HomeMy WebLinkAboutNCC231343_ESC Approval Submitted_20230509 f7,‘,..,-1R0 -'",,,N.,, t
e
ROY COOPER _1
l
Governor
ELIZABETH S.BISER -f
Secretary •asvn
DOUGLAS R.ANSEL NORTH CC R 3 INN
Interim Director Environmental Quality
April 27, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Robert and Sarah Sablich, Owners
10612 Providence Road 376 D
Charlotte,North Carolina 28277
RE: Project Name: Twin Lakes Lot 83 (Express Plan)
Project ID: UNION-2023-066
Acres Approved: 0.43
County: Union
City: Matthews
Location: 206 Sugar Maple Lane
River Basin: Catawba
Stream Classification: Others
Submitted By: Eagle Engineering
Date Received by LQS: April 25, 2023
Plan Type: New
Dear Mr. And Mrs Sablich:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Peimit. After the forum is reviewed and found to be complete, you will receive a link
with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the
COC via email. As the Financially Responsible Party shown on the FRO forma submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
optof 704-663-1699
Letter of Approval with Modifications
Robert and Sarah Sablich, Owners
April 27,2023
Page 2 of 3
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
deteiiiiined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the infounation provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended foiiu if there is any
change in the information included on the faun. In addition, it would be helpful if you notify this office of
the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Z AA ,c . 1<&wrt.
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
ZK
Enclosure: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Eagle Engineering,
Attention: Steven Prophet, PE
2013-A Van Buren Avenue
Indian Trail,North Carolina 28079
North Carolina Department of Environmental Quality;Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
�as�oxNtile%.°
704-663-1699
Letter of Approval with Modifications
Robert and Sarah Sablich, Owners
April 27, 2023 •
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Twin Lakes Lot 83
Project ID: UNION-2023-066
1 County: Union
•
1. The proposed silt fence should be extended to the North side along Lot 84 and the South side along
Lot 82 up to the proposed Limits of disturbance.
2. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient,the applicant must take
those additional,steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] .
1;?;,,,,,D North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115
ototav 704-663-1699