Loading...
HomeMy WebLinkAbout_External_ Provisional Verification _ SAW-2022-01646 _ Hinton Oaks Industrial Park (North) _ Wake Stone Property Company _ Knightdale _ Wake County Baker, Caroline D From:Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent:Friday, May 5, 2023 1:30 PM To:bosebratton@wakestonecorp.com; Bob Zarzecki Cc:Thomas, Zachary T Subject:\[External\] Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County Attachments:NWP39.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear Bose Bratton and Bob Zarzecki, This e mail serves to notify you that your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived AND until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification. The special conditions below will be included with the permit verification: a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. b. A Pre‐construction meeting whereby the permanent loss impact limits would be staked by a licensed surveyor and reviewed in the field, including measuring the impact footprint. If the footprint of loss exceeded 0.031 acre, we would then rescind the use of NWP 39, and the applicant would then have the option to either proceed via the Individual Permit process, or resubmit a request to use NWP 39 providing additional avoidance and mitigation of impacts (below the impact limit threshold); c. An as‐built survey of the wetland fill showing the footprint of permanent loss impacts overlaid on the stream/wetland delineation. If the footprint of wetland loss impacts exceeds 0.031 acre, we would then rescind the use of NWP 39, and the applicant would then have the option to either proceed via the Individual Permit process, or re‐construct the crossings such that they fit NWP 39 impact limit thresholds. d. The permittee shall inform the U.S. Army Corps of Engineers Wilmington District Raleigh Field Office Project Manager of the date work within jurisdictional waters commenced. The discharge of dredged or fill material, as proposed for a temporary haul road depicted as Impact Area 2 on the attached exhibits, may not be located within waters of the United States after 03/01/2026 without specific written permission from the Corps. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Lyle Phillips Regulatory Project Manager 1 US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 588-9200 Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. 2