Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC231344_ESC Approval Submitted_20230509
ROY COOPER d o4 Governor ZY- ELISABETH BISER Secretary DOUGLAS ANSEL ft °"""�~ Interim Director NORTH CAROLINA Environmental Quality April21, 2023 LETTER OF STATUTORY APPROVAL Ardmore Gibsonville LLC Attention: Brantley White, Manager 1400 West Northwood Street Greensboro,NC 27408 RE: Project Name: Ardmore Meadows Acres Approved: 24.9 Project ID: GUILF-2023-025 County: Guilford City: Gibsonville Address: Burlington Road(US-70) River Basin: Cape Fear Stream Classification: WS-V;NSW Submitted By: Hagen Engineering,PA Date Received by LQS: April 4, 2023 Plan Type: Revised Dear Mr. White: The subject erosion and sedimentation control plan has been approved by default. The Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of receipt of G.S. 113A-54.1. The Act further states that if the approving authority fails to approve or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan will be deemed approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Storm water Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. DEQs) North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources ,iti Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336-776-9800 Letter of Approval <Financially Responsible Company> <Date of Letter> Page 2 of 2 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Tamera Epl' , PE Regional Engineer Land Quality Section Enclosures: Certificate of Approval c: Hagen Engineering, PA Attn: Nolan Franz, PE 3859 Battleground Avenue, Ste 300 Greensboro,NC 27410 •- tu c d :� ;:lt z o a� : acu ct a ,��,, CI ae - 44, W Ts >~ to v r..i y � .� v I .- - _ y y ° '> � s - C A) w en v : 3 P4 cc Pm z O N : .- O Pli E an ,-� . :~ zL In c = qt ARptl, C A M C�_ L., : - o M� N ' ,,) u P= Cis a - �"., /� 1 E ts,( d s W O © ^l g N ce ,,,.. , ,,A41, Ci sly• ''' .> /0, L L W r).., -1 ) PC ',7,4, .2. '2, ct d Po c...) .. „, ..., .,.. © r ) : a4 O Z bk VZ1y > 3 Ilt © WO ,� 'i l - r4 L 0 z • >~ `� +� .g O r v a C -- = = � 4 y = © ;.0 ".* w ,c::, rt, p $5 '',' C—+ ct ct C.) s a C.) z