Loading...
HomeMy WebLinkAboutNCC231389_ESC Approval Submitted_20230511 ?,�YCOOPER sutFo05-0 -��G121M11175 Governor "y JOHNNICHOLSON g .f/ f ,� ° RECEIVED Interim Secretary BRIAN WRENN .44 JUL 6 REC'D Director NORTH CAROLINA Environmental Quality BY: July 1, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Buel B. Barker, Jr. 3632 Friedberg Church Rd. Winston-Salem, NC 27127 RE: Project Name: Wynfall Subdivison Phase One Acres Approved: 6.77 Acres Project ID: DAVID-2021-036 County: Davidson City: Lexington Address: Hinkle Ln. River Basin: Cape Fear Stream Classification: WS-V; NSW-Jordan Lake Watershed Submitted By: Kennerly Engineering & Design, Inc. Date Received by LQS: June 21, 2021 Plan Type: Revised Dear Mr. Barker, Jr.: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. Q'U North Carolina Department of Environmental(ialtty I Division of Energy,Mineral and Land Resources r Winston-Salem Regional Office I450 Hanes M81 Road Suite 300 1 Winston-Salem,North Carolina 27103 V 336.776.9800 Letter of Approval with Modifications Buel B. Barker,Jr. July 1, 2021', Page 2 of 4 This form MUST be submitted prior to the commencement of any land disturbing activity on the above-named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance- oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S1 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or.county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Letter of Approval with Modifications Buel B. Barker, Jr. July 1, 2021 Page 3 of 4 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, A(/ Jack Dalton Assistant Regional Engineer Land Quality Section cc: Kennerly Engineering & Design, Inc. ATTN: Timothy Kennerly, PE 12133 N. HWY 150, Suite F Winston-Salem, NC 27127 Enclosures: Certificate of Approval NCG01 Fact Sheet Modifications Required for Approval Letter of Approval with Modifications Buel B. Barker,Jr. July 1, 2021 Page 4of4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Wynfall Subdivison Phase One Project ID: DAVID-2021-036 County: Davidson 1. This plan only covers land-disturbing activity associated with installation of measures and grading of the roadway. Grading of the site for any activity not specified on this plan, including mass grading or construction, will require a separate approval. The measures must be removed and stabilized prior to closeout, and plan cannot be closed out or transferred in sections. [15A NCAC 4B, G.S. 113A-57(3,5)] 2. Be advised, that low density projects shall not exceed the low-density development thresholds set forth in the stormwater programs they are pursuant to. [15A NCAC 02H .1003, .1017, .1019, .1021] 3. The site must be managed such that the extent and duration of the land - disturbing activity is minimized. Please sequence construction to limit the size of the area exposed at any one time. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0106(2), 15A NCAC 4B .0106(3), and 15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities