Loading...
HomeMy WebLinkAboutWQ0044349_Application (FTSE)_20230427Received 4-27-2023 State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: WQ0044349 (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Uwharrie Green School, INC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Chris Wheat per 15A NCAC 02T .0106(b) Title: Assistant Superintendent 4. Applicant's mailing address: 5154 US HWY 220 Bus S City: Asheboro State: NC Zip: 27205- 5. Applicant's contact information: Phone number: (336) 610-0818 Email Address: Chris wheatkuwharriecharter.org II. PROJECT INFORMATION: 1. Project name: Uwharrie Charter Academy High School & Trades 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Randolph County 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.6294' Longitude:-78.8258' 5. Parcel ID (if applicable): 7658355370 & 7658338825 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Steven Miller License Number: 22625 Firm: CLH Design PA Mailing address: 400 Regency Forest Dr. #120 City: Cary State: NC Zip: 27518- Phone number: (919) 319-6716 Email Address: smiller@clhdesignpa.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: City of Asheboro WWTP Owner Name: City of Asheboro V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): NC00026123 2. Downstream (Receiving) Sewer Information: Permit Number: NC00026123 ❑ Gravity ❑X Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS NA Owner Name(s): City of Asheboro FORM: FTA 06-21 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® N/A 4. Origin of wastewater: (check all that apply): ❑ Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ® School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater : 0 % Domestic 100 % Commercial 0 % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow High School 10 gal/student 800 8,000 GPD GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 8,000 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 8,000 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 233 PVC 8 98 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: Uwharrie Charter High School 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.6287' Longitude:-79.8305' 3. Total number of pumps at the pump station: 2 3. Design flow of the pump station: 0.13536 millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): 94 gallons per minute (GPM) at 83 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 4 1195 PVC If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01 C. Lb. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ® Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(fl & (g)? ® Yes ❑ No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches ZWater mains (vertical - water over sewer preferred, including in benched trenches) 18 inches ZWater mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 02T.0305( or (g), see Section X.1 of this application *15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0I05(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for thePermittingof Pump Stations and Force Mains (latest version), and the Gravity -Sewer -Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and proiects requiring a variance approve! may be subiect to Ionger review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the proiect, the full technical review is required. 2. Professional Engineer's Certification: I, Steven J. Miller , attest that this application for Uwharfie Charter Academy High School & Trades (Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item H.1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC,56.0,7,Q4 North Carolina Professional Engineer's seal, signature, and date: D�0�^'m • r AL 02 625 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Chris Wheat attest that this application for Uwharrie Charter Academy High School & Trades (Signature Authority Name from Application Item 1.3.) (Project Name from Application Item H.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information -and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-21 S.6B, any person who knowingly makes any false statement, representation, or certification in any ap ication package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as ci nalties up to $25,000 per violation. Signature: Date: r FORM: FTA 06-21 Page 5 of 5 6/27/22, 1:32 PM North Carolina Secretary of State Search Results • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings Non -Profit Corporation Legal Name Uwharrie Green School, Inc. Information Sosld: 1180565 Status: Current -Active O Date Formed: 12/20/2010 Citizenship: Domestic Annual Report Due Date: Registered Agent: Whatley, L McKay Addresses Mailing 19 South Fayetteville Street Asheboro, NC 27203 Reg Mailing 19 South Fayetteville Street Asheboro, NC 27203 Officers Principal Office 19 South Fayetteville Street Asheboro, NC 27203 Reg Office 19 South Fayetteville Street Asheboro, NC 27203 https://www.sosnc.gov/online_services/search/Business_Registration_ResuIts 1/1 State of North Carolina Department of Environmental Quality Division of Water Resources Division of Wafter ResourcesFlow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Asheboro Project Name for which flow is being requested: Uwharrie Charter School More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: City of Asheboro WWTP b. WWTP Facility Permit #: NC00026123 All flows are in MGD c. WWTP facility's permitted flow 9.0 d. Estimated obligated flow not yet tributary to the WWTP 0.441 e. WWTP facility's actual avg. flow 3.570 £ Total flow for this specific request 0.025 Tkcs C64 was a ►I+c-G �`O +,0 g. Total actual and obligated flows to the facility 4.036 �o,�; t., _,6 , 3-0 ~ 43 h. Percent of permitted flow used 44.8 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Total Pump Pump Daily Current Not Yet Current Flow Station Station Firm Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm / pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** 14 WQCS00025 0.345 0.138 0.030 0 0.030 0.207 6 WQCS00025 2.59 1.04 0.216 0.055 0.271 0.769 2 WQCS00025 4.75 1.9 0.389 0.074 0.463 1.437 0 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page 1 of 6 FTSE 10-18 III. Certification Statement: I John N. Ogburn, III certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. of Signing Page 2 of 6 FTSE 10-18 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Uwharrie Green School, INC Project Name for which flow is being requested: Uwharrie Charter Academ HS & Trades More than one FTSE may be required far a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: _ b. WWTP Facility Permit #: All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station (Name or Permit Number) No. S eagrove- Uwharric (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Average Approx. Not Yet Total Current Firm Daily Flow** Current Tributary Flow Plus Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available MGD MGD Flow, MGD MGD Flow Capacity*** 0.288 0.1152 0.025 0 0.025 0,0902 Note: This Flow was allocated to the Pump Station on 3-19-23. * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): City of Asheboro Downstream Permit Number: NCO0026123 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Mike Walker certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Ojfcz�hl Signature Date Title of Signing ; --762 Page 2 of 6 FTSE 1Q-18 q NON hFiGyT o�L J 1 )n Vv ANS T i 800 ✓-J I I LUDLUM LN = VIRGI BELL SlM ONS RD � m MIILCER�RDEXD a I v 800 �0 800 R SOL17HMONT Ij �I � O -� j STEL Phi ,p i si— agR�% E R o D � l � Doti � � 00 QUAD MAP: ASHEBORO QUADRANGLE DATE: 2019 AVWRIE CHARTER ACADEMY HIGH SCHO( SHEBORO, NC lATE APRIL, 2023 ROJECT NO. 21.136 'ANDOLPH COUNTY QUAD MAP THORNE DR o 1 CLEARVIEW DR J o� -7 i �-fr _ = o ¢� 0h0 , -• �I 850 o z Q � W W OBUS 220 Oa i�f���/ltS p,pC � �Farlozos TALL PINE ST -- _ 0 LJlah D� (J �D P L LTI v SCALE 1" = 2000' CLH DESIGN, P.A. Regency Park 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919) 319-6716 Fax: (919) 319-7516 NCDWR Fast -Track Application Attachment — Project Narrative Project: Uwharrie Charter Academy High School Owner: Wake County Board of Education Engineer: CLH Design, PA Date: 10-April-2023 The project proposes the construction of a new high school, and associated parking on a 39.98- acre tract with an additional 33.25-acre parcel to the south to source soil for the project. The project is located off US Hwy 220 Business South, just south of the 64 bypass. This tract has an existing middle school on the northeast half of the site. The High School will be built to the west of the existing school and the administrative building will be built to the north of the existing middle school. The student capacity of the new school will be 800 students. The High School will have a warming only cafeteria and no showers. An existing pump station and forcemain serve the existing middle school building to the northeast of the High School project. The proposed project includes a new pump station and forcemain that will connect to the existing forcemain. The site proposes private sewer which includes approximately 330-ft of 8-in private gravity sewer and 1,195-1f forcemain. The new system will discharge to a sewer system owned and operated by Seagrove. The Seagrove — Ulah Metropolitan Water District has applied to DEQ for a permit to increase the capacity of the downstream sewer system. The existing wetlands on the site that will not be impacted by this project. No streams are impacted by this project.