Loading...
HomeMy WebLinkAbout20040124 Ver 3_More Info Letter_20040316imap://Cynthia.vanderwiele~l~40dwq.denr.nemail.net it c... Subject: Re: R-2813C From: "T. Lindsey Riddick" <Iriddick@dot.state.nc.us> Date: Wed, 10 Mar 2004 17:47:17 -0500 To: Cynthia Van Der Wiele <cynthia.vanderwiele@ncmail.net> CC: Michael A Turchy <maturchy@dot.state.nc.us> Sounds good. I've contacted EEP and hopefully we will be able to get their letter soon. Thanks again for your help. LR Cynthia Van Der Wiele wrcte: No problem. I've done a preliminary review to check for any "loose ends". The only thing that's needed is: 1. Public Notice (from USACE) 2. ICI report 3. EEP confirmation letter. I've reviewed the plans/hydraulic design against meeting notes, minutes and everything is OK there. So, once the public notice is issued and the comment period ends, I can issue the 401 immediately (unless the ICI reveals the need for some special conditions like Monroe or Kannapolis). If that's the case, I will let everyone know asap. T. Lindsey Riddick wrote: Thanks, Cynthia. I appreciate you letting Michael know you were still waiting on the ICI. Michael is out of the office for a few days and I told him I would check on the ICI while he was out b/c he wanted to make sure you get it as soon as it is available. Just trying to make sure we're doing all we can to get yc what you need for issuance. Thanks again for your help. LR Cynthia Van Der Wiele wrote: The only reason it's an issue is because I have a permit application on my desk...The public notice hasn't arrived yet, but...i don't want anything to be perceived as delaying the issuance of this. Robert Deaton wrote: Hey Lindsey, One of our consultants, HNTB, is working on this project as we speak. We happened to talk with them today, and they should have a draft to us in a week or two, and then we'll review it and turn it back to them for the final copy. Their reports are usually pretty sharp, and we don't often have loads of comments requiring an extensive rewrite, so it shouldn't take long to get the final in after our comments . Ultimately, we should have the final copy in DWQ's hands the last week in March. If that time-frame presents a problem, let us know and we'll see what we can do to speed it up. Bob 715-1588 "T. Lindsey Riddick" wrote: 1 of 2 3/16/200410:23 AM i~nap://cynthia.vanderwiele%4 Odwq.denr.ncnutil.nctLir~c... Bob, Got an emial from DWQ that says they don't have a copy of the ICI for this project. Is it available? Can we send them a copy? Thanks. LR 2 of 2 3/16/200410:23 AM