HomeMy WebLinkAboutNCC212867_NOT Closeout Documents_20230504 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building,225 Green Street, Suite 714,Fayetteville,NC 28301-5094
(910)433-3300
Taylors Creek Subdivision,Phase
County: Sampson Project: 1 -Lots 1-3&49-58 River basin: Cape Fear
Person financially responsible:H&H Constructors of Fayetteville, Project#: SAMPS-2021-010
LLC-Leslie Groves,VP of Sales NCC212867
Address: 3709 Raeford Road,Suite 200,Fayetteville,NC 28304
1. Project Location: Taylors Creek Way&Merlin Cou,Dismal Twp
Pictures: No
2. Weather and soil conditions: dry,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No one Title:
Inspection report: Sent Report Date given/sent: November 02,2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG010000)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Evangelyn Lowery-Jacobs Others present: Melissa Joyner
Date of inspection: October 26,2022 Time arriving on site: 11:15 AM Time leaving site: 11:30 AM
cc: