Loading...
HomeMy WebLinkAboutNCC202386_NOT Closeout Documents_20230510 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Robeson Project: 2020 Building Addition at Gibson River basin: Lumber Person financially responsible:Southeastern Regional Medical Center-Joseph Project#: ROBES-2020-024 Buri,Director of Facility Services Address: P.O.Box 1408,Lumberton,NC 28359 1. Project Location: Pine Run Drive,Lumberton Pictures: No 2. Weather and soil conditions: Clear Soil Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Silas Haynes Title: Project Manager Inspection report: Sent Report Date given/sent: January 10,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Nicholas Mills Others present: Date of inspection: January 05,2023 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM cc: