Loading...
HomeMy WebLinkAbout20140275 Ver 3_CAMA Application_20150526A � ..rte.. NCDENR 2 0 1 5 0 5 1 7 North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Donald R. van der Vaart Governor Secretary MEMORANDUM TO: Ms. Cyndi Karoly Env. Biological Supervisor Division of Water Quality Wetlands Unit FROM: Daniel Govoni Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE: 21 May 2015 SUBJECT: CAMA Application Review APPLICANT: Tobin J. Tetterton Respond to Daniel Govoni Morehead City Office FMAY2 s 205 I D PROJECT LOCATION: SR 1718, Yeatesville Road, in existing farmland adjacent to the Pungo Creek near Belhaven in Beaufort County, North Carolina. PROPOSED PROJECT: Applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washers and dryers and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. Please indicate below your position or viewpoint on the proposed project and return this form by 11 June 2015. Please contact Steve Trowell at 252- 948 -3854, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. Signed This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Date 943 Washington Square Mall, Washington, NC 27889 Phone: 252 - 946 -6481 1 FAX: 252 - 948 -0478 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer— Made in part by recycled paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: TJ's Land Development, LLC 2. LOCATION OF PROJECT SITE: Project site is located off SR 1718, Yeatesville Road, in existing farmland adjacent Pungo Creek near Belhaven in Beaufort County, North Carolina. Photo Index - 2006:117 -8454; J -6 2000:117 -1473; J -5 1995:117 -1271; K -16 State Plane Coordinates - X: 2,669,200 Y: 646,200 Pantego Quad. (lower left corner) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 29 August 2013 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received — 20 May 2015 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP — Rural with Services (B) AEC(s) Involved: PTA, PTS, CW (D) Water Dependent: Yes (D) Intended Use: Campground with associated marina. (E) Wastewater Treatment: Existing - None. Planned - Individual Septic (F) Type of Structures: Existing - None Planned - 106 camp sites, septic system for camp sites, 66 slip marina with fuel and pump and haul wastewater system. (G) Estimated Annual Rate of Erosion: Unknown 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED (A) Vegetated Wetlands 1,760 ft2 (Coastal Wetland shaded) 2,600 ft2 (Wooded 404 shaded) (B) Non - Vegetated Wetlands Pungo Creek bottom 9,478 ft2(Shaded Creek bottom) (C) Other Uplands 33.5 acres (D) Total Area Disturbed: 1,473,969 ft2 (33.8 acres) (E) Primary Nursery Area: No (F) Water Classification: SC NSW Open: NO PROJECT SUMMARY: The applicant proposes to convert cropland into a campground with 106 camping sites, associated septic systems and campground building with showers, washer and dryers, and store. The applicant also proposes to construct a 66 slip marina in Pungo Creek. NARRATW CAMA Permit TJ's Land Development, LLC This project is to build a camp ground with marina on the Yeatsville Road fronting on Pungo Creek in Beaufort County. The entire tract of land is 46.47 acres with 12.95 acres of undisturbed 404 and CAMA wetlands. The remainder, approximately 33.52 acres, is farm land. There will be dockage for approximately 76 boats and more than 100 camp sites with sewage facilities for both the dockage and the camp sites. The wetland area is well defined and has been examined by the US Army Corps of Engineers and The Division of Coastal Management. No attempt has been made to make the distinction between CAMA and 404 wetlands because the only impact in these wetlaHds will be limited to pile driving. CAMA wetlands are along the Pungo Creek shore line. A pump out for boaters will be provided with disposal of the sewerage at a permitted facility. Bathrooms and other amenities will be provided at a high ground commercial facility located as shown on the plans. Elevations range from sea level to 10 feet. Generally the project area is flat with grades less than one percent. The entire project area to be disturbed is farm land and the existing excavated pond. Soils are Augusta and Altavista fine sandy loam. The project includes the excavation of an approximately 3.6 acre pond that is fed by ground water. There will be no surface water flow into the pond or natural discharge. The pond will not be connected to local ditches or streams. The existing borrow pit will be enlarged to construct the pond. A mine permit is being applied for concurrently with these applications. The purpose of these permits is to construct the pond and provide a partial place to place fill dirt resulting fromthat construction. The pond will be used for recreation including swimming. Putrefaction will be avoided by periodically decanting by pumping to high ground with sheet flow of more than 50 feet into ditches. An after the fact Tar- Pamlico buffer permit has been granted to resolve the road crossing issue at the head of the designated stream Borrow will be used to raise the ground elevation at those camper lots that are below the base flood elevation, and for raising the ground elevation at the septic tank disposal ground absorption drain fields as required by ground absorption permits. There will be an estimated surplus of about 114,000 cubic yards of borrow. The owner, TJ's Land Development, LLC intends do the excavation and construction of the property. Some of the borrow will be used on properties owned by Toby J. Tetterton who is also the owner of TJ's Land Development, LLC, and some of the borrow will be sold for use at other sites. Storm water strategy in these sandy silts is to avoid collecting rainwater into hardened or ditched conveyances. Roads will be constructed as nearly as possible without ditches. Gentle swales will be used. The Tar - Pamlico riparian buffer will be protected by sheet flowing all water into the- This is a low density storm water project. 7p st+.q"'sae,,�,r 72� $ �yro y� (a�° ' _ 4SHlilnui`OD6 ;a 1► TJ's ]Land )[Development, L1LC Pungo Creek Beaufort County Project Setting The 46.5 acre project site is located off SR 1718, Yeatesville road, adjacent Pungo Creek near Belhaven in Beaufort County, North Carolina. The most common land use near and adjacent to the project site is agriculture, with some scattered single family residences. The site consists of 33.5 acres of uplands that is currently used as row crop farmland and 12.9 acres of wetlands. The farmland has an elevation of f7' above the normal water level (NWL) and consist of sandy loam soils. At the east end of the field is a borrow pond next to a broad expanse of scrub shrub wooded 404 wetlands that transition to a Coastal Wetland marsh adjacent Pungo Creek. This wetland,area is approximately 540' wide between the uplands and the normal water level (NWL) of Pungo Creek. The wooded portion of the wetland is vegetated with bald cypress (Taxodium distichum ), red bay (Persa borbonia), dead and stressed loblolly pines Pinus taida , wax myrtle M rica ceri erra and red cedar Juni erus vir iniana . The wooded wetlands transition to an herbaceous Coastal Wetland marsh vegetated with black needlerush (Juncus roemerianus), sawgrass (Cladium jamaicense), and giant cordgrass S artina cynosuroides). There is an unnamed tributary off of Banjo Creek, a tributary to Pungo Creek, whose channelized head waters traverse the existing project site /field. The channelization was undertaken most likely to improve agricultural drainage. An unimproved dirt road was constructed through the field to the existing borrow pond during the winter of 2013/14. This road crossed the channelized stream with a 36" culvert pipe. An "after -the- fact" 401 Water Quality Certification from the Division of Water Resources and a Nationwide Permit 14 from the US Army Corps of Engineers authorized this improvement. - The project site has 854' of Coastal Wetland marsh shoreline adjacent Pungo Creek. Water depths in Pungo Creek range from 3' at the marsh edge to +5' below the NWL approximately 150' offshore. The Environmental Management Commission classifies Pungo Creek at this location as SC NSW and the NC Wildlife Resource Commission as Inland Waters. This area of Pungo Creek is closed to shellfishing. Project (Description A pre - application scoping meeting was held for this project on 21 June 2013 in the Washington Regional Office. The applicant proposes to develop the farmland into a campground with 106 camping sites, that will include supporting infrastructure such as a 50' wide x 150' long building housing full bathroom facilities, laundry mat, store, and a 100 person reception venue. A 66 slip marina is proposed in Pungo Creek as well as a large groundwater fed pond to be used for recreational purposes including swimming. A road system will be constructed to access the camping spaces and other campground and marina facilities. A 90 space parking lot is proposed for the campground building and a 33 space parking lot is proposed for the marina. Wastewater generated from the campground will be handled by onsite septic TJ's Land (Development, LLC Pungo Creek Page Two systems. The marina will have a pump and haul system that will pump to a holding tank near the base of the marina pier from which the wastewater will be trucked to local municipality for disposal. The application did not include any documentation authorizing the proposed methods of wastewater disposal. The 66 slip marina will be accessed by an 8' wide pier of which ±50' is over highground, ±300' is over wooded 404 wetlands, ±240' is over Coastal Wetlands marsh and ±1401 over open water. The applicant desires to build the pier 8' wide because of the distance to the slips and the extra width would allow traffic to pass on the pier. The applicant proposes to mitigate for this impact by constructing the pier with the decking elevated 5' above the ground level to reduce the shading impact. The pier will access an 8' wide x 586' long T- shaped dock with 66 slips. The dock will have a square shaped, roofed, platform 30' x 30' at the intersection of the access pier and dock. This platform will support the fueling area as well as the marine pumpout. Two 15' x 30' slips will be designated for use by boats fueling or pumping out onboard holding tanks. There is also proposed 2 -25' x 25' roofed platforms at each end of the dock. There will be 24- 18' x 40' slips with a "stem to" orientation on the offshore side of the dock accessed by 14 -3' x 20' finger piers. The inshore side of the dock will have 40 -10' x 10' boat lifts accessed by 22 -3' x 20' finger piers providing access to the boatlifts. The existing borrow pond will be modified and enlarged to 3.6 acres. An area of the existing pond will be filled ±50' x 250' for more highground space to accommodate camping spaces and the perimeter road around the campground. Fill generated from the pond excavation will be used onsite to build up the existing ground elevations where they do not meet the base flood elevation. Fill dirt will also be sold and trucked offsite. The applicant states that a mining permit application has been submitted to the Division of Land Resources. The applicant plans to construct a bulkhead around the perimeter of the pond. An 8' wide pier system with a covered platform and a 20' x 40' T -head platform are proposed to be constructed in the 3.6 acre pond. The pond will be pumped out to prevent putrefaction pumping the pond water to highground with sheetflow of more than 50' into ditches. Project Impacts The development of the campground spaces and associated infrastructure including the pond excavation will disturb 33.5 acres of uplands. The access pier over wetlands will shade 2,600 ft2 of wooded wetlands and 1,760 ft2 of Coastal wetlands. The proposed dock, platforms and finger piers will shade 9,478 ft' of Pungo Creek bottom. Construction of the pier, dock and slips will result in some localized short-term turbidity. The marina will increase boat traffic in Pungo Creek and their associated impacts. Steve Trowell — Washington Regional Office — 20 May 2015 `X�r r3 pry� ti "`f �Yl:ti %. - v3 ^✓. �1 I.,.ri.'t,i•. `�5- P,:;c t.Y. atr r. ri << "�kl��id rl Sr. jrS I:i I.,��rt �b'� ���ti +����E{�• (goat eev4sed 92129106) It tF,S i� North Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Applicant/ Landowner Information ' n Foil /i .4 T 1-4 r- K,e d Business Name Project Name (if applicable) M/4- Applicant 1: First Name qq MI a� Last Name _Ny Last Name Agent/ Contractor 2: First Name ,,�yy e rre r, / �y Applicant 2: First Name MI Last Name State W� ZIP 78 �� If additional applicants, please attach an additional pages) with names listed. Mailing Address PO Box City State Contractor # go Street Address (if different from above) ZIP 7 Country Phone No... FAX No. Street Address (if different from abo e) ?15-Y 1 a City State �c ZIP r Email J "° Email 2. Agent/ ' n Foil /i .4 T 1-4 r- K,e d Business Name. All Cont Agent/ Cont actor 1; First Name MI Last Name Agent/ Contractor 2: First Name M Last Name Mailing Address PO Box city :.SS bt. State W� ZIP 78 �� Phone No. 1 -2f-Z, - f 3- Phone No. - ext. FAX No. �! ^^ Contractor # Street Address (if different from above) City State ZIP Email J "° <Form continues on back> Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # w1c01Zr �,�r,�vol�e, mid &Sk0 A0 *1 J *r4D'-3 10 5'AMS Subdivision Name 14o #ie City A��� A ✓8,V State 9C Zip 7 10 Phone No. 237- - 3- 667TH. Lot No. (s) (rfmany, attach additional page with list) La 0,1 rd,xu,1,06 Oq Y6-Y) /zSC�ecs�G� f. Man -made features and uses now on tract , �c',�n�,�t ��+d F• �1 denr ��r,r��y g. Identify and describe the existing land uses ad'a�cent to the proposed project site. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project ..., /4M /ICo r'(!';4(r0 C— f-e/< c. Is the water body identified in (b) above, natural or manmade? "Natural d. Name the closest major water body to the proposed project site. ❑Manmade []Unknown /1 .• v-4 o CA ee« e. Is proposeddFork within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes No work falls within. $e C,,> LwT National Register listed or eligible property? ^ vico /t r U 4. Site Description a. Total length of shoreline on the tract (ft.) fsY 64 e b. Size of entire tract (sq.fL) fit& Y7 /9cAes c. Size of individual lot(s) CA P4/009 Pp X14 TV A L - vox 7o Near many lot d. Approximate elevation of tract above NHW (normal high water or NWL (normal waterleveq (!f sizes, please atdch additional page with a list) 7 0 r,4 e *HW or ❑NWL e. Vegetation on tract ,,/,e7.1 -* d JS 4PV—: oA vs rolove v/te 33•sz A(,/�eS 6 f p-� rc At LODMD ✓� relad� '+� • 4r /4- G a,cs �,s -d•, e,�,�,� w�,rl•��ds -: • A cAes rorm. f. Man -made features and uses now on tract , �c',�n�,�t ��+d F• �1 denr ��r,r��y g. Identify and describe the existing land uses ad'a�cent to the proposed project site. I✓ AYLP4t41 R44 WOJA /,g' -td, h. How does local government zone the tract? - i. Is the proposed project consistent with the applicable zoning? 1 f� (Attach zoning pli nce certificate, if applicable) ❑Yes []No j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. Oyes ANo []NA If yes, by whom? 1. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes No ❑NA National Register listed or eligible property? <Form continues on next page> 2 r Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. () Are there wetlands on the site? Yes ❑No (i) Are there coastal wetlands on the site? Yes ❑No (iii) If yes to either ) or (ii) above, has a delineation been conducted? ( ❑No PYes (Attach documentation, if available) � '06 Alal, n. Describe existing wastewater treatment facilities. ewe �$ i G•Y . ®'%e(v fy-fr8rqs 4fo- s-e frtc r-o,�,,vA -ro A 6so��rs , dJ�f e�'J0A°r ®ter G-e sEAsr ro A STv/t.¢. r4'e�l� et9-V f.r /'t•✓c r �i e rt. S,/ST �f W ea�/3 jr'e K �rwJ fJ �91� Cv �rlT� • %°it � �4�AAfe c��O/t! s$sd/a�..¢ YRB�rr/6a.B�r>' � /s$�sT• o. Describe existing drinking water supply source. jVA4f 4p4 T L y e /U017,41 IL •M ! W 1 re It We I I -f Ptw 0J-46 ✓bvM 7#C 4,1oc1Ar e0%.1.4-JrX WAr' =h,� p. Describe e6disting storm water management or treatment systems. Jio�a �.�r��, 6.•e'll 6g P.���Ii N� � /�C67E/��: >Ip�/�, 5. Activides and Impacts a. Will the project be for commercial, public, or private use? Commercial ❑PubliclGovemment e4 f 0-er- Aegr,4 L 91 Pt 9 a rd I- A" r ❑Private /Community b. We a brief description o purpose, use, and daily operations of the pr ct when complete. CA /4$47 Wir* Pa.*VSe' --JP Sron' +,ifJ � '06 Alal, c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. et9-V f.r /'t•✓c r �i e rt. S,/ST �f W ea�/3 jr'e K �rwJ fJ �91� Cv �rlT� fl eri d4 V14 usrpey `,4(.AAve .4-4 fir' /e eB /ta vs re, d. List all development activities y ou propos . GB ��e�. 19"Y d /U017,41 e. Are the proposed activities maintenance of an existing project, new work, or both? 1� zt.-i Mai it Ic f. What is the approximate total disturbed land area resulting from the proposed project? ❑Sq.Ft or Acres 3.sZ C/Uq rclt dell. C'0~ briar /A .MC! 5- J.YJ 'Vv A& '0�a+-d g. Will the proposed project 6ncroach on any public easement, public accessway or other area ❑Yes Ro that the public has established use of? DNA h. Describe location and type of existing and proposed discharges to wateq of the state. �v K i:�h a e, ba/I r crt, ,2 v y crC fj f , *,a r i. Will waste ter or 4�,CteW. r be discharged into a we and? es []No I I � s �,� � � � s� ry �w� '805" et sW O. DNA If yes, will this discharged water be of the same salinity as the receiving water? es ❑No ❑NA j. Is there any mitigation proposed? '❑Yes no DNA If yes, attach a mitigation proposal. <Form continues on backs It 2 C�' G•i= .f "a.•Z CC E'i3 3 4"r � r' r=Gi', .. . :, -is 4' .,.cC 0C. S'; c.. ni c._._ LLG[ ;:.fl l ?i:,n Form DCM MP -1 (Page 4 of 4) APPLICATION for ° Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. , a. A project narrative. /3 rr� /a b. An accurate, dated work /plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? I�� previously work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. `7 c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. v Pic lwlz K 11-op d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties L e. The appropriate application fee. Check or money order made payable to DENR. r Arr,4 f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name W7R r 7t f S. Phone No. %ty �—.—} ��.r � �� Address X876 vS c klA A(C �, Name ��� s L(, Phone No. Address Z 9a'aa-'s k4 dart, N.C., Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Eiaysju4 A-ro �'ed iA4e- 4t,4 -rt~ tj..r7 -rj1 �e �F �olS oO* �I-11,r h. Signed consultant or agent authorization form, if applicable. / f i. Wetland delineation, if necessary. 4i'A 51'� j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) / k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expend' r of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act 7 Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify at the information provided in this application is truthful to the best of my knowledge. Date J %Jr, Print Name od Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM, MP -5 Bridges and Culverts 'WDCM MP -3 Upland Development CM MP4 Structures Information 252 —ECG• c!? r( ?'a _ „'. Cif -'•`, -f '11,1 -,L G V y., Lim;: Form ®CH NP-3 ON RXI (Construction and/or land disturbing activities) TJ 09-a v' d v mak,( 44 C_ Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. 70 (1 c. Density (give the number of residential units and the units per acre). A> C � WI -e s4s ;!- 2.7- j' C,/4, /,•,PP -- An, 44AZ e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land- disturbing activity begins. (1) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? Z;Jes []No ❑NA ec (ii) If ygs, list the mate submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and /or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. -- L e Ss -Fe# A,V ;.5— Describe proposed method of sewage disposal. /� Ab y'0/7 U'fi P / I ip 4 z:;FYk 3i lvtrl# fit a% t G�-' /t46a4r`. &4&.o r0pk &N,' /K0u9gv 1Z7Ar_[ZCrY: Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). WA1' .ere- /•1PuA1( b. Number of lots or parcels. ,sF`r,R-S , All R eNI-. -L e d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Cow ,,e A/)- /rte h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? Oyes o ❑NA W41 ird'�l (ii) If yes, list the date submitted: k. Have the facilities described in Item (i) received state or local approval? ❑Yes No ❑NA If yes, a ach appropriate documentation. m. • Does the proposed project include an innovative sormwater design? ❑Yes o ❑PIA If yes, a tchappropNate documentation. - =+s•� - - - -= 'iii--- r-- �''.���;,:,ir_c. ;'C.:,w'.0 -',�: ��,IrnC =!Cc m. Describe proposed drinking water supply source (e.g., well, n. community, public system, etc.) 170-413-9 1 t- 1 `tit" a(.,L4 tV o. When was the lot(s) platted and recorded? P. Date /At Project Name Applicant Name ljj�rg Z_ (i) Will water be impounded? []Yes No ❑NA (ii) If yes, how many acres? If proposed development is a subdivision, will additional utilities be installed for this upI nd development? ❑Yes []NO A M !."� � yd ° <. �,'.'s •. �.'(�. �.!r !'��: �•.ti ��: �L"..'iC z'w l ".r"" �F31 ,�� �r., �f a - r �• (Construction within ( ubIlic Trust Areas) e Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 9. DOCKING FACILITYINARINA CHARACTERISTICS a. (i) ,I he docking facility /marina: ommercial ❑Public/Govemment ❑Pdvate/Community c. (i) Dock(s) e (ii) Number (iii) Length (iv) Width (v) Floating pt6f; nd /or f ier(s) �It[ vj�l�S �e?cicS� ❑YU No H I r f%*;Vv4 p e. (i) Are Platforms included? 4(yes []No If yes: (ii) Number (iii) Length)- Loy to Ty ,1 dK— r (iv) Width d -,LF6 0119 —off (v) Floating []Yes KNo Note: Roofed areas are calculated from dripline dimensions. g. (i) N 6 ber of slips proposed (ii) Number of slips existing _t4 ON £ i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel *Open water; no dredging required []Other; please describe: k. Typical boat length: - f= r v K Pf m. i ill the facility have tie pilings? es [--]No (ii) )I�If.goyes number of be pilings? �1 E] This section not applicable b. p) Will the facility be open to the general public? XYes []No d. (!)Are Finger Piers included? [files []No If yes: (ii) Number (ii) Length 12 4 1466' t (iv) Width F A5 F. t' (v) Floating ❑Yes KNo f. (I) Are Boatlifts included? AYes []No If yes: (ii) Number (ii) Length g:- (iv) Width !`y FF c t h. Check all the types of services to be provided. ❑ Full service, including travel lift and /or rail, repair or maintenance service Dockage, fuel, and marine supplies l❑ Dockage (Wet slips ") only, number of slips: AL4 ❑ Dry storage; number of boats: fV11' ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: T ' j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). . I. (1) Will Pe facility be open to the general public? Yes ❑No 4.!_��••_.8�c�C!ox _� i..,i'cisCa•!= ':GG'i;�vL' � C�i'�!r=C'vr�[�]� � 'i =;:; r=_ rc�r'- 4; -`' �j° -t f• � � =ChG_ L�,__E�5•�, c ^_� rte_ _i._Ci �. CGF''ls`�:c?�'` '6G. G'ft � [a Form DCM MP -4 (Structures, Page 2 of 4) 12. DOCKING FACILITYINARINA OPERATIONS a. C r each of the following sanitary facilities that will be included in the proposed project. 'A Office Toilets Toilets for patrons; Number:; Location: ' showers Boatholding tank pumpout; Give type and location: n- i ii2 rO b. Describe treatment type and disposal location for all sanitary wastewater. A // DDA r ue i1/ L_ AeeJ)R4 d 7-0 Uf c rHe. 4vm 10 S OA A eg c. Describe the disposal of solid waste, figh offal and trash. 7'ms4 C A g J tv & �-e 0 of r Sr48F. All 7i\.%.fk ivITLe J4 d. How will overboard discharge of sewage from boats be controlled? [I This section not applicable yto 6►� p'� � �'�eo�r�� GK . WA-f re- AV // ke 6Q seft11 i6g J 4,Z o° e. (1) Give the location and number of "No Sewage Discharge" signs proposed. 6�I' c4 .ewd !4 r/+_ ,di eX A4,0 Z vW � (ii) Give the location and number of " Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. / /:-! - )KS ` tJ k .J2�t-e48- A/G " X l W -e G✓J Z g Where )l A x.446 P-111 nrl 7o �Z.� r� ✓�� 6 y ,de �� .� iii«c� �-�g kcj, will resi ue from ve aintenance be disposed of? (9)4_ tt,,em e h.1 //s �. // e rv1 t ro �-Q C) Fr �i7-C , X_ - /i7.4 0 k /17Ar <��y I'r$P14 itu , h. Give the number of chann I markers and "No Wake" signs proposed. I. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality. &e, 4 k o✓ - �'lv�d Zvr k_ w t rN �° rrt p y'. t� j. What will be the marina policy on ovemight and live -a and dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 1`4u/ 252-808-2808:: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/27106 m. Is the marina/docking facility proposed within a primary or secondary nursery area? pp ❑Yes No n. Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area? []Yes NO o. Is the marina/docking facility proposed within or adjacent to coastal wetlands /marsh (C", submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (� CW 1746 ❑sAv ❑SB WL 2kO []None p. Is the proposed madna/docking facility located within or within dose proximity to any shellfish leases? []Yes )XNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. WA 3. BOATHOUSE (including covered lifts) (This section not applicable a. @ Is the boathouse structure(s): ❑Commercial ❑Public /Government ❑Private /Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) This section not applicable a. @ Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) This section not applicable a. Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 6. MOORING PILINGS and BUOYS This section not applicable a. Is the structure(s): ❑Commercial ❑PubliclGovemment ❑Pdvate/Community c• Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing b. Number d. Description of buoy (color, inscription, size, anchor, etc.) E�'�- �l� °�.�tZx I��i= ,��DC,IR::�� � k .` l.` C'C���nCYr� �. �Y: 2. ��i= .'s..�fiC'.�t'•Fall�','�C -:L 'cr_u^ ` ��" [���� . Form DCM MP -4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines !So r 0^>M 0,' CY, 4 J IOWA , Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Wjdth of water body y—,,i (i) Will navigga,,,,t[[ti[i'''o''nal aids be required as a result of the project? ❑Yes pfrvo ❑NA (ii) If yes, el`ain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. /00,41L 7'#A i 0 f�vr•^ /y �i d. Water depth at waterward end of structure at NLW or NWL S• 8. OTHER This section not applicable a. Give complete description: :t•:- Date Project Name TJ dry �. y.efre n rcay J'Y/lfi�r.��e/ti., re Applicant Name �L- Applicant S' a e J f lb 252 -808 -2808 :: 1- 888- 4RCOAST :: www.necoastaimanagement.net revised: 12127/06 �9 1710 SyAndell 821 . LO 21 ELKAVEN r Pon 1821 - 1624 204 1113 We 6 1778 1. IeI7 3.0 17 1822 1809 Am" 1717 1 1723, 25 1716 1770 -171 73 747 IA 1738 zoom 4;h Lai zu L3 34 "�� ----_ ~~� u - -.. ^ -- PLOUNTS SAY ` - - -- -- SCALE 1:24 000 - - - -_ -- 1 0.5 0 IOLOMETERS 1 2 1000 500 0 /• METERS 1000,x` c - i 2000 1 0.5 0 1 64 w - -- —' MILES i 3935 -- -- 1000;0 - - -- 0'-- °! 1000 2000 --- 6 3000 4000 -_ — 5000 -- 6000 7000 80 0 �, 9oao -- FEET - -10, i - FREE UNION - CHURCH RD 32'30„ 10 = r a' 5EEDTICKNECKF 34 L 3x 64�. 3x33 , -- --- =- Yeatesville - - - -- - -- -- — T' -- - - - - - -- - !P41 - f0 32 - - - - - - -- -- - - -- i 650 000 FEET —5r 3931 - - -- ---- -- - - -- ------- - - - - -- ----------- - - - - -- -... -- -- - - -- -- ---- -- ----------- :-- - - -- -- - ;10 10 : BISHOP RD - \^ \ ,� y• �i ' i Gra'_ y d 3930 ----------- ---- ------- �'-- ----- v- -- - --�^- ------ v� —�-� ------------- - - - - -- -Point ---- - - - - -- 76 °45' 2 670 000 FEET 342 42'30" PANTEW QUADRANGLE CONTOi1R OiT K& 5 DATUM f NORTH CAROLINA- BEAUFORT CO. NORTH AJNERICAN VERTICAL DATUM OF 1988 7.5- MINUTE SERIES -1+0 Pgr2.eryt7CL- IC(�7C6DI! f tpwi f�vo 19 IZez -4,kg t k t -t 0) in v O 1 <\ h ,,J oti Icy/ &z \ 9 0 - ? - 3" -m- iry a V \ ° `Pti / IQ P ` - 3' � I I ----- - - - - -- - - - - o I !1 I Zi P k k ri I I 4? s .J P v� m WE ND E APPROVED o k o� `, l 11 NORTH CAROLINA ENVI I�ENTA! �r4.1 / / OM SS40t, I OF vVA L DATE ^ k � i i o � t- � =� 4 Pe No vi 'Irk / N 47 N % % L UI l N„ I n ii TAR • PA?ia" 2 I I aa2 , , 1RR PARIAN o I �I ^• k 6 o v I Iry i i ;n 1 ^r I n Tam 1 ROAD- N 13'34 03 ANN. 1 8 ro 60' 81 17 OIF 194Y a it, TJ'S LAND DEVELOPMENT, LLC - _ - - - - -- I's-01-109-0 5e6• T DAaBD it XUP&W If ,Np&w Y Fls rs ar Y T u BAT P 2' GOAT 2• LIFTS en • T Bar r uar uFrs auFlS aD•F 23r w S BaT B r LOS PIER DETAIL, 1' - 30' 404 W AT MARSH GRASS AT HIGH GROUND 404 WETLAND MARSH CRASS AT I� 1 NORMAL WATER UME [LEVATED V CROSSING 10' TIP MINIMUM B2p• 404 WEND YIAINf GRADE PIUN09 ELEyATED S' CROSSING COASTAL MARSH 135' q.Rou D MARSH y e9Ln NOTE It THIS WEW DOES NOT SHOW ALL OF rvuNOC NEW PIER LO GITUD NAL 1 1 1 CROSS SECTIO �A TO NO S,-.17 o i N 72'x �9 7Y3't 1' �1 CAy 7a,x ' GO _I 76•x - r +3'4Sx ea•x u os 1" D' -395 + 61' ♦p' 7' 1 /� DFWN DRNN 111 (�6.0 S.R. 1739 _ - 116 9A' 4 1 1 FlEfD \ BISHOP ROAD Xx DRAIN ,7._L d \ - , 11 06'x \ \\I. O Fl e!3' (9 ® ®De -e ® ®GB -e ® ®>u -e ® ©le -e ® eaT uFrs eoAr uFlS ear uFrs ear urrs bar uFrs ear lass ear LIFTS MAT LIFTS BOAT 3. ear uFls Y2• Yz• zr YC' er Yr Yz• rYr- -- Yx• ea• . ®.Og.. ®.0 .. ®.70..Q. @.. ©.O.. 1p. O..O.07 ., ©. O.. Oy .Oj �liml�L FIELD + Flf7D 1,11 ;11 FI 7Xx Op 7A' BACKUP 17 + uv \ 1 \ \ \ eACK u ls6 � ' • ; \ \\ 59 bss + 1 s4•x - \ \\ ``,, 1 111 .!� x]1• 1 \ iJ' 1 u °s.1 �\ °�- \\1.�� "ew•x '" FURIRE s \P \ �,6 B7 11 _ : Y. a1 R \ \ �GL EVELOPMENT 1 x i 1 11 ] + ;tt C \ \ 73'B 76 ACRES 64'x ' e.5'x 1 Sx \1 [: i1eA1 710 DIP• _��'y_'. D 1\ 1\ .o am CaICK]F CONSTRUCTION ENTRANCE 1 1'1 ���' bs 9 O BB ® 10 ® 1 + \1 a \\ "'X x 11 10' X 60' CRUSHED STONE S 1 ` ; 7.r DRAW 1 7. • O ex a 4. ' 0® B r 1\ / ` 1\ �, 1 DRAIN 73.x O \ a FIELD FIELD 7a' 1 rx $ 1 � - 1 Q 94 O _- GRAIN 1 DRAIN 1\ 7 95 !ae•x a 7 � 1 ,.a' erv. f4' ` FIELD O ,i 111 1 1 - FlELDN xx �8°S YrrAi +nA 1� p1111 BACK 1 1 R r 4D•I ed"6A. 1 \ 7s�''x UBbS ��i/ __ �'� x69' y 4. a3• o' u'1 LEGEND: 0 NEW IRON PB7$ CONTROL ` �, 1 \\ e e•x o D' A RABAOADSP[E$CONTROL �° \,, r e.e'x O DITCH CONEROT. `• _ / RMA710N DA1NL• 19Ft nCIABBA 6) DITCH �yT I x7.3' TBM 406 WSILAND LTNB 1 '1Y31 NORT1 FOLZ IA AND" OWTHRD1801WP�f NOAMALWATELIINE e' °' S 3o x NMYHPADMANBR' ORAVELROAD AND , THE POLPTRABELE ®fIiQ OP 77® A.NOTTOSCALE 1 I �� ASPew ,XOPbalnena]BSVOIAMAD>1.0FEBT LABELED 719SC WM. THE BJBVAT10910PTHRKAG. EBB[ INF. INVEST PEST (5.0')X WATER. OTBLE AT[ I° 1 NORTH MOM Atmw�VB.R�OADAND3 �eASr�Feoa'=�iOFno 7t'x SPOT IDSVA170N " I ACRES ASPBALTOPeJL 1711(Y6K7BVD181OAD). THE POLSLS LABELED TRW ISM. 7ffi E M ELEVATION TH3 HAM 13IA RZr.. —�� SILTFZNCS AT[ON - i I HIGH GROUND 33.52 DISTURBED TB611KAa6BID1AlsINWwAFLS79I�iSer >BrAROVaoRDDrm7Ba7R ®n CAMA /404 WETLANDS 12_93 NOT DISTURBED TSMI it NDR781 IN A MCHMA 1MAPOND.EBTAR 601 GROUND. r1ANK WA O1 °° ASPFIALT(YBAT714VBIJiROAD) TOTAL 46A7 vffcR READING INTO 7HB WOODS AMON THE DDOMOF71nTRES Loa TW BLO VATI ON OP 7HB NAIL U 7.O PE41'. CONTOUR un PDB.iM CONTOUR 111N41KAD.SBTDIAIl4i(CB OUMTRABLAPBITA11MG10UND TH67=13 Ile PFJST NOM FRGS TBB O MUM M A POND AND ON TBB 7RM L 2a ® 1OD 0 100 200 SDD TO BDVATTON OPTH6NAIL 37A FRIT. TAR - PAMTICO RIPARIAN BUFFER DWQ #144W5 9 KUM 11®1911 DATUM 141113 FLOOD ALZVATHW FORTHII Lar GRAPHIC SCALE - PEST T4 APTOSTACCORDING 115AD, FLOM DOUAANCIS RATS � A L6-x 11351p9�� SP 1 .�" +DEV4"•• � 1 \ 0.4.1 A�pUS 1 71% D/PEfA'1 J 7s'x A m 1 PILING DETAIL TYPICAL 9DT TO SCALD � r9SJX \ \ Y � \x (3p) s oarios3_��I/ E N 7 L1- A! •1p Lo T,T9 �� B 1809, P.15 4SA7 ACRES xa9' x� s °3 x�S� J 1,110;, s \ X(4.0') reR ,R, x K,jD J 74'x PATIO a 20' 25' Of o"', 75' 3 e' WATER LEVEL OF a9' � as•x xaa• , 1 IXISBNC POND I 9/ P�0t' 20' BANK OF 1 '\ ST1NG POND 14 PARKING BOAT PUMPOUTTANK/ TOPATQAPBBT ; e.e' x ° r SPACES es' x (STORE) 19 PARKIN: SPACES 7.1'x 90 71oa6• 7 M• 11 12 13 �' /. S 1Y171d'N 9O O o 10 -r \N� OS 1 '11 °D� R STORAGE W 155A` 9 �... F n 1749 Rr x ]"L t x 7sx Q Rl' x OFFICE I 74'x PATIO a 20' 25' 3D' 75' WASHERS k DRYERS VENDING DRY KITCHEN (STORE) 20' 171 100 PERSON R STORAGE RECEPTION VENUE •�, F n - PATIO OFFICE I RES ROOM FEMALE GAME ROOM SHOIWERS SHOWERS STORAGE I- n 25' 1 7' 17' 1 STAGE PATIO b II� SCALE: I• - 20' X(SO) X(s3. - VI xr ssJ � a � o X b� X(6-') X(ASl x \ \ Z (6,0) \ \� BA\> X .• \ � 11 �pE `N• 8 I �l 1 Ix( ?'' I X(5 �1��4l SFR R • `'C Jq . /F a STREET i 4 Tar men11 u^ , � U 0 w n °o °Erf�r, 11��c`�C� v L, R 1 La_SLm1otJ �`o ®�06daSC �ti It tL S CAMA PERMIT TrPTCwL CAMPER SI'YB RESPONSIBLE PARTY. T09IN J. TETTERTON, 252 -943 -6677 S,..,,. 1' . 30' Rrym 6/OS /lb. GANA MEANT REVISED WWI /14: PERNIII RY6m ] /0e /Ik TOPO ° OMMXO SCAB RMSID S /te /fk PR:R LOCATION RMS[D t0 tk BOAT SUPS PROPERTY OF: TA LAND DEVELOPMENT, LLC r 8 BATH TOWNSHIP BEAUFORT COUNTY NORTH CAROLINA +r • SCALE: 1' a 100' SURVEY DATE: NOVEMBER 22, 2013 sunle D ". HOOD RICXMOSDN, P.A D10W[[RS- O[OLO°N15 -IWINW 110 W[ST ]ND 51ACR 4� � A%WP �AS�MOTOx,,N�t S]btl