HomeMy WebLinkAboutNCC200370_NOT Closeout Documents_20230506 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 2090 US Highway 70, Swannanoa,NC 28778 (828) 296-4500
County: Transylvania Project: SWMU-11 Closure-Dupont Brevard River basin: French Broad
Person financially responsible:Corteva Agriscience,Inc.-Douglas P Fletcher, Project#: TRANS-2020-008
Project Director
Address: PO Box77614,Charlotte,NC 28271
1. Project Location: 701 Dupont Drive,Cedar Mountain
Pictures: Yes-Digital
2. Weather and soil conditions: clear;dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Michael Robinson Title: Engineer-Parsons
Inspection report: Sent Report Date given/sent: May 03,2023
9. Corrective action needed:
10. Comments: No corrective actions are required.
This site is stabilized and approved for closure.
Please file the eNOT located at deq.nc.gov/ncg01
Reported by: Bryan Shamblin Others present:
Date of inspection: May 02,2023 Time arriving on site: 12:30 PM Time leaving site: 12:50 PM
cc: