HomeMy WebLinkAboutNC0060526_Fact Sheet_20230510FACT SHEET FOR EXPEDITED PERMIT RENEWALS
This form must be completed by Permit Writers for all expedited permits which do not require
full Fact Sheets. Expedited permits are generally simple 100% domestics (e.g., schools, mobile
home parks, etc.) that can be administratively renewed with minor changes but can include
facilities with more complex issues (Special Conditions, 303(d) listed water, toxicity testing,
instream monitoring, compliance concerns).
Basic Information for Expedited Permit Renewals
Permit Writer/Date
Charles H. Weaver — 4/24/2023
Permit Number
NCO060526
Facility Name
Pope Industrial Park WWTP
Basin Name/Sub-basin number
03-04-02
Receiving Stream
UT Swift Creek
Stream Classification in Permit
WS-III NSW
Does permit need Daily Max NH3 limits?
No. NH3 limits are already at BAT.
Does permit need TRC limits/language?
No — already resent
Does permit have toxicity testing?
No
Does permit have Special Conditions?
Neuse nutrient conditions and several reporting
requirements
Does permit have instream monitoring?
Temperature and dissolved oxygen
Is the stream impaired on 303 d list)?
No
Any obvious compliance concerns?
Seven enforcements during the current permit
cycle as well as nine NOVs.
Any permit modifications since lastpermit?
None.
New expiration date
3/31/2028
Changes in Draft Permit
• Updated eDMR language
• Added Neuse modeling reo ener