Loading...
HomeMy WebLinkAbout20230675 Ver 1_Site Plan_20230512 La ke (At Full Pond/Normal water Level) I below x loo' 1 Q5 '6e.I0W ?C ao Pull Pond/ Normal Water Level am Shoreline ' be4�h 1�, 1'a6ove X i0pr I� , ermove. +reel/ 6ru:5-) a,bov e X a0 on imme-&a-VC i ao' length Shore\I n-e_ t0' 1Yl nlrra�t d'+6i�� barce Uncle-ve�ot ed W C12 o�- C 5 Please approximately sketch the following information on this plan, length ©f shareline (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/Formal Wafer Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/Normal Water Level elevation 6. Location of construction access corridors l�tJall -1o�ers down ors hancl 5►6e- o� CNoct<, a� I�eo eh area. 16 FotkoW -the. nc,- ora.1 Con-door oV 6 More-`,ne 4 13eocln are-a- W',tl nod be 1ynPOC-�ed FORM:SSGP 10-2013 Page 3 of 3