Loading...
HomeMy WebLinkAboutNCC231427_ESC Approval Submitted_20230511 pyr 7 STATE ROY COOPER � ,� Governor WIPr ELIZABETH S. BISER Secretary DOUGLAS R.ANSEL p Interim Director NORTH CAROLINA Environmental Quality April 17, 2023 LETTER OF APPROVAL City of Charlotte - Aviation Attention: Jeff McSwain, Airport Development Manager 600 East 4th Street Charlotte,North Carolina 28202 RE: Project Name: Airport Grading & Stockpile Project Acres Approved: 291 Project ID: MECKL-2023-033 County: Mecklenburg, City: Charlotte Address: West Boulevard River Basin: Catawba Stream Classification: Other Submitted By: WSP USA Date Received by LQS: March 31, 2023 Plan Type: Revised Dear Mr. McSwain: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act(hereinafter"Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual penult fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.goviNCG01. Please direct questions about the eNOl form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality;Division of Energy,Mineral and Land Resources - • Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 704-663-1699 Letter of Approval City of Charlotte -Aviation April 17,2023 Page2of2 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the infolniation provided in the Financial Responsibility Form, which you provided. You are requested to file an amended foiui if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this pelinit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Is! George Adams George D. Adams Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGO1 Fact Sheet c: Inspection Department ec: WSP USA Attention: Robert Green robert.green2 ci,wsp.com 1 E 64 °� 04 '7 CI CD 01 Z E L) IC a) •® 0 In a) ® �A v 6 I ® °� eav) eel vs ct .7+ COD ••••4 •h• _ VI N ct CI ct 1 - ti,CI •°� cc3 t004 Cr) )mil tKa�CAR°L • a> Pt M W ..r , ,) ,4 1, W •C/1 �d 01 ®PO pp. M q �r ‘1r ® 4, N E"' r 1 a ® �.4 4-) vA ,e w• � ,- �� he_HW 6 In WO ® CI) t cu .4 •r� '� 4-1N 0 - = PO i CJ E., CJ -� 0 a) .., ® ca., CI