Loading...
HomeMy WebLinkAboutNCG030504_Outfall Update_20230510 SwSG Stormwater Services Group, LLC 8916 Oregon Inlet Court Raleigh, North Carolina 27603 Phone: 919.661.9954 Fax: 919.661.810S May 8, 2023 RECEIVED MAY 10 2023 Mike Lawyer Stormwater Permits Supervisor DEMLR-Stormwater Program NCDEQ/DEMLR 1612 MSC Raleigh NC 27699-1612 RE: Flowserve USA Inc NPDES General Permit NCG030504 Elimination of SDO-005 Dear Mr. Lawyer: By this letter, we are notifying NCDEQ/DEMLR, that the Permittee is eliminating SDO-005 as a location subject to outfall monitoring. SDO-0051 was designated as an outfall by one of your field inspectors in late 2017. However, this "outfall" does not discharge into waters of the State. SDO-005 is at the end of a curb & gutter which discharges into a wooded area on Flowserve's property (see Figure 1). There is no defined conveyance that meets the definition of Point Source Discharge of Stormwater as indicated in General Permit NCG030000. The flow from the end of the SDO-005 gutter disperses into this wooded area as sheetflow. The sheetflow from SDO-005 commingles with the flow in the SDO-002 conveyance east of the public greenway (see Figure 2). The SDO-002 sample collection point is at the end of a pipe passing under the greenway (see Figure 3)which discharges into Walnut Creek. The industrial activity within the SDO-002 drainage area includes the same as within the SDO- 005 drainage area. Prior to the NCDEQ inspector making his designation, neither the Permittee nor this Consultant ever considered that SDO-005 would be a separate outfall. We believe some erroneous assumptions were made when this additional outfall was designated. Map 1 is enclosed to show the outfalls in question. ' The label "SDO-005"follows the outfall numbering scheme established by the Permittee in 2005. NCDEQ/DEMLR wQG May 8, 2023 S S Page 2 Therefore, in accordance with General Permit NCG030000 Part H Section H-3, we are providing notification of this change to eliminate SDO-005 as an outfall subject to monitoring. In the meantime, if you have any questions, do not hesitate to call us. S' ely, TO S ERVICEs GROUP, LLC ames D. Frei Project Manager cc: Adams Moraldnyo, Flowserve File K w�a y Designated 11 115 Figure 2-SDO-002 looking Downstream Open conveyance is downstream from pipe outlet. a '"` hahFe �♦ �; 1'�r g - A h y SDO-002 SampleCollection Point at Pipe View is r ` looking upstream. `path. r, r- _v X- + f r i R T 2, �r 4 y .y�•r.. ,Mr.. rAU "�f►'r'�. �s.r.s fOreek i �n i T ILI ! • ii Map 1 —Partial Site Plan North is at Top of Plan.