Loading...
HomeMy WebLinkAbout20071578 Ver 1_More Info Letter_20071025~QF W ATF9G, ~ Michael F. Easley, Governor `Q ~i William G. Ross Jr., Secretary Vj ~. North Carolina Department of Environment and Natural Resources ~ .~ ~ ,`. Coleen H. Sullins, Director Division of Water Quality October 25, 2007 DWQ Project # 07-1578 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Aaron Brower City of Raleigh -Public Utilities Department One Exchange Plaza, Room 620 219 Fayetteville Street Raleigh, NC 27601 Subject Property: City of Raleigh -Gorman Street Sanitary Sewer Rehabilitation Ut to Brushy Creek [030402, 27-34-3, C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Brower: On September 18, 2007, the Division of Water Quality (DWQ) received your application dated March 20, 2007, to fill or otherwise impact 5301inear feet of intermittent stream (temporary impact) and 54,400 square feet of Zone 1 Neuse River basin protected riparian buffers and 15,400 square feet of Zone 2 Neuse River basin protected riparian buffers to replace approximately 4,850 feet of aging 8" sanitary sewer with a new 12" sanitary sewer and to rehabilitate or replace existing manholes. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold ~s incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please indicate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.). Additionally, please provide plan and profile for aerial stream impacts (only four are shown on the plans, i.e., Plan Sheet C-7). Please identify where the other four crossings are shown on the PCN. 2. Please explain why your stream impact table lists intermittent streams that are as wide as 47 feet which would likely indicate a perennial stream. 401 Oversight/Express Review Permitting Unit ' 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http•//h2o eur state nc us/ncwetlands NonehCarolina ~atura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper City of Raleigh Page 2 of 2 ;. , },,, , r October 25, 2007 3. Stream crossing between MH32 and MH31 appears to be outside of the 75° to 105° threshold. Please provide additional information on this crossing as well as where the bankfull/floodplain is located. Severe bank destabilization can be caused by a non- perpendicular aerial crossing that is located too low on the floodplain. 4. Please provide a buffer impacts mitigation plan since mitigation is required for: - parallel impacts in Zone 1 - perpendicular crossings of streams that disturb > 1501inear feet of buffer. - perpendicular crossings of streams that disturb greater than 401inear feet of buffer but equal to or -less than 1501inear feet of buffer with a maintenance corridor greater than 10 feet in width. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sinc ly, yndi Karoly, Supervisor. 401 Oversight/Express Review Permitting Unit CBKlijm cc: Lauren Cobb, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files William Mason, CDM, 5400 Glenwood Avenue, Suite 300, Raleigh, NC 27612 Filename: 071578CORaleighGormanstreetsa nitarysewe rReha bilitation(VVa ke)O o_Hold