Loading...
HomeMy WebLinkAboutNCC231296_ESC Approval Submitted_20230509 ROY COOPER e.0suar4 Governor 1111 ELIZABETH S. BISER i�, t, Secretary illy■ DOUGLAS R.ANSEL "M` Interim Director NORTH CAROLINA Environmental Quality April 28, 2023 LETTER OF APPROVAL WITH MODIFICATIONS SDH Charlotte, LLC Attention: Charles Worsham, Vice President Land Development Post Office Box 311 Midland,North Carolina 28107 RE: Project Name: Pine Bluff Road Subdivision Acres Approved: 47.85 Project ID: CABAR-2023-059 County: Cabarrus, City: Locust Address: Pine Bluff Rd. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Andrew Grant, PE, BGE Date Received by LQS: April 20, 2023 Plan Type: Revised Dear Mr. Worsham: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 704-663-1699 Letter of Approval with Modifications SDH Charlotte, LLC April 28, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notified this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Andrew Grant, PE Letter of Approval with Modifications SDH Charlotte, LLC April 28, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Pine Bluff Road Subdivision Project ID: CABAR-2023-059 County: Cabarrus 1. A revision request was received to correct an administrative error on the Letter of Approval with Modifications issued on October 13, 2022. The approval letter listed the incorrect financial responsible entity. A review of the plans was not conducted with this revision. 2. All modifications listed in the Letter of Approval with Modifications dated October 13, 2022, shall be followed. ID ad el � .4 .14� a �-+ [ .-, E +� "Z N C S ae : 61° 1 MO .Il ,o C I. i 440 g4.•ct ,--+ ,~ •~ O - 0 • 44P *Ei* ...I E o cine 5 = I = 11 I ‘-1 t .= ‘5 +6 I-� - AR•it , • D litL O -1 • f9' ' en 2: CC ° ^' d' co) � 4 To,,,,vb • ` A :111 t. c.. " =c' � © .0 G.> le.',' O w SC i ry a o v , -, 8 CI aV C.) ‹% 0 ' , , , ..=, , i : 6 -..• lL . , W,4 .= ..p., -cl ie'' .0 t '11 d . „, 6 VI 4IJ .G O IO ♦' O VS 2 I* V 0 `t g -4,a •"5 Cd '''' ° . e ..,=. , < 04 40 .4., r5 .Fj 0 NI 1a. • v 0 6 = $ Oratom ,I) Pat VI U pq ..I ° Eli — e, C 0. E„ 6cij ' C v Lrpl ••r 6 p P .: CI E , ' V �� w'r sue., eg 4,4 E. ea et V e� 0., 1 V