Loading...
HomeMy WebLinkAbout20230660 Ver 1_Site Plan_20230508 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization ENVIRONMENI AL OUAU i Y FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application(including attachments)and the application fee should be sent to: If sending via US Postal Service if sending via delivery service(UPS, FedEx,etc.) Paul Wojoski Paul Wojoski DWR—401&Buffer Permitting Branch DWR—401&Buffer Permitting Branch 1617 Mail Service Center 512 N.Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: John and Sharon Hines Mailing Address: 8870 Route 28 Brockway PA 15824 Telephone Number: (814)590-4051 Fax Number: N/A E-mail Address: sharonandjohn8@gmail.com 2. Agent/Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatorV/regdocs/Permits/SAMPLE AGENT AUTHORIZ_ ATION FORM.pdf) Name: Charlie Washburn Company Affiliation: Marine Construction LLC Mailing Address: PO Box 6400 Hickory, NC 28603 Telephone Number: 828-495-3040 Fax Number: N/A E-mail Address: office@marineconstructionilc.com B. Project Information [15A NCAC 02H .0502(a)&(b)] 1. Attach a vicinity map(i.e.street map)clearly showing the location of the property with respect to local landmarks such as towns, rivers,and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls,docks,impervious surfaces, rip rap,excavation or dredging below Full Pond/Normal Water Level elevations,and construction access corridors. You may use the diagram provided at the end of this application form. FORM:SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/buffer proposed to be stabilized. (Include a scale of some sort-a yard stick,shovel handle,etc.) 4. Location of the property(where work is to be conducted) County: Caldwell Nearest Town: Granite Falls Lake/river/ocean adjacent to property: Lake Hickory Property size(acres):0.511 Subdivision name or site address(include phase/lot number): Lot 10 Phase 2 Waterfront Harbor Subdivision Directions to site-please include road names and numbers, landmarks,etc.: Included in packet Latitude(in decimal degrees) 35.789 Longitude(decimal degrees) -81.373 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped,etc.): Residential, lndev _loved 6. Describe proposed work(include discussion as to how hardening of shoreline has been avoided,or why it is necessary): We plan to stabilize the shoreline with riprap to prevent further erosion and construct a stationary dock. 7. Will work be conducted from land? x From water? 8. Total amount of impacts below the normal pool lake level/Normal Water Level Permanent impacts(including all excavation,backfill, rip rap, retaining walls,etc.)in square feet: 432 sgft Temporary impacts in square feet: 0 sgft 9. Total amount of impacts above the normal pool lake level/Normal Water Level and 50 feet land-ward Permanent impacts(including back fill,excavation, rip rap, retaining walls,etc.)in square feet: 432 sgft Temporary impacts(temporary clearing,construction corridor)in square feet: (Construction corridor= 2,160 sgft) 10. Please describe the vegetation above the normal pool lake level/Normal Water Level and 50 feet landward to be impacted(number of trees,for instance): The lot is wooded. We plan to remove 14 trees but will replant 1 for 1 with native hardwood trees. re caner/Agent's Signature*[15A NCAC 02H .0502(f)] Date *Agent's signature is valid only if an authorization letter from the owner is provided. FORM:SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls,docks,etc. e. Location of any excavation or dredging below the Full Pond/Normal Water Level elevation La ke (At Full Pond/Normal Water Level) a'x pa1 ,Below Full Pond/ Normal Water Level 01lPonalNKtL- . i iiim alaan aIM1111 Shoreline ,. W X 2�I ' Cons'r�vck,o� Cocn�,oc a' x a►1, Abae ��ll POnd] Nw� No G tdv\off No Clan n Plan View Lake {At Full Pond/Normal Water Levell Existing Dock 3 hv150k I Full Pond/Normal Water Lev*"10 Below full pond/NW e nhore7ine—w �lkx150h y kJiPond/NWL 2ft..150h.add.onal clearing 'if necessary 1 1E , AMPLE Plan View FORM:SSGP 02-2017 Page 3 of 4 `Xal ' Rio _t�10 Ueann . We Ulan YD c MOW, M U5 bo+ a` X 2,1t, VM +r JaM-j �n( �.. Al M5 FM Pond [ N)NL r�Ptan 14M be a•5 , diam ' oc grea,�i^. �tti �s w�►► ►� c�ror� Lake N6DVJo. MCOM npi W �lisf Ail (At Full Pond/Normal Water Vte $ W``t b� *CXd 60�14R-1� Gnd .� Platted►n � dormunk mason �o emsVc�e r�laximVrn Success. V) C- Side View U- 3 ft.below full pond water level 4 ft.above full pond water level Z ft.additional clearing If necessary Existing bank 10 ft.bank height yea QO qko ( Side Vi L F FORM:SSGP 02-2017 Page 4 of 4