Loading...
HomeMy WebLinkAboutMark Cramer_ Draft NCG050000 Comments Cook, Brittany From: Mark Cramer <mcramer@ei1.com> Sent: Thursday, April 20, 2023 11:45 AM To: Cook, Brittany Subject: [External] Draft NCG050000 Questions Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. I see the draft NCG050000 is now available for review, and have taken a quick look. I have a couple of questions: 1. Inspections—Section B-7 describes Facility Inspections that need to occur "at a minimum of semi-annually' and Section B-11 discusses inspections that need to occur"at a minimum on a quarterly schedule." Are these different inspections, or should both say quarterly? What is the difference? 2. The Part D Qualitative Monitoring of Stormwater Discharges D-1.(b) states that, "Visual inspections shall be performed concurrent with required analytical monitoring." However,the analytical monitoring is only required if more than 55-gallons of new motor oil and/or hydraulic oil per month are used. What if a facility never exceeds this threshold and is not required to do analytical monitoring. Are they then never required to do the visual qualitative evaluation of stormwater discharges at outfalls, or is this always required at least quarterly or semi-annually? Mark Cramer, P.E. -Senior Engineer The El Group, Inc. Environmental, Health and Safety Solutions.TM Direct: 919.459.5229 Mobile: 919.623.1833 www.eil.com 1