Loading...
HomeMy WebLinkAbout20140719 Ver 2_401 Application_20150515LETTER OF TRANSMITTAL DATE May 19, 2015 To NCDENR -DWR- Raleigh Attn Jennifer Burdette 512 N Salisbury St Raleigh, NC 27604 9th Floor, Archdale Bldg, Room 942G -1 FROM Chris Jain (for Hy Nguyen) PROJECT Van Hanh Temple DPR PROJECT # 10003 RE Updating PCN form COPIES DATE i NO landscape architecture =9V planning evil engineering WE ARE SENDING YOU THE FOLLOWING ITEMS VIA UPS DESCRIPTION 1 varies 11 -shts Van Hanh Temple Construction Documents (C -0 thru C -10) 3 5 -19 -2015 10 -pgs Revised Signed PCN Form - - -- 5 -19 -2015 1 check Check No 14836 in the amount of $240 00 payable to NCDENR THESE ARE TRANSMITTED FORAPPROVAL FOR YOUR USE FOR REVIEW/ COMMENT OTHER REMARKS Chris Jain (for Hy Nguyen) hnguyen @dprassociates net COPY TO SIGNED RECIEVED BY DPR Associates, Inc. 1 420 Hawthome Land Chariotte, NC 282011 ph 704 332 1204 I fx 704 332 1210 1 www dprassoaates net a�oF wn rF9o� 7 � P < Office Use Only Corps action ID no DWQ project no Form Version 1 4 January 2009 Page 1 of 10 PCN Form —Version 1 4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1P 1 Processing `i?v v 1 a Type(s) of approval sought from the Corps ❑X Section 404 Permit ❑ Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑X No For the record ❑ Yes only for Corps Permit ❑X No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ❑X No 1 g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑ Yes ❑X No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X❑ No 2 Project Information 2a Name of project Van Hanh Temple 2b County Wake 2c Nearest municipality / town Raleigh 2d Subdivision name N/A µ 2e NCDOT only, T I P or state project no �1r �r?"�+ ; 3 Owner Information 3a Name(s) on Recorded Deed Van Hanh Temple IIIAt 1 9 2015 3b Deed Book and Page No DB 7975 PG 514 & MB 1974, PG 100 tip �, _ 3c Responsible Party (for LLC if applicable) Van Hanh Temple / North Carolina Buddhist Association L 401 & 13UFL h �� ( —... _V 3d Street address 4229 Forestville Road 3e City, state, zip Raleigh, NC 272616 3f Telephone no 919 - 426 -4757 3g Fax no 3h Email address dulenc @gmail com Page 1 of 10 PCN Form —Version 1 4 January 2009 Or 4 Applicant Information (if different from owner) 4a Applicant is XD Agent ❑X Other, specify 4b Name Same as Above 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name Hy Nguyen, PE 5b Business name (if applicable) DPR Associates, Inc 5c Street address 420 Hawthorne Lane 5d City, state, zip Charlotte, NC 28204 5e Telephone no 704 - 332 -1204 5f Fax no 704- 332 -1210 5g Email address hnguyen @dprassocaites net Page 2 of 10 B. Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) (ID 009544) PIN 1746 -49 -3709 1b Site coordinates (in decimal degrees) Latitude 35 864168 Longitude -78 513184 1c Property size 4 895 acres 2 Surface Waters 2a Name of nearest body of water to proposed project Harris Creek (Peeples Creek) (Wake Crossroad Lake) 2b Water Quality Classification of nearest receiving water C, NSW 2c River basin NEUSE RIVER 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The site has an existing building and existing outdoor religious displays and gazeboos 3b List the total estimated acreage of all existing wetlands on the property 1 03 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 390 3d Explain the purpose of the proposed project (3c Centerline of creek is property line per Map book 1974, pg 100, but surveyed boundary is not the same) Proposed new building parking lot Proposed 8" gravity sewer to serve new building needs to aerial -cross the stream to tie into existing sewers stem 3e The Describe the overall project in detail, including the type of equipment to be used proposed gravity sewer will be aerial crossing with concrete piers 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑X Yes ❑ No ❑ Unknown Comments USAGE- Wetlands (Eric Alsmeyer) on 11 -12 -10 & 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑X Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Eric Alsmeyer, Martin Richmond Agency /Consultant Company Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation USACE - Wetlands (Eric Alsmeyer) on 11 -12 -10 & DWQ- Streama (Martin Richmond) on 10 -18 -10 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑X Yes ❑ No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions Previous permit/certification was issued on July 22, 2014, DWR #14 -0719 for boring sewer under the creek Aerial crossing is now required by Raleig 6. Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 ind C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑X Wetlands ❑X Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary T W1 T Type In (Other) Unknown No Corps 002847 W2 T Type In (Other) Unknown No Corps 001653 W3 P Type In (Cone piers) Unknown No DWQ 000165 W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts 1 0 047 2h Comments W1 Type of Impact is open cut for Construction (on -site) W2 Type of Impact is open cut for Construction (off -site) W3 Type of Impact is for concrete piers Proposed sewer crossing is aerial with concrete piers No stream impact is anticipated besides the rip -rap The 8" gravity sewer crossing will be inside the 16" steel casing 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream Impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Choose one Harris Creek (Peeples) PER DWQ 20 S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 20 31 Comments Proposed sewer crossing is aerial with concrete piers No stream impact is anticipated besides the rip -rap per City of Raleigh requirements The 8" gravity sewer aerial crossing will be inside the 16" steel casing See plans Page 4 of 10 PCN Form — Version 1 4 January 2009 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivii ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose O2 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total. 5g Comments N /A 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then vou MUST fill out Section D of this form 6a. Project is in which protected basin? ❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (P) or Temporary T 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet B1 Yes /No B2 P rip -rap Harris Creek 0 No 200 B3 P concrete piers Harris Creek No 36 18 B4 Yes /No B5 Yes /No B6 Yes /No 6h Total Buffer Impacts- 36 218 61 Comments Only permanent piers and rip -rap permanent impact Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Original design and permitted was for the 8" gravity sewer crossing to be bored to minimize the impact to stream and wetlands The creek bottom elevation turns out to be lower than anticipated, therefore, City of Raleigh requires aerial crossing instead There is no other options besides aerial crossing Only concrete piers and rip -rap (per Raleigh standard) are permanent impact lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The 8" gravity sewer crossing will be aerial to minimize the impact to stream and wetlands Construction to be carried out with extra caution and diligence to stay within the 20' corridor or less 2 Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑X No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project'? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation Yes ❑X No El 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified Yes ❑ No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why Stormwater and erosion control are proposed as part of overall plans submitted and approved by City of Yes No Raleigh Stormwater Department Total TN buydown was approved by City of Raleigh, purchased with a ❑ ❑X private mitigation bank Copy attached 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 2b Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan Stormwater and erosion control are proposed as part of overall plans submitted and approved by City of Raleigh Stormwater Department Total TN buydown was approved by City of Raleigh, purchased with a private mitigation bank Copy attached 2e Who will be responsible for the review of the Stormwater Management Plant Certified Local Government 3 Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Raleigh ❑X Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑X Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply) ❑Session Law 2006 -246 ❑X Other N /A 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 4 January 2009 F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the protect involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No use of public (federal /state) land? lb If you answered "yes' to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA /SEPA)? 1c If you answered "yes' to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, E] Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? El Yes ❑X No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in El Yes ❑X No additional development, which could impact nearby downstream water quality? 3b If you answered "yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description The proposed development for this site includes a new building and parking lot All applicable permits are being obtained with local authority, City of Raleigh Total TN buydown was approved by City of Raleigh, purchased with a private mitigation bank Copy attached 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility future +/- 1,359 GPD Wastewater discharges to the proposing 8" gravity sewer, discharge Page 9 of 10 PCN Form —Version 1 4 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts'? 5c If yes, indicate the USFWS Field Office you have contacted - 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat9 Contacted Corps Office (Eric Alsmeyer) 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat'? N/A -not in coastal region 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Contacted Corps Office (Eric Alsmeyer) 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? X❑ Yes ❑ No 8b If yes, explain how project meets FEMA requirements The proposed development is outside of the FEMA floodline The proposed sewer aerial crossing height and design were dictated by City of Raleigh Engineering The sewer +/- 5 7' sewer vertical clearance with the bottom creek and its relationship to 25 -yr storm were directed by Raleigh Engineering 8c What source(s) did you use to make the floodplain determination? I have contacted the FEMA Region IV office (Mohammad Waliullah, 770 - 220 -5493) Du Le 5 -19 -15 for NC Buddhist Association Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10