HomeMy WebLinkAboutNC0024236_Pretreatment Compliance Inspection_20230510NORTH CAROLINA DIVISION OF WATER QUALITY
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)l
1. Control Authority (POTW) Name: City of Kinston
2. Control Authority Representative(s): _Benjamin Overton
3. Title(s): Environmental Compliance SuRervisor
4. Last Inspection Date: 5/3/2022 Inspection Type (Check One): ❑ PCI ® Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ® NO
6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ❑ NO
Order Type, Number, Parameters:
Are Milestone Dates Being Met? ❑ YES ❑ NO
PCS CODING
Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac. Type
�I I N I C 1 0 1 0 1 2 14 12 1 3 1 6 1 1 5 19 1 2023 1 l-P� I S
(DTIA) (TYPI) INSP
7. Current Number Of Significant Industrial Users (SIUs)? 7
I 11 1
(FACC
SILTS
8. Current Number Of Categorical Industrial Users CIUs ?
3
CIUS
9. Number of SIUs Not Inspected By POTW in the Last Calendar Year?
0
10. Number of SIUs Not Sampled By POTW in the Last Calendar Year?
0
11. Enter the Higher Number of 9 or 10
0
NOIN
12. Number of SIUs With No IUP, or With an Expired IUP
0
NOCM
13. Number of SILTS in SNC for Either Reporting or Limits Violations During Either of the Last 2
Semi -Annual Periods Total Number of SIUs in SNC
0
PSNC
14. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods
0
MSNC
15. Number of SILTS In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods
0
SNPS
16. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2
Semi-annual Periods
0
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the Parameters and How are these Problems Being Addressed?
The facility was issued a Civil Penalty Assessment for Total Suspended Solids
violations that occurred in February 2023.
18. Since the Last PCI, has the POTW had any Problems Related to an Industrial
Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased
Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
19. Which Industries have been in SNC for Limits or Reporting during SNC for
either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for
Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Put
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an
Order, Has a Signed Copy of the Order been sent to the Division?
21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which
Ones?
® YES ❑ NO
❑ YES ® NO
Limits: N/A
Reporting: N/A
,lished: N/A
N/A
F
YES ® NO
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? EYES ❑ NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO 10-22 DMR spot checked
26. If NO to 23 - 26, list violations
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO
If yes, which ones? Eliminated: Added:
NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 1
28. PRETREATMENT PROGRAM ELEMENTS REVIEW — Please review POTW files, verify POTW has copy of Program Element in
their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info:
Program Element
Last Submittal
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis (HWA)
3/22/2018
® Yes ❑ No
5/30/2018
® Yes ❑ No
4/1/2023
Industrial Waste Survey IWS
8/18/2021
® Yes ❑ No
6/2/2022
® Yes ❑ No
5/31/2027
Sewer Use Ordinance SUO
8/22/2012
® Yes ❑ No
9/21/2012
® Yes ❑ No
Enforcement Response Plan RP
2/13/2020
® Yes ❑ No
2/14/2020
® Yes ❑ No
Long Term Monitoring Plan (LTMP)
1 9/26/2018
® Yes ❑ No
12/3/2018
® Yes ❑ No
INDUSTRIAL USER PERMIT IUP FILE REVIEW 3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION
29. User Name
1. William Barnet & Son
2. Smithfield Packaged
3. Electrolux
Meats
30. IUP Number
WRO09
WRO07
WRO03
31. Does File Contain Current Permit?
® Yes ❑ No
® Yes ❑ No
® Yes ❑ No
32. Permit Expiration Date
12-31-2024
12-31-2024
12-31-2024
33. Categorical Standard Applied I.E. 40 CFR, Etc. Or N/A
N/A
N/A
433
34. Does File Contain Permit Application Completed Within One Year Prior
® Yes ❑ No
® Yes ❑ No
® Yes ❑ No
to Permit Issue Date?
35. Does File Contain an Inspection Completed Within Last Calendar Year?
I ® Yes ❑ N=ol
® Yes ❑ No
® Yes ❑
No
36. a. Does the File Contain a Slug/Spill Control Plan?
a. ®Yes [:]No
a. ®Yes ❑No
a. ®Yes ❑No
b. If No, is One Needed? See Inspection Form from POTW
b. []Yes []No
b. ❑Yes ❑No
b. []Yes []No
37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
❑Yes❑NoEN/A
❑Yes❑NoEN/A
®Yes❑No❑N/A
Organic Management Plan TOMP ?
38. a. Does File Contain Original Permit Review Letter from the Division?
a. ®Yes ❑No
a. ®Yes []No
a. ®Yes ❑No
b. All Issues Resolved?
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
39. During the Most Recent Semi -Annual Period, Did the POTW Complete
®Yes ❑ No
® Yes ElNo
®Yes ❑ No
its Sampling as Required b IUP, includingflow?
40. Does File Contain POTW Sampling Chain -Of -Custody Forms?
I ® Yes ❑ No
® Yes ❑ No
® Yes ❑ No
41. During the Most Recent Semi -Annual Period, Did the SIU Complete its
®Yes❑No❑N/A
®Yes❑No❑N/A
®Yes❑No❑N/A
Sampling as Required b IUP, includingflow?
41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports
®Yes❑No❑N/A
11
®Yes❑No❑N/A
®Yes❑No❑N/A
on time?
42a. For categorical IUs with Combined Wastestream Formula (CWF), does
❑Yes❑NoEN/A
❑Yes❑NoEN/A
❑Yes❑NoEN/A
file include process/dilution flows as Required b IUP?
42b. For categorical IUs with Production based limits, does file include
❑Yes❑NoEN/A
❑Yes❑NoEN/A
❑Yes❑NoEN/A
production rates and/or flows as Required by IUP?
43a. During the Most Recent Semi -Annual Period, Did the POTW Identify
es ElNo
FN/A
❑ Yes ❑ No
❑ Yes ❑ No
All Limits Non-Com liance from Both POTW and SIU Sam lin ?
N/A
N/A
43b. During the Most Recent Semi -Annual Period, Did the POTW Identify
❑Yes❑NoEN/A
❑Yes❑NoEN/A
❑Yes❑NoEN/A
All Re ortin Non-Com liance from SIU Sampling?
44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
a.❑Yes❑NoEN/A
a.❑Yes❑NoEN/A
a.❑Yes❑NoEN/A
Monitoring Violations?
b. Did Industry Resample and submit results to POTW Within 30 Days9
b.❑Yes❑No®N/A
b.❑Yes❑NoEN/A
b.❑Yes❑NoEN/A
c. If applicable, Did POTW resample within 30 days of becoming aware
c.❑Yes❑NoEN/A
of SIU limit violations in the POTW's sampling of the SIU?
c.❑Yes❑No®N/A
c.❑Yes❑No®N/A
46. During the Most Recent Semi -Annual Period, Was the SIU in SNC?
❑
Yes
®
No
❑
Yes
®
No
I
❑
Yes
®
No
47. During the Most Recent Semi -Annual Period, Was Enforcement Taken
❑Yes❑NoEN/A
❑Yes❑NoEN/A
11
❑Yes❑NoEN/A
as Specified in the POTW's ERP OVs, Penalties, timing, etc.)?
48. Does the File Contain Penalty Assessment Notices?
❑Yes❑NoEN/A
❑Yes❑NoEN/A
❑Yes❑NoEN/A
49. Does The File Contain Proof Of Penalty Collection?
❑Yes❑NoEN/A
❑Yes❑NoEN/A
❑Yes❑NoEN/A
50. a. Does the File Contain Any Current Enforcement Orders?
a.❑Yes❑No®N/A
a.❑Yes❑No®N/A
a.❑Yes❑No®N/A
b. Is SIU in Compliance with Order?
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
b.❑Yes❑No®N/A
51. Did the POTW Representative Have Difficulty in Obtaining Any of This
❑ Yes ®No
ElYes ®No
ElYes ® No
Requested Information For You?
11
NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2
FILE REVIEW COMMENTS:
Headworks Analysis was submitted to Raleigh on May 30, 2023
Files were well organized and readily available.
INDUSTRY INSPECTION PCS CODING:
Trans.Code Main Program Permit Number MM/DD/YY
I- N-j I I I I I I I l I I 1
(DTIA)
1. Industry Inspected:
2. Industry Address:
3. Type of Industry/Product:
Inspec.Type Inspector Fac. Type
II L SI 1 2
(TYPI) (INSP) (FACC)
4. Industry Contact:
Title:
Phone:
Fax:
5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO
6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview
❑ YES ❑ NO
B. Plant Tour
❑ YES ❑ NO
C. Pretreatment Tour
❑ YES ❑ NO
D. Sampling Review
❑ YES ❑ NO
E. Exit Interview
❑ YES ❑ NO
Industrial Inspection Comments:
OVERALL SUMMARY AND COMMENTS:
Comments:
Requirements:
Recommendations:
NOD: ❑ YES ❑ NO
NOV: ❑ YES ❑ NO
QNCR: ❑ YES ❑ NO
POTW Rating:
Satisfactory X Marginal
PCI COMPLETED BY: � �GZClel
nSatisfactory
TE: 5/10/2023
NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 3