Loading...
HomeMy WebLinkAboutBrunswick Bridge 202_R.81_Permit Plans(Version 2.08; Released April 2018) 55040.1.FD1 TIP No.:17BP.3.R.81 County(ies):Brunswick Page 1 of 1 TIP Number:Date: Phone:Phone: Email:Email: County(ies): CAMA County? Yes Design/Future:Year:2040 Existing:Year: Aquatic T&E Species?No Comments: Yes No No Wetlands within Project Limits? Swamp Waters (Sw) None Supplemental Classification: Rural Area with Agricultural or Residential Land Uses Mulberry Branch 15-25-2-7 0.28 0.151 miles Project Description Proposed Project LumberRiver Basin(s): City/Town: 0.54 Typical Cross Section Description: Surrounding Land Use: General Project Narrative: (Description of Minimization of Water Quality Impacts) Yes jlmoore6@ncdot.gov Raleigh, NC 27610 Address: 4/29/2022 BrunswickShallotte Jon Moore, PE 1020 Birch Ridge Drive WBS Element: Bridge ReplacementWBS Element: Jason Patskoski, PE, PhDNCDOT Contact: (919) 707-6738 1110 Navaho Dr #600 Raleigh, NC 27609 Contractor / Designer: (919) 322-0115 Summit Design and Engineering Services North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Project Type: NCDOT Hydraulics Unit Address: General Project Information 17BP.3.R.8155040.1.FD1 Impairments: Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.) State Project involves the replacement of NCDOT Bridge #202 over Mulberry Branch on SR 1357 in Brunswick county. The existing structure is a 31 feet and 2 inch long, single span prestressed channel structure. The proposed structure will be a single span (1@70’) 24-inch cored slab bridge with an out-to-out deck width of 33 feet. The existing structure has deck drains. The proposed bridge will maintain the existing level of service. There is one proposed outfall at the begin bridge left side. This drainage network will catch the water flowing from the bridge on both sides of the road and outlet it to the wetland on the left side of the road. The proposed bridge has 3:1 side slope on the left begin and end bridge, 2:1 side slope on the right begin bridge and 3:1 side slope on the right end bridge. Rip Rap outlet pads will be utilized to dissipate the flow and minimize erosion. There are two proposed ditches. A 55' detour bridge with 18' clear roadway with single 11' lane will be constructed downstream of the proposed bridge.The detour bridge is designed for the 10 year storm with one proposed temporary outfall at the begin bridge right side. The detour bridge has 3:1 side slope on the left begin and end bridge, 2.3:1 side slope on the right begin bridge and 3:1 side slope on the right end bridge. This drainage network will catch the water flowing from the bridge on both sides of the road and outlet it to the wetland on the right side of the road. Rip Rap outlet pad will be utilized to dissipate the flow and minimize erosion. There are two proposed ditches for the detour bridge. N/ABuffer Rules in Effect:Mulberry Branch None 436 2 lane road with 11' travel lanes and 4' paved shoulder. The total bridge length is 70' with an out-to-out width of 33'. Waterbody Information 2018 NCDWR Stream Index No.: NRTR Stream ID: Annual Avg Daily Traffic (veh/hr/day): Existing Site Project Length (lin. miles or feet): ac. Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body ac. 2 lane road with 10' travel lanes and no paved shoulder with a total bridge length of 31- 2" and width of 30.6 ft. 700 jason.patskoski@summitde.net Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?No Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) SHEET 1 OF 15 PERMIT DRAWING APRIL 29, 2022 .31 .21 .12 .05 .1 2 1.06 .05 .45 .72 .05.12 .31 .04 M ul b err y R d. Northside Arnold St. Russ St. R a n d all St. M u l b e r r y M u lb err y Grace Shallotte Ocean West Brunswick High School 17 T V = = = =MPH ADT ADT FUNC CLASS = 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK: 0 9 / 0 8 / 9 9 0 00 See Sheet 1-B For Conventional Symbols See Sheet 1-A For Index of Sheets 2 9 - A P R - 2 0 2 2 0 8 : 5 0 B - 5 5 4 0 _ H y d _ p r m _ t s h . d g n h e . y a n g C O N T R A C T : D C 0 0 3 1 3 VICINITY MAP 4 2040 2018 60 10 5 2010 50 50 25 25 50 50 N.T.S. PROJECT ENGINEER SUB-REGIONAL TIER GRADING, DRAINAGE, PAVING AND STRUCTURE ADAM M. CONRAD, PE Prepared in the Office of: NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. = = =0.014 MILES 17BP.3.PE.81 436 VPD 700 VPD * TTST =DUAL LOCAL 100 100 DAVID Z. KEISER, PE PROJECT BEGIN BRUNSWICK COUNTY REPLACE BRIDGE 202 OVER MULBERRY BRANCH A R T MEN N A S O H D E P T O F TRA SPORT T I O N T A TEOFN RT CAR O LI N A DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (WHITEVILLE RD) TO NC 130 (OCEAN HWY ) TO US 17 -L- POT STA. 14+23.88 BEGIN BRIDGE -L- POT STA. 14+96.13 END BRIDGE 9% 1%8% 2018 STANDARD SPECIFICATIONS NCDOT CONTACT -L- -L_DET- -L_DET- POT STA. 14+40.00 BEGIN BRIDGE -L_DET- POT STA. 14+95.00 END BRIDGE (N MULBERRY ROAD) SR 1357 ON SR 1357 (N MULBERRY ROAD) PE M U L B E R R Y B R A N C H 0.151 MILES 0.165 MILES 17BP.3.R.81 N/A N/A N/A ROW/UTIL. CONST. DEREK PIELECH, PE -L- POC STA. 19+58.29, 3.37' RT -L_DET- POC STA. 19+57.61 = END DETOUR -L- POT STA. 10+85.36, 3.72' RT -L_DET- POC STA. 10+85.46 = BEGIN DETOUR 1 7 B P . 3 . R . 8 1 LENGTH ROADWAY PROJECT 17BP.3.R.81 LENGTH BRIDGE PROJECT 17BP.3.R.81 TOTAL LENGTH PROJECT 17BP.3.R.81 P R O J E C T : -L- POT STA. 10+85.36 BEGIN PROJECT 17BP.3.R.81 -L- POT STA. 19+58.29 END PROJECT 17BP.3.R.81 17BP.3.ROW.81 OCTOBER 22, 2021 (FORMERLY B-5540) 17BP.3.R.81 S LEA N ORTHCAR O L IN APROFESS IONA L E N GINEER 033400 RESIEK .Z D IV A D S LEA N ORTHCAR O L IN APROFESS IONA L E NGINEER 046226 IKSOKSTAP . M N O SA J APRIL 21, 2022 4 PROJECT END N A 2 011 N A D 8 3/ S m ith Northsid e Dr. Sm ith Ave. Bailey St. 1357 1357 1357 1358 1362 1357 Ground Natural Geotextile Grade Ditch 1.0' GEOTEXTILE TEMP 15" TEMP 15" EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING PROFILE ALONG CENTERLINE 1.5:1 1.5:1 DATE SURVEYED 02/21/2018 NWSEL & WSEL = 12.1 FT NCDOT 10-YR FLOOD EL.= 15.7 FT KEYED IN 3.5' (TYP) CLASS II RIP RAP ELEV. 13.2' EXCAVATE TO NOT TO EXCEED 3' SUPERSTRUCTURE 95' DETOUR BRIDGE, BRIDGE LOW SIDE OF LOW STEEL ON GROUND NATURAL SLOPE FILL GEOTEXTILE PI = 12+59.92 EL = 16.86' VC = 135' K = 52 PI = 16+67.24 EL = 19.30' VC = 200' K = 55 EXISTING GROUND PROPOSED GRADE DS = 35 mph BM-1 -L- STA. 10+42.32 BM-2 -L- STA. 14+99.81 50.33' RT, EL 21.64' 35.07' LT, EL 17.36' BENCH TIE NAIL IN 4X4 POST BENCH TIE NAIL IN 16" SWEET GUM EL. 17.94' -L_DET- STA. 14+40.00 BEGIN BRIDGE EL. 18.27' -L_DET- STA. 14+95.00 END BRIDGE DS = 35 mph DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA FT DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = = = = = = = = = = = = EL. 20.33' -L_DET- STA. 10+85.46 BEGIN GRADE EL. 31.39' -L_DET- STA. 19+57.61 END GRADE (-)1.9904%(+)0.6000% (+)0.6000% (+)4.2640% (+)4.2640% (+)3.1903% PI = 19+30.00 EL = 30.51' K = 33 DS = 35 mph VC = 35' RIGHT DITCH EL. 15.75' STA. 11+50 -LDET- RT BEGIN EQUILIZER DITCH EL. 15.75' STA. 12+65 -LDET- RT END EQUILIZER DITCH EL. 16.20' STA. 15+35 -LDET- RT BEGIN SPECIAL CUT DITCH EL. 19.50' STA. 17+00 -LDET- RT GRADE CHANGE EL. 23.50' STA. 18+00 -LDET- RT GRADE CHANGE EL. 24.50' STA. 19+00 -LDET- RT END SPECIAL CUT DITCH 0.0000% (+)2.0000% (+)4.0000% (+)1.0000% (+) 2.9944% (+) 5.8432% EL. 20.56' STA. 17+00 -LDET- LT BEGIN SPECIAL CUT DITCH EL. 22.06' STA. 17+50 -LDET- LT GRADE CHANGE EL. 24.98' STA. 18+00 -LDET- LT END SPECIAL CUT DITCH LEFT DITCH RIGHT DITCH 410 10 15.7 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. -10-10 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 2 9 - A P R - 2 0 2 2 0 8 : 5 0 B - 5 5 4 0 _ H y d _ p r m _ 2 . d g n h e . y a n g RE VIS IO N S 0 10 20 30 40 50 60 70 0 10 20 30 50 60 40 70 Hillsborough, NC 27278 504 Meadowland Drive Engineering Services Summit Design and NC FIRM LICENSE No: P-0339 ON SHEET 4. STATIONS/OFFSETS SHOWN NOTE: ROW AND EASEMENT S LEA N ORTHCAR O LIN APROFESS IONA L E N GINEER 033400 RESIEK .Z D IV A D S LEA N ORTHCAR O LIN APROFESS IONA L E N GINEER 046226 IKSOKSTAP . M N O SA J 2B-5540 N A D 8 3/N A 2011 DETOUR BRIDGE IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND UTILITY E E IN WETLAND DENOTES EXCAVATION HC HC CLEARING DENOTES HAND CLEARING DENOTES MECHANIZED** * * *** ** * * T T FILL IN WETLAND DENOTES TEMPORARY WETLAND DENOTES FILL INFF Fill Slope2:1 or Flatter DETAIL 4-4 ( Not to Scale) TOE PROTECTION d d= 2.0 Ft. 83 SY GEOTEXTILE Type of Liner= 37 TON CL B Rip-Rap FROM STA. 13+50 TO STA. 14+15 -L- RT FROM STA. 13+25 TO STA. 14+05 -L- LT ( Not to Scale) TEMP. RIP RAP AT EMBANKMENT FROM STA. 14+85 TO STA. 15+35 -L_DET- RT DETAIL 5-3 Geotextile= 44 sy Type of Liner= 25 TONS, CL B Rip-Rap 10'min. 1.0'min. SEE SHEET 4/5 FOR ENLARGEMENT SHEET 2 OF 15 PERMIT DRAWING APRIL 29, 2022 .0 3 . 0 2 5 EXIST. EXIST. EXIST. EXIS T. .025 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 N 85°48'23" W 375.54' S 5 6 °0 3 '5 7 " W 2 0 2 .7 8 ' S 56 °0 3 '5 7 " W 2 0 2 .9 6 ' N 43 °35'38 " W 75 .00 ' S 56 °0 3 '57 " W 2 0 2 .6 5 ' N 37°53' 22 " W 8 3.12' S 37 °53' 22 " E90 .38' S 2 5 ° 5 8 ' 11 " W 10 8 . 4 6 ' S 2 2 ° 4 7 ' 1 9 " W 5 6 . 5 9' 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EIP TO EIP 1.22' R/W EPK GR GR CONC TO E IP 0 .45 ' R /W ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BST N 4 4 °2 1 '4 1 " E 3 0 9 .4 4 ' N 2 8 ° 11' 3 9 " E 7 0 . 8 1' S 2 3 ° 2 9' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC PUMP GRINDER PUMP GRINDER HTR BY THE TOWN OF SHALLOTTE WERE VERIFIED BY & ARE OWNED THESE 1 1/2" LINES N 3 6 ° 3 4 ' 5 4 " E 18 5 . 9 0 ' DRAIN LINES S DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE S 3 7 °4 1 ' 4 3 " W 16 6 . 7 0 ' UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE NO TERMINI FOUND ASSUMED ABANDONED, UNKNOWN UTILITY BY LOCATION & SURVEYS AND MAPPED LOS C TOWN OF SHALLOTTE 8" AND 12" FSS LOCATED BY WING WALL BRUNSW ICK COUNTY SHALOTTE RIVER ON SR1357, REPLACE BRIDGE #202 OVER TIP NUMBER: B-5540 50' POT Sta. 10+00.00 EXIST . 0 2 5 . 0 2 .0 1 .0 0 .0 1 . 0 2 .0 2 5 . 0 5 .0 4 .0 3 .0 2 5 .05 EXIS T . 0 2 5 .0 2 5 EXIS T EXIST C C CC 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EPK GR GR CONC ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BSTTIMBERED AREA 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC HTR DRAIN LINES S A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE WING WALL PC Sta. 10+00.00 PRC Sta. 11+90.92 PT Sta. 13+81.83 PT Sta. 20+47.17 15 2 0 PC Sta. 18+21.57 PT Sta. 19+37.95 PC Sta. 15+39.82 ( Not to Scale) TOE PROTECTION d .3:1 FROM STA. 12+25 TO STA. 13+25 -L- LT DETAIL 4-3 Geotextile= 67 sy Type of Liner= 30 TONS, CL B Rip-Rap d= 1.0 Ft. 0'50'100'25'50' PLANS Ground Natural Geotextile Grade Ditch 1.0' GEOTEXTILE TEMP 15" TEMP 15" EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING PROFILE ALONG CENTERLINE 1.5:1 1.5:1 DATE SURVEYED 02/21/2018 NWSEL & WSEL = 12.1 FT NCDOT 10-YR FLOOD EL.= 15.7 FT KEYED IN 3.5' (TYP) CLASS II RIP RAP ELEV. 13.2' EXCAVATE TO NOT TO EXCEED 3' SUPERSTRUCTURE 95' DETOUR BRIDGE, BRIDGE LOW SIDE OF LOW STEEL ON GROUND NATURAL SLOPE FILL GEOTEXTILE 6 7 7 7 8 88 9 9 9 9 1 0 10 10 1 0 10 1 1 11 11 1 1 11 11 11 11 12 1 2 12 12 1 2 12 1 2 1 2 12 1 2 12 13 13 13 1313 1 3 13 13 131313 13 1 3 1 3 13 13 13 1 3 1414 1 4 14 14 14 14141414 14 1414 14 14 14 14 14 14 14 14 14 14 14 141414 1 4 14 1 4 14 15 15 15 15151515 15 15 1 5 15 15 15 15 15 1 5 15 15 15 1515 1 5 15 1 5 15 15 1 5 1 5 15 15 15 15 16 16 16 1 6 16 1 6 16 16161616 16 16 16 1 6 16 16 16 16 16 16 16 16 16 1 6 16 16 16 16 1616 16 1 6 1 7 17 17 17 17 1 7 17 1717 1717 17 17 17 17 17 17 17 1 7 17 17 17 17 1717 1 7 17 17 17 17 17 17 17 17 18 1 8 1 8 1 8 18 18 18 18 1 8 18 18 1 8 18 1818 18 18 18 18 18 18 18 18 18 18 18 1 8 1 8 18 1 8 18 1 8 18 19 19 19 1 9 19 19 1 9 1 9 19 19 19 19 19 19 19 19 19 19 19 19 19 1 9 19 19 1919 19 20 2 0 2 0 20 2 0 20 2 0 20 20 20 2 0 20 20 20 20 20 2 0 2 0 20 20 20 20 20 20 20 21 2 1 2 1 21 21 21 2 1 21 21 21 21 212 1 21 21 21 21 21 21 21 21 2 1 2 1 21 21 22 2 2 2 2 22 22 22 22 22 22 2 2 22 2 2 2 2 22 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 22 22 22 2 3 23 2 3 23 2 3 2 3 23 23 2 3 23 2 3 23 23 2323 2323 2 3 2 3 2 3 23 23 23 23 2 3 2 3 23 2 3 2 3 2 4 2 4 24 2 4 24 24 24 2 4 24 2 4 2 4 24 2 4 24 24 24 24 24 24 25 25 25 2 5 25 25 2 5 25 2 5 2 5 25 2525 25 25 2 5 25 25 26 26 26 26 26 26 2 6 26 2 6 26 2 6 26 26 26 27 27 27 27 27 2 7 27 27 27 27 27 27 2 7 2 7 28 2 8 28 28 28 28 28 28 28 2 8 29 29 29 29 29 29 29 2 9 29 29 29 29 30 3 0 3 0 30 30 30 3 0 3 0 3 0 31 3 1 313 1 3 1 31 3 1 31 32 3 2 3 2 32 3 2 3 2 333 3 33 3 3 33 33 33 33 33 33 33 34 3 4 34 34 34 34 34 34 3 4 353 5 3 5 35 3535 PI = 12+59.92 EL = 16.86' VC = 135' K = 52 PI = 16+67.24 EL = 19.30' VC = 200' K = 55 EXISTING GROUND PROPOSED GRADE DS = 35 mph BM-1 -L- STA. 10+42.32 BM-2 -L- STA. 14+99.81 50.33' RT, EL 21.64' 35.07' LT, EL 17.36' BENCH TIE NAIL IN 4X4 POST BENCH TIE NAIL IN 16" SWEET GUM EL. 17.94' -L_DET- STA. 14+40.00 BEGIN BRIDGE EL. 18.27' -L_DET- STA. 14+95.00 END BRIDGE DS = 35 mph DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA FT DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = = = = = = = = = = = = EL. 20.33' -L_DET- STA. 10+85.46 BEGIN GRADE EL. 31.39' -L_DET- STA. 19+57.61 END GRADE (-)1.9904%(+)0.6000% (+)0.6000% (+)4.2640% (+)4.2640% (+)3.1903% PI = 19+30.00 EL = 30.51' K = 33 DS = 35 mph VC = 35' RIGHT DITCH EL. 15.75' STA. 11+50 -LDET- RT BEGIN EQUILIZER DITCH EL. 15.75' STA. 12+65 -LDET- RT END EQUILIZER DITCH EL. 16.20' STA. 15+35 -LDET- RT BEGIN SPECIAL CUT DITCH EL. 19.50' STA. 17+00 -LDET- RT GRADE CHANGE EL. 23.50' STA. 18+00 -LDET- RT GRADE CHANGE EL. 24.50' STA. 19+00 -LDET- RT END SPECIAL CUT DITCH 0.0000% (+)2.0000% (+)4.0000% (+)1.0000% (+) 2.9944% (+) 5.8432% EL. 20.56' STA. 17+00 -LDET- LT BEGIN SPECIAL CUT DITCH EL. 22.06' STA. 17+50 -LDET- LT GRADE CHANGE EL. 24.98' STA. 18+00 -LDET- LT END SPECIAL CUT DITCH LEFT DITCH RIGHT DITCH 410 10 15.7 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. -10-10 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 2 9 - A P R - 2 0 2 2 0 8 : 5 0 B - 5 5 4 0 _ H y d _ p r m _ 3 . d g n h e . y a n g RE VIS IO N S 0 10 20 30 40 50 60 70 0 10 20 30 50 60 40 70 Hillsborough, NC 27278 504 Meadowland Drive Engineering Services Summit Design and NC FIRM LICENSE No: P-0339 ON SHEET 4. STATIONS/OFFSETS SHOWN NOTE: ROW AND EASEMENT S LEA N ORTHCAR O LIN APROFESS IONA L E N GINEER 033400 RESIEK .Z D IV A D S LEA N ORTHCAR O LIN APROFESS IONA L E N GINEER 046226 IKSOKSTAP . M N O SA J 3B-5540 N A D 8 3/N A 2011 DETOUR BRIDGE IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND UTILITY E E IN WETLAND DENOTES EXCAVATION HC HC CLEARING DENOTES HAND CLEARING DENOTES MECHANIZED** * * *** ** * * T T FILL IN WETLAND DENOTES TEMPORARY WETLAND DENOTES FILL INFF Fill Slope2:1 or Flatter DETAIL 4-4 ( Not to Scale) TOE PROTECTION d d= 2.0 Ft. 83 SY GEOTEXTILE Type of Liner= 37 TON CL B Rip-Rap FROM STA. 13+50 TO STA. 14+15 -L- RT FROM STA. 13+25 TO STA. 14+05 -L- LT ( Not to Scale) TEMP. RIP RAP AT EMBANKMENT FROM STA. 14+85 TO STA. 15+35 -L_DET- RT DETAIL 5-3 Geotextile= 44 sy Type of Liner= 25 TONS, CL B Rip-Rap 10'min. 1.0'min. SEE SHEET 4/5 FOR ENLARGEMENT SHEET 3 OF 15 PERMIT DRAWING APRIL 29, 2022 .0 3 . 0 2 5 EXIST. EXIST. EXIST. EXIS T. .025 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 N 85°48'23" W 375.54' S 5 6 °0 3 '5 7 " W 2 0 2 .7 8 ' S 56 °0 3 '5 7 " W 2 0 2 .9 6 ' N 43 °35'38 " W 75 .00 ' S 56 °0 3 '57 " W 2 0 2 .6 5 ' N 37°53' 22 " W 8 3.12' S 37 °53' 22 " E90 .38' S 2 5 ° 5 8 ' 11 " W 10 8 . 4 6 ' S 2 2 ° 4 7 ' 1 9 " W 5 6 . 5 9' 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EIP TO EIP 1.22' R/W EPK GR GR CONC TO E IP 0 .45 ' R /W ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BST N 4 4 °2 1 '4 1 " E 3 0 9 .4 4 ' N 2 8 ° 11' 3 9 " E 7 0 . 8 1' S 2 3 ° 2 9' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC PUMP GRINDER PUMP GRINDER HTR BY THE TOWN OF SHALLOTTE WERE VERIFIED BY & ARE OWNED THESE 1 1/2" LINES N 3 6 ° 3 4 ' 5 4 " E 18 5 . 9 0 ' DRAIN LINES S DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE S 3 7 °4 1 ' 4 3 " W 16 6 . 7 0 ' UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE NO TERMINI FOUND ASSUMED ABANDONED, UNKNOWN UTILITY BY LOCATION & SURVEYS AND MAPPED LOS C TOWN OF SHALLOTTE 8" AND 12" FSS LOCATED BY WING WALL BRUNSW ICK COUNTY SHALOTTE RIVER ON SR1357, REPLACE BRIDGE #202 OVER TIP NUMBER: B-5540 50' POT Sta. 10+00.00 EXIST . 0 2 5 . 0 2 .0 1 .0 0 .0 1 . 0 2 .0 2 5 . 0 5 .0 4 .0 3 .0 2 5 .05 EXIS T . 0 2 5 .0 2 5 EXIS T EXIST C C CC 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EPK GR GR CONC ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BSTTIMBERED AREA 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC HTR DRAIN LINES S A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE WING WALL PC Sta. 10+00.00 PRC Sta. 11+90.92 PT Sta. 13+81.83 PT Sta. 20+47.17 15 2 0 PC Sta. 18+21.57 PT Sta. 19+37.95 PC Sta. 15+39.82 ( Not to Scale) TOE PROTECTION d .3:1 FROM STA. 12+25 TO STA. 13+25 -L- LT DETAIL 4-3 Geotextile= 67 sy Type of Liner= 30 TONS, CL B Rip-Rap d= 1.0 Ft. 0'50'100'25'50' PLANS EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN R/W SHEET NO. ENGINEER ENGINEER HYDRAULICS B-5540 4 SHEET NO.PROJECT REFERENCE NO. 0 157.515 30 PLANS HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * *** ** * * DETOUR BRIDGE IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND UTILITY N A D 83/N A 2 011 WETLAND DENOTES FILL INFF SHEET 4 OF 15 PERMIT DRAWING APRIL 29, 2022 EXIS T. EXIS T. .0 2 5 CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' S 2 5 ° 5 8 ' 1 1 " W 1 0 8 . 4 6 ' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST S 2 3 ° 2 9 ' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA M U L B E R R Y B R A N C H DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND WING WALL . 0 2 5 . 0 2 . 0 1 . 0 0 . 0 1 . 0 2 . 0 2 5 E XI S T . 0 2 5 . 0 2 5 E XI S T C C CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST TIMBERED AREA M U L B E R R Y B R A N C H O WING WALL PRC Sta. 11+90.92 PT Sta. 13+81.83 EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING 6 7 7 7 8 88 9 9 9 9 1 0 10 10 1 0 10 1 1 11 11 11 11 11 11 11 1 2 12 12 1 2 12 1 2 1 2 12 1 2 12 1 3 13 13 1 3 13 13 13 13 13 13 1 3 1 3 13 13 13 1 3 14 1 4 14 14 14 1414 14 14 1414 14 14 14 14 14 14 14 14 14 14 1 4 14 15 15 15 1515 15 15 15 1 5 15 15 15 15 15 1 5 15 1515 1 5 15 1 6 16 1616 16 16 16 16 16 16 1 6 16 1 6 16 16 16 16 16 17 17 17 17 17 17 17 17 1 7 17 1717 17 17 17 17 17 17 17 1 8 18 18 18 18 18 18 18 18 18 18 1 8 1 8 18 18 1 9 1 9 19 19 19 19 19 19 19 1 9 19 19 20 20 20 20 20 20 2 0 21 21 21 21 2 1 22 2 2 2 2 2 22 324 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN R/W SHEET NO. ENGINEER ENGINEER HYDRAULICS B-5540 5 SHEET NO.PROJECT REFERENCE NO. 0 157.515 30 PLANS HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * *** ** * * DETOUR BRIDGE IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND UTILITY N A D 83/N A 2 011 WETLAND DENOTES FILL INFF SHEET 5 OF 15 PERMIT DRAWING APRIL 29, 2022 EXIS T. EXIS T. .0 2 5 CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' S 2 5 ° 5 8 ' 1 1 " W 1 0 8 . 4 6 ' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST S 2 3 ° 2 9 ' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA M U L B E R R Y B R A N C H DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND WING WALL . 0 2 5 . 0 2 . 0 1 . 0 0 . 0 1 . 0 2 . 0 2 5 E XI S T . 0 2 5 . 0 2 5 E XI S T C C CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST TIMBERED AREA M U L B E R R Y B R A N C H O WING WALL PRC Sta. 11+90.92 PT Sta. 13+81.83 Ground Natural Geotextile Grade Ditch 1.0' GEOTEXTILE OF BRIDGE AT LOW SIDE LOW STEEL EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING GROUND NATURAL SLOPE FILL GEOTEXTILE NCDOT 25 YEAR FLOOD EL. = 16.1 FT ELEV. 13.2' EXCAVATE TO ELEV. 13.2' EXCAVATE TO 1.5:1 1.5:1 DATE SURVEYED 02/21/2018 NWSEL. AND WSEL = 12.1 FT KEYED IN 3.5' (TYP) CLASS II RIP RAP MATTING COIR FIBER MATTING COIR FIBER BE REMOVED STRUCTURE TO EXISTING CENTERLINE PROFILE ALONG PERMANENT FILL IN WETLAND 6B-5540 FINAL BRIDGE N A D 8 3/N A 2011 WETLAND DENOTES FILL INFF T T FILL IN WETLAND DENOTES TEMPORARY CLEARING DENOTES MECHANIZED** * * *** ** * * HC HC CLEARING DENOTES HAND E E IN WETLAND DENOTES EXCAVATION IMPACTS APPEAR GRAY ON THIS SHEET NOTE: DETOUR BRIDGE AND UTILITY SEE SHEET 8/9 FOR ENLARGEMENT Fill Slope2:1 or Flatter DETAIL 4-4 ( Not to Scale) TOE PROTECTION d d= 2.0 Ft. 83 SY GEOTEXTILE Type of Liner= 37 TON CL B Rip-Rap FROM STA. 13+50 TO STA. 14+15 -L- RT FROM STA. 13+25 TO STA. 14+05 -L- LT ( Not to Scale) TEMP. RIP RAP AT EMBANKMENT FROM STA. 14+85 TO STA. 15+35 -L_DET- RT DETAIL 5-3 Geotextile= 44 sy Type of Liner= 25 TONS, CL B Rip-Rap 10'min. 1.0'min. SHEET 6 OF 15 PERMIT DRAWING APRIL 29, 2022 10 11 12 13 14 15 16 17 18 19 20 21 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. -10-10 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 2 9 - A P R - 2 0 2 2 0 8 : 5 0 B - 5 5 4 0 _ H y d _ p r m _ 6 . d g n h e . y a n g RE VIS IO N S 0 10 20 30 40 50 60 70 0 10 20 30 50 60 40 70 Hillsborough, NC 27278 504 Meadowland Drive Engineering Services Summit Design and NC FIRM LICENSE No: P-0339 S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 033400 RESIEK .Z DIV A D S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 046226 IKSOKSTAP .M N O SA J T DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA FT DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 570 = 25 = 16.1 = 870 = 100 = 17.0 = 1200 = 500 = 18.0 = 02/21/2018 = 12.1 POT Sta. 10+00.00 EXIST . 0 2 5 . 0 2 .0 1 .0 0 .0 1 . 0 2 .0 2 5 . 0 5 .0 4 .0 3 .0 2 5 .05 EXIS T . 0 2 5 .0 2 5 EXIS T EXIST C C CC 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 N 85°48'23" W 375.54' S 5 6 °0 3 '5 7 " W 2 0 2 .7 8 ' S 56 °0 3 '5 7 " W 2 0 2 .9 6 ' N 43 °35'38 " W 75 .00 ' S 56 °0 3 '57 " W 2 0 2 .6 5 ' N 37°53' 22 " W 8 3.12' S 37 °53' 22 " E90 .38' S 2 5 ° 5 8 ' 11 " W 10 8 . 4 6 ' S 2 2 ° 4 7 ' 1 9 " W 5 6 . 5 9' 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EIP TO EIP 1.22' R/W EPK GR GR CONC TO E IP 0 .45 ' R /W ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BST N 4 4 °2 1 '4 1 " E 3 0 9 .4 4 ' N 2 8 ° 11' 3 9 " E 7 0 . 8 1' S 2 3 ° 2 9' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC PUMP GRINDER PUMP GRINDER HTR BY THE TOWN OF SHALLOTTE WERE VERIFIED BY & ARE OWNED THESE 1 1/2" LINES N 3 6 ° 3 4 ' 5 4 " E 18 5 . 9 0 ' DRAIN LINES S DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE S 3 7 °4 1 ' 4 3 " W 16 6 . 7 0 ' UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE NO TERMINI FOUND ASSUMED ABANDONED, UNKNOWN UTILITY BY LOCATION & SURVEYS AND MAPPED LOS C TOWN OF SHALLOTTE 8" AND 12" FSS LOCATED BY 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EPK GR GR CONC ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BSTTIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC HTR DRAIN LINES S A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE PI = 12+75.00 EL = 17.60' VC = 130' K = 69 PI = 16+15.00 EL = 19.64' VC = 190' K = 69 EXISTING GROUND PROPOSED GRADE DS = 40 mph DS = 40 mph EL. 18.93' -L- STA. 14+96.13 END BRIDGE EL. 18.40' -L- STA. 14+23.88 BEGIN BRIDGE BM-1 -L- STA. 10+42.32 BM-2 -L- STA. 14+99.81 50.33' RT, EL 21.64' 35.07' LT, EL 17.36' BENCH TIE NAIL IN 4X4 POST BENCH TIE NAIL IN 16" SWEET GUM (-)1.2901%(+)0.6000%(+)0.6000% (+)3.3470% EL. 25.83' -L- STA. 18+00.00 BEGIN OVERLAY END GRADE EL. 18.57' -L- STA. 12+00.00 BEGIN GRADE END OVERLAY -L- STA. 19+58.29 END OVERLAY -L- STA. 10+85.36 BEGIN OVERLAY LEFT DITCH RIGHT DITCH EL. 12.31' STA. 14+95 -L- RT BEGIN SPECIAL CUT DITCH EL. 13.50' STA. 15+75 -L- RT GRADE CHANGE EL. 14.50' STA. 16+00 -L- RT END SPECIAL CUT DITCH EL. 17.60' STA. 16+25 -L- LT BEGIN SPECIAL CUT DITCH EL. 18.60' STA. 16+75 -L- LT GRADE CHANGE EL. 20.35' STA. 17+25 -L- LT GRADE CHANGE EL. 22.60' STA. 17+70 -L- LT END SPECIAL CUT DITCH (+)1.5000% (-)4.0000% (+)2.0000%(+)3.5000%(+)5.0000% WING WALL PT Sta. 19+37.95 PC Sta. 15+39.82 ( Not to Scale) TOE PROTECTION d .3:1 FROM STA. 12+25 TO STA. 13+25 -L- LT DETAIL 4-3 Geotextile= 67 sy Type of Liner= 30 TONS, CL B Rip-Rap d= 1.0 Ft. 0'50'100'25'50' PLANS Ground Natural Geotextile Grade Ditch 1.0' GEOTEXTILE OF BRIDGE AT LOW SIDE LOW STEEL EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING GROUND NATURAL SLOPE FILL GEOTEXTILE NCDOT 25 YEAR FLOOD EL. = 16.1 FT ELEV. 13.2' EXCAVATE TO ELEV. 13.2' EXCAVATE TO 1.5:1 1.5:1 DATE SURVEYED 02/21/2018 NWSEL. AND WSEL = 12.1 FT KEYED IN 3.5' (TYP) CLASS II RIP RAP MATTING COIR FIBER MATTING COIR FIBER BE REMOVED STRUCTURE TO EXISTING CENTERLINE PROFILE ALONG PERMANENT FILL IN WETLAND 7B-5540 FINAL BRIDGE N A D 8 3/N A 2011 IMPACTS APPEAR GRAY ON THIS SHEET NOTE: DETOUR BRIDGE AND UTILITY WETLAND DENOTES FILL INFF T T FILL IN WETLAND DENOTES TEMPORARY CLEARING DENOTES MECHANIZED** * * *** ** * * HC HC CLEARING DENOTES HAND E E IN WETLAND DENOTES EXCAVATION SEE SHEET 8/9 FOR ENLARGEMENT Fill Slope2:1 or Flatter DETAIL 4-4 ( Not to Scale) TOE PROTECTION d d= 2.0 Ft. 83 SY GEOTEXTILE Type of Liner= 37 TON CL B Rip-Rap FROM STA. 13+50 TO STA. 14+15 -L- RT FROM STA. 13+25 TO STA. 14+05 -L- LT ( Not to Scale) TEMP. RIP RAP AT EMBANKMENT FROM STA. 14+85 TO STA. 15+35 -L_DET- RT DETAIL 5-3 Geotextile= 44 sy Type of Liner= 25 TONS, CL B Rip-Rap 10'min. 1.0'min. SHEET 7 OF 15 PERMIT DRAWING APRIL 29, 2022 10 11 12 13 14 15 16 17 18 19 20 21 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. -10-10 SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 2 9 - A P R - 2 0 2 2 0 8 : 5 0 B - 5 5 4 0 _ H y d _ p r m _ 7 . d g n h e . y a n g RE VIS IO N S 0 10 20 30 40 50 60 70 0 10 20 30 50 60 40 70 Hillsborough, NC 27278 504 Meadowland Drive Engineering Services Summit Design and NC FIRM LICENSE No: P-0339 S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 033400 RESIEK .Z DIV A D S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 046226 IKSOKSTAP .M N O SA J T DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA FT DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 570 = 25 = 16.1 = 870 = 100 = 17.0 = 1200 = 500 = 18.0 = 02/21/2018 = 12.1 POT Sta. 10+00.00 EXIST . 0 2 5 . 0 2 .0 1 .0 0 .0 1 . 0 2 .0 2 5 . 0 5 .0 4 .0 3 .0 2 5 .05 EXIS T . 0 2 5 .0 2 5 EXIS T EXIST C C CC 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 N 85°48'23" W 375.54' S 5 6 °0 3 '5 7 " W 2 0 2 .7 8 ' S 56 °0 3 '5 7 " W 2 0 2 .9 6 ' N 43 °35'38 " W 75 .00 ' S 56 °0 3 '57 " W 2 0 2 .6 5 ' N 37°53' 22 " W 8 3.12' S 37 °53' 22 " E90 .38' S 2 5 ° 5 8 ' 11 " W 10 8 . 4 6 ' S 2 2 ° 4 7 ' 1 9 " W 5 6 . 5 9' 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EIP TO EIP 1.22' R/W EPK GR GR CONC TO E IP 0 .45 ' R /W ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BST N 4 4 °2 1 '4 1 " E 3 0 9 .4 4 ' N 2 8 ° 11' 3 9 " E 7 0 . 8 1' S 2 3 ° 2 9' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC PUMP GRINDER PUMP GRINDER HTR BY THE TOWN OF SHALLOTTE WERE VERIFIED BY & ARE OWNED THESE 1 1/2" LINES N 3 6 ° 3 4 ' 5 4 " E 18 5 . 9 0 ' DRAIN LINES S DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE S 3 7 °4 1 ' 4 3 " W 16 6 . 7 0 ' UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE NO TERMINI FOUND ASSUMED ABANDONED, UNKNOWN UTILITY BY LOCATION & SURVEYS AND MAPPED LOS C TOWN OF SHALLOTTE 8" AND 12" FSS LOCATED BY 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EPK GR GR CONC ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BSTTIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC HTR DRAIN LINES S A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE PI = 12+75.00 EL = 17.60' VC = 130' K = 69 PI = 16+15.00 EL = 19.64' VC = 190' K = 69 EXISTING GROUND PROPOSED GRADE DS = 40 mph DS = 40 mph EL. 18.93' -L- STA. 14+96.13 END BRIDGE EL. 18.40' -L- STA. 14+23.88 BEGIN BRIDGE BM-1 -L- STA. 10+42.32 BM-2 -L- STA. 14+99.81 50.33' RT, EL 21.64' 35.07' LT, EL 17.36' BENCH TIE NAIL IN 4X4 POST BENCH TIE NAIL IN 16" SWEET GUM (-)1.2901%(+)0.6000%(+)0.6000% (+)3.3470% EL. 25.83' -L- STA. 18+00.00 BEGIN OVERLAY END GRADE EL. 18.57' -L- STA. 12+00.00 BEGIN GRADE END OVERLAY -L- STA. 19+58.29 END OVERLAY -L- STA. 10+85.36 BEGIN OVERLAY LEFT DITCH RIGHT DITCH EL. 12.31' STA. 14+95 -L- RT BEGIN SPECIAL CUT DITCH EL. 13.50' STA. 15+75 -L- RT GRADE CHANGE EL. 14.50' STA. 16+00 -L- RT END SPECIAL CUT DITCH EL. 17.60' STA. 16+25 -L- LT BEGIN SPECIAL CUT DITCH EL. 18.60' STA. 16+75 -L- LT GRADE CHANGE EL. 20.35' STA. 17+25 -L- LT GRADE CHANGE EL. 22.60' STA. 17+70 -L- LT END SPECIAL CUT DITCH (+)1.5000% (-)4.0000% (+)2.0000%(+)3.5000%(+)5.0000% 6 7 7 7 8 88 9 9 9 9 1 0 10 10 1 0 10 1 1 11 11 1 1 11 11 11 11 12 1 2 12 12 1 2 12 1 2 1 2 12 1 2 12 13 13 13 1313 1 3 13 13 131313 13 1 3 1 3 13 13 13 1 3 1414 1 4 14 14 14 14141414 14 1414 14 14 14 14 14 14 14 14 14 14 14 141414 1 4 14 1 4 14 15 15 15 15151515 15 15 1 5 15 15 15 15 15 1 5 15 15 15 1515 1 5 15 1 5 15 15 1 5 1 5 15 15 15 15 16 16 16 1 6 16 1 6 16 16161616 16 16 16 1 6 16 16 16 16 16 16 16 16 16 1 6 16 16 16 16 1616 16 1 6 1 7 17 17 17 17 1 7 17 1717 1717 17 17 17 17 17 17 17 1 7 17 17 17 17 1717 1 7 17 17 17 17 17 17 17 17 18 1 8 1 8 1 8 18 18 18 18 1 8 18 18 1 8 18 1818 18 18 18 18 18 18 18 18 18 18 18 1 8 1 8 18 1 8 18 1 8 18 19 19 19 1 9 19 19 1 9 1 9 19 19 19 19 19 19 19 19 19 19 19 19 19 1 9 19 19 1919 19 20 2 0 2 0 20 2 0 20 2 0 20 20 20 2 0 20 20 20 20 20 2 0 2 0 20 20 20 20 20 20 20 21 2 1 2 1 21 21 21 2 1 21 21 21 21 212 1 21 21 21 21 21 21 21 21 2 1 2 1 21 21 22 2 2 2 2 22 22 22 22 22 22 2 2 22 2 2 2 2 22 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 22 22 22 2 3 23 2 3 23 2 3 2 3 23 23 2 3 23 2 3 23 23 2323 2323 2 3 2 3 2 3 23 23 23 23 2 3 2 3 23 2 3 2 3 2 4 2 4 24 2 4 24 24 24 2 4 24 2 4 2 4 24 2 4 24 24 24 24 24 24 25 25 25 2 5 25 25 2 5 25 2 5 2 5 25 2525 25 25 2 5 25 25 26 26 26 26 26 26 2 6 26 2 6 26 2 6 26 26 26 27 27 27 27 27 2 7 27 27 27 27 27 27 2 7 2 7 28 2 8 28 28 28 28 28 28 28 2 8 29 29 29 29 29 29 29 2 9 29 29 29 30 3 0 3 0 30 30 30 3 0 3 0 3 0 31 3 1 313 1 3 1 31 3 1 31 32 3 2 3 2 32 3 2 3 2 333 3 33 3 3 33 33 33 33 33 33 33 34 3 4 34 34 34 34 34 34 3 4 353 5 3 5 35 3535 WING WALL PT Sta. 19+37.95 PC Sta. 15+39.82 ( Not to Scale) TOE PROTECTION d .3:1 FROM STA. 12+25 TO STA. 13+25 -L- LT DETAIL 4-3 Geotextile= 67 sy Type of Liner= 30 TONS, CL B Rip-Rap d= 1.0 Ft. 0'50'100'25'50' PLANS EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING PERMANENT FILL IN WETLAND DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN R/W SHEET NO. ENGINEER ENGINEER HYDRAULICS B-5540 8 SHEET NO.PROJECT REFERENCE NO. 0 157.515 30 PLANS HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * *** ** * * N A D 83/N A 2 011 WETLAND DENOTES FILL INFF FINAL BRIDGE IMPACTS APPEAR GRAY ON THIS SHEET NOTE: DETOUR BRIDGE AND UTILITY SHEET 8 OF 15 PERMIT DRAWING APRIL 29, 2022 . 0 2 5 . 0 2 . 0 1 . 0 0 . 0 1 . 0 2 . 0 2 5 E XI S T . 0 2 5 . 0 2 5 E XI S T C C CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' S 2 5 ° 5 8 ' 1 1 " W 1 0 8 . 4 6 ' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST S 2 3 ° 2 9 ' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA M U L B E R R Y B R A N C H DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND WING WALL CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST TIMBERED AREA M U L B E R R Y B R A N C H WING WALL T EXCAVATION IN WETLAND HAND CLEARING HAND CLEARING PERMANENT FILL IN WETLAND 6 7 7 7 8 88 9 9 9 9 1 0 10 10 1 0 10 1 1 11 11 11 11 11 11 11 1 2 12 12 1 2 12 1 2 1 2 12 1 2 12 1 3 13 13 1 3 13 13 13 13 13 13 1 3 1 3 13 13 13 1 3 14 1 4 14 14 14 1414 14 14 1414 14 14 14 14 14 14 14 14 14 14 1 4 14 15 15 15 1515 15 15 15 1 5 15 15 15 15 15 1 5 15 1515 1 5 15 1 6 16 1616 16 16 16 16 16 16 1 6 16 1 6 16 16 16 16 16 17 17 17 17 17 17 17 17 1 7 17 1717 17 17 17 17 17 17 17 1 8 18 18 18 18 18 18 18 18 18 18 1 8 1 8 18 18 1 9 1 9 19 19 19 19 19 19 19 1 9 19 19 20 20 20 20 20 20 2 0 21 21 21 21 2 1 22 2 2 2 2 2 22 324 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN R/W SHEET NO. ENGINEER ENGINEER HYDRAULICS B-5540 9 SHEET NO.PROJECT REFERENCE NO. 0 157.515 30 PLANS HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * *** ** * * N A D 83/N A 2 011 WETLAND DENOTES FILL INFF FINAL BRIDGE IMPACTS APPEAR GRAY ON THIS SHEET NOTE: DETOUR BRIDGE AND UTILITY SHEET 9 OF 15 PERMIT DRAWING APRIL 29, 2022 . 0 2 5 . 0 2 . 0 1 . 0 0 . 0 1 . 0 2 . 0 2 5 E XI S T . 0 2 5 . 0 2 5 E XI S T C C CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' S 2 5 ° 5 8 ' 1 1 " W 1 0 8 . 4 6 ' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST S 2 3 ° 2 9 ' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA M U L B E R R Y B R A N C H DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND WING WALL CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST TIMBERED AREA M U L B E R R Y B R A N C H WING WALL T AT&T LINE EXISTING GROUND MINIMUM DEPTH 42" UNDER STREAM CROSSING MINIMUM DEPTH 20' UNDER STREAM CROSSING MINIMUM DEPTH 10' ATMC LINE MINIMUM DEPTH 48" EXISTING GROUND WETLAND DENOTES FILL INFF 10B-5540 T T FILL IN WETLAND DENOTES TEMPORARY N A D 8 3/N A 2011 E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED** * * *** ** * * -10 0 10 20 10 20 30 -10 0 10 11 12 13 14 15 16 17 18 19 20 21 AT&T LINE ATMC LINE UTILITIES IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND DETOUR BRIDGE HC HC CLEARING DENOTES HAND SEE SHEET 12/13 FOR ENLARGEMENT SHEET 10 OF 15 PERMIT DRAWING APRIL 29, 2022 10 11 12 13 14 15 16 17 18 19 20 21 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 2 9 - A P R - 2 0 2 2 0 8 : 5 1 B - 5 5 4 0 _ H y d _ p r m _ 1 0 . d g n h e . y a n g RE VIS IO N S Hillsborough, NC 27278 504 Meadowland Drive Engineering Services Summit Design and NC FIRM LICENSE No: P-0339 S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 033400 RESIEK .Z DIV A D S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 046226 IKSOKSTAP .M N O SA J T POT Sta. 10+00.00 EXIST . 0 2 5 . 0 2 .0 1 .0 0 .0 1 . 0 2 .0 2 5 . 0 5 .0 4 .0 3 .0 2 5 .05 EXIS T . 0 2 5 .0 2 5 EXIS T EXIST C C CC 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 N 85°48'23" W 375.54' S 5 6 °0 3 '5 7 " W 2 0 2 .7 8 ' S 56 °0 3 '5 7 " W 2 0 2 .9 6 ' N 43 °35'38 " W 75 .00 ' S 56 °0 3 '57 " W 2 0 2 .6 5 ' N 37°53' 22 " W 8 3.12' S 37 °53' 22 " E90 .38' S 2 5 ° 5 8 ' 11 " W 10 8 . 4 6 ' S 2 2 ° 4 7 ' 1 9 " W 5 6 . 5 9' 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EIP TO EIP 1.22' R/W EPK GR GR CONC TO E IP 0 .45 ' R /W ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BST N 4 4 °2 1 '4 1 " E 3 0 9 .4 4 ' N 2 8 ° 11' 3 9 " E 7 0 . 8 1' S 2 3 ° 2 9' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC PUMP GRINDER PUMP GRINDER HTR BY THE TOWN OF SHALLOTTE WERE VERIFIED BY & ARE OWNED THESE 1 1/2" LINES N 3 6 ° 3 4 ' 5 4 " E 18 5 . 9 0 ' DRAIN LINES S DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE S 3 7 °4 1 ' 4 3 " W 16 6 . 7 0 ' UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE NO TERMINI FOUND ASSUMED ABANDONED, UNKNOWN UTILITY BY LOCATION & SURVEYS AND MAPPED LOS C TOWN OF SHALLOTTE 8" AND 12" FSS LOCATED BY 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EPK GR GR CONC ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BSTTIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC HTR DRAIN LINES S A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE WING WALL PT Sta. 19+37.95 PC Sta. 15+39.82 0'50'100'25'50' PLANS TO EXIST. AT&T TIE TO EXIST. AT&T TIE BORE FO CABLES AT&T DIRECTIONAL REMREM REM REM REM REM ABANDONED ABANDONED REM TEL PED TEL PED TO EXIST. ATMC TIE TO EXIST. ATMC TIE AND (2) 1.25" DUCTS ATMC BORE (1) 2"DUCT AT&T LINE EXISTING GROUND MINIMUM DEPTH 42" UNDER STREAM CROSSING MINIMUM DEPTH 20' UNDER STREAM CROSSING MINIMUM DEPTH 10' ATMC LINE MINIMUM DEPTH 48" EXISTING GROUND WETLAND DENOTES FILL INFF 11B-5540 T T FILL IN WETLAND DENOTES TEMPORARY N A D 8 3/N A 2011 E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED** * * *** ** * * -10 0 10 20 10 20 30 -10 0 10 11 12 13 14 15 16 17 18 19 20 21 AT&T LINE ATMC LINE UTILITIES IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND DETOUR BRIDGE HC HC CLEARING DENOTES HAND SEE SHEET 12/13 FOR ENLARGEMENT SHEET 11 OF 15 PERMIT DRAWING APRIL 29, 2022 10 11 12 13 14 15 16 17 18 19 20 21 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC COA No. F-1255 Raleigh, NC 27612-3228 Suite 400 5400 Glenwood Avenue CDM Smith Inc. SHEET NO.PROJECT REFERENCE NO. HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.8 / 1 7 / 9 9 2 9 - A P R - 2 0 2 2 0 8 : 5 1 B - 5 5 4 0 _ H y d _ p r m _ 1 1 . d g n h e . y a n g RE VIS IO N S Hillsborough, NC 27278 504 Meadowland Drive Engineering Services Summit Design and NC FIRM LICENSE No: P-0339 S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 033400 RESIEK .Z DIV A D S LEA N ORTHCAR O LIN APROFESS IONA L E NGINEER 046226 IKSOKSTAP .M N O SA J T POT Sta. 10+00.00 EXIST . 0 2 5 . 0 2 .0 1 .0 0 .0 1 . 0 2 .0 2 5 . 0 5 .0 4 .0 3 .0 2 5 .05 EXIS T . 0 2 5 .0 2 5 EXIS T EXIST C C CC 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 N 85°48'23" W 375.54' S 5 6 °0 3 '5 7 " W 2 0 2 .7 8 ' S 56 °0 3 '5 7 " W 2 0 2 .9 6 ' N 43 °35'38 " W 75 .00 ' S 56 °0 3 '57 " W 2 0 2 .6 5 ' N 37°53' 22 " W 8 3.12' S 37 °53' 22 " E90 .38' S 2 5 ° 5 8 ' 11 " W 10 8 . 4 6 ' S 2 2 ° 4 7 ' 1 9 " W 5 6 . 5 9' 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EIP TO EIP 1.22' R/W EPK GR GR CONC TO E IP 0 .45 ' R /W ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BST N 4 4 °2 1 '4 1 " E 3 0 9 .4 4 ' N 2 8 ° 11' 3 9 " E 7 0 . 8 1' S 2 3 ° 2 9' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC PUMP GRINDER PUMP GRINDER HTR BY THE TOWN OF SHALLOTTE WERE VERIFIED BY & ARE OWNED THESE 1 1/2" LINES N 3 6 ° 3 4 ' 5 4 " E 18 5 . 9 0 ' DRAIN LINES S DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE S 3 7 °4 1 ' 4 3 " W 16 6 . 7 0 ' UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE NO TERMINI FOUND ASSUMED ABANDONED, UNKNOWN UTILITY BY LOCATION & SURVEYS AND MAPPED LOS C TOWN OF SHALLOTTE 8" AND 12" FSS LOCATED BY 15" CMP 15" CMP 15" HDPE 15" RCP C C C C T T T TT T T S S S PLASTIC 6 0 .0 0 ' EX IST R /W EX IST R/W EXIST R/W EXIST R/W TO NC 130 (WHITEVILLE RD) TO US 17 (OCEAN H IGHWAY ) MULB E R R Y B R AN CH WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 COUNTY OF BRUNSWICK DB 2627 PG 1344 DB 1205 PG 380 SUZIE MAE PRICE CHARLES E. PRICE DB 1108 PG 965 PB 18 PG 3 RHE HELMS DB 2865 PG 537 PB 18 PG 3 -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99'WOODS WOODS WOODS -EL - LULA MAE HOLMES DB 452 PG 903 MON IQU E K ING DB 3318 PG 843 PB 18 PG 3 KA T IE MAE PR ICE DB 1108 PG 959PB 18 PG 3 W IILBERT TOMM Y PR ICE DB 1108 PG 963 3 GR GR PAVED E PK GR 6 54 1 2 7 8 RR SPK EPK EPK EPK EPK GR GR CONC ELEV = 23.16' OH WIRE SOIL HTR HTR 6 0 . 0 0 ' CONC CONC SOIL S OIL SR-1357 N. MULBERRY RD 20' BST SR -1357 N . MULBERRY RD 20 ' BSTTIMBERED AREA ELEV = 16.17' HIGH WATER MARK 2 4 5 6 8 1 3 9 M U L B E R R Y B R A N C H TANK SEPTIC HTR DRAIN LINES S A.T .T . 20 ' EAS EMENT MB 2 7 P G 10 MB 2 1 P G 50 8 DB 76 7 P G 7 0 FSS VALVE 6 7 7 7 8 88 9 9 9 9 1 0 10 10 1 0 10 1 1 11 11 1 1 11 11 11 11 12 1 2 12 12 1 2 12 1 2 1 2 12 1 2 12 13 13 13 1313 1 3 13 13 131313 13 1 3 1 3 13 13 13 1 3 1414 1 4 14 14 14 14141414 14 1414 14 14 14 14 14 14 14 14 14 14 14 141414 1 4 14 1 4 14 15 15 15 15151515 15 15 1 5 15 15 15 15 15 1 5 15 15 15 1515 1 5 15 1 5 15 15 15 1 5 1 5 15 15 15 15 16 16 16 1 6 16 1 6 16 16161616 16 16 16 1 6 1 6 16 16 16 16 16 16 16 16 16 1 6 16 16 16 16 1616 16 1 6 1 7 17 17 17 17 1 7 17 1717 1717 17 17 17 1 7 17 17 17 17 1 7 17 17 17 17 1717 1 7 17 17 17 17 17 17 17 17 18 1 8 1 8 1 8 18 18 18 18 1 8 18 18 1 8 18 1818 1 8 18 18 18 18 18 18 18 18 18 18 18 1 8 1 8 18 1 8 18 1 8 18 19 19 19 1 9 19 19 1 9 1 9 19 19 19 19 19 1 9 19 19 19 19 19 19 19 19 1 9 19 19 1919 19 20 2 0 2 0 20 2 0 20 2 0 20 20 20 2 0 2 0 20 20 20 20 20 2 0 2 0 20 20 20 20 20 20 20 21 2 1 2 1 21 21 21 2 1 21 21 21 21 212 1 2 1 21 21 21 21 21 21 21 21 2 1 2 1 21 21 22 2 2 2 2 22 22 22 22 22 22 2 2 22 2 2 2 222 2 2 22 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 22 22 22 2 3 23 2 3 23 2 3 2 3 23 23 2 3 23 2 3 23 23 2323 2 3 2323 2 3 2 3 2 3 23 23 23 23 2 3 2 3 23 2 3 2 3 2 4 2 4 24 2 4 24 24 24 2 4 24 2 4 24 2 4 2 4 24 2 4 24 24 24 24 24 24 25 25 25 2 5 25 25 2 5 25 2 5 25 2 5 2 5 25 2525 25 25 2 5 25 25 26 26 26 26 26 26 2 6 26 2 6 26 2 6 2 6 26 26 26 26 27 27 27 27 27 2 7 27 27 27 2727 27 27 27 2 7 2 7 28 2 8 28 28 28 28 28 28 2 8 28 28 2 8 29 29 29 29 29 29 29 2 9 2 9 29 29 29 29 30 3 0 3 0 30 30 30 3 0 3 0 30 3 0 31 3 1 313 1 3 1 31 3 1 31 32 3 2 3 2 32 3 2 3 2 333 3 33 3 3 33 33 33 33 33 33 33 34 3 4 34 34 34 34 34 34 3 4 353 5 3 5 35 3535 WING WALL PT Sta. 19+37.95 PC Sta. 15+39.82 0'50'100'25'50' PLANS TO EXIST. AT&T TIE TO EXIST. AT&T TIE BORE FO CABLES AT&T DIRECTIONAL REMREM REM REM REM REM ABANDONED ABANDONED REM TEL PED TEL PED TO EXIST. ATMC TIE TO EXIST. ATMC TIE AND (2) 1.25" DUCTS ATMC BORE (1) 2"DUCT DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN R/W SHEET NO. ENGINEER ENGINEER HYDRAULICS B-5540 12 SHEET NO.PROJECT REFERENCE NO. 0 157.515 30 PLANS HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * *** ** * * N A D 83/N A 2 011 WETLAND DENOTES FILL INFF UTILITIES IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND DETOUR BRIDGE SHEET 12 OF 15 PERMIT DRAWING APRIL 29, 2022 . 0 2 5 . 0 2 . 0 1 . 0 0 . 0 1 . 0 2 . 0 2 5 E XI S T . 0 2 5 . 0 2 5 E XI S T C C CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' S 2 5 ° 5 8 ' 1 1 " W 1 0 8 . 4 6 ' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST S 2 3 ° 2 9 ' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA M U L B E R R Y B R A N C H DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND WING WALL CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST TIMBERED AREA M U L B E R R Y B R A N C H WING WALL T ABANDONED TO EXIST. AT&T TIE AND (2) 1.25" DUCTS ATMC BORE (1) 2"DUCT REM REM REM 6 7 7 7 8 88 9 9 9 9 1 0 10 10 1 0 10 1 1 11 11 11 11 11 11 11 1 2 12 12 1 2 12 1 2 1 2 12 1 2 12 1 3 13 13 1 3 13 13 13 13 13 13 1 3 1 3 13 13 13 1 3 14 1 4 14 14 14 1414 14 14 1414 14 14 14 14 14 14 14 14 14 14 1 4 14 15 15 15 1515 15 15 15 1 5 15 15 15 15 15 1 5 15 1515 1 5 15 1 6 16 1616 16 16 16 16 16 16 1 6 16 1 6 16 16 16 16 16 17 17 17 17 17 17 17 17 1 7 17 1717 17 17 17 17 17 17 17 1 8 18 18 18 18 18 18 18 18 18 18 1 8 1 8 18 18 1 9 1 9 19 19 19 19 19 19 19 1 9 19 19 20 20 20 20 20 20 2 0 21 21 21 21 2 1 22 2 2 2 2 2 22 324 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROADWAY DESIGN R/W SHEET NO. ENGINEER ENGINEER HYDRAULICS B-5540 13 SHEET NO.PROJECT REFERENCE NO. 0 157.515 30 PLANS HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * *** ** * * N A D 83/N A 2 011 WETLAND DENOTES FILL INFF UTILITIES IMPACTS APPEAR GRAY ON THIS SHEET NOTE: FINAL BRIDGE AND DETOUR BRIDGE SHEET 13 OF 15 PERMIT DRAWING APRIL 29, 2022 . 0 2 5 . 0 2 . 0 1 . 0 0 . 0 1 . 0 2 . 0 2 5 E XI S T . 0 2 5 . 0 2 5 E XI S T C C CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' S 2 5 ° 5 8 ' 1 1 " W 1 0 8 . 4 6 ' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST S 2 3 ° 2 9 ' 5 7 " W 4 9 . 0 6 ' TIMBERED AREA M U L B E R R Y B R A N C H DOWN THE GRAVEL ROAD TIES TO THE SEWAGE TREATMENT PLANT 8" PVC FSS LINE IS NOT CAPPED & THE TOWN OF SHALLOTTE VERIFIED THE UNKNOWN UTILITY ASSUMED ABANDONED, NO TERMINI FOUND WING WALL CT T T S S S EXIST R/W EXIST R/W MU LB E R R Y B R AN C H WOODS WOODS MARY DEVONE, HEIRS DB 3127 PG 1152 PB 68 PG 30 DB 1205 PG 380 SUZIE MAE PRICE -EL- SEAT=15.91' SEAT=16.03' SEAT=15.99' SEAT=15.99' 3 4 1 2 EPK ELEV = 23.16' OH WIRE 6 0 . 0 0 ' SR-1357 N. MULBERRY RD 20' BST TIMBERED AREA M U L B E R R Y B R A N C H WING WALL T ABANDONED TO EXIST. AT&T TIE AND (2) 1.25" DUCTS ATMC BORE (1) 2"DUCT REM REM REM Hand Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 11+97 TO 14+85 -L-Roadway Fill 0.053 0.003 0.034 0.004 1 12+89 TO 14+55 -LDET-Detour Roadway Fill 0.024 0.003 0.015 1 10+89 TO 14+67 -L-O/H Power Utility Impacts 0.090 TOTALS*: 0.053 0.024 0.006 0.034 0.109 *Impact totals are the actual impact to the thousandths placed. Revised 2013 10 24 SHEET 15 OF 15 WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS 17BP.3.R.81 4/29/2022 BRUNSWICK COUNTY NC DEPARTMENT OF TRANSPORTATION 17BP.3.R.81