Loading...
HomeMy WebLinkAboutNC0060526_Fact Sheet_20230510FACT SHEET FOR EXPEDITED PERMIT RENEWALS This form must be completed by Permit Writers for all expedited permits which do not require full Fact Sheets. Expedited permits are generally simple 100% domestics (e.g., schools, mobile home parks, etc.) that can be administratively renewed with minor changes but can include facilities with more complex issues (Special Conditions, 303(d) listed water, toxicity testing, instream monitoring, compliance concerns). Basic Information for Expedited Permit Renewals Permit Writer/Date Charles H. Weaver — 4/24/2023 Permit Number NCO060526 Facility Name Pope Industrial Park WWTP Basin Name/Sub-basin number 03-04-02 Receiving Stream UT Swift Creek Stream Classification in Permit WS-III NSW Does permit need Daily Max NH3 limits? No. NH3 limits are already at BAT. Does permit need TRC limits/language? No — already resent Does permit have toxicity testing? No Does permit have Special Conditions? Neuse nutrient conditions and several reporting requirements Does permit have instream monitoring? Temperature and dissolved oxygen Is the stream impaired on 303 d list)? No Any obvious compliance concerns? Seven enforcements during the current permit cycle as well as nine NOVs. Any permit modifications since lastpermit? None. New expiration date 3/31/2028 Changes in Draft Permit • Updated eDMR language • Added Neuse modeling reo ener