To: TRANSMITTAL
Division of Energy, Mineral & Land Resources
Stormwater Program
Att: Brlanna Holland
1612 Mail Service Center
512 N. Salisbury Street
Raleigh, NC 27699.1612
Date: 04/19/23
Project: Phalange CrossfIt
HE#: HC2217
Please find enclosed the following:
One (1)
Original
IRevised Drainage Areas sheet from the Supplement EZ
Two (2)
Copies
ISigned and Sealed Affected Plan Sheets due to revisions
The enclosed are submitted for approval per comment letter received via email April 11, 2023
Responses to comments are below:
1. Additional dimensions for BUA have been added to sheet C2.0
2. The wetland delineation note was on Sheet 3.3 in the top left corner, last sentence under'Nature and Purpose of Construction'
3. The Supplement EZ form Drainage Area Information Table has been revise to reflect entire site data.
In addition, revisions to the forebay to make the entrance deeper than the exit has been revised in the plans.
Please let me know if you have any questions or need any additional information.
Jarrod E. Hilliard, PE, CFM
Hilliard Engineering, PLLC