Loading...
HomeMy WebLinkAboutNCC213593_NOT Closeout Documents_20230508 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Onslow Project: Jacksonville Setion 1-2 Dist Gas Line River basin: White Oak Person financially responsible:Piedmont Natural Gas-Joseph B Keily Project#: ONSLO-2021-087 Address: 401 Executive Parkway,New Bern,NC 28562 1. Project Location: Fire Tower Rd;;Pony Farm Rd., Pictures: No Jacksonville 2. Weather and soil conditions: 70 clear dry Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Brad Tripp Title: Duke Inspection report: Sent Report Date given/sent: May 02,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. file closed brian.lambe@ncdenr.gov Reported by: Brian Lambe Others present: Date of inspection: May 02,2023 Time arriving on site: 8:10AM Time leaving site: 8:20 AM cc: