HomeMy WebLinkAboutNCC231396_Site Plan or Location Map_20230511 I
SHEET INDEX: 1
COVER
SEALED ALTA SURVEY(SHEET 1)
SEALED ALTA SURVEY(SHEET 2)
C 1.0-OVERALL SITE& UTILITY PLAN
C 1.1 -SITE& UTILITY PLAN
C 1.2-SITE& UTILITY PLAN
C 1.3-SITE& UTILITY PLAN
C 1.4- DEMOLITION PLAN
C 1.5-OVERALL PHASE PLAN F I VEC 1.6-SITE NOTES& STORM DRAINAGE CHART R R O
CK_ SUB
� IVISI C2.0 GOLD OI�WIND DRIVE 10+00 TO 21+00 PLAN & PROFILE
C 2.1 -GOLD WIND DRIVE 21+00 TO 30+50 PLAN& PROFILE WINSTON-SALEM, NC
C 2.2-GOLD WIND DRIVE 30+50 TO 32+50 PLAN & PROFILE
C 2.3-WOOD VALLEY ROAD (SOUTH) 10+00 TO 21+20 PLAN& PROFILE
C 2.4-WOOD VALLEY ROAD (NORTH) 10+00 TO 21+20 PLAN & PROFILE
C 2.5-WOOD VALLEY ROAD(NORTH) 18+00 TO 25+00 PLAN& PROFILE DRIARCLIFFE RD
C 2.6-WOOD VALLEY ROAD (NORTH)25+00 TO 32+20 PLAN & PROFILE
C 2.7- PANOLA ROAD(EAST) 10+00 TO 18+00 PLAN & PROFILE
C 2.8- PANOLA ROAD (WEST)10+00 TO 18+00 PLAN& PROFILE o Lt_ TANGLE LN
C 2.9-GOLD WIND DRIVE SAN. SEWER OUTFALL PLAN & PROFILE o
C 2.10 WOOD VALLEY SAN. SEWER OUTFALL PLAN & PROFILE `r WITHEROW RD
C 2.11 -NORTH SAN.SEWER OUTFALL PLAN & PROFILE 4y� S"'"nOyOA so
C 2.12 NORTH SAN. SEWER OUTFALL PLAN& PROFILE
29a
C 3.0- OVERALL INITIAL CLEARING & GRUBBING PLAN s�e9
C 3.OA OVERALL INITIAL CLEARING & GRUBBING PLAN o9l2 7 �p•4'8'
C 3.1 - INITIAL CLEARING& GRUBBING PLAN e
C 3.2- INITIAL CLEARING & GRUBBING PLAN SITE
C 3.3-INITIAL CLEARING& GRUBBING PLAN
C 3.4-INITIAL CLEARING & GRUBBING PLAN
C 3.5-INITIAL CLEARING & GRUBBING PLAN 'Or" % aT ,0O
C 3.6- INITIAL CLEARING & GRUBBING PLAN a3
C 3.6A- INITIAL CLEARING& GRUBBING PLAN
9
C 3.7-OVERALL INTERMEDIATE GRADING & EC PLAN 0<790 POWERS POINT CT
C 3.7A-OVERALL INTERMEDIATE GRADING & EC PLAN
C 3.8-INTERMEDIATE GRADING& EC PLAN
C 3.9- INTERMEDIATE GRADING& EC PLAN o y� ePaaRD
C 3.10-INTERMEDIATE GRADING& EC PLAN o. 9Fa
�° W000
ob
C 3.11 -INTERMEDIATE GRADING& EC PLAN
o nAF A
LrNNDEEDR
C 3.12-INTERMEDIATE GRADING& EC PLAN d �.yn
C 3.13-INTERMEDIATE GRADING& EC PLAN POWERS RD
C 3.14- FINAL GRADING& EC PLAN
C 3.15-FINAL GRADING& EC PLAN
C 3.16- FINAL GRADING & EC PLAN
C 3.17-FINAL GRADING& EC PLAN LOCATION MAP
C 3.18 FINAL GRADING & EC PLAN SCALE: 1" = 500'
E C 3.19-FINAL GRADING& EC PLAN
Fr C 3.20-STOCKPILE GRADING PLAN
C 3.21 -STOCKPILE GRADING PLAN SITE DEVELOPER/OWNER SURVEYOR
C 3.22-WETPOND#1 ENLARGEMENT PLAN WILLIAMS LAND DEVELOPMENT, INC. REGIONAL LAND SURVEYORS, INC.
m C 3.23-WETPOND#2 ENLARGEMENT PLAN
C 4.0 OVERALL DRAINAGE AREA MAP MR. DIXON PITT 8624 WEST MARKET STREET, SUITE 100
C 4.1 DRAINAGE AREA MAP 331 HIGH STREET GREENSBORO, NORTH CAROLINA 27409
C 4.2- DRAINAGE AREA MAP WINSTON SALEM , NC 27101
0,T,
C 4.3-DRAINAGE AREA MAP
C 4.4-SKIMMER BASIN DRAINAGE AREA MAP
C 4.5- PRE-DEVELOPMENT DRAINAGE AREA BASIN MAP LaBella
0C 4.6-POST-DEVELOPMENT DRAINAGE AREA MAP-WET POND 1 v,,o"°"1c Powered by partnership.
``�o�4H...A o0'L
q a C 4.7- POST-DEVELOPMENT DRAINAGE AREA MAP TO WET POND 2 �&� ' 939 Burke Street, Suite H
C 4.8-DRAINAGE, MAINTENANCE &ACCESS EASEMENT MAP psr a�
22052 ; Winston-Salem, NC 27101
Q E C 5.0 EROSION CONTROL DETAILS A•F22052?
C 5.1 EROSION CONTROL DETAILS r0o/yl,,,, ;S7IM?,,o's C#0430
Fi g C 5.2-NCG01 GROUP STABILIZATION/SELF INSPECTION
e 9
q Email: pstimpson@labellapc.com
=o%
REVISION NO: DATE: DESCRIPTION:
oa•
PROJECT NO: 2220142