Loading...
HomeMy WebLinkAboutSW4230101_Supplement-EZ Form_20230510SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name E M Holt ES On -site Queuing Improvements 2 Project Area ac 30.2 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this ro'ect High or Low Density? Low 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS)_ 20 Disconnected Impervious Surface (DIS)_ 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED Name and Title: Street address: City, State, Zip: Phone number( Email: Blake Hall. PLA. PE. LEED AP BD+C 5410 Trinity Road, Suite 102 Raleigh, NC, 27607 919-866-4933 Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. De Iti I I I if t I F"' " r H PAP !p Q� SEAL9r Si m of De er i - 055780 •S �r7- W • ` ��Date luiiun DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM Vegetated Swale Vegetated Swale 5 Total drainage area (sq ft) 1,315,512 1,315,512 6 Onsite drainage area (sq ft) 1,315,512 1,315,512 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project (sq ft) 251486 sf 251486 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) N/A N/A 10 New BUA not on subdivided lots (subject to permitting) (so 79583 sf 79583 sf 11 Offsite BUA (sq ft) N/A N/A 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) 32946 sf 32946 sf Sidewalk (sq ft) 3444 sf 3444 sf Roof (sq ft) sf sf Roadway (sq ft) 43193 sf 43193 sf Future (sq ft) N/A N/A Other, please specify in the comment box below (sq ft) N/A N/A 13 New infiltrating permeable pavement on subdivided lots (sq ft) N/A N/A 14 New infiltrating permeable pavement not on subdivided lots (sq ft) N/A N/A 15 Existing BUA that will remain (not subject to permitting) (sq ft) 171903 sf 171903 sf 16 Existing BUA that is already permitted (sq ft) sf sf 17 Existing BUA that will be removed (sq ft) 13293 sf 13293 sf 18 Percent BUA 19% 19% 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM (cu ft) N/A N/A 21 Calculation method for design volume N/A N/A ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 021-11.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per. 1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 31 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 3.37 6 Are curb outlet swales proposed? Yes 7 Maximum longitudinal slope of curb outlet swale(s) (%) 3.2 8 Bottom width of curb outlet swale(s) (feet) 2 ft 9 Maximum side slope of curb outlet swale(s) (H:V) 31 10 Minimum length of curb outlet swale(s) (feet) 70.0 ft 11 Are treatment swales used instead of curb outlet swales? No 12 1 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 1 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: The maximum achievable length for PDD8 is 70-ft. This curb outlet swale is located to improve existing drainage issues to direct flow to the existing drop inlet Al instead of sheet flowing across the proposed queue lanes to PDD2. The curb outlet swales are: PDD2, PDD3 & PDD8