HomeMy WebLinkAbout820058_Routine Inspection_20230504i ype or visit: j<-,rt..,ompnance inspection V operation Review U Structure Evaluation O Technical Assistance
Reason for Visit: j(D-Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: ; C) Departure Time: J� County:
Farm Name: Owner Email:
Owner Name: } (.cJAL Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative: t
Certified Operator:
Back-up Operator:
Location of Farm:
Title:
Latitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Region:62L
Phone:
Integrator:
Certification Number:
Certification Number: 1106 g7lt`
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
❑ Yes _21"No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes o ❑ NA ❑ NE
❑ Yes -0 No ❑ NA ❑ NE
Page 1 of 3 511212020 Continued
Facility Number: Date of Inspection:, 1I
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes .r-E5-No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes 0 No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: f
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes -T 10 ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes -ErNo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes -�No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require Yes 0 No ❑ NA ONE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes - ET io ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes f7rNo ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): 1 4:_ 1�ibk_4)
U
13. Soil Type(s): z0a 1-
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes f f T714o ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes ,e�No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes.2]Ro ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes E:fNo ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes _Jallo ❑ NA ❑ NE
Reauired Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes JE[-N-o 0 NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes La"No ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. 0 Yes 0 No ❑ NA 0 NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes,,Q No ❑ NA 0 NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes J�fNo ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: - 7Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes _Q-No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes _E]-No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes .-ElNo
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes .Q-No
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑NA ❑NE
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ Yes r f Hr 10 ❑ NA ❑ NE
❑ Yes.—E[--N"N ❑ NA ❑ NE
❑ Yes fffNo ❑ NA ❑ NE
❑ Yes ..- rNo ❑ NA ❑ NE
❑ Yes J::]-No ❑ NA ❑ NE
❑ Yes ..❑ No ❑ NA ❑ NE
❑ Yes J❑'IQo ❑ NA ❑ NE
cde�ey� oyo is Yv '0"„a /vo asr�,
Reviewer/Inspector Name
Phone:Ild
Reviewer/Inspector Signature:
Page 3 of 3
Date:
511212020
FACILITY # FARM NAME:
LAGOON LEVEL
PERMIT ct9)
- DUE EVERY 5 YEARS
- EXPERIATION DATE
- CURRENT NUMBER OF ANIMAL
- OIC CARD YES OR NO
NUMBER OF ANIMALS
WASTE UTILIZATION PLAN (WUP) (#20)
SOIL TYPES
CROP TYPES
- ODOR CONTROL CHECK LIST YES OR NO
- Irrigation Plan Maps YES OR NO
WASTE REPORT (#21)
-GOOD FOR 60 DAYS BEFORE OR AFTER
DATE G % / ��
NITROGEN LEVEL ; L�4 U
DATE-1l �'G ( 1,93
NITROGEN LEVEL
DATE 1f 1dQ-
NITROGEN LEVEL if
SOIL REPORT
- EVERY 3 YEARS:
DATE /,2-/b/)L/
- P-1 (NO MORE THEN 400)
- P H (Note if 4 or less)
— Cu/ZN (NO MORE THEN 3000) CU ZN
(IF PEANUTS NO MORE THEN 300)
IRR2 (#21)
Not over PAN
FLOW RATES
Not over PAN
FLOW RATES
CROP TYPES
NITROGEN (N) _
CROP TYPES
NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
Not over PAN
FLOW RATES
CROP TYPES
NITROGEN (N)
CALBRIATION (#24)
EACH REEL SHOULD BE CALIBRATED EVERY OTHER YEAR
DATE OF CALIBRATION
FLOW RATES 7 �_
RAIN FALL (#21)
-INITIAL AFTER 1" RAIN EVENT
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED.
SLUDGE (#21 &25)
DUE EVERY YEAR: DATE
0: P:
% RATIO OF SLUDGE
0: P:
% RATIO OF SLUDGE
0: P:
% RATIO OF SLUDGE
0: P.
% RATIO OF SLUDGE
OTHER FORMS (#22 AND #21)
RAIN BREAKER FORM CROP YEILDS MORTALITY
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON SEEPAGE LAGOON BARE
AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS GOOD HEALTHY CORPS CORRECT
CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE
Bermuda grass: Opens March 1 st - Ends September 30th
Small Grain Over seed: Opens October 1st— Ends March 313t
Corn: Opens February 15th - Ends June 3011,
Cotton: Opens March 15th - Ends August 13t
Rye: Opens SeptemberIst - Ends March 31gt
Oats: Opens September 1 A - Ends April 15th
Wheat: Opens September 13t - Ends April 30th
Soybeans: Opens April 1st- Ends September 15th
Fescue: Opens August 1 st— Ends July 31 st
Sorghum Hay: Opens March 15th - Ends August 31 st