Loading...
HomeMy WebLinkAboutSite Inspection 05.05.23 Skyland Drive Chipper CurveWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190909 NCDOT - Skyland Drive sidewalk culvert extension (EB-5923)Jackson NCDOT - Skyland Drive sidewalk culvert extension (EB-5923) NC DOT Division 14 - Sylva 5/5/2023 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Pipe extension Region:Asheville Longitude:-83° 12' 45''+35° 23' 10'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant - Recommend adding cover on bare slopes at inlet and outlet of triple barrel. - NPDES records were up to date. Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on May 5, 2023 by Kevin Mitchell with the Asheville Regional Office. Tommy Sutton was present during the inspection. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190909 5/5/2023 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2