-mile radius Description: 2016 - 2020 Percent ACS Estimates Population by Language Spoken at Home* Total (persons age S and above) English Spanish French, Haitian, or Cajun German or other West Germanic Russian, Polish, or Other Slavic Other Indo-European Korean Chinese (including Mandarin, Cantonese) Vietnamese Tagalog (including Filipino) Other Asian and Pacific Island Arabic Other and Unspecified Total Non -English Data Note: Detail may not sum to totals due to rounding. Hispanic popultion can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020. *Population by Language Spoken at Home is available at the census tract summary level and up. MOE (±) 6,811 100% 747 6,045 89% 702 630 9% 385 0 0% 18 17 0% 27 0 0% 19 11 0% 18 0 0% 19 0 0% 19 0 0% 19 0 0% 19 100 1% 107 0 0% 19 8 0% 15 766 11 % 1,025 February 23, 2023 3/3 EPA EJSCREEN ACS Summary Report Location: Blockgroup:370350117023 Ring (buffer): 0-mile radius Description: Summary of ACS Estimates Population Population Density (per sq. mile) People of Color Population % People of Color Population Households Housing Units Housing Units Built Before 1950 Per Capita Income Land Area (sq. miles) (Source: SF1) Land Area Water Area (sq. miles) (source: SF1) % Water Area Population by Race Total Population Reporting One Race White Black American Indian Asian Pacific Islander Some Other Race Population Reporting Two or More Races Total Hispanic Population Total Non -Hispanic Population White Alone Black Alone American Indian Alone Non -Hispanic Asian Alone Pacific Islander Alone Other Race Alone Two or More Races Alone Populati Sex Male Female Population by Age Age 0-4 Age 0-17 Age 18+ Age 65+ 2016 - 2020 1,022 356 77 8% 492 492 46 36,201 2.87 99% 0.02 1% 2016 - 2020 Percent MOE (±) ACS Estimates 1,022 100% 414 980 96% ' 485 945 92% 386 0 0% 13 8 1% 15 0 0% 13 0 0% 13 27 3% 45 42 4% 64 27 3% 45 995 945 92% 386 0 0% 13 8 1% 15 0 0% 13 0 0% 13 0 0% 13 42 4% 64 417 41% 179 59% 42 4% 65 106 10% 96 916 90% 337 156 15% 137 Data Note: Detail may not sum to totals due to rounding. Hispanic population can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020 February 23, 2023 1/3 4ft EJSCREEN ACS Summary Report n.ircs �i r� MT1 a;�wif. VV axx, Location: Blockgroup:370350117023 Ring (buffer): 0-mile radius Description: Population 25+ by Educational Attainment Total Less than 9th Grade 9th - 12th Grade, No Diploma High School Graduate Some College, No Degree Associate Degree Bachelor's Degree or more Population Age 5+ Years by Ability to Speak English Total Speak only English Non -English at Home1+2+3+4 'Speak English "very well" 2Speak English "well" 'Speak English "not well" 4Speak English "not at all" 1+4Speak English "less than well" 2+3+4Speak English "less than very well" Linguistically Isolated Households* Total Speak Spanish Speak Other Indo-European Languages Speak Asian -Pacific Island Languages Speak Other Languages Households by Household Income Household Income Base < $15,000 $15,000 - $25,000 $25,000 - $50,000 $50,000 - $75,000 $75,000 + Occupied Housing Units by Tenure Total Owner Occupied Renter Occupied Employed Population Age 16+Years Total In Labor Force Civilian Unemployed in Labor Force Not In Labor Force 2016 - 2020 Percent MOE (±) ACS Estimates 889 100% 386 11 1% 23 96 11% 132 395 44% 238 96 11% 86 193 1'7R 98 11% 75 980 35 35 0 0 0 0 0 0 0 0 0 0 100% 383 96% OW01 4% 49 4% 49 0% 13 0% 13 0% 13 0% 13 0% 13 0% 13 0% 13 13 0% 13 492 100% 209 3% 29 85 17% 131 19% 72 54 11% 68 49% 492 100% 209 Data Note: Datail may not sum to totals due to rounding. Hispanic population can be of anyrace. N/A means not available. Source: U.S. Census Bureau, American Community Survey (ACS) *Households in which no one 14 and over speaks English "very well" or speaks English only. 74 15% 74 916 100% 386 80% 383 85 9% 80 20% 125 February 23,2023 2/3 r►A� EJSCREEN ACS Summary Report Location: Blockgroup:370350117023 Ring (buffer): 0-mile radius Description: 2016 - 2020 Percent ACS Estimates Population by Language Spoken at Home* Total (persons age S and above) English Spanish French, Haitian, or Cajun German or other West Germanic Russian, Polish, or Other Slavic Other Indo-European Korean Chinese (including Mandarin, Cantonese) Vietnamese Tagalog (including Filipino) Other Asian and Pacific Island Arabic Other and Unspecified Total Non -English Data Note: Detail may not sum to totals due to rounding. Hispanic popultion can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020. *Population by Language Spoken at Home is available at the census tract summary level and up. MOE (±) 6,811 100% 747 6,045 89% 702 630 9% 385 0 0% 18 17 0% 27 0 0% 19 11 0% 18 0 0% 19 0 0% 19 0 0% 19 0 0% 19 100 1% 107 0 0% 19 8 0% 15 766 11 % 1,025 February 23, 2023 3/3 EPA EJSCREEN ACS Summary Report Location: Blockgroup:370350116013 Ring (buffer): 0-mile radius Description: Summary of ACS Estimates Population Population Density (per sq. mile) People of Color Population % People of Color Population Households Housing Units Housing Units Built Before 1950 Per Capita Income Land Area (sq. miles) (Source: SF1) % Land Area Water Area (sq. miles) (source: SF1) % Water Area Population by Race Total Population Reporting One Race White Black American Indian Asian Pacific Islander Some Other Race Population Reporting Two or More Races Total Hispanic Population Total Non -Hispanic Population White Alone Black Alone American Indian Alone Non -Hispanic Asian Alone Pacific Islander Alone Other Race Alone Two or More Races Alone Populati Sex Male Female Population by Age Age 0-4 Age 0-17 Age 18+ Age 65+ 2016 - 2020 1,363 307 521 38% 338 391 87 21,361 4.43 100% 0.01 0% 2016 - 2020 Percent MOE (±) ACS Estimates 1,363 100% 398 1,074 79% 369 909 67% 247 _ 165 12% 70 0 0% 13 0 0% 13 0 0% 13 - 0 0% 13 289 21% 254 75 6% 116 1,288 842 62% 255 157 12% 69 0 0% 13 0 0% 13 0 0% 13 0 0% 13 289 21% 254 847 62% 234 38% 113 8% 105 353 26% 162 1,010 74% 188 193 14% 68 Data Note: Detail may not sum to totals due to rounding. Hispanic population can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020 February 23, 2023 1/3 ift EPA .. EJSCREEN ACS Summary Report Location: Blockgroup:370350116013 Ring (buffer): 0-mile radius Description: Population 25+ by Educational Attainment Total Less than 9th Grade 9th - 12th Grade, No Diploma High School Graduate Some College, No Degree Associate Degree Bachelor's Degree or more Population Age 5+ Years by Ability to Speak English Total Speak only English Non -English at Home1+2+3+4 'Speak English "very well" 2Speak English "well" 'Speak English "not well" 4Speak English "not at all" 1+4Speak English "less than well" 2+3+4Speak English "less than very well" Linguistically Isolated Households* Total Speak Spanish Speak Other Indo-European Languages Speak Asian -Pacific Island Languages Speak Other Languages Households by Household Income Household Income Base < $15,000 $15,000 - $25,000 $25,000 - $50,000 $50,000 - $75,000 $75,000 + Occupied Housing Units by Tenure Total Owner Occupied Renter Occupied Employed Population Age 16+Years Total In Labor Force Civilian Unemployed in Labor Force Not In Labor Force 2016 - 2020 Percent MOE (±) ACS Estimates 921 100% 182 3% 36 68 7% 48 33% 69 284 31% 106 15% 76 104 PMEW 11% 63 1,250 100% 297 96% W54 54 4% 60 31 2% 42 14 1% 28 9 1% 22 0 0% 13 9 1% 22 23 2% 33 0 0% 13 0 0 0% 13 0 —IMEMENNE13 0 0% 13 338 100% 88 9 3% 19 27 8% 28 64 19% 39 45 13% 29 M 57% 97 338 100% 88 Data Note: Datail may not sum to totals due to rounding. Hispanic population can be of anyrace. N/A means not available. Source: U.S. Census Bureau, American Community Survey (ACS) *Households in which no one 14 and over speaks English "very well" or speaks English only. 13 4% 16 1,048 100% 232 202 0 0% 13 123 February 23,2023 2/3 r►A� EJSCREEN ACS Summary Report Location: Blockgroup:370350116013 Ring (buffer): 0-mile radius Description: 2016 - 2020 Percent ACS Estimates Population by Language Spoken at Home* Total (persons age S and above) English Spanish French, Haitian, or Cajun German or other West Germanic Russian, Polish, or Other Slavic Other Indo-European Korean Chinese (including Mandarin, Cantonese) Vietnamese Tagalog (including Filipino) Other Asian and Pacific Island Arabic Other and Unspecified Total Non -English Data Note: Detail may not sum to totals due to rounding. Hispanic popultion can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020. *Population by Language Spoken at Home is available at the census tract summary level and up. MOE (±) 4,708 100% 687 4,074 87% 731 593 13% 293 0 0% 13 8 0% 12 0 0% 13 0 0% 13 0 0% 13 0 0% 13 0 0% 13 0 0% 13 33 1% 55 0 0% 13 0 0% 13 634 13% 1,003 February 23, 2023 3/3 EPA EJSCREEN ACS Summary Report Location: Blockgroup:370350116021 Ring (buffer): 0-mile radius Description: Summary of ACS Estimates Population Population Density (per sq. mile) People of Color Population % People of Color Population Households Housing Units Housing Units Built Before 1950 Per Capita Income Land Area (sq. miles) (Source: SF1) % Land Area Water Area (sq. miles) (source: SF1) % Water Area Population by Race Total Population Reporting One Race White Black American Indian Asian Pacific Islander Some Other Race Population Reporting Two or More Races Total Hispanic Population Total Non -Hispanic Population White Alone Black Alone American Indian Alone Non -Hispanic Asian Alone Pacific Islander Alone Other Race Alone Two or More Races Alone Populati Sex Male Female Population by Age Age 0-4 Age 0-17 Age 18+ Age 65+ 2016 - 2020 Percent ACS Estimates 820 100% 820 100% 712 87% 0 0% 0 0% 59 7% 0 0% 49 6% 0 0% 0 0% 820 712 87% 0 0% 0 0% 59 7% 0 0% 49 6% 0 0% Data Note: Detail may not sum to totals due to rounding. Hispanic population can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020 363 49 677 44% 56% 6% 17% 83% 24% 2016 - 2020 820 607 108 13% 397 397 64 24,952 1.35 100% 0.01 0% MOE (±) 266 436 252 13 13 82 13 63 13 13 252 13 13 82 63 MM 161 ow 64 100 223 111 February 23, 2023 1/3 ift EPA .. EJSCREEN ACS Summary Report Location: Blockgroup:370350116021 Ring (buffer): 0-mile radius Description: Population 25+ by Educational Attainment Total Less than 9th Grade 9th - 12th Grade, No Diploma High School Graduate Some College, No Degree Associate Degree Bachelor's Degree or more Population Age 5+ Years by Ability to Speak English Total Speak only English Non -English at Home1+2+3+4 'Speak English "very well" 2Speak English "well" 'Speak English "not well" 4Speak English "not at all" 1+4Speak English "less than well" 2+3+4Speak English "less than very well" Linguistically Isolated Households* Total Speak Spanish Speak Other Indo-European Languages Speak Asian -Pacific Island Languages Speak Other Languages Households by Household Income Household Income Base < $15,000 $15,000 - $25,000 $25,000 - $50,000 $50,000 - $75,000 $75,000 + Occupied Housing Units by Tenure Total Owner Occupied Renter Occupied Employed Population Age 16+Years Total In Labor Force Civilian Unemployed in Labor Force Not In Labor Force 2016 - 2020 Percent MOE (±) ACS Estimates 664 100% 209 27 4% 34 113 17% 101 228 34% 118 52 8% 54 104 16% 0 82 140 21% 114 771 100% 250 100 13% 97 41 5% 59 8% 83 0 0% MM 0 0% 13 0 0% 1s 59 8% 83 0 0% 13 0 0 0% 13 0 13 0 0% 13 397 100% 119 78 20% 60 16 4% 31 160 40% 107 23 6% 40 397 100% 119 Data Note: Datail may not sum to totals due to rounding. Hispanic population can be of anyrace. N/A means not available. Source: U.S. Census Bureau, American Community Survey (ACS) *Households in which no one 14 and over speaks English "very well" or speaks English only. 48 12% 48 690 100% 214 39 6% 48 February 23,2023 2/3 r►A� EJSCREEN ACS Summary Report Location: Blockgroup:370350116021 Ring (buffer): 0-mile radius Description: 2016 - 2020 Percent ACS Estimates Population by Language Spoken at Home* Total (persons age S and above) English Spanish French, Haitian, or Cajun German or other West Germanic Russian, Polish, or Other Slavic Other Indo-European Korean Chinese (including Mandarin, Cantonese) Vietnamese Tagalog (including Filipino) Other Asian and Pacific Island Arabic Other and Unspecified Total Non -English Data Note: Detail may not sum to totals due to rounding. Hispanic popultion can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020. *Population by Language Spoken at Home is available at the census tract summary level and up. MOE (±) 4,636 100% 639 4,478 97% 658 27 1% 42 0 0% 13 41 1% 66 0 0% 13 0 0% 13 59 1% 82 0 0% 13 0 0% 13 0 0% 13 31 1 % 45 0 0% 13 0 0% 13 158 3% 917 February 23, 2023 3/3 EPA EJSCREEN ACS Summary Report Location: Blockgroup:370350117024 Ring (buffer): 0-mile radius Description: Summary of ACS Estimates Population Population Density (per sq. mile) People of Color Population % People of Color Population Households Housing Units Housing Units Built Before 1950 Per Capita Income Land Area (sq. miles) (Source: SF1) Land Area Water Area (sq. miles) (source: SF1) % Water Area Population by Race Total Population Reporting One Race White Black American Indian Asian Pacific Islander Some Other Race Population Reporting Two or More Races Total Hispanic Population Total Non -Hispanic Population White Alone Black Alone American Indian Alone Non -Hispanic Asian Alone Pacific Islander Alone Other Race Alone Two or More Races Alone Populati Sex Male Female Population by Age Age 0-4 Age 0-17 Age 18+ Age 65+ 2016 - 2020 726 267 144 20% 304 384 69 30,503 2.72 99% 0.03 1% 2016 - 2020 Percent MOE (±) ACS Estimates 726 100% 284 100% - 601 83% 289 76 10% 68 0 0% 13 1 0 0% 13 0 0% 13 49 7% 79 0 0% 13 68 9% 86 658 582 80% 287 76 10% 68 0 0% 13 0 0% 13 0 0% 13 0 0% 13 0 0% 13 369 51% 168 jllllv� 49% 136 80 11% 78 162 22% 109 564 78% 181 165 23% 95 Data Note: Detail may not sum to totals due to rounding. Hispanic population can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020 February 23, 2023 1/3 4ft EJSCREEN ACS Summary Report ��-n.ircs�a�'a MT1 a;�wif. - - Location: Blockgroup:370350117024 Ring (buffer): 0-mile radius Description: 2016 - 2020 Percent MOE (±) ACS Estimates Population 25+ by Educational Attainment Total Less than 9th Grade 9th - 12th Grade, No Diploma High School Graduate Some College, No Degree Associate Degree Bachelor's Degree or more Population Age 5+ Years by Ability to Speak English Total Speak only English Non -English at Home1+2+3+4 'Speak English "very well" 2Speak English "well" 'Speak English "not well" 4Speak English "not at all" 1+4Speak English "less than well" 2+3+4Speak English "less than very well" Linguistically Isolated Households* Total Speak Spanish Speak Other Indo-European Languages Speak Asian -Pacific Island Languages Speak Other Languages Households by Household Income Household Income Base < $15,000 $15,000 - $25,000 $25,000 - $50,000 $50,000 - $75,000 $75,000 + Occupied Housing Units by Tenure Total Owner Occupied Renter Occupied Employed Population Age 16+Years Total In Labor Force Civilian Unemployed in Labor Force Not In Labor Force Data Note: Datail may not sum to totals due to rounding. Hispanic population can be of anyrace. N/A means not available. Source: U.S. Census Bureau, American Community Survey (ACS) *Households in which no one 14 and over speaks English "very well" or speaks English only. 564 100% 218 3 1% 17 38 7% 61 146 26% 84 183 32% 104 123 22% 0 119 71 13% 55 646 100% 229 50 85%�18 96 15% 76 77 12% 68 19 3% 36 0 0% 13 0 0% 13 0 0% 13 19 3% 36 0 0% 13 0 0 0% 13 0 13 0 0% 13 304 100% 111 10% 34 24 8% 31 19% 63 18 6% 30 57°/6 304 100% 111 80 26% 70 564 100% 218 2 0% 9 154 February 23,2023 2/3 r►A� EJSCREEN ACS Summary Report Location: Blockgroup:370350117024 Ring (buffer): 0-mile radius Description: 2016 - 2020 Percent ACS Estimates Population by Language Spoken at Home* Total (persons age S and above) English Spanish French, Haitian, or Cajun German or other West Germanic Russian, Polish, or Other Slavic Other Indo-European Korean Chinese (including Mandarin, Cantonese) Vietnamese Tagalog (including Filipino) Other Asian and Pacific Island Arabic Other and Unspecified Total Non -English Data Note: Detail may not sum to totals due to rounding. Hispanic popultion can be of any race. N/A meansnot available. Source: U.S. Census Bureau, American Community Survey (ACS) 2016 - 2020. *Population by Language Spoken at Home is available at the census tract summary level and up. MOE (±) 6,811 100% 747 6,045 89% 702 630 9% 385 0 0% 18 17 0% 27 0 0% 19 11 0% 18 0 0% 19 0 0% 19 0 0% 19 0 0% 19 100 1% 107 0 0% 19 8 0% 15 766 11 % 1,025 February 23, 2023 3/3 Clarion Ledger Home Data Central (1) 1 American Community Survey (American -community -survey) Search Median Household Income Total Number North Carolina Catawba County v Percent in change compare to 2010-14 ACS 5-year Summary v V View or Compare Two Areas —> {lmerican-community-surveylcomparelmedian-household-inoomeltotallnuml05000US370351na1} 2019 American Community Survey 5-Year Estimates Catawba County, North Carolina: Median Household Income Median household income in the past 12 months (in 2019 inflation-adjused dollars) Other Areas in Catawba County, North Carolina U.S. Median Household Income: $62,943 (2019) prune Pine Marion Lenoir Taylorsville Harmony Mo Statesville Morganton t _ - ft- 4k, Mooresville Lincolnton Kannapc Huntersv ile Con @ Mapeox(https:/hnvw,mapbox.00mlaboutlmapsl) 0OpenStreetMap (hops:lhvww.openstmetmap.nrglaboutl) Less than MK $30K - $35K $35K - $40K $40K - $45K $45K - $50K $50K- $55K $55K- $60K $60K - $65K More than $65K NIA — Back to County -by -county Map (lamerican-community-surveylnorth-Carolina!median-household-incomeltotal/num104000U5371) More About Catawba County, North Carolina —{lamerican-oommunity-surveylcatawba-county-north-caroiinalmed ian-household- incomeltota4ln u m105000 US370 35(a real] Race Two Area Total White Black Asian Indian Islander Other or More United States (lamerican-comrrrunity- 62,843 66,536 41,935 88,204 43.825 63,613 49,221 59,184 survey/united-states/median-household- 17.5% ts.9% 17.8 % 20.4% 17.9% 19.2%t 22.1°% 24.3% in©omeltotallnum1010000S1) t t t t ♦ t t North Carolina (lamerican-community- 54.602 60,845 39,108 84,513 40,272 44,740 40,405 49,025 survey!north-carolinalmedian-household- 16.9% 17.1 % 18.8% 25.9% 28.0°% -9.2%4 25.6% 28.5% incomeltotallnum104000US371) ♦ t t ♦ t t Catawba County, North Caratina 52,456 55,051 37,840 67,176 33,500 58,475 (lamerican-community-surveylcatawba- 14 7% 14.4% 36.T% 38.7% 17.0% 59A^6 county-north-caroiinalmedian-household- t ♦ t ♦ t t i ncomeltotailn u m105000 U 537035/) Block Group 1, Census Tract 101.01, 70.090 Catawba County, North Carolina 67.8% (lame rice n-community-surveylblack-group- t 1-censu s-tract-10101-Catawba -cou nty- n orth-carol i nalmedian-h ousehold- i n comeltotallnu nV 15000U S3703501010111) Block Group 2, Census Tract 101.01. 93,315 Catawba County. North Carolina 78.3% (lame rican-community-surveylblack-group- t 2-censu s-tract-10101-catawba-cou nty- n orth-Caro l i nalmed ian-h ousehold- i ncome/tota Ilnum115000US370350101012J) Mock Group 3, Census Tract 101.01, 46,438 Catawba County, North Carolina •2.3%4 (la me Hca n-community-su rveylblock-g rou p- 3-census-tract 10101-Catawba-county- north-carol i nalmed ian-house hold- i ncomeltota Ilnum115000U S3 703501010131) Block Group 4, Census Tract 101.01, 47,105 Catawba County, North Carolina -4.0%Z (la merica n-community-su rveyl block-grou p- 4-census-tract-10101-Catawba-county- north-caroll nalmed ian-h ouse hold- i ncomeltota I1num11500OU S3 703501010141) Origin White, Hispania Not Hispanic 51,811 68,785 22.2%t 16.0%t 42,397 62,036 21.3%t 17.3%f 35,348 55,284 10.9%t 13A°%t Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group ' , Census Tract 101.02, 49,375 Catawba County, North Carolina 7.2%,t (la me rica n -community-su rveylblock-grou p- 1-census-tract-10102-Catawba-caunty- n orth-carol i nalmed ian-h ous ehold- I ncomeltota Unum115000U S 3 703501010211) Block Group 2, Census Tract 101.02. 39,427 Catawba County, North Carolina -24.6% (lamerican-community-surveylblock-group41 - 2-censu s-tract-10102-ratawba-cou nty- n orth-carp I i nalmedian-h ousehoid- inoomel4o Vnum11SON U53703501010221j Black Group 3, Census Tract 101.02. 70,278 Catawba County, North Carolina 43.3% (lamerican-community-surveylblock-group- t 3-censu s4ract- 10 1 02-catawba-cou nty- north-caroi i nalmed ian-h ousehold- i ncomehota)lnumll 5000U S3703501010231) Block Group I, Census Tract 102.01, 47,548 Catawba County, North Carolina 5.1%♦ (lameriC n-community-surveylblock-group- 1-census-tract-10201-Catawba-county- north-carol inalmed ian-h ouse hoid- i n com ellotaUnu m115 000U 53703501020111) Block Group 2, Census Tract 102.01, 58,400 Catawba County, North Carolina 75.0% (lamerican-community-surveylblock-group- t 2-census-tract-10201-ratawba-co unty- north-caroll nalmed ian-h ouse hoid- i ncomeltota I1num115000U53703501020121) Block Group 3, Census Tract 102.01. 55,887 Catawba County, North Carolina 18.9% (lamerican-community-surveylblock-group- t 3-census-tract 10201-Catawba-county- north-carol i nalmed ian-household- i ncomeltota llnum115000U 53703501020131) Black Group 1, Census Tract 102.02, 56,371 Catawba County, North Carolina 5.7%t (lamerican-community-surveylblock group- 1-censu s-tract-10202-Catawba-cou nty- nort h-caroi i nalmed ian-household- i ncomeltata Ilnumll 50fl0U5 3703501020211) Black Group 2, Census Tract 102.02, 51,875 Catawba County, North Carolina 46.9% (/american-community-surveylblock-group- t 2-censu s-tract-10202-ratawba-ca u n ty- north-car(3i i nalmed ian-h ousehold- i noomeltota Ilnum11500OUS3703501020221} Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group 3, Census Tract 102.02, 54,741 Catawba County, North Carolina 51.7% (lamerican-community-surveylblock-group- ! 3-census-tract 10202-Catawba-county- n orth-carol i nalmed ian-h ous ehold- i ncomeltota I1num115000U S 3 703501020231) Block Group 4, Census Tract 102.02. 62,059 Catawba County, Forth Carolina 50.7% (lamerican-community-surveytblock-group- t 4-censu s-tract-10202-ratawba-cou nty- n orth-Caro l i nalmedian-h ouse hoid- i ncomeltotailnum115000 US3703501020241) Block Group I, Census Tract 103.01, 44,599 Catawba County, North Carolina 7.1%4t (la merican -community-su rveyl block-g rou p- 1-censu s4ract-10301-Catawba-cou nty- north-carol i nalmed ian-h ouseh old- incomeltotallnumll 8000US3703501030111) Block Group 2, Census Tract 103.01, 62,121 Catawba County, Forth Carolina 44.8% (/american-community-surveylblock-group- 't 2-censu s-tract-10301-Catawba-rou nty- north-carol inalmed ian-h ouse hold- i ncomehotailnum115000US3 703501030121j Block Group 3, Census Tract 103.01, 73,542 Catawba County, North Carolina 18.9% (lamerican-community-surveylblock-group- t 3-census-tract-10301-Catawba -co u n ty- north-carol I nalmed ian-h ouse haid- mcomelteta llnum1150OOUS3703501030131) Block Group 1, Census Tract 103.02, 67.375 Catawba County, North Carolina 5.0%♦ (la me rica n-community-su rveyl block-grou p- 1-census-tract I0302-Catawba-county- north-carol i nalmed ian-househoid- i ncomeltata llnumll 51)00U 53703501030211) Block Group 2, Census Tract 103.02, 56,435 Catawba County, North Carolina -13.4% (lamerican-community-surveylblock group- i 2-tens u s-tract-10302-Catawba-cou n ty- n ort h-caroi i nalmed ian-house hold- s ncomeltota 11num115000US 3703501030221) Block Group 3, Census Tract 103.02, 46,328 Catawba County. North Carolina -1.i%� (la me dea n-cam munity-surveylblock-gro up- 3-censu s-tract-10302-ratawba-co u n ty- north-carpi i nalmed ian-household- i noomellota Ilnuml15000US3703501030231) Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group ' , Census Tract 103.03, 53,750 Catawba County, North Carolina -9.7%♦ (1a me rica n -community-surveylblock-gro u p- 1-census-tract-10303-Catawba-county- n orth-caroli nalmed ian-h ous ehold- i noomeltota Ilnum115000U S 37035010 30311) Block Group 2, Census Tract 103.03, 38,365 Catawba County. North Carolina -9.7%4 (la me rica n -community-su rveytblock-g rou p- 2-censu s-tract-10303-catawba-cou nty- n orth-carol i nalmedian-househoid- i ncomeltotallnum115004US37035010 30321) Block Group 1, Census Tract 103.04, 52.344 Catawba County, North Carolina 53.5% (lamerican-community-surveylblock-group- It 1-censu s4ract-10304-catawba-cou nty- north-Caro; i nalmed lan-h ouseh old- i ncomeltotallnumll 5000U S37035010 30411) Block Group 2, Census Tract 103,04, 30,667 Catawba County, Forth Carolina -2A.9% (lamerican-community-surveylblock-group- Y 2-censu s-tract-10304-Catawba-cou nty- north-carol inalmed ian-h ouse hold- i ncomehotallnum115000US3 703501030421) Block Group 3, Census Tract 103.04, 39,500 Catawba County, North Carolina -15.8% (lamerican-community-surveylblock-group- 3-censu s-tract-10304-Cataw ba -co u nty- north-carol I nalmed ian-h ouse hoid- mcomeltota 11num115000US3703501030431) Block Group 1, Census Tract 104.01. 52.857 Catawba County, North Carolina 8.60k t (la menca n-community-su rveyl block-group- 1-census-tract 10401-Catawba-county- north-carol i nalmed ian-household- i n com eltota Ilnuml l 5 000U S3703501040111) Block Group 2, Census Tract 104.01, 50,545 Catawba County, North Carolina 3.2%t (lame rice n-community-surveylblock group- 2-censu s-tract-10401-Catawba-cou nty- north-Caroi i nalmed ian-household- i ncomeltota Ilnumll 5000US 3703501040121) Block Group 3, Census Tract 104,01, 32,985 Catawba County. North Carolina 10.9% (lamerican-commun4-surveylblock-group41 - 3-censu s-tract-10401-ratawba-oa u n ty- north-carol i nalmed ian-h ousehold- I noomeltota Ilnum115000US 3703501040131) Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group ' , Census Tract 104.02, 31.173 Catawba County, North Carolina 42.4% (lamerican-community-surveylblock-group- t 1-census-tract-10402-Catawba-county- n orth-carol I nalmed ian-h ous ehold- i ncomeltota Ilnum115000U S 3 703501040211) Block Group 2, Census Tract 104.02, 37,045 Catawba County. North Carolina 51.4°% (lamerican-community-surveylblock-group- 2-censu s-tract-10402-catawba-cou nty- n orth-taro I i nalmedian-househoid- i ncomeltotallnum115DDGUS3743501040221) Block Group 1, Census Tract 105,01. 68,750 Catawba County, North Carolina -31.8% (lamerican-community-surveylblock-group- I& 1-censu s4ract-10501-Catawba-cou nty- north-tarot i nalmed ian-h ouseh old- i n com eltotallnu nit 15 000U S3703501050111) Block Group 2, Census Tract 105,01, 71,765 Catawba County, North Carolina -20.8% (/amerir n-community-surveylblock-group- 2-Censu s-tract-10501-Catawba-cou nty- north-carol inalmed ian-h ouse hold- i n comeltotallnuml1500OUS3 703501050121) Block Group 3, Census Tract 105,01, 85,812 Catawba County, North Carolina 93.4% (lamerican-community-surveylblock-group- t 3-census-tract-10601-Catawba-co unty- north-taro! I nalmed ian-h ouse hoid- t ncomelteta 11num115000US370350105013/) Block Group 1, Census Tract 105.02. 138.750 Catawba County, North Carolina 41.6% (lamedcan-Community-surveylblock-group- t 1-census-tract 10502-Catawba-county- north-carol inalmed ian-househoid- i ncomeltota Ilnum115UOOU 53703501050211) Block Group 2, Census Tract 105.02, 55,781 Catawba County, North Carolina -2.2%4 (lamerican-community-surveylblock group- 2-censu s-tract-10502-Catawba-cou nty- nort h-Carol i nalmed ian-house hold- 1 ncomeltota Ilnumll 5COOU53703501050221) Block Group 1, Census Tract 106, Catawba 81,135 County, North Carolina (lamerican- 5C7% community-s urvey /block-g roup- 1 -census- tract- 1 06-catawba-cou my -no rth- carol i nalmed ion-h ousehold- i ncomeltota Ilnum)15000US3703501060011j Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Black Group 2, Census Tract 106, Catawba 52,005 County, North Carolina (lamerican- 41.0% community-survey/block-group-2-census- tract- 1 06-calawba-cou n ty-no rth- carol i nalmed ian-h ous ehold- i ncomeltota I1num115000U S 3703501060021) Black Group 3, Census Tract 106, Catawba 38,287 County, North Carolina (lamerican- -e.S% community-surveylblock--group-3-census41 - tract-106-catawba-cou n ty-no rth- cara l i nalmed ian-h ousehold- i ncom eltutallnum1150 00 US3703501060031) Block Group 4, Census Tract 106, Catawba 26,104 County, North Carolina (lamerican- 1.8%t community-s u rvey bblock-grou p-4-census- tract-106-Catawba -co u my -no rth- carol i nalmed lan-h ouse h old- i ncomeltutallnum115000U 53703501060041) Black Group 1, Census Tract 107, Catawba 30,240 County, North Carolina {lamerican- -14.7% community-surveylblock-group-1-census- tract-10 7-Catawba-cou n ty-north- carol i nalmed ian-house hold- i ncomeltota Ilnum115000U S 3 7035010 70 011] Black Group 2, Census Tract 107, Catawba 28,125 County, North Carolina (lamerican--5.6954 community -survey (block-g rou p-2-census- tract-10 7-Catawba-cou my -no rth- caroll nalmed ian-h ouse hold - I ncome/totallnum/ 15000U 53703501070021) Black Group 3, Census Tract 107, Catawba 43,365 County, North Carolina (lamerican- 89.7% community-surveylblock-group-3-census- t tract-10 7-Catawba-cou my -no rth- carol i nalmed ian-household- i ncomeltota Ilnumll 5000U S 370350107003/) Block Group 1, Census Tract 109, Catawba 23,375 County, North Carolina (lamerican- -9.7%4 community-s u rvey (block-grou p- l -census- tract 109-catawba-county-north- carol i nalmedian-household- i ncomeltota Ilnum115000US3703501090011) Block Group 2, Census Tract 109, Catawba 21,813 County, North Carolina {lamerican- 1&9% community-surveylblock-group-2-census- } tract- 1 09-calawba-cou my -north - carol i nalmed ion-h ousehoid- I ncomeltota Ilnum)15000US3703501090021} Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Stock Group 1, Census Tract 110. Catawba 28,807 County, North Carolina (lamerican- .10.7% community-surveylhlock-group-1-census- tract-110-catawba-county-north- carol i nalmed ian-household- i ncom eltota Ilnum115 OOOU S3703501100011 ) Block Group 2, Census Tract 110, Catawba 31,742 County. North Carolina (lamerican- 4.9%t community-su rveylblock-group-2-census- tract-11 acatawba-county-north- caral i nalmed ian-h ouse hold- i n cam eltotallnu m115 000U 53703501100021) Block Group 1, Census Tract 111.01, 51,250 Catawba County, North Carolina 25.0% (lamerican-community-surveylblock-group- It 1-cen sus-tract-11101-Catawba-cou nty- north-carol i nalmed ian-h ouse h old- incomeltotalln u ml15000 US370 3 50 1110 111) Block Group 2, Census Tract 111.01, 68.194 Catawba County, North Carotina 32.5% (lamerican-community-surveylblock-group- t 2-cen sus-tract-11101-Catawba-cou nty- north-carol inalmed ian-h ouse hold- inco meltotalln u m115000 US370350111012/) Block Group 1, Census Tract 111,02, 47,109 Catawba County, North Carolina 1.6%t (la merica n -community-su rveylblock-grou p- 1-census-tract-11102-catawba-county- n orth-carol I nalmed ian-h ouse hoid- inco meltotalln urn/ 15000 US3703601110211) Block Group 2, Census Tract 111.02, 33,949 Catawba County, North Carolina 5.3%t (la merica n-community-su rveyl block-grou p- 2-census-tract-11 i 02-Catawba-county- north-carol i nalmed ian-household- Incomeltatalln urn/ 15000 US3703501110221) Block Group 3, Census Tract 111.02, 54,135 Catawba County, North Carolina 31.9% (lamerican-community-surveylblock group t 3-census-tract-11102-Catawba-cou nty- nort h-carol i nalmed ian-household- Incomeltota Iln uml15000 US3703501110231) Block Group 4, Census Tract 111.02, 70,727 Catawba County, North Carolina 31.2% (lamerican-community-surveylblock-group- t 4-cen sus-tract-11102-Catawba-cou nty- north-carol i nalmed ian-h ouse hold- inco meltotalln uml15000 US3703501110241) Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group 1, Census Tract 112. Catawba 37,491 County, North Carolina (lamerican- 43.4% community-surveylhloek-group-l-census- r tract-112-catawba-county-no rth- carol i nalmed ian-household- i ncom eltota Ilnunn115 000U S3703501120011 ) Block Group 2, Census Tract 112, Catawba 76,551 County, North Carolina (lamerican- 6&2% community-surveylblock-group-2-census- t tract-112-catawba-county-no rth- carol i nalmed ian-house hold - in com eltvtallnu ml15040U 53703501120021) Block Group 3, Census Tract 112, Catawba 71,522 County, North Carolina (lamerican- 221.9% community-surveylblock-group-3-census- t tract-112-catawba-county-north- carQl i nalmed ian-h ouse h old- i n comeltotallnu m115 OOOU S3703501120031) Block Group 4, Census Tract 112, Catawba 55,889 County, North Carolina (lamerican- 2.0%t community-su rvey /block-group-4-census- tract-112-catawba-cou n ty-north- caroi inalmed ian-h ouse hold- i ncom eltotallnu m115 00OU 53703501120041] Block Group 1, Census Tract 113, Catawba 50,789 County, North Carolina (lamerican- 65.0% community-surveylblock-group-l-census- tract-113-catawba-cou n ty-no rth- caroll nalmed ian-h ouse hold - in com eltotal/nu m115 OOOU S37035011 300 11) Black Group 2, Census Tract 113, Catawba 4500 County, North Carolina (lamerican- -17.6% community-surveylblock-group-2-census- # tract-113-catawba-cou n ty-no rth- carol i nalmed !an -household - in com eRota llnu ml15 00OU S370350113 0021) Block Group 3, Census Tract 113, Catawba 32,350 County, North Carolina (lamerican- 34.5% community-surveylblock-group-3-census- tract- 113 catawba-county-north- carol i nalmed ian-h ouse hold - in com eltota Ilnu rn/15 000U S3703501130031) Block Group 1, Census Tract 114.01, 63,472 Catawba County, North Carolina -11.7% (lamerican-community-surveylblock-group- } 1-ce n so s-tra ct-1 1401 -catawba-cou nty- north-carol i nalmed ian-household- inco meltotalln uml15000 U83703501140111) Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group 2, Census Tract 114.01, 44.464 Catawba County, North Carolina 21.1% (lamencan-community-surveylblock-group- t 2-census-tract-11401-Catawba-cou nty- n orth-carol inalmed ian-h ous ehold- i n com eltota llnu ml l 5 000U 5370350114 0121) Block Group 3, Census Tract 114.01, 55,625 Catawba County, North Carolina MR% (lamerican-community-surveylblock•group- 3-ce n sus-tra ct-11401-catawba-cou nty- n orth-carpi i nalmedian-household- i n tom eltotallnu m115 G00U 53703501140131) Block Group 1, Census Tract 114.02, 63,646 Catawba County, North Carolina 1.1%4t (la merican -community-su rveylblock-g rou p- 1-census-tract-11402-Catawba-county- north-carrn i nalmed ian-h ouse h old- i n comeltotal/nu m115 GOGU S3 70350114 0211) Black Group 2, Census Tract 114,02. 41.917 Catawba County, North Carolina 7.3%t (la merica n -community-su rveylblock-g rou p- 2-census-tra ct-11402-Catawba-cou nty- north-carol inalmed ian-h ouse hold- i n com eltotal/nu rN15 OOOU 53703501140221) Block Group 3, Census Tract 114.02, 44,500 Catawba County, North Carolina 1"% (lamerican-community-surveylblock-group- 3-ce nsu s-tra ct-11402-cataw ba-cou rnty- north-caroll nalmed ian-h ouse hold - in com eltotallnu m115 DDOU 53703501140231) Block Group 1, Census Tract i15.01. 53,386 Catawba County, North Carolina 1A%f (la menca n-community-su rveyl block-group- 1-cen su s-tract-11501-Catawba-cou nty- north-taro] i nalmed ian-household- Incomehotalln um115000 US3703501150111) Block Group 2, Census Tract 115.01, 63,462 Catawba County. North Carolina 41.7% (lamerican-community-surveylblock group- 2-ce n sus-tra ct-11501-Catawba-cou nty- n art h-carol i nalmed ian-h ousehold- i n cam eltota Ilnu nU15 OOOU 5370350115E 121 ) Block Group 3, Census Tract 115.01, 54,821 Catawba County. North Carolina 0.9%t (la me rica n-cam munity-surveylblack-gro up- 3-ce n su s-tra ct-11501-Catawba-cou nty- north-carol i nalmedian-household- i n comeltotallnum115 000U S3703501150131) Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group 1, Census Tract 115.03, 72.019 Catawba County, North Carolina 21.8% (lamerican-community-surveylblock-group- t 1-ce n su s-tra ct-11503-Catawba-cou nty- north-carol i nalmed ian-h ous ehold- i n com eltota I1numl15 000U S3703501150311) Block Group 2, Census Tract 115.03, 119.423 Catawba County, North Carolina 2&1°% (lamerican-community-surveylblock-group- t 2 -ce nsus-tra ct-11503-Catawba-cou nty- n orth-cars l i nalmed ian-househoid- i n com eltotallnu m115 000U 537035011503W) Block Group 1, Census Tract 115.04. 79,545 Catawba County, North Carolina 33.0% (lamerican-community-surveylblock-group- t 1-census-tra ct-11504-Catawba-county- north-tarn; i nalmed ian-h ouse h old- i n comeltotallnu ml15 GOGU S37035011 504 11) Black Group 2, Census Tract 115,04, 63,035 Catawba County, North Carolina 0.2%♦ (la merica n -com munity-su rveylblock-group- 2-census-tra ct-11504-Catawba-cou nty- north-carol inalmed ian-h ouse hold- i n com eltotallnu rn115 OOOU S3703501150421) Block Group 3, Census Tract 115,04, 83,929 Catawba County, North Carolina 23.8% (lamerican-community-surveylblock-group- t 3-ce nsu s-tra ct-1 1 504-cataw ba-cou nty- north-carol inalmed ian-h ouse hold - in cam eltota Ilnurn115D00U 53703501150431) Block Group 1, Census Tract 116.01, 41,050 Catawba County, North Carolina 7&5% (la menca n-community-su rveylblock-group- 1-cen su s-tract-11601-Catawba-cou nty- north-taro: i nalmed ian-household- lncomehotallnum115000US3703501 A 60111) Block Group 2, Census Tract 116.01, 35,363 Catawba County. North Carolina 41.3% (lamerican-community-surveylblock group- 4 2-ce n sus-tra ct-11601-Catawba-cou n ty- n art h-Carol i nalmed ian-household- i n com eltota Ilnu nU15 000U S3703501160121) Block Group 3, Census Tract 116.01, 72,125 Catawba County. North Carolina 20.4% (lamerican-community-surveyiblack-group- t 3-ce n su s-tra ct-11601-Catawba-cou nty- n orth-carol i nalmedion-house hold - in comeltotallnu m115 000U S3 703501160131) Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group 1, Census Tract 116,02. 42,778 Catawba County, North Carolina 14.5 % (lamencan-community-surveylblock-group- ? 1-ce n su s-tra ct-11602-Catawba-cou nty- north-carol i nalmed ian-h ous ehold- i n com eltota Ilnu m115 000U S370350116 0211 ) Block Group 2, Census Tract 116.02. 58,811 Catawba County, North Carolina 33.7% (lamerican-community-surveylblock-group- t 2 -ce nsu s-tra ct-116O2-Catawba-cou nty- n orth-carol i nalmedian-house hold - in com eltota Ilnu ml15 QOOU S3703501160221) Block Group 3, Census Tract 116,02, 51.909 Catawba County, North Carolina -22.6% (lamerican-community-surveylblock-group- i 3-ce nsu s-tra ct-11602-Catawba-cou nty- north-carol i nalmed ian-h ouseh old- i n cam eltotallnu m115 0O0U S3703501160231) Black Group 4, Census Tract 116.02. 43,384 Catawba County, North Carolina .22.1% (lameriran-community-surveylblock-group- f 4-ce nsus-tra ct-11602-Catawba-cou nty- north-carol inalmed ian-h ouse hold- i n com ellotaVnu rN15 OOOU S3703501160241) Block Group 1, Census Tract 117.01, 58,917 Catawba County, North Carolina 94.9% (lamerican-community-surveylblock-group- 1-ce n su s-tra ct-11701-cataw ba -cou n ty- north-carol inalmed ian-h ouse hold- inco meltotal/n um115000 US3703501170111) B Block Group 2, Census Tract 117.01, 92,321 Catawba County, North Carolina 68.1% (la merica n-community-surveylblock-grou p- 2-cen su s-tract-11701-Catawba-cou nty- north-carol i nalmed ian-household- i n com eltota Ilnurnl l 5 0O0U S3703501170121) Block Group 3, Census Tract 117.01, 44,750 Catawba County, North Carolina 1.1%T (la me rica n-com murnity-su rveyl block-g ro u p- 3-ce n sus-tra ct-117 01-Catawba-cou n ty- n orth-carol i nalmed ian-household- i n com eltota Ilnu m115 OOOU S3703501170131) Block Group 1, Census Tract 117.02, 68,083 Catawba County, North Carolina 59.4% (la me dca n-com munity-su rveylblack-g routIt - 1-ce n su s-tract-11702-Catawba-cou nty- north-carol i nalmedion-h ousehold- i ncomeltotallnumll 5 000U S37035011 702 11) Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic C Block Group 2, Census Tract 117.02. 68.268 Catawba County, North Carolina 34.3% (lamencan-community-surveylblock-group- t 2-ce n su s-tra ct-11702-Catawba-cou nty- north-carol i nalmed ian-h ous ehold- i n cam eltota Ilnu ml15 OQOU S3703501170221) Block Group 3, Census Tract 117.02, 75,385 Catawba County, North Carolina 26.9% (lamerican-community-surveylblock-group- 3-ce nsus-tra ct-11702-Catawba-tau nty- n orth-care i i nalmed ian-house hoid- i n com eltotallnu m115 OOOU 5370350117 0231) Block Group 4, Census Tract 117,02, 52.399 Catawba County, North Carolina 7.3%,t (la merican -cam munity-su rveyl block-g rou p- 4-ce nsu s-tra ct-11702-Catawba-cou nty- north-taro; i nalmed ian-h ouse h old- i n cam eltotallnu m715 000U S3703501170241) Black Group 5, Census Tract 117.02. 80,691 Catawba County, North Carolina 31.0% (lamerican-community-surveylblock-group- 5-census-tra ct-117 02-Catawba-cou nty- north-carol inalmed ian-h ouse hold - in cam eltotaVnu m115 OOOU S 370350117 0251) Block Group 1, Census Tract 118.01, 63,750 Catawba County, North Carolina 45.3% (lamerican-community-surveylblock-group- t I -ce nsu s-tra ct-1 180 1 -cataw ba-cou n ty- north-taro! inalmed ian-h ouse hold- nnro meltotalln urn/ 15000 US370350 1180111) 131ock Group 2, Census Tract 118.01, 75.889 Catawba County, North Carolina -48.1% (lamerican-community-surveylblock-group- i 2-cen su s-tract-11801-Catawba-cou nty- north-carol i nalmed ian-household- i n com eltota Ilnu m115 000U 5370350118 0121) Block Group 3, Census Tract 118.01, 55.348 Catawba County, North Carolina 0.3%t (lamerican-community-surveylblock group- 3-ce nsus--tra ct-11801-Catawba-cou n ty- n art h-caroi i nalmed ian-household- in corn eltota Ilnu rn115 OOOU S3703501180131) Block Group 1, Census Tract 118.02, 42,721 Catawba County, North Carolina -28.4% (la me rica n-com munity-surveyiblack-g roup- 1-ce n su s-tra ct-11802-catawba-cou nty- n orth-caroi i nalmedion-household- i n comeltotallnum115 000U S37035011 802 11) 0 Race Origin Two White, Area Total White Black Asian Indian Islander Other or Hispanic Not More Hispanic Block Group 2, Census Tract 118.02, 43,971 Catawba County, North Carolina -10.8% (lamencan-community-sur reylblock-group- i 2-ce nsu s-tract-11802-Catawba-cou nty- n orth-carol i nalmed ian-h ous ehoid- in cam eltota Ilnu rn115 000U S37 035011 80221) Block Croup 3, Census Tract 118.02, 44,891 Catawba County, North Carolina -2.0%4 (lamerica n-cam munity-su rveylblock-g ro u p- 3-censu s-tra ct-11802-catawba-cou n ty- north-carol i nalmed ian-h ousehold- i ncom eltotal/nu rN 15 000U S3703501180231) Block Group 4, Census Tract 118.02. 42,458 Catawba County, North Carolina 10.3% (lamerican-community-surveylblock-group- ? 4-ce nsus-tra ct-11802-Catawba -cc u nty- north-carol Inalmed ian-h ouse hold- i n corneltotallnunill 5 000U 53703501180241) source- U-3 Census Bureau Alf rights reserved_ Users of this site agree to the Terms of Service(httpJ(em.darionledger. comlterms), Privacy Noticethttp.11em.clariontedgercomlprivacy), Your Calitomin Privacy Rights(http://cm.clartonledger.camlprivacy-policy), Cookie Policy(httpllcm.darionledger.00rnlcookie-policy) and Ad Choices (http:llem.cla rionledger.wmlprl vacyl#ad_choicas ) m m m m m m m m m m m m m a Q a a a a a a a a a Q o CD X CD X CD X CD X CD X CD X CD X CD X CD X CD X CD X CD X 00000a0000003 W m_ Q N 0) CD a _ j7D' w N OCD �: L (O a �1 Corp C o' o' CD V! O = d 7 O X (p 911CD � n n (D m chi CD S (D xX C (D 9] O C E; �] N (fl CD (D Q X - 2 F 2) (D Ul (D CD 0 <D a a CD N CD 0 CD 3 w 07 W -1 W A C71 1 w v A t0 w A A w w w w v v, 07 (p 3 CD <D C� (D 7 rt A O A W S A (Il w w w w CD A N O -I O 7 C a m Z G F+ rt x. n lD 3 a a p rt 3 �u �ooa O 1.0 Z O 3 = r �. -0 a rr (D .. � x m UR 0 c a 3 obi � N F+ m (D rnD) cn O d 3 U N N G C p6 (n C p N D � N O � N N O N S 3 N (D N 3 � � N N m m s m � O � CD CD 3 � N 3 c o T < n — v m v C p O m m a � a m � m 3 0 0 co m m v O << � O 3 N � d m m S n � n m Cr O O p m � a � 3 o c �a x � m v a v m N m v o p_ m E {y N S O 3 m 3 < a o m m m 3 N N ID 3 � N 3 n m n � � a .Y m a p v � —CD v v a m . n s 7t � o v p X p a m � m cD 3 v � o cn. v p- G N N � Ul n (D O p a N 3 n v 4 3 p v o o � N 3 p _ m 3 N m N 3 3 � N 3 d n a _v a o 3 n m E u�— m p < 3 3 -. O v v v � � � v p_ N C 3 � p m o m � � m m 0 o v m m p "6 !D a T E Ln 0 a CD D m N N Percentile m O c r r C r-0❑ O* C m ;U w r D D 0 0 T 0 m G N 7 0 (D CD 0 v 7 N C (D O N v D CD � D 3 n n O 0 �� n- c � O X ' X (D c � (D (fl (D (0 v m 0 0 0 p v o 0 0: v c c' m a m a c0 (D (� 3 C cn m CD ❑ CC C O o O W C _' Q. �. 3 3 O 7 __ W can, X 91 m N Cn C CJ 3 O (D O X 3 ^n v W O =o 3 CD lD X 7 Q v N O - m �. O aJ N N p N T CJ CO (D W X `< N ^' `G w Ln 0 - 7 (fl 0 CD -c U)m C p' m c p o 3 a 0 m y o 0 n N 3 (D � p C 0 N O 0 0 O A 07 O O N O w O W O N U'7 N O W U'7 N A 0 0 0 0 o a o o O A D (.Q W W W O 0 0 0 0 O A J (n O 0 M 0 0 N 0 Ui o W a J o Ui o N CO �''� CO O W A O 07 U1 O 0 W 0 N 07 J O V1 W J � 0 cn M U7 O J N W N (0 A A J A J A (0 (0 A J m J N J Gn w O W N w- cc J J J A m J- m D fC O O O OW O m m N Ln (.77 0 0 mW N W N C0 N W C D W O O W GJ O J Ol w J w N W w J A (O W W W N w U7 m O W Cn M M Ln J W 3 3 3 m (A W (D a c 0 cn c a Z T W r CD (D R 3 O rt U) 0 w UD _O fl1 c n W 0 O cn D) n Cl) U) n O O 101.1 FY 2019 MEDIAN FAMILY INCOME F-- LI.SER DOCUMENTATION SYSTEM HUD.gov HUD User Home Data Sets Fair Market Rents Section 8 Income Limits MTSP Income Limits HUD LIHTC Database Median Family Income Calculation Methodology Estimates of median family income for metropolitan and non -metropolitan areas are developed as follows: All information presented here applies to the Hickory -Lenoir -Morganton, NC MSA which Catawba County is a part of. 1. A special tabulation of Median Family Income (MFI) estimates from the 2012-2016 5- year ACS was prepared by the U.S. Census Bureau and used by HUD as the basis for calculating HUD's FY2019 MFIs. Estimates of MFI from this tabulation are used if they are determined to be statistically reliable. For FY2019, the test for reliability is whether the margin of error for the estimate is less than 50% of the estimate itself and whether the ACS estimate is based on at least 100 survey cases. Note: HUD began using the count indicator in assessing statistical reliability beginning with the FY 2019 Fair Market Rent estimates. HUD does not receive the exact number of survey cases in this special tabulation, but rather a categorical variable known as the count indicator, indicating a range of cases. An estimate based on at least 100 cases corresponds to a count indicator of 4 or higher. If an area does not have a reliable 2012-2016 5-year estimate, HUD checks whether the area has had minimally reliable estimates in any of the past 3 years (a minimally reliable estimate is an estimate where the margin of error for the estimate is less than 50% of the estimate itself). If so, the FY2019 MFI is the average of the inflated ACS estimates. In order to use as much local data as possible, HUD averages the minimally reliable estimates from the last three 5-year ACS estimates. If an area has not had a minimally reliable estimate in the past 3 years, the estimate from the next larger encompassing geography is used. For example, sub -areas of metropolitan areas would be assigned the MFI estimate of the entire metropolitan area and for non -metropolitan counties, the estimate from all non-metrpolitan potions of the State (state non -metropolitan). 2. If there is a statistically reliable 2016 1-year ACS estimate of median family income available, HUD replaces the 5-year data with the 1-year data. For FY2019, the special tabulation of 2016 1-year ACS MFI estimates provided to HUD by the U.S. Census Bureau for the Hickory -Lenoir -Morganton, NC MSA was statistically reliable. 3. Once the appropriate 2016 ACS data has been selected, an inflation factor based on the CBO projection of the national C.P.T. for FY2019 is calculated to inflate the estimate from 2016 to April, 2019 (or mid FY2019). Note: The CPI projection used in this calculation is from the CBO's January 2017 release of it's 10-Year Economic Projections. MFI Step by Step Calculation 1. The following are the 2016 American Community Survey 5-year median income estimate, margin of error, and sample size category for Hickory -Lenoir -Morganton, NC MSA: ACS2016 ACS2016 Area 5-Year 5-Year Ratio Sample Size Result Median Margin of Category Income Error $1,075 / 0.02 >_ .5 Hickory -Lenoir- and 6.0 >= 4 Morganton, NC $52,705 $1,075 $52,705 6 MSA Reliable 0.02 Estimate 2. Since there is a 1-year 2016 ACS estimate available, the margin of error of the estimate and the sample size category are checked for reliability: ACS2016 ACS2016 Area 1-Year 1-Year Ratio Sample Size Result Median Margin of Category Income Error 0.035 <_ .5 and 6.0>=4 $1,797 / Hickory -Lenoir- $51,881 Use Morganton, NC $51,881 $1,797 — 6 ACS2016 1- MSA 0.035 Year Median Income 3. The calculation of the CPI Inflation Factor is as follows: FY2019 2016 Annual CPI Inflation Area CPI CPI Factor Hickory -Lenoir -Morganton, NC (255.1 / 240.007) 255.1 240.007 = MSA 1.06289 4. The FY 2019 median family income is estimated as follows: ACS20161-Year CPI Inflation FY 2019 Area Area MFI Estimate Factor Estimate ($51,881 Hickory -Lenoir- 1.06289) Morganton, NC MSA $51,881 1.06289 $55,144 5. In keeping with HUD policy, the median family income estimate is rounded to the nearest $100: Unrounded Rounded Area FY 2019 MFI FY 2019 MFI Estimate Estimate Hickory -Lenoir -Morganton, NC $55,144 $55,100 MSA NOTE: Due to differences in the computing platforms used to generate the official FY 2019 MFI estimates, and this web system, the calculated value shown may differ slightly from the official published value because of rounding. Press below to select a different state: Select a new state Or select a FY 2019 HUD Metropolitan FMR Area's Median Family Income: Hickory -Lenoir -Morganton, NC MSA Select Area Update URL for bookmarking or E-mailing Technical Problems or questions? Contact Us. BOYD FARM DATA CENTER (CLT10) PERMIT APPLICATION NARRATIVE APPPN DIX MITIGATION ROY COOPER Governor ELIZABETH S. BISER Secretary MARC RECKTENWALD Director Claire Wolanski Microsoft Corporation One Microsoft Way Redmond, WA 98052 Project: Boyd Farm Data Center (CLT 10) NORTH CAROLINA Environmental Quality May 3, 2023 Expiration of Acceptance: 11/3/2023 County: Catawba The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in - lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed on the DMS website. Based on the information supplied by you in your request to use the DMS, the impacts for which you are requesting compensatory mitigation credit are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. River Basin Impact Location (8-di it HLIC) Impact Type Impact Quantity Catawba 03050102 Warm Stream 604 Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28, 2010. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly.Williams@ncdenr.gov. Sincerely, At�d"� FOR James. B Stanfill Deputy Director cc: Amber Coleman, agent North Caraltna Department of Environmental Quality I Division of Mitigation Services �Aw 217 West Jones Street l 1652 Mail Service Center I Raleigh. North Carolina 27699-1652 oeoaiunen�mEmsrommeri n 919,707.8976