Loading...
HomeMy WebLinkAboutNC0024406_Spillway Variance Approval_20150505 Air"ratA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald van der Vaart Governor Secretary Certificate of Approval May 5, 2015 Mr. John Elnitsky RECEIVEDIDENR!DWR Vice President Duke Energy MAY — S 2015 P.O Box 1321, DEC 22C Charlotte,NC 28201-1007 Water Quality Permitting Sec►ion RE: Spillway Variance Approval Belews Creek Active Ash Basin Dam Stokes County State Dam ID: STOKE-116 Dear Mr. Elnitsky: A review has been made of the report entitled "Request for waiver of NCAC 2K .0205 (d)" for Belews Creek Active Ash Basin Dam (STOKE-116). The report, authored by Mr. Douglas W. Carr, PE of URS Corporation, is dated April 27, 2015 and was received by this office on April 28, 2015. The report presents a hydrologic and hydraulic (H&H) analysis as well as a geotechnical analysis. The report concludes that even though the structure is not capable of draining 80-percent of the design storm runoff volume within 15 days, it is capable of containing two consecutive 72 hour PMP storm events while maintaining additional freeboard. This finding provides evidence that no significant risk of overtopping under the current spillway configuration exists. Therefore, the variance to requirements of 15A NCAC 2K .0205 (d) is granted in accordance with 15A NCAC 2K .0205 (e). In addition, we concur with the findings of the stability analysis presented in the geotechnical portion of the report which indicates that the dam embankment meets the requirements of 15A NCAC 2K .0208 (b). Division of Energy, Mineral,and Land Resources Energy Section•Geological Survey Section•Land Quality Section 1612 Mail Service Center, Raleigh,North Carolina 27699-1612.919-707-9200/FAX:919-715-8801 512 North Salisbury Street,Raleigh,North Carolina 27604•Internet:http://portal.ncdenr.orq/web/lr/ An Equal Opportunity\Affirmative Action Employer—50%Recycled 110%Post Consumer Paper Mr.John Elnitsky Belews Creek Active Ash Basin Dam Spillway Variance Approval STOKE-116 May 5, 2015 Page 2 of 2 Please contact Mr. Matthew Gantt,PE, Regional Supervisor, Land Quality Section,450 West Hanes Mill Road, Suite 300, Winston-Salem,North Carolina 27105,telephone number(336) 776-9800 or me at telephone number(919) 707-9220 should you have any questions concerning this matter. Sincerely, fr Steven M. Mc 4 PE State Dam Safety Engineer SMM/bsc cc: Mr. Douglas W. Carr, PE, Design Engineer Mr. Matthew Gantt, PE, Land Quality Regional Engineer Mr.Jeff Poupart, Division of Water Resources Mr. Randy Hart, Duke Energy File name: STOKE-I l6_20150505_SpwyVarBelews Creek Active Ash Basin Dam