HomeMy WebLinkAbout20230660 Ver 1_Pictures_20230508 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: Hines-5753 Lake Pointe Dr County: Caldwell
Owner: John and Sharon Hines q _
Print Signature
Contractor/agent:Charlie Washburn—Marine Construction
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule.Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B.0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer(within 30 ft of the full pond elevation),unless
approved.Exception,those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. 115A NCAC 02B.0243(6)]
Benching and grading in the buffer is not allowed.Excessive disturbance of ground cover. [15A NCAC 02B.0243
(6)]
Beaches,impervious patios,impervious walkways,etc.are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B.0243(4)and(6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described.The approved access corridor shall be restored.Staging,spoil,construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B.0243 (4), (6),(8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non-erosive velocities to the lake. [15A NCAC 02B.0243(5), (6)]
Acknowledgement of Notification
I, John and Sharon Hines hereby state that I have been informed of the Catawba Riparian Buffer Rule.
Any work conducted in the buffer, not specifically stated in the application and approved by the Division of
Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the
construction will be built within substantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules,the approved plan(s)and specification(s),and other supporting materials.
Signature(owner): =� - �I�Lc l'f�L�. �l]�n , a
Date:
e.34 ro80-80(1)
T!4 eowmeMPr°n.0°xtl Me:
IlRjpl
Oae]IN1a0D:1<:19 PM
t.rr c.n.e c«,arsxnn�I.. 1ao 0 10o zoo aoo _Lake Hickory
r...r. WMSLRw,PytMIXDeeex oPPWaC aG4E-FEET 1'.too,
H La
ke Hickory
*` 9,w1nm'w"ao"losxi7cc
ie4./A5',
7L.t 1S x\
fie n ro...
wxn Wt
' � � ` q � �. ? �ao i�wf � ` � �x Y ✓° o.s3e
Edge of Lake Hickory
..;.11 r 1 a� �,o '°`R W,-•,Pmet. _ "'fin...>.- _ 'o'��'° '',, >]. x-x.
° .�.7�rh„.Lek.Pelnle �w•^.Br.. //
a /+ t o g 'rRI Lot ' B
111 E --a
a Lot 35 A Lot 34 11 0."7 A-�8s�
A 7 a o- l + 0.814 Aen qj o.Tae Imn p '' '3 /
Lot 25 1N 717 Aer
_ aiv •uxsM mxr : J N N (p o a
u 9 Lot yy
0.848 AeGr..
i
_ mw�
th
IM
mM.,,x-o- Lake Hickory
1
Open Space
3.807 Acres a // 1Eaerm
Curve D.to T.bla
11 .r `
/ 'Yp
1 '�• F$ m �� nu.i w",w.a•' .w..i
11" � J
insy ��.'4yp"10,dj+ c.x•.s,v..xberu.x. _
w I xr-eoaymoC'• 1t 6� •,� E
En MRS,
o-u tmm txr 'uiii."e,.1.w j`"� �'7A•0r �6 uPet.,E.Fleming Prot.asional Land Surveyor No, L-4240
Comma o:,.Aw° :7
hors Slln%' "11O mbenmox er:
Waterfront Harbor — Phase r2 x
-
wsn..t 2.f 2 for We.k C-till-n.n. '�:a.�roy�i1. _ -- u=;m
ieoel-soz m
q • °�3 Y• pp
{ 4tR r�. � y"T,� ��!� .•� � T$Lt�4"w 'y,, any., <�''� *j`�� �.<,
�! a
� ��1k11.`� �Y K 1�k,�yf�d •� �� x � � / � �'+a�r��•'�
�S rYF'� •,�t�. 'tr"�7 �`by 'aV' �+x JP ,i
�++
r v
r
17
�;Rom.+ `ft/w► �.y '�' M'^:�fi r� �' a '' __ � � �;
Fm
`V
IN
.'4i1,. ,Mr s► Y„JI' !i:�Ly''t(��r* e i •Y`_bY,y.,,,. �k �a y� � t '�'�,� � . , ,f'�� ���` "�d•.�
a t fr��! #\hii•,^`yl.w., �g_?���� � �.' t ,4'q.X '+ � +�.: ki}5 *� ''i::
',,."�,� �, �' ^� ,�'� �F� e 'f� � " �'� ,fit. .� '1 �� „•��� .;`
r ti
t
rob" / •�• 4 ( �,/>m ! ! �y I � ���'�,� �`w�: � i t
3 3
7` Fi t, Y y, iii q•p tgMYiV,