Loading...
HomeMy WebLinkAboutGW1-2023-01829_Well Construction - GW1_20230223 W.U CONSTRUCTION RECORD (Gib-1) For Internal Use Only: Well Contractor Information: n Cce�_ 14.WATERZONES PROM To DESCRIPTION Well Contractor N a _�+e -�1 1 9 5-7 -a ft. ft. NC Well Contractor Certification Number 15.OUTER PROM CT G for mulUI�TER bl D R lMTeE AL YADKIN WEL COMPANY,INC. TLN ft. ft. in. Company Name /� �s 16.INNER CASING OR TUBING eothermal closed400 2.Well Construction Permit#:A J.S M � �o /�' e-0 i Z FROMI TO DIAMETER TBICI(NESS MATERIAL List all applicable well construction pumits(i.e.MC,County,Slate,Variance,etc.) ft. tt. / S- In. 3.Well Use(check well use): ft. ft. �e in. �M r Water Supply Well: 17.SCREEN PROM TO I DIAMETER J SLOT SIZE I THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. fr. in. ❑Gcothermal(Heating/Cooling Supply) Residential Water Supply(single) ft. it• in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT 01rrigation ❑Wells>100,000 GPD FROM TO MATERIAL EMLACEMBNTMETHOD&AMODNT Non-Water Supply Well: 0 ft. a fr. 00"l-ett.l. Irew ❑Monitoring ❑Recovery ft. ft. r"-flve't/ Injection Well: ft. ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(if a linable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEtVIIiNrMEI'HOD ❑Aquifer Test ❑Stonnwater Drainage ft. fL ' ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) []Tracer 20.DRILLING LOG attach additional sheet:if necessary) ❑Geothermal(Heating/Cooling Return) ❑Cther(explain Under#21 Remarlo) FROM TO DESCRIPTION color,hardness,son/rock 4 is sae,etc 4.Date Well(s)Completed: Well ID# 3 7 'ft 07 fr. i'J'1 Xb - fZ PLs^ 5a.Well Location: ft. Phone #3.X�J'3oP �202 r ft. ft. Uu a ese, G C1 I,a W Facilityl6wner Name Facility IDN(if applicable) fL ft fL Physical Address,City,and Zip ft ft 21.REMARKS ldd ►� County Parcel Wentificatim No.MN) t!r- 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certification' 13 . O! N W �-9/ PIS 1 W /7- 6.h(are)the well(s): W24manent or ❑Temporary Sign of CertWed Well Contractor Date ��( By signing thisform,l hereby certify that the wells)was(were)constructed in accordance with 7.Is this a repair to an Wsting well: ❑Yes or &.(0 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy i If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form_ 23.Site diagram or additional well details' 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GVj(-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remark Box).You may also attach additional pages if necessary. drilled: / 24.SUBMTITAL INSTRUCTIONS 9.Total well depth below land surface:' (ft) Submit this GWA within 30 days of well completion per the following: For multiple wells list all depths Ifdifferent(ex=ple-3@200'and2t@100D 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: 7 S (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 Ifwaier level is above casing,use"+" Bit Off: ,d[-7 S_ 24b.For Infection Wells:Copy to DWR,Underground Injection Control(TUC) 11.Borehole diameter: C. _(in.) Program,1636 MSC,Raleigh,NC 27699-1636 t 12.Well construction method: AIR ROTARY 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e,auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA O Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: . ` o DATE SITE VISITED: [' 2 3 13b.Disinfection type: 70/o HTH Amount: OZ may/ VISITED BY: D P r i r-P - ,,,e W Quality-Division of Water Resources Revised 6-6-2018