Loading...
HomeMy WebLinkAboutSW6230401_Response To Comments_20230509HILLIARD ENGINEEi PO Box 249, Sanford, NC 27331 (919) 352-2834 To: TRANSMITTAL Division of Energy, Mineral & Land Resources Stormwater Program Att: Brlanna Holland 1612 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699.1612 Date: 04/19/23 Project: Phalange CrossfIt HE#: HC2217 Please find enclosed the following: One (1) Original IRevised Drainage Areas sheet from the Supplement EZ Two (2) Copies ISigned and Sealed Affected Plan Sheets due to revisions The enclosed are submitted for approval per comment letter received via email April 11, 2023 Responses to comments are below: 1. Additional dimensions for BUA have been added to sheet C2.0 2. The wetland delineation note was on Sheet 3.3 in the top left corner, last sentence under'Nature and Purpose of Construction' 3. The Supplement EZ form Drainage Area Information Table has been revise to reflect entire site data. In addition, revisions to the forebay to make the entrance deeper than the exit has been revised in the plans. Please let me know if you have any questions or need any additional information. Jarrod E. Hilliard, PE, CFM Hilliard Engineering, PLLC