HomeMy WebLinkAboutNCG060412_Inspection Report - Amazon Fulfillment Center_20230509C��rf�lrie-J4fetkJanburg
STORM
CATER
SuviceS
Facility Inspection
Ste rmW ate r. Cho rMe a k. erg
Facility Name: Amazon Sort Center Inspection # : 75144
Contact: Scott Lambeth, Regional Environmental Manager Permit #: NCG060412
Inspector: Ron Eubanks Receiving Stream:
Inspection Date: 04/25/2023 Entry Time: 10:00 am Exit Time: 12:30 pm SIC #:
JL SUMMARY
Facility Description: Amazon Fulfillment is located at 3620 Reeves Ridge Drive in Charlotte on approximately 56.05
acres. The facility is a "Middle Mile" operations center of Amazon. There is a large processing/sorting warehouse building
with several loading docks located on the property. There are also employee parking and trailer storage lots located on
the paved areas of the property.
File Review/History: Charlotte -Mecklenburg Storm Water Services (CMSWS) has not previously conducted an
inspection of this property.
Inspection Summary: The Amazon Fulfillment facility was observed to be in compliance with the City of Charlotte Storm
Water Pollution Control Ordinance at the time of the inspection. Please refer to the report for comments and
recommendations.
Site Inspection Deficiency Comments
Stormwater system (catch basins,
No
Stormwater runoff conveys by sheet flow into several drop
inlets, outfalls, etc.)
inlets, which drain into two underground detention basins.
The effluents from the detention basins are the outfalls for the
property. The drainage system appeared to be in good
condition; no stormwater pollution issues were observed.
Erosion issues
Recommendation
There was minor erosion observed on the property which was
causing sediment accumulation on the pavement. CMSWS
recommends that the disturbed area be stabilized with
groundcover to control erosion.
Structural stormwater control
No
There are two detention basin SCMs located on the property.
measures (SCMs)
Since the SCMs are located underground, they were not
inspected; however, there were no issues observed at the
effluents.
Illicit discharges/connections
No
There were no illicit discharges or connections observed on
the property during the inspection.
Aboveground storage tank(s) (ASTs)
N/A
Facility staff indicated that there are no ASTs located on the
and any associated venting and/or
property.
dispenser(s) — list tank size(s) and
contents
Underground storage tank(s) (USTs)
N/A
Facility staff indicated that there are no USTs located on the
and any associated fill port area(s)
property.
and dispenser(s) — list tank size(s)
and contents
Outdoor material storage area(s)
N/A
Materials are stored inside the warehouse building. No
stormwater pollution issues were observed.
Outdoor processing area(s)
N/A
All processing/sorting areas are located inside the warehouse
building. No stormwater pollution issues were observed.
•
(& To report pollution or drainage problems call: 311
CHARLOTTE_ http://stormwater.charmeck.org
5/8/2023 5:12:49PM
0
Page 1 of 3
Site Inspection Deficiency Comments
Loading/unloading area(s)
No
The loading and unloading areas appeared to be in good
condition; no stormwater pollution issues were observed.
Vehicle/equipment area(s) - fueling,
No
Facility staff indicated that no vehicle fueling or maintenance
maintenance, washing, storage, etc.
activities are conducted on the property. Vehicle washing
activities are conducted on the property by a mobile washing
contractor; the wash water is collected and disposed of
properly. Trailers and facility equipment are stored on the
property. No stormwater pollution issues were observed.
Oil/water separator and/or
N/A
pretreatment
Waste storage/disposal area(s) -
No
There is a municipal waste compactor located on the
open tops, waste containers, scrap
property. A roll off dumpster was also observed on the
metal bins, etc.
property during the inspection. The waste compactor and roll
off dumpster are covered; no stormwater pollution issues
were observed.
Food service area(s)
N/A
Indoor material storage area(s)
No
All product and materials are stored indoors; no stormwater
pollution issues were observed.
Indoor processing area(s)
No
All processing/sorting areas are located indoors; no
stormwater pollution issues were observed.
Floor drains
No
There is a floor drain located in the custodial area inside the
warehouse building. Facility staff indicated that the floor
drain is connected to the sanitary sewer system. No
stormwater pollution issues were observed.
Spill response equipment
No
Several spill kits are located on the property. The spill kits
were observed to be stocked with absorbent pads and booms
SWPPP Section Observed Comments
Does the facility have a Stormwater
Yes
A SWPPP has been prepared and implemented for the
Pollution Prevention Plan (SWPPP)?
Amazon Fulfillment facility.
Reviewed and updated annually
Yes
The SWPPP was reviewed and updated on June 6, 2022.
Responsible party
Yes
General location (USGS) map
Yes
Detailed site map
Yes
Narrative description of industrial
Yes
processes
Feasibility study
Yes
Evaluation of stormwater outfalls (non
Yes
The recent non-stormwater discharge evaluation of the
-stormwater discharge evaluation)
outfalls was conducted on January 10, 2023.
Stormwater best management
Yes
practice (BMP) summary
Secondary containment plan (all
N/A
There are no ASTs located on the property.
necessary secondary containment
provided and documented)
Records on every release from a
N/A
secondary containment system (for
the last 5 years)
Spill prevention and response
Yes
procedures (SPRP)
List of significant spills or leaks (for
Yes
Facility staff indicated that there have been no significant
the last 3 years)
spills or leaks on the property during the last 3 years and
documented in the SWPPP.
•
(& To report pollution or drainage problems call: 311
CIIARIATTE_ http://stormwater.charmeck.org
5/8/2023 5:12:49PM
Page 2 of 3
SWPPP Section Observed Comments
Solvent management plan (SMP)
Yes
Preventative maintenance and good
Yes
housekeeping program (PMGHP)
Facility inspections conducted as
Yes
The recent quarterly inspections were completed on 09/22/22
required
, 10/12/22, 01/22/23, and 04/07/23. The inspections are
documented in the SWPPP.
Employee training (provided and
Yes
Annual training is conducted via online modules. Training is
documented)
also conducted for all new employees. The training records
are documented in the SWPPP.
Qualitative/Analytical Monitoring Observed Comments
Qualitative monitoring conducted as
Yes
The recent quarterly qualitative monitoring was conducted on
required
02/23/22, 06/29/22, 11/25/22, 01/22/23, and 04/07/23. There
was no discharge reported for the 3rd Quarter of 2022.
Analytical monitoring conducted as
Yes
The recent quarterly analytical monitoring was conducted on
required
02/23/22, 06/29/22, 11/25/22, 01/22/23, and 04/07/23. There
was no discharge reported for the 3rd Quarter of 2022. There
have been permit benchmark exceedances reported for
elevated pH at outfall 02.
Analytical monitoring for onsite
N/A
vehicle and equipment maintenance
as required
Permit and Outfalls Observed Comments
Copy of permit and certificate of
Yes
The property has Certificate of Coverage #NCG060412.
coverage onsite
All outfalls observed
Yes
There were no stormwater pollution issues observed at the
outfalls.
Number of Outfalls Observed
2
Representative outfall status
N/A
documented by DEMLR
Annual no -exposure self re-certificatio
N/A
n documented
•
(& To report pollution or drainage problems call: 311
CIIARIATTE_ http://stormwater.charmeck.org
5/8/2023 5:12:49PM
0
Page 3 of 3