HomeMy WebLinkAboutSW4230101_Stormwater Narrative_20230510 NARRATIVE / CALCULATIONS / MAPS/ SUPPORTING
INFORMATION FOR
STORMWATER, EROSION AND SEDIMENT CONTROL
REVIEW
for project
EM HOLT ELEMENTARY SCHOOL QUEUING
IMPROVEMENTS
TG#52013
Stormwater Permit No. SW4230101
* * * * *
7k *
RLIKGTON SC
h
** Juiy 3, 1996SF��*** 144 ahlti+�` 5,�
NG SUCCE$
* *
Site Address: 4751 NC-62, Burlington, NC 27215
Issued:
May 03, 2023
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
5410 Trini ty Road, Sui to 102
Raleigh, North Carolina 27607
Phone: 919.866.4951 Fax: 919.859.5663
TABLE OF CONTENTS
Project Narrative
USGS, Soils, & FIRM Maps
Deed
Supporting Calculations:
Rip Rap Outlet Protection Design
Sediment Basin Design
Channel Design
Pre/Post Impervious Map.
(Refer to Full size plan set for additional information)
PROJECT NARRATIVE
Proiect Narrative
1. General Information
a. Project: EM Holt Elementary School On-Site Queuing Improvements
b. Address: 4751 NC-62, Burlington,NC 27215
c. Site Area: 30.2 Acres
d. Disturbed Area: 4.64 Acres
e. Wetlands and Jurisdictional Streams: None located within project area.
f. Ownership: Alamance-Burlington School System
g. Proposed Development: This project will be to provide an approximate 1,300 LF two-lane
on-site queuing drive at EM Holt Elementary School in Burlington,North Carolina. The site
work will include asphalt paving of the new queuing drive, concrete sidewalks,and
installation of drainage culverts to accommodate the site improvements. The project will also
repave an existing staff and visitor parking lot in front of the school. The total disturbed area
is approximately 4.64 acres. The disturbed area will flow to a temporary diversion ditch to a
temporary sediment basin to treat most of the disturbed area. The remaining disturbed area
will be protected by silt fence, silt fence stone outlets, inlet protection, and rock pipe inlet
protection.
This project meets all low-density stormwater requirements. The proposed development will
have a built upon area(BUA)below 24%and has maximized the usage of vegetated swales
and culverts only for driveway crossings. The amount of impervious area flowing to the
existing unmodified storm network has been reduced with new impervious flowing through
the proposed swales.
h. Phasing: This project will be completed in a single phase.
i. Water& Sewer Service: None
j. Historic Sites &Public Funding: This project is being funded with public monies. This site
is not an historic site.
k. NCDEQ Compliance Issues: None.
1. FEMA FIRM 4 3710885200K, dated November 17, 2017 indicates there are no 100-year or
500-year flood plains that exist on the project site.
in. Soils on the site consist of predominately Cullen clay loam (CnB2), Cullen clay loam (CnD2)
and Udorthents loamy(Ud). Cn132 and CnD2 has an HSG Classifications of B.
n. River Basin: Cape Fear
o. Receiving Stream: Big Alamance Creek, Class WS-V;NSW
2. Permanent Ditch Calculations
Length Bottom Right Left Flow
Slope g
Slope Depth Permanent Velocity Erosive
Ditch Width Slope pe p
(o�O) (FT) (FT)) (H:V) H:V (FT) Liner (FPS) (Y/N)
PDD1 3.2 138 0 4:1 5:1 0.35 Curled Mat 2.73 N
PDD2 1.9 155 2 20:1 11:1 0.40 Curled Mat 3.37 N
PDD3 1.6 122 2 12:1 14:1 0.15 Curled Mat 1.90 N
PDD4 3.7 195 0 9:1 13:1 0.35 Curled Mat 2.98 N
PDD5 3.1 159 0 11:1 7:1 0.35 Curled Mat 2.74 N
PDD6 1.0 357 0 4:1 6:1 1.10 Curled Mat 3.19 N
PDD7 4.7 147 1 0 3:1 7:1 0.30 Curled Mat 2.93 N
*PDD8 2.9 70 1 2 20:1 1 18:1 0.35 Curled Mat 3.36 N
* The maximum achievable length of PDD8 is 70-ft compared to the required 100-ft. The location of this
curb outlet swale is to improve existing drainage issues by directing flow to the existing drop inlet `AF
and preventing sheet flow across the proposed queue lanes to PDD2.
PLANNED EROSION AND SEDIMENT CONTROL PRACTICES:
1. Silt Fence: Silt fence will be utilized to filter sediment laden runoff in locations where the drainage
area is less than 1/4 acre per 100-ft of fence.
2. Tree Protection Fencing: Tree protection fencing will be installed to protect existing trees that are
intended to remain. In some locations, silt fence will serve as tree protection fence
3. Construction Entrance: Temporary gravel construction entrances will be utilized to minimize soil
being tracked off the site by construction traffic.
4. Outlet Protection: Riprap outlet protection aprons will be installed at outlets as they are constructed
to slow storm-water velocities and dissipate energy to protect downstream channels from erosion.
5. Sediment Skimmer Basin: Sediment skimmer basin will be installed to filter concentrated sediment
laden runoff prior to discharge from the site.
6. Channel Matting: Straw or excelsior matting will be installed in permanent channels and swales to
stabilize the seedbed and promote vegetative growth.
7. Check Dams: Rock check dams will be installed in permanent channels to reduce flow velocities and
erosion in the channel.
8. Temporary Wattles: Temporary Wattles will be installed around installed curb inlet to prevent
sediment from entering storm drainage systems.
9. Temporary Inlet Protection: Gravel block inlet protection will be installed around existing drop inlets
to prevent sediment from entering storm drainage systems.
10. Rock Pipe Inlet Protection: Rock pipe inlet protection will trap sediment at the approach to the storm
drainage systems.
Refer to drawings C-4.0-4.1 for Erosion Control Construction Sequences and Maintenance Plan.
U SGS, SOILS, Et FIRM MAPS
14
NN
I
:
-
fi
n
� m
.k 1Cl
lip
i
>l
I ..
1 I �
,
Eon
® can
ru-niviru,t L- €�u i,4 i i, v4un in IVq (Sheet # )
0
SITE
_ m ....rr.. v. �.. m.......__....
SITE
ALAMANCE COUNTY: NORTH CAROLNA
21
a&i!a
DOb
F
t
a
: x ;
_ l
Lb8 x
MxC3. .
���,q c t
;
litC2-
x
�y. la8t
x
•
Ia8
ObC �Y
Bz
po�
0 1We soU,_•�; (Sheet 2511
79030'21.7V W 3601'59.WN
UE:LAGE OFALAa�`:(• ���.. � � �;i(..
303»
SITE
EFWA
a t =
y �
ff fit•. ` .'�E� may-,. _
r .may � ! :,. � y:•:•-�.
"� �f S' � � 9 �aE�Mi�iMA�FL000 Ar uu.t `� ••~�,.•r-
1
� \'ILL•A4EOE�iE�\'CE•ETI
J,0a l
r
ALAMANGE•!]NTY
J10001 .)
r
FLOOD HAZARD INFORMATI ON NOTES TO USERS SCALE
sEE FIs FOR ORAFrrlRm vnxEL urour Ex mAp um Lseo C FLOOD L FLOOD INSURANCE RATE MAP
PROGRAM
l>7 FLOOD INSURANCE RATE MAP
Wilmn a Bew E .(BFE) a ,eieilwwrsierce,m .xa dwee uneren eemeememmWrwemem xvm laeweem. ooa '�
w¢n aFE.oePm zone aeAR,aH.uE aR warervw aY 1vFlsl R:aen ,wa,wm��1alHnnnpe://me�(:`m::wr ervFly p pAxEE 8852 of 9920
v. .m Clem onedwmmFlH tlmis m+ oaf uwsrendw�axn e�In rera n �
xAZARO AR ......... 1:8,000
,.00C W d
o W
a Nn.e�allw�m�fw�wwnn a� �: Fkw nwrerc p remel,mnauaua. ""'""Y`"'I.nwv,lrcwm®.s=m v,wilne rvoevml t C Me— �= C
0 60 100 200 300 600 1� (
\e\\�a 7 Penei Con[alns:
Creas ess awaoa max awmtewe m.m.m.vawwvow uses rvmo,.i d.n.omoi ,.w,�.il�xmmx�owzo.Y�v°`rv�1Y°rlusosl. � CUMMUNITY NUMBER PANEL
OROo0 xAURo Area w,sn Flood Rlsk euemtewe zoaeo x'nwes uvmmw,vmv v.nsn.xdmry..,rrm.rema.soniremem,arv�a++ulaooim.ma„ea,e O azoasz aess
ke.e.w.e.. O AtwaxcE couxx a�000. eesa
NO SCREEN A,ee of minimal FNaa xa rere..wo.em.«M..imxle.mm.rs.Flkx re.I..ma.,em Flw.n.wwew.
zones L.L
O ExMrve LUMRs �
OTHER AR Area d UnEetr,m-Fleotl HmNzeaeo
STREEM. aee ke o,Flwawen we,
W Z
Crow s aww noel Manee
O 1]3� ion
ew oo Ion Une(pHEI
F—R. —�axeeimiaamwaan
MAP NUMBER
37108852OOK
EFFECTIVE DATE
November 17,2017
IC—
DEED
- - - - - — -�-RECORD OF DEED 64
11 204
STATE OF NORTH CAROLINA---Alamance County S
�•4
C. -
. G
T�� t; .-.-er e�A.r J /•Grp,
('7 T,iLti9 IlEl:Il.M1[ado tb[er"u-.�`!1.....dW et...........................................fl. 191.V.^r br«.1�;...F....'7�4'C�Fackus.ewF.!�.....[..«........:fit.�!;�fr.Y..Es.-.....1..!7..•�
, (iGn•l.c' } •t C .v.�L•v .........'.••�f �J � 1�....
.. _4-i;t..•f�. 4r...n ...+�... -... �-.-,�:.ti...�. .....i....�.�`:7.J... l='^it�.....�.,,:t„�-;•.... .-V-.... �'l:,i+...l! _
l/' -•Z....�� .,.«.Z�l�•� `.r1 1......(f�•�s}� C...a,.•.�[r.ia- �,�.•..�,.-r.e..�c� r`a X ...... ��, Yl:=��1.•�},�7 y.-.C'•��^^/i.�-`, '
' Q,rYr1.,.1�.� a...�..,c,,. tc�!_........ .f.."..�.�ouetY,,athd 8tal° ot................�Y..i.a*.FT:�4.•...t.:..c�.+...a-�.w'�...,.�...��� ..,.°,.........of rho!lest rt.to ol...._
(� ( f�.�/� ,,/ «/ y.� yp ^ �+�/-fir• +�! q -y
/gyp r �-. �.•..... �.............ff.. � S/}/� /� .«.......
WITN1:39IiT}I.TPhat en1A.. .:..c�t�'a5-+�......t';....�'.�*-�....�-zr.Y..� .G�r�..._�........._............................... ._..........._.........__......._._........................
L..........._...............--........................................................................Dollars, to co
!?::,:x-....Hard by....................... 4w: .... �< t�ram....z.... �i d... r �^ [he rocofpt of which is he acko w edged,ho.f`�.._bargained _
� rr �II �J �^1
I and Bold.and by these presents doZ fir,......LarlTnln,sell,and convey to saki .Gk.��t4r ....lh �tL� 1J`�'C�'u:•rr•..ry.r�f�S. `Lt�t1.1:.....�f..-4.:!� C:!;+�:x'.Y.i- d
1 ... 4 . ... �.�..... ..
'f .................... ...batre�wd assIgns,a certain tract or parcel of land 1nc..s..:!.. .Q:..V.:.. ........y.........}.•... ..............Tow4ahln............. :!~ +yr..R...�a....r..a2i�»...». �•,,, ■
�i County.State of North Carolina,adletning the land■oG.•r.�...P,C..-..�.}, lJ,Jr..... --'..l..C.L.......a?�,:�a�,. ........../..�i,C1..fr..r^ «.......»..« Count
. ....... ........................................-........._. ........................................-......»....1........ ........».................. ..... ............................ .-.ad others,and banded a follows,vla.l
r� .._.
.11.c?, .. ^, 'ar.-,.,,.•..r�.�... ..«.'tit.......c�iac.+ ... ...r..:.'..-rt..Y...br.......t ...`..l-v' ..... . . S.rl„... ,.r ,
i � .........q6. C:x.-.s.....:v?.-.-l1Vt....... r'ITV'.f i,r�.✓-+.r.+.•.... �.�'x1c ^.:..«.. .. . .,1.�% ,(..._[�?.cr :.. .. .........
•' ....a.
i f.f
.........
.......ki,�-J •��x.. �.ti_-Gr ...........'l..t_....
L
_ _ _ __ _ _ _ _..............._
«..«.».»»«.«»...«.«.....».......»............«.»».. «....«,..._�...»....»»«................•.......«...«.......................-........._............ »................ «�.._....�..�- - ---�•....•....-..............�«...... �.
1
t _..«. ...........».......»_..»....«..«. ..-.-.._........«......................_.............--....--...._.......--..................-...........--_....................................._....«—...._._...._.._..._.__.....__•___.-...._...+.._..........».........
.�F ............«.«....»...»...............»...... .... ...... ..«.... «».«............
.»..«..«....t........ .....................»n«.......««........._.....�.... .«».««.......» «...w._' _.ram...— y-..................
.....'-».......................
«-»........«:=. ,
' .«..«..«.................»..«»........»...«.....«.......»......»«............-».....«.»......__1...-..-......«.•.------............._.....__._.......-.... --_----------
_----
__._.-------...._ ...r.y
r ...».».._.....»».»_..........................«......»...«.........................................»..«.».........................«.....----....._..........».._._..._._ ....... .. _.
TO Tlst^VF4.ANI)TO 110 D the ntorenald tract or parcel of land,and all prlvtleaes and appurtenances therotQby(iSaging.to the sold.,°.
(�//o Gt tp 1-... .. la/li)T....�/ - L..hefre'rt hd wo►dne.to............. .........only ue and baboof forever.
p' And the sals>~ . ..C4/l 6RlSL..... ..... ..t�!l�_ ..................
«......._
l •
11 Cat:................... ... /r »...................................I............_...._.....
1 covanant{-te"d th the said....f l.Cf -^Q....<�U......47...! :.....---..1. .:C; lei!t..c .--.-.. .rr..t c .. I,: ....;«.:...........
5VJ g .try�?:,c ?ir.....Q 2r.. ... -Ke11...
I
Doran
I ..............................hats.•.ad-a..itm■........._.............................................that.... .....r..i.�.S.1..................._,.....seized of said premises In lea,and ha+•f.. i6ht to convey ....:...
f the same 1n fee simple; that the acme are tree and clear from all lacumbranco4*nd that........! will warrant and defend the said Me to the eamo ho q
against iha-Cialme of all persona wbomsoavrt.J�...................................... ................................... ...
1. INivi4N+3Pi9 �i'1[F.T1E0>•.TAe,f.a.id.t(lG,rr.<:.•---.N" r.. .....:,.:� ...rx...: . .. ....`.7....V.�. . ..-ice .F<.!_..y.,......,,`- W.,, .�:.«:.i:-5 ............./.1.
Via.? ce wU.,r `%
h >rr J
d
I
t--�-+.*... ..f8ea1?
: -
.....
LT rk c nn
fir...... . ... .
�i ttaet ............J..,'1�...� j, �!l-t.... "..t .9.J..... ..........................._~�....'-:4_t�P'L. .....i.:..7......-.• 1
U_...... d... . .h�....�..*.`i.._ ....(9anq Attest;
/1 NgE�7It C.1l101.l fA, ..-.. ..:.._ c 4,C C- Cannty - 1t _ NOAT
TY µ
�-
�q .. ... .cam
yy C
.U GI7�T'i. .� ./90u�� '�ln..•.4 li�rau-,:.��_r ...
, ••n
said
q. ---
�' dG-,P r
nd........._ B.-L.
..............
. ........._.._.
• - 1 t E Y\O 'fF! f 5T'>71.1\.t-Llmm�ynre�I'nn ty. � 4 J� �•<,:� /r am �,L,�.: .�Q �j�77 BTAT
r ma�.yy"--����w�.� � �Y•�-�� `� ��;��1�. � �.�i. 7..��ZZgyri� A�...�.¢,�io/�•.C�s�..r+l
' (.�G �r...•gr-„y_ r ....,.�..�,. T,g .h-w. •�cf-ef-.�� ate.-b4
c-�.. due✓t... for
Let the
t Witness my hand,thlet"lw.d�,.'-....«day of.... ... vrw.a..G'�rt..x f_....................7D1�....
� 1
NORTII CAIIOLINA-Alamance C
KUTIJ
The foregoing cartldcnte�ot.C ^'�•v�Ta'vw/; , cs+y.!t.'.(.��.� r.-Fa,,, ,c_rt+•.-L�,,..�!'�. o�-�'-t� •s Q .
..VZ—
�nl
� ......_»..>�.....�:._ ���.`,:.`.��...`^"`�-�• Olerlc Superior Court.
od for
tration at
IF
poeda olr Alamance■Connq,to taook to_(.�,ia d_- ,1. ,th1a.....LW Ir_..._day af.....r ^7 ;; 1�7 1�..and ragletn'ra 1�1 ottlae at the Register ofDeeda t
� .-
_...---......_._..__...._.......». .�.. » �� r.4 ,7.
........,Register of Deeds.
_ I ,
SUPPORTING CALCULATIONS
RIP RAP OUTLET DESIGN
• " • lei 01
05/01/2023
a i
EM Holt ElementarySchool Queuin Improvements 52013 TIMMQNS GROUP
YOUR VISION 0.CHIFVEC THROUGH OURS.
LOCATION
Burlington, NC JLMB
RR EW-1
Pipe Diameter: 18.00 in
Upper Invert: 640.06
Lower Invert: 639.91
Pipe Length: 43.30 ft *Discharge from Storm Sewers
Pipe Slope: 0.003 Discharge: 6.20 cfs
Pipe Material: RCP
Qto= 6.20 cfs Qto/QfuII = 1.00
QfuII = 6.19 cfs V/VfuII = 1.14
VfuII = 3.50 fps V= 3.99 fps
Dissipator Dimensions* Zone= 1
Stone Filling Class= A
Entry Width(3 X Do)= 4.5 ft
Length(4 X Do)= 6.0 ft
Width(La+Do)= 7.5 ft
Min.Thickness= 12 inches
Stone Diameter(D50)= 3 inches
6.0
I
4.5 7.5
IF
All units are in feet
"Dissipator pad designed for full flow of pipe
Rip Rap Calcs 5/3/2023 Page 1 of 6
• " • lei 01
05/01/2023
a i
EM Holt ElementarySchool Queuin Improvements 52013 TIMMQNS GROUP
YOUR VISION 0.CHIFVEC THROUGH OURS.
LOCATION
Burlington, NC JLMB
RR FES 1131
Pipe Diameter: 12.00 in
Upper Invert: 635.95
Lower Invert: 635.25
Pipe Length: 46.05 ft *Discharge from Storm Sewers
Pipe Slope: 0.015 Discharge: 0.85 cfs
Pipe Material: DIP
Qto= 0.85 cfs Qto/Qfull = 0.19
Qfull = 4.40 cfs V/Vfull = 0.75
Vfull = 5.60 fps V= 4.21 fps
Dissipator Dimensions* Zone= 1
Stone Filling Class= A
Entry Width(3 X Do)= 3.0 ft
Length(4 X Do)= 4.0 ft
Width(La+Do)= 5.0 ft
Min.Thickness= 12 inches
Stone Diameter(D50)= 3 inches
4.0
I
3.0 5.0
IF
All units are in feet
"Dissipator pad designed for full flow of pipe
Rip Rap Calcs 5/3/2023 Page 2 of 6
• " • lei 01
05/01/2023
a i
EM Holt ElementarySchool Queuin Improvements 52013 TIMMQNS GROUP
YOUR VISION 0.CHIFVEC THROUGH OURS.
LOCATION
Burlington, NC JLMB
RR FES C1
Pipe Diameter: 18.00 in
Upper Invert: 637.00
Lower Invert: 635.00
Pipe Length: 38.69 ft *Discharge from Storm Sewers
Pipe Slope: 0.052 Discharge: 8.96 cfs
Pipe Material: RCP
Qto= 8.96 cfs Qto/QfuII = 0.37
QfuII = 23.92 cfs V/VfuII = 0.91
VfuII = 13.54 fps V= 12.34 fps
Dissipator Dimensions* Zone= 2
Stone Filling Class= B
Entry Width(3 X Do)= 4.5 ft
Length(4 X Do)= 6.0 ft
Width(La+Do)= 7.5 ft
Min.Thickness= 22 inches
Stone Diameter(D50)= 6 inches
6.0
I
4.5 7.5
IF
All units are in feet
"Dissipator pad designed for full flow of pipe
Rip Rap Calcs 5/3/2023 Page 3 of 6
• " • lei 01
05/01/2023
a i
EM Holt ElementarySchool Queuin Improvements 52013 TIMMQNS GROUP
YOUR VISION 0.CHIFVEC THROUGH OURS.
LOCATION
Burlington, NC JLMB
RR FES D1
Pipe Diameter: 15.00 in
Upper Invert: 636.00
Lower Invert: 635.00
Pipe Length: 36.78 ft *Discharge from Storm Sewers
Pipe Slope: 0.027 Discharge: 2.75 cfs
Pipe Material: RCP
Qto= 2.75 cfs Qto/QfuII = 0.26
QfuII = 10.67 cfs V/VfuII = 0.83
VfuII = 8.69 fps V= 7.22 fps
Dissipator Dimensions* Zone= 2
Stone Filling Class= B
Entry Width(3 X Do)= 3.8 ft
Length(4 X Do)= 5.0 ft
Width(La+Do)= 6.3 ft
Min.Thickness= 22 inches
Stone Diameter(D50)= 6 inches
5.0
I
3.8 6.3
IF
All units are in feet
"Dissipator pad designed for full flow of pipe
Rip Rap Calcs 5/3/2023 Page 4 of 6
• " • lei 01
05/01/2023
a i
EM Holt ElementarySchool Queuin Improvements 52013 TIMMQNS GROUP
YOUR VISION 0.CHIFVEC THROUGH OURS.
LOCATION
Burlington, NC JLMB
RR FES E1
Pipe Diameter: 15.00 in
Upper Invert: 636.50
Lower Invert: 634.50
Pipe Length: 45.72 ft *Discharge from Storm Sewers
Pipe Slope: 0.044 Discharge: 2.07 cfs
Pipe Material: RCP
Qto= 2.07 cfs Qto/QfuII = 0.15
QfuII = 13.53 cfs V/VfuII = 0.72
VfuII = 11.03 fps V= 7.93 fps
Dissipator Dimensions* Zone= 2
Stone Filling Class= B
Entry Width(3 X Do)= 3.8 ft
Length(4 X Do)= 5.0 ft
Width(La+Do)= 6.3 ft
Min.Thickness= 22 inches
Stone Diameter(D50)= 6 inches
5.0
I
3.8 6.3
IF
All units are in feet
"Dissipator pad designed for full flow of pipe
Rip Rap Calcs 5/3/2023 Page 5 of 6
• " • lei 01
05/01/2023
a i
EM Holt ElementarySchool Queuin Improvements 52013 TIMMQNS GROUP
YOUR VISION 0.CHIFVEC THROUGH OURS.
LOCATION
Burlington, NC JLMB
RR FES F1
Pipe Diameter: 15.00 in
Upper Invert: 640.50
Lower Invert: 638.50
Pipe Length: 61.50 ft *Discharge from Storm Sewers
Pipe Slope: 0.033 Discharge: 2.50 cfs
Pipe Material: RCP
Qto= 2.50 cfs Qto/QfuII = 0.21
QfuII = 11.67 cfs V/VfuII = 0.78
VfuII = 9.51 fps V= 7.42 fps
Dissipator Dimensions* Zone= 2
Stone Filling Class= B
Entry Width(3 X Do)= 3.8 ft
Length(4 X Do)= 5.0 ft
Width(La+Do)= 6.3 ft
Min.Thickness= 22 inches
Stone Diameter(D50)= 6 inches
5.0
I
3.8 6.3
IF
All units are in feet
"Dissipator pad designed for full flow of pipe
Rip Rap Calcs 5/3/2023 Page 6 of 6
SEDIMENT BASIN DESIGN
: I C4�0.#,. -
Skimmer Basin A it 4F EM Holt Elementary School
" TIMMONS GROUP " " •
Angad Singh ENGINEERING I DESIGN I TECHNaLOC' 52013
Time of Concentration Calculation
BASIN NAME: Skimmer Basin A
Modified Rational
Highest Elevation = 650 feet
Inlet Elevation = 634 feet
Difference = 16 feet
Travel Length = 556 feet
Equation 2.3 Kirpich Equation
Tc = L[ 3 f H)u.385
128
VVhere
Tc =Time of Concentration (min)
H =Height of the most remote point on the watershed above
the outlet (ft)
L =Length of fla v from the most remote point on the
watershed to the outlet (ft)
(Civil Engineering, Vol. 10, No. 6.June 1940,p.362.)
A graph of the Kirpich Equation also appears in Figure 2.4.
Tc= 3.98 min
Tc= 5 min
Intensity 10 year= 7.08 in/hr
C = 0.60
Disturbed Area = 4.31 acres
Additional Drainage Area = 0.00 acres
Total Drainage Area = 4.31 acres
Equation 2.1 Rational Equation Q = C I A
Where:
Q = Peak flow from the drainage area (cfs)
C = Coefficient of runoff (dimensionless)
I = Rainfall intensity for a given time to peak (in/hr)
A = Drainage area (acres)
Q10 = 18.31 cfs
*RED IS USER INPUT
LATEST REVISION: 1/2/2023 11:41 AM
Skimmer Basin A 4& a EM Holt Elementary School
TIMMONS GROUP IIIIINUETW94THMMEME
Angad Singh ENGINEERING I DESIGN I TECHNOLOGY 52013
Skimmer Basin A
Skimmer Basin A Type of Basin: SKIMMER
Disturbed Area: 4.31 ac
Additional Drainage Area: 0.00 ac
Total Drainage Area: 4.31 ac
Runoff Coeff[Cc]: 0.60
10-yr Rainfall Intensity[1]: 7.08 in/hr
10-yr Discharge[Q10]: 18.31 cfs
Sizing of Basin
7758 Required Volume ft3 (Disturbed Area x 1800 cf/ac)
5950 Required Surface Area ft2 (Q10 x 325)
54.5 Suggested Width ft
109.1 Suggested Length ft
112 Width at Surface Area(ft)
125 Length at Surface Area(ft)
3 Side Slope Ratio Z:1
2 Depth(ft)
24 Bottom Width(ft)
79 Bottom Length(ft)
4177 Bottom Area(ft2)
14854 Actual Volume(ft3) Okay
6500 Actual Surface Area(ft2) Okay
Skimmer Size
7 Emergency Spillway Width(ft) (Inches)
1 Depth of Flow(ft) 1.5
21.0 Spillway Capacity(cfs) Okay 2
2.5
4 Skimmer Size(in) 3
0.333 Head on Skimmer(ft) 4
1.25 Orifice Size(1/4 inch increments) 5
3.72 Dewatering Time(days) 6
Suggest about 3 days 8
Elevation Area(sf) Depth(ft) Incr.Vol. (cf) Cumulative Volume (cf)
631.50 4177 0.00 0 0
632.50 5310 1.00 4744 4744
633.50 6500 2.00 5905 10649
634.50 7746 3.00 7123 17772
635.50 9049 4.00 8398 26169
Emergency Spillway Elevation: 634.00 ft
Top of Embankment Elevation: 635.00 ft
Bottom Elevation: 631.50 ft
Embankment Width: 5 ft
"RED IS USER INPUT
LATEST REVISION: 1/2/2023 11:41 AM
CHANNEL DESIGN
TDD Al 0 s E M HOLT
TIMMONS GROUP '
Angad Singh ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
TEMPORARY • DD Al
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope, &channel slope).This program determines depth of flow,velocity and tractive force assuming
n=0.03 for grass or rip rap(n can be varied if desired). (Vary depth until z actual equals z required;v&t will
be correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 2.70 (Acres)
Coef.(C)= 0.75 (Dimensionless)
Inte. (1)= 7.08 (in/hr)
Flow(Qlo)= 14.3 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 183 LF
Slope= 0.005 (ft/ft) Highest Elevation= 635.5
Z Required= 3.90 Ratio Lowest Elevation= 634.5
Side Slope(M)= 3 :1
QuantitiesVariable
Flow Depth(Y)= 1.35 ft 16.2 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.46 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
General Lining LBISF North American
Jute Net 0.45 Green Lining LBISF
Curled Mat 1.55 675 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I (12"@22"THK) 5.00 C125 2.25
Class II (18"@30"THK) 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 5.47 SF
New P= 8.54 Wetted perimeter
New R= 0.64 Hydraulic radius
Z Actual= 4.06 Must be greater than z required=> 3.90 Okay
New V= 2.73 fps
Liner: Curled Mat 1.55 LB/SF>0.47 LB/SF Okay
............ ..................:
Top Width=8.1 ft
Min. Ditch Depth 1.35 ft ...........................
3 Flow Depth(Y)=1.35 ft
;1
Bottom Width(B)=0 ft
Ditch Geometry
Min. Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) Side Slope
1.35 1 0.00 1.35 8.1 3:Ditch Liner
Curled Mat *RED IS USER INPUT
LATEST REVISION: 12/8/2022 4:12 PM
TDD Al E M HOLT
' TIMMONS GROUP •
Angad Singh ENGINEERING I DESIGN I TECHNOLOGY 52013
Ditch Outlet Protection (NYDOT Method)
' Ditch Name: DD Al
Velocity= 2.73 fps From Fig. 8.06.c: ZONE= 1
Top Width = 8.1 ft
Ditch Area= 5.4675 sf Rip Rap Class= A
Equivalent Pipe Diameter= 31.66 in Apron Thickness= 12 in
Equivalent Pipe Diameter= 36 in Apron Length = 12.0 ft
Apron Width =Top Width.= 8.1 ft
From Fig. 8.06.e:
s
Length
LATEST REVISION:12/8/2022 4:12 PM
TDD A2 0 s E M HOLT
TIMMONS GROUP '
Angad Singh ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
TEMPORARY • DD
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope, &channel slope).This program determines depth of flow,velocity and tractive force assuming
n=0.03 for grass or rip rap(n can be varied if desired). (Vary depth until z actual equals z required;v&t will
be correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.47 (Acres)
Coef.(C)= 0.75 (Dimensionless)
Inte. (1)= 7.08 (in/hr)
Flow(Qlo)= 2.5 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 79.1 LF
Slope= 0.040 (ft/ft) Highest Elevation= 643.6
Z Required= 0.25 Ratio Lowest Elevation= 640.4
Side Slope(M)= 3 :1
QuantitiesVariable
Flow Depth(Y)= 0.50 ft 6.0 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 1.26 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
General Lining LBISF North American
Jute Net 0.45 Green Lining LBISF
Curled Mat 1.55 675 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I (12"@22"THK) 5.00 C125 2.25
Class II (18"@30"THK) 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 0.75 SF
New P= 3.16 Wetted perimeter
New R= 0.24 Hydraulic radius
Z Actual= 0.29 Must be greater than z required=> 0.25 Okay
New V= 3.83 fps
Liner: Curled Mat 1.55 LB/SF>1.27 LB/SF Okay
............ ..................:
Top Width=3 ft
Min. Ditch Depth 0.5 ft ...........................
3 Flow Depth(Y)=0.5 ft
;1
Bottom Width(B)=0 ft
Ditch Geometry
Min. Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) Side Slope
0.50 1 0.00 0.50 3 3:Ditch Liner
Curled Mat *RED IS USER INPUT
LATEST REVISION: 12/8/2022 4:13 PM
TDD A2 E M HOLT
' TIMMONS GROUP •
Angad Singh ENGINEERING I DESIGN I TECHNOLOGY 52013
Ditch Outlet Protection (NYDOT Method)
' Ditch Name: DD
Velocity= 3.83 fps From Fig. 8.06.c: ZONE= 1
Top Width = 3 ft
Ditch Area= 0.75 sf Rip Rap Class= A
Equivalent Pipe Diameter= 11.73 in Apron Thickness= 12 in
Equivalent Pipe Diameter= 18 in Apron Length = 6.0 ft
Apron Width =Top Width.= 3.0 ft
From Fig. 8.06.e:
s
Length
LATEST REVISION:12/8/2022 4:13 PM
TDD A3 0 s E M HOLT
TIMMONS GROUP '
Angad Singh ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
TEMPORARY • DD
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope, &channel slope).This program determines depth of flow,velocity and tractive force assuming
n=0.03 for grass or rip rap(n can be varied if desired). (Vary depth until z actual equals z required;v&t will
be correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.78 (Acres)
Coef.(C)= 0.60 (Dimensionless)
Inte. (1)= 7.08 (in/hr)
Flow(Qlo)= 3.3 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 293.5 LF
Slope= 0.032 (ft/ft) Highest Elevation= 640
Z Required= 0.37 Ratio Lowest Elevation= 630.5
Side Slope(M)= 3 :1
QuantitiesVariable
Flow Depth(Y)= 0.60 ft 7.2 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 1.21 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
General Lining LBISF North American
Jute Net 0.45 Green Lining LBISF
Curled Mat 1.55 675 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I (12"@22"THK) 5.00 C125 2.25
Class II (18"@30"THK) 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 1.08 SF
New P= 3.79 Wetted perimeter
New R= 0.28 Hydraulic radius
Z Actual= 0.47 Must be greater than z required=> 0.37 Okay
New V= 3.87 fps
Liner: Curled Mat 1.55 LB/SF>1.22 LB/SF Okay
............ ..................:
Top Width=3.6 ft
Min. Ditch Depth 0.6 ft ...........................
3 Flow Depth(Y)=0.6 ft
;1
Bottom Width(B)=0 ft
Ditch Geometry
Min. Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) Side Slope
0.60 1 0.00 0.60 3.6 3:Ditch Liner
Curled Mat *RED IS USER INPUT
LATEST REVISION: 12/8/2022 4:13 PM
TDD A3 E M HOLT
' TIMMONS GROUP •
Angad Singh ENGINEERING I DESIGN I TECHNOLOGY 52013
Ditch Outlet Protection (NYDOT Method)
' Ditch Name: DD
Velocity= 3.87 fps From Fig. 8.06.c: ZONE= 1
Top Width = 3.6 ft
Ditch Area= 1.08 sf Rip Rap Class= A
Equivalent Pipe Diameter= 14.07 in Apron Thickness= 12 in
Equivalent Pipe Diameter= 18 in Apron Length = 6.0 ft
Apron Width =Top Width.= 3.6 ft
From Fig. 8.06.e:
s
Length
LATEST REVISION:12/8/2022 4:13 PM
",SOif '•
PD61
' EM Holt ES
' - TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.31 (Acres)
Coef.(C)= 0.54 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 1.2 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 138 LF
Slope= 0.032 (ft/ft) Highest Elevation= 644.7
Z Required= 0.13 Ratio Lowest Elevation= 640.25
Side Slope(M)= 4 :1
Variable RWidth -.
Flow Depth(Y)= 0.35 ft 4.2 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.70 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 0.49 SF
New P= 2.89 Wetted perimeter
New R= 0.17 Hydraulic radius
Z Actual= 0.15 Must be greater than z required=> 0.13 Okay
New V= 2.73 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.71 LB/SF Okay
---------- - 2----ft------------
Top Width Min. Ditch Depth 0.35 ft --------------------.
4 Flow Depth(Y)=0.35 ft
-----------------------
Bottom Width(B)=0 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
0.35 1 0.00 1 0.35 2.8 1 41
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/1/2023 2:49 PM
",SOif '•
PD62 ' EM Holt ES
' - TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 1.64 (Acres)
Coef.(C)= 0.58 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 6.7 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 155 LF
Slope= 0.032 (ft/ft) Highest Elevation= 639.9
Z Required= 0.76 Ratio Lowest Elevation= 635
Side Slope(M)= 11 :1
Variable RWidth -.
Flow Depth(Y)= 0.40 ft 4.8 in
Bottom Width(B)= 2.00 ft 24.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.79 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 2.56 SF
New P= 10.84 Wetted perimeter
New R= 0.24 Hydraulic radius
Z Actual= 0.98 Must be greater than z required=> 0.76 Okay
New V= 3.37 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.79 LB/SF Okay
----------------------------------------------------
Top Width=10.8 ft
Min. Ditch Depth 0.4 ft --------------------.
11 Flow Depth(Y)=0.4 ft
1
Bottom Width(B)=2 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
0.40 1 2.00 1 0.40 10.8 1 111
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/3/2023 7:32 AM
",SOif '•
PD63 ' EM Holt ES
' - TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.18 (Acres)
Coef.(C)= 0.76 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 1.0 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 122 LF
Slope= 0.031 (ft/ft) Highest Elevation= 638.75
Z Required= 0.11 Ratio Lowest Elevation= 635
Side Slope(M)= 12 :1
Variable RWidth -.
Flow Depth(Y)= 0.15 ft 1.8 in
Bottom Width(B)= 2.00 ft 24.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.29 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 0.57 SF
New P= 5.61 Wetted perimeter
New R= 0.10 Hydraulic radius
Z Actual= 0.12 Must be greater than z required=> 0.11 Okay
New V= 1.90 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.29 LB/SF Okay
----------------------------------------------------
Top Width=5.6 ft
Min. Ditch Depth 0.15 ft --------------------.
12 Flow Depth(Y)=0.15 ft
-----------------------
Bottom Width(B)=2 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
0.15 1 2.00 1 0.15 5.6 1 121
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/3/2023 7:34 AM
PDD4 & 0 EM Holt ES
- 11 TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD-
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.65 (Acres)
Coef.(C)= 0.63 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 2.9 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 195 LF
Slope= 0.037 (ft/ft) Highest Elevation= 644.25
Z Required= 0.30 Ratio Lowest Elevation= 637
Side Slope(M)= 9 :1
Variable RWidth -.
Flow Depth(Y)= 0.35 ft 4.2 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.81 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 1.10 SF
New P= 6.34 Wetted perimeter
New R= 0.17 Hydraulic radius
Z Actual= 0.34 Must be greater than z required=> 0.30 Okay
New V= 2.98 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.82 LB/SF Okay
----------Top Width- ---3-ft------------
Min. Ditch Depth 0.35 ft --------------------.
9 Flow Depth(Y)=0.35 ft
-----------------------
Bottom Width(B)=0 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
0.35 1 0.00 1 0.35 6.3 1 91
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/1/2023 2:58 PM
",SOif '•
PD65 ' EM Holt ES
' - TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.49 (Acres)
Coef.(C)= 0.46 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 1.6 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 159 LF
Slope= 0.031 (ft/ft) Highest Elevation= 641.5
Z Required= 0.18 Ratio Lowest Elevation= 636.5
Side Slope(M)= 7 :1
Variable RWidth -.
Flow Depth(Y)= 0.35 ft 4.2 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.69 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 0.86 SF
New P= 4.95 Wetted perimeter
New R= 0.17 Hydraulic radius
Z Actual= 0.27 Must be greater than z required=> 0.18 Okay
New V= 2.74 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.69 LB/SF Okay
---------- - 4-9-ft------------
Top Width Min. Ditch Depth 0.35 ft --------------------.
1
Flow Depth(Y)=0.35 ft
-----------------------
Bottom Width(B)=0 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
0.35 1 0.00 1 0.35 4.9 1 71
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/1/2023 3:03 PM
PD66 % EM Holt ES
' - �TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD.
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 3.71 (Acres)
Coef.(C)= 0.55 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 14.4 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 357 LF
Slope= 0.010 (ft/ft) Highest Elevation= 635
Z Required= 2.98 Ratio Lowest Elevation= 631.6
Side Slope(M)= 4 :1
Variable RWidth -.
Flow Depth(Y)= 1.10 ft 13.2 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.65 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 4.84 SF
New P= 9.07 Wetted perimeter
New R= 0.53 Hydraulic radius
Z Actual= 3.18 Must be greater than z required=> 2.98 Okay
New V= 3.19 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.66 LB/SF Okay
----------Top Width- --------------------
Min. Ditch Depth 1.1 ft -----
---------
----------------
.
4 Flow Depth(Y)=1.1 ft
-----------------------
Bottom Width(B)=0 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
1.10 1 0.00 1.10 8.8 1 41
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/1/2023 3:03 PM
",SOif '•
PD67 ' EM Holt ES
' - TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.23 (Acres)
Coef.(C)= 0.45 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 0.7 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 147 LF
Slope= 0.047 (ft/ft) Highest Elevation= 642.9
Z Required= 0.07 Ratio Lowest Elevation= 636
Side Slope(M)= 3 :1
Variable RWidth -.
Flow Depth(Y)= 0.30 ft 3.6 in
Bottom Width(B)= 0.00 ft 0.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.88 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 0.27 SF
New P= 1.90 Wetted perimeter
New R= 0.14 Hydraulic radius
Z Actual= 0.07 Must be greater than z required=> 0.07 Okay
New V= 2.93 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.88 LB/SF Okay
----------Top Width- 1----ft------------
Min. Ditch Depth 0.3 ft --------------------.
3 Flow Depth(Y)=0.3 ft
1
Bottom Width(B)=0 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
0.30 1 0.00 1 0.30 1.8 1 31
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/1/2023 3:05 PM
",SOif '•
PD68 ' EM Holt ES
' - TIMMONS GROUP -
Lynsie Barnes ENGINEERING I DESIGN I TECHNOLOGY 52013
Drainage Ditch Design (Velocity Constraint)
DIVERSIONPERMANENT •DD:
This worksheet is designed to determine channel lining based on flow and ditch geometry(base width,side
slope,&channel slope).This program determines depth of flow,velocity and tractive force assuming n=0.03
for grass or rip rap(n can be varied if desired).(Vary depth until z actual equals z required;v&t will be
correct;select appropriate lining based on tractive force)
Watershed Data
Area(A)= 0.64 (Acres)
Coef.(C)= 0.61 (Dimensionless)
Inte.(1)= 7.08 (in/hr)
Flow(Q10)= 2.8 (cfs)
QuantitiesKnown
Line channel with: 6 "rip-rap (Assume 6"even if using grass)
Manning n= 0.030 (Dimensionless) Ditch Length= 70 LF
Slope= 0.029 (ft/ft) Highest Elevation= 645
Z Required= 0.33 Ratio Lowest Elevation= 643
Side Slope(M)= 3 :1
Variable RWidth -.
Flow Depth(Y)= 0.35 ft 4.2 in
Bottom Width(B)= 2.00 ft 24.0 in
Freeboard= 0.00 ft 0.0 in
Compute .
T=YxDxS Y=Weight of water(62.4 LB/CUFT)
T= 0.62 LB/SF D=Depth of flow in channel(ft)
S=Slope of channel(ft/ft)
LeTg-jgn North American
Jute Net 0.45 Green Lining LB/SF
Curled Mat 1.55 S75 1.55
Class A(4"@9"THK) 2.00 S150 1.75
Class B(8"@18"THK) 3.50 SC150 2.10
Class I(12"@22"THK) 5.007 C125 2.25
Class 11 18" 30"THK 7.50 P300 8.00
Determine If Z Actual Is Greater Than Z Required
New A= 1.07 SF
New P= 4.21 Wetted perimeter
New R= 0.25 Hydraulic radius
Z Actual= 0.43 Must be greater than z required=> 0.33 Okay
New V= 3.36 fps
Minimum Design Geometry
Liner: Curled Mat 1.55 LB/SF>0.63 LB/SF Okay
----------------------------------------------------
Top Width=4.1 ft
Min. Ditch Depth 0.35 ft --------------------.
3 Flow Depth(Y)=0.35 ft
----------------------------
-----------------------
Bottom Width(B)=2 ft
Ditch Ditch Depth(ft) Bottom Width(ft) Flow Depth(ft) Top Width(ft) ISide Slope
0.35 1 2.00 1 0.35 4.1 1 31
Curled Mat I *RED IS USER INPUT
LATEST REVISION:5/3/2023 10:27 AM
PRE/POST IMPERVIOUS MAP
FOR REVIEW ONLY
c
e •
L y
— s
570 �a
�SS7Z ac ,
INQ- •
TT W
DO NOT USE FOR CONSTRUCTION
E
I I g
o c
o
N E
W u E
Z
0 1u is
a � —
? z
Lu 0 o -m O
1 , 1 a-
it i it i o _ �' 1
/ ' 1Lu
1 1f pi
tf
N i
--- '' '--- a x cn
a ,Q w
� 0 0
U-) L O
----------- l \+ I ----------- I \+ I ~
CD W
Li Li Ln
W
ui
x x p
I
F_
I I w
W
U 0
o o
Lr) DATE
\ 1 \ 1 0510512023
1 1 0
DRAWN BY
LMB
X _ ® X_ ��1 1 / X _ ® XJ DESIGNED BY
GWF
—XJ ` �1 \ L —XJ • CHECKED BY
` 1 ` / \ • GWF
Al � \ _ Al \
SCALE
AS SHOWN
3 / 3
OAP 011( •
IL
cu
/ O =
z X__�7 019 / X� off` CL
cn
Q Q N LJJ c
0A ,0-j0F z 01 j0F z w a z z
SCALE 1"=100' SCALE 1"=100' LJJ (0 a
z a
0 100' 200' 0 160, 200' J w
c LJJ c
EXISTING CONDITIONS POST CONDITIONS z
W U a
J U � 0
c 0 W
a
O J z ��
Q � � � 0
M
U � 0 �
_ c~n co
M ID
N E M HOLT RENOVATION AND ADDITION BUA: E M HOLT RENOVATION AND ADDITION BUA: a o
M0
U
In O O
A: TOTAL PARCEL SIZE: 30.2 AC EXISTING IMPERVIOUS z = z N
o O a�'i
a B: 2007 GRANDFATHERED BUA: 5.46 AC (PRE-ORDINANCE)
3 PROPOSED IMPERVIOUS r
a C (A-B): NEW"PARCEL" SIZE SUBJECT TO 24% BUA: 24.74 AC
d L
D (C X 24%): ALLOWABLE IMPERVIOUS: 5.94 AC — — PROPERTY BOUNDARY ui a
U > c
Y
m E (B + D): TOTAL ALLOWABLE IMPERVIOUS: 11.40 AC cn
M X c
0 .0
o F: TOTAL ONSITE IMPERVIOUS 2023: 5.77 AC
b THIS DRAWING IS FOR AGENCY REVIEW ONLY- NOT FOR CONSTRUCTION
G (F- B): 2023 ADDITIONAL IMPERVIOUS: 0.31 AC ° °
aa) o
H (G/C x 100): % BUA 2023: 1.25% (UNDER 24%) =
DRAINAGE TO EXISTING PIPE NETWORK-POINT OF ANALYSIS 1 $ m
o IMPERVIOUS AREA UNDER ALLOWABLE (D-G): 5.63 ±ACRES PRE-DEVELOPMENT POST-DEVELOPMENT DIFFERENCE '
w
JOB NO. o
_� % BUA UNDER ALLOWABLE (24% - H): 22.75% BUA IMPERVOUS AREA 0.457 ACRES 0.439 ACRES 0.018 ACRES °
w (19,923 SQFT) (19,119 SQFT) (804 SQFT) 52013 N
N c
0
oN SHEET NO. m co
n
co
coC3. 1
M
f—
L