Loading...
HomeMy WebLinkAboutNC0085511_Renewal (Application)_20150526 City of Asheville, NC 1. Mills River Water Treatment Facility Mills River Water Treatment Plant—City of Asheville 4037 Haywood Rd Mills River, NC 28759 RECEIVED/DENR/DWR May 22, 2015 MAY 2 6 2015 Water Wren Thedford Permitting Section NC DENR/ DWR/ NPDES Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Mr. Thedford, Please renew NPDES permit# NC0085511 for the Mills River Water Treatment Facility. There are no expected changes in the nature and volume of the waste to be treated. Attached are the completed application forms and our sludge management plan. Sinc ely, Reginald Widemon Mills River Water Treatment Plant Supervisor NPDES PERMIT APPLICATION - SHORT FORM C - WTP For discharges associated with water treatment plants Mail the complete application to: N. C. Department of Environment and Natural Resources RECEIVED/DENR/DWR Division of Water Quality / NPDES Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 MAY 2 6 2015 NPDES Permit Number NC008551 I Water Qua�ec ion Permitting e If you are completing this form in computer use the TAB key or the up - down arrows to move from one field to the next. To check the boxes, click your mouse on top of the box. Otherwise,please print or type. 1. Contact Information: Owner Name City of Asheville N.C. Facility Name Mills River Water Treatment Faciliy Mailing Address 4037 Haywood Road City Mills River State / Zip Code N.C./28759 Telephone Number (828-232-4574) Fax Number (828-232-4590) e-mail Address RWidemon@ashevillenc.gov 2. Location of facility producing discharge: Check here if same as above Street Address or State Road City State / Zip Code County Henderson 3. Operator Information: Name of the firm, consultant or other entity that operates the facility. (Note that this is not referring to the Operator in Responsible Charge or ORC) Name Mailing Address City State / Zip Code Telephone Number ( Fax Number ( ) 4. Ownership Status: Federal ❑ State 0 Private 0 Public 5. Type of treatment plant: Page 1 of 4 C-WTP 03/05 NPDES PERMIT APPLICATION - SHORT FORM C - WTP For discharges associated with water treatment plants ® Conventional (Includes coagulation, flocculation, and sedimentation, usually followed by filtration and disinfection) El Ion Exchange (Sodium Cycle Cationic ion exchange) ❑ Green Sand Filter (No sodium recharge) ❑ Membrane Technology (RO, nanofiltration) Check here if the treatment process also uses a water softener ❑ 6. Description of source water(s) (i.e. groundwater, surface water) Surface water 7. Describe the treatment process(es) for the raw water: Water is drawn from the Mills River and pumped to an untreated water storage reservoir where suspended materials are settled out. The settled water is pumped to the pre- ozonation system to begin disinfection where ozone gas is used to eliminate pathogens and other bacterial contamination. The water then flows to the rapid mix and flocculation basins where aluminum sulfate and sodium hydroxide are added to produce suspended particles. Sedimentation follows where suspended particles settle to the bottom of the sedimentation basin. The water then proceeds to another ozonation chamber for further disinfection as well as taste, color, and odor control. Next, the water flows through filters containing granular activated carbon where the media traps suspended solids and adsorbs other organic material in the water. Following filtration, a small amount of sodium hypochlorite is added for disinfection and to prevent the reintroduction of pathogens into the drinking water. Enough is added to maintain a minimum residual concentration throughout the distribution system. Fluoride is added to prevent tooth decay, sodium bicarbonate and zinc orthophosphate are added for corrosion control and sodium hydroxide to control pH. The inclusion of sodium bicarbonate also increases the buffering capacity of water thereby helping to prevent pH swings in the distribution system. 8. Describe the wastewater and the treatment process(es) for wastewater generated by the facility: The wastewater is process water primarily from filter backwashes and periodic sludge discharges from the sedimentation basins. This wastewater flows to a lagoon where the suspended solids are allowed to settle and the supernate flows to the river. Each year, a predetermined amount of sludge solids and liquid is contracted for removal from the lagoon and the solid/liquid waste is delivered to the local sewerage treatment facility. 9. Number of separate discharge points: 1 Outfall Identification number(s) 001 10. Frequency of discharge: Continuous ® Intermittent El If intermittent: Days per week discharge occurs: Duration: 11. Plant design potable flowrate 7.5 MGD Backwash or reject flow 0.05 MGD Page 2 of 4 C-WTP 03/05 NPDES PERMIT APPLICATION - SHORT FORM C - WTP For discharges associated with water treatment plants 12. Name of receiving stream(s) (Provide a map showing the exact location of each outfall, including latitude and longitude): French Broad River 13. Please list all water treatment additives, including cleaning chemicals or disinfection treatments, that have the potential to be discharged. Aluminum sulfate, sodium hydroxide Sodium hypochlorite, sodium bicarbonate Hydrofluosilic acid Zinc orthophosphate Sodium thiosulfate, lime (calcium hydroxide) 14. Is this facility located on Indian country? (check one) Yes ❑ No El 15. Additional Information: • Provide a schematic of flow through the facility, include flow volumes at all points in the treatment process, and point of addition of chemicals. • Solids Handling Plan 16. NEW Applicants Information needed in addition to items 1-15: • New applicants must contact a permit coordinator with the NCDENR Customer Service Center. Was the Customer Service Center contacted? ® Yes 0 No • Analyses of source water collected • Engineering Alternative Analysis • Discharges from Ion Exchange and Reverse Osmosis plants shall be evaluated using a water quality model. 17. Applicant Certification I certify that I am familiar with the information contained in the application and that to the best of my knowledge a d belief such information is true, complete, and accurate. /.. ..weet 440,40.112 Water Plant Supervisor Prin name of Person Signing Title Page 3 of 4 C-WTP 03/05 NPDES PERMIT APPLICATION - SHORT FORM C - WTP For discharges associated with water treatment plants Signature of Applicant Date North Carolina General Statute 143-215.6 (b)(2) provides that: Any person who knowingly makes any false statement representation, or certification in any application, record, report, plan, or other document files or required to be maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under Article 21 or regulations of the Environmental Management Commission implementing that Article, shall be guilty of a misdemeanor punishable by a fine not to exceed $25,000, or by imprisonment not to exceed six months, or by both. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $25,000 or imprisonment not more than 5 years, or both, for a similar offense.) Page 4 of 4 C-WTP 03/05 I Ttaik •t 1 I _ -4:4+0.1.C--.1t IA �,.rte_ 't �. -. I 1 V P t ,._ 1 , ytvd - ;- r t , ( I t`t.- N c- . ti -. ''), "l'- NC O C 8 5 511 ••• , .Lc . ' -/d " fiDischarge ,' ;i'.:, . `..• , i Wit I ii./7 } ~_� 1 . i :.-f 0. � 1\EIS River 7N.1.1, • , ., :� ., ,., 1, NC0085511 •• :• '. ' 4 �i • ,..1,7,7-:,.:, ; . r.-- •,_;, Aft a• t/ J t_4•n; . _ ;�.i `: I ♦� cr -tea` ' .� i tiE 4 ._----3, (lU o2 ',t"10 gale i -tit r tl/�� r—--1 •:),6 11.---,) \-1,--\--=..„-.'..:_'---' / f —f,,GN. `.— 171 . --F_. !'"j t}t 1`,, ..•!' :.•!� i..r'f i' { ` . cA� fit. - •' . �\ { it f{ •� C = y` Y': . �" i? .r t ..- �4 I- ..k--- �.1 ', 4- •-:�t :_i tir e • Sg" bre . rear. -_ 4„ /,11.7, --)t( \- d '; ,Ci ze- /7 •.. USGS Quad: F8NE Skyland, NC Outfall Facility t • Latitude: 35° 23' 14.5"N 35°22' 43.6"N -...,...1, ; Longitude: 82° 31' 56.4" W 82° 32' 46.4" W Stream Class: WS-IV, B, CA North Facility Location Subbasin: 04-03-02 HUC: 06010105 Mills River WTP NC0085511 Receiving Stream: French Broad River Henderson County OVERVIEW OF THE MILLS RIVER WATER TREATMENT PLANT Aluminum Sodium Sulfate Hydroxide (Alum) (Caustic) I ..-1-1 - ,. Reservoir r Mills River , ;���i I Rapid Flocculation Tanks ' Sedimentation Basins (3) I �� Ozone Mix Tanks ',i' i Sodium Hypochlorite i i Sodium Bicarbonate — i Fluoride Zinc ' Ortho Filters (3) Phosphate _a__I -.FF._rrx,...` _.,. 1' - Clearwell t' _..1 Sodium i i Hydroxide i (Caustic) i ' > To Distribution Lagoons 3., To French Broad River ., - .., City of Asheville, NC .111 , 1 Mills River Water Treatment Facility SLUDGE MANAGEMENT PLAN The facility's waste water is primarily generated during the filter backwash process.Treated/filtered water is used to back flush the filters.The contaminants that are removed plus the water used for backwashing, drains to one of two lagoons located on the premises. Once in the lagoon,the suspended solids are allowed to settle to the bottom and the supernatant flows to the French Broad River. In addition to backwashes, the contamination flushed out during wash ups and spill clean ups,filter excursions that initiate the filter to waste sequence, leaks and the daily discharge of sludge that accumulates in the sedimentation basins also contribute to sludge/waste generation. Once a year a commercial firm is contracted to dredge, dewater and remove the sludge from the lagoon.The liquid/solid waste that is removed is delivered to the local sewerage treatment plant for processing/disposal. 41:(.4420 iji4441-4°11-- Reginald Widemon Mills River Water Treatment Plant Supervisor Aidi NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary May 27, 2015 Reginald L.Widemon Mills River WTP 4037 Haywood,Rd Mills River,NC 28759 Subject: Acknowledgement of Permit Renewal Permit NC0085511 Henderson County Dear Permittee: The NPDES Unit received your permit renewal application on May 26, 2015. A member of the NPDES Unit will review your application. They will contact you if additional information is required to complete your permit renewal. You should expect to receive a draft permit approximately 30-45 days before your existing permit expires. If you have any additional questions concerning renewal of the subject permit, please contact Joe Corporon(919) 807-6394. Sincerely, Wsre rvTIS-eo( rd, Wren Thedford Wastewater Branch cc: Central Files Asheville Regional Office NPDES Unit --• 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 Location:512 N.Salisbury St.Raleigh,North Carolina 27604 Phone:919-807-63001 Fax:919-807-6492/Customer Service:1-877-623-6748 Internet::www.ncwater.ory An Equal OpportunitylAffirmative Action Employer