Loading...
HomeMy WebLinkAboutWQ0014391_Monitoring - 01-2023_20230502Monitoring Report Submittal Permit Number#* Name of Facility:* Month: * January WQ0014391 Builders First Source Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: Name of Submitter: * Signature: Date of submittal: Initial Review Biowater@aol.com Randall Jarrell Reviewer: Wanda.Gerald Year:* 2023 Upload Document* BFS NDMR 1-23 (2).pdf PDF Only 6.02 M B Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). 5/2/2023 This will be filled in automatically Is the project number correct?* WQ0014391 Is the monitoring report accepted?* Yes No Regional Office* Raleigh Reviewer: _anonymous Review Date: 5/12/2023 FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page [ of Permit No.: WQ0014391 Facility Name: Builders FirstSource - Apex Yard WWTF County: Chatham Month: January Year: 2023 PPI: 002 Flow Measuring Point: E influent ❑ Effluent ❑ No flow generated Parameter Monitoring Point: ❑ influent 0 Effluent ❑ Groundwater Lowering ❑ surface water Parameter Code - 10 50050 00310 31616 00610 00625 00620 00600 00400 00665 00530 >, '70c N Q E o O �_ .d+ O 03 � 0 I t�.1 0 L) 'o O a = m N o Z Z 16 Z 2 t t a v "C N •�. C 'a w N 24-hr hrs GPD mg/L #1100 mL mg/L mg/L mg/L mg/L su mg/L mg/L 1 343 2 343 3 11:05 0.33 343 6.26 4 704 5 704 6 704 7 704 8 704 9 12:20 0.42 704 6.31 10 704 11 704 121 704 13 704 14 704 15 704 16 12:15 0.33 704 6.42 17 768 181 768 19 768 20 768 21 1 768 22 768 23 12:35 0.42 768 6.48 241 768 25 768 26 768 27 768 28 768 29 768 301 13:25 0.42 768 6.39 311 1 768 Average: 700 Daily Maximum: 768 6.48 Daily Minimum: 343 6.26 Sampling Type: Estimate Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: 3,750 30 200 15 30 Daily Limit: Sample Frequency: Monthly 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year Weekly 3 X Year 3 X Year FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page '— of 8 Sampling Person(s) 11 Certified Laboratories Name: Randall Jarrell Name: ENCO Name: Name: Wastewater Management, L.L.C. Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessarv. Operator in Responsible Charge (ORC) Certification I ORC: Randall Jarrell I Certification No.: 23925 Grade: Phone Number: 919-210-2500 Has the ORC changed since the previous NDMR? ❑ Yes (] No Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Permittee Certification Permittee: Goldston - Apex Properties, L.L.C. Signing official: Randall Jarrell Signing Official's Title: ORC Phone Number: Permit Expiration: Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of 8 •.: WQ0014391 Facility Name: Builders• - Apex • WWTF County:anuary 1 •irrigationoccur 17910 . Name: Field 1 • 1 i at this facility? / • 1 • 1 • 1 Cover Crop: YES NO Hourly Rate (in): Annual Rate (in): Annual Rate (inKi ••. • • .. • •Field •. •? Field Irrigated? •Fiel,1 Irrigated?0 • Monthly Loading: 12 Month Floating Total (in): FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Li of g Permit No.: WQ0014391 Facility Name: Builders• - Apex Yard WWTF County:Month:anuary •irrigationoccur Field 1 Field Name: Field 1 •: at this facility? Area (acres): 1 • / •Area1 • 1 Giver Crop: C+V r Crop:, [v�] YES NO Hourly Rate (in):;��� Hourly Rate (in)- ►► .Annual Rate (in): Annual Rate (in):' m ___ __ -_-- ---- -_-- -_-- ® ___ __ -_-- -_-- -_-- -_-- ® ___ __ -_-- ---- -_-- -_-- m ___ __ ---- ---- -_-- ---- m =®M _ -_-- ---- -_-- -_-- m ___ __ -_-- ---- -_-- -_-- ® ___ __ -_-- ---- -_-- -_-- ® =®M __ -_-- ---- -_-- -_-- ® ___ __ -_-- ---- -__- -_-- Monthly•.. • ��jj�� 1 11 jj/��jj���jj/j 1 •/ jjjjjj���jjj/j�0 9• 11 12 M*nth FloatingTotalmmm mm�mmm:,mjjjm mm� ojjm/ ,o jjjjj jjm� EMmN= N= �jjj/ FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page s of a WQ0014391 Facility Name: 7County: #NAME? Month: January 1 • irrigationoccur Field 1 • • 1 S . 1 • 1 C at this facility? 1 /Area / I Area I Cover Crop: C4ver Crop: I Cover Crop:' 7 YES El NO Hourly Rate (in): Hourly Rate (in):; Annua-rRril .•. --.•. . - . .. -. • - . •. -. Q • - • Field Irrigated? ®_____ 11 ��� 11 m� 1 1®' � 1 1 1 • • • 1 ® ___ Monthly... • • 11jj=�j��/�jj� • /1jjjjj/�j�/���/ �' jjj/j�/®jj�jj.�jj���j® Month12 •. . • j��jj����j/�jj��jjjjjjj�jjjjj����jjjj�i.�������/ij�jjjjjj//,jjj��j • 1 �jjjj�i.'•�jjjjjjji. j/��jj/��jj�jj FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page G of-, Permit No.: VVQ0014391 Facility Name: Builders FirstSource - Apex Yard WWTF County: Chatham Month: January Year: 2023 Did irrigation occur Field Name: 02-3A Field Name: 02-313 Field Name: 02-4A Field Name: 02-413 at this facility? Area (acres): 0.32 Area (acres): 0.25 Area (acres): 0.28 Area (acres): 0.32 Cover Crop: Pine Trees Cover Crop: Pine Trees Cover Crop: Pine Trees Cover Crop: Pine Trees ❑ YES ❑ NO Hourly Rate (in): 0.2 Hourly Rate (in): 0.2 Hourly Rate (in): 0.2 Hourly Rate (in): 0.2 Annual Rate (in): 18.11 Annual Rate (in): 18.11 Annual Rate (in): 18.11 Annual Rate (in): 18.11 Weather Freeboard Field Irrigated? ❑ YES ❑ NO Field Irrigated? ❑ YES ❑ NO Field Irri ated? 9 ❑ YES ❑ NO Field Irrigated? YES ❑ NO T a d Y f F f Q UO d T Q R to d 3 n C i E m y O 7 =E p X O Oi E _ Q Q c N @Ea Of6 = p O Q iQ M E 0 d N iQ CD ~t �. c O J �EO C E3 =�' 6C O J OF in ft ft gal min in in gal min in in gal min in in gal min in in 1 2 3 PC 62 0.4 754 38 0.09 0.09 754 38 0.11 0.11 746 38 0.10 0.10 731 37 0.08 0.08 4 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 5 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 6 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 7 1 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 8 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 1 0.14 9 C 51 0.65 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 10 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 ill 1,508 75 0.17 1 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 12 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 13 1 1, 508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 14 1,508 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 15 1,508 1 75 0.17 0.14 1,508 75 0.22 0.18 1,492 75 0.20 0.16 1,462 74 0.17 0.14 16 PC 51 0.53 754 38 0.09 0.09 1,508 75 0.22 0.18 746 38 0.10 0.10 731 37 0.08 0.08 17 18 19 20 21 22 23 PC 51 1.03 24 25 26 27 28 29 30 PC 59 0.89 31 I Monthly Lo ading:11 19,604 2.26 20,358 3.00 19,396 2.55 19,006 2.19 12 Month Floating Total (in): 5.38 7.00 6.06 5.20 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page -1 of e Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? 0 Compliant ❑ Non -Compliant El Compliant ❑ Non -Compliant El Compliant ❑ Non -Compliant 2 Compliant ❑ Non -Compliant El Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessarv. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Randall Jarrell Permittee: Goldston - Apex Properties, L.L.C. Certification No.: 23925 Signing Official: Randall Jarrell Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC Has the ORC changed since the previous NDAR-1? ❑ Yes F No Phone Number: 919-201-0347 Permit Exp.: 3 20 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Builders First Source 12 Month Rolling Total Application In Inches 2023 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2023 Field Jan Feb March April May June July August Sept Oct Nov Dec Total 1 0 0 0 0 0 0 0 0 0 4.03 0 0 4.03 2 0 0 0 0 0 0 0 0 0 4.03 0 0 4.03 3 0 0 0 0 0 0 0 0 0 3.95 0 0 3.95 4 0 0 0 0 0 0 0 0 0 3.9 0 0 3.9 5 0 0 0 0 0 0 0 0 0 3.97 0 0 3.97 6 0 0 0 0 0 0 0 0 0 3.97 0 0 3.97 7 0 0 0 0 0 0 0 0 0 3.97 0 0 3.97 8 0 0 0 0 0 0 0 0 0 3.97 0 0 3.97 9 3.99 0 0 0 0 5.55 0 0 0 0 0 0 9.54 10 3.26 0 0 0 0 4.54 0 0 0 0 0 0 7.8 11 2.55 0 0 0 0 3.55 0 0 0 0 0 0 6.1 12 3.23 0 0 0 0 4.27 0 0 0 0 0 0 7.5 13 2.26 0 0 0 0 3.12 0 0 0 0 0 0 5.38 14 3 0 0 0 0 4 0 0 0 0 0 0 7 15 2.55 0 0 0 0 3.51 0 0 0 0 0 0 6.06 16 2.19 0 0 0 0 3.01 0 0 0 0 0 0 5.2