HomeMy WebLinkAbout20140554 Ver 3_Approval Letter_20230505 (2)
COMPENSATORY MITIGATION RESPONSIBILITY ACCEPTANCE FORM
May 5, 2023
Permittee:Bose Bratton and Wake Stone Property CompanyDWR Project #20140554 V3
Project Name:Hinton Oaks Industrial Park (North)County:Wake
The Division has received a Statement of Availability (SOA) from EBX-Neuse I, LLC for the Neu-Con
Wetland & Stream UmbrellaMitigation Bank (Mitigation Provider), specificallytheBlackbird Site, to
satisfy the mitigation requirements set forth in 401 Individual Certification No. WQC005899, issued to
Bose Bratton and Wake Stone Property Company, dated May 5, 2023,as provided in the table below.
Compensatory Mitigation River and 8-digit HUC Number
Riparian Wetland0.031acres (credits)Neuse -03020201
The Permittee must provide a copy of this form to the Mitigation Provider specified above who will then
sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once the
of this form for all buffer mitigation and the mitigation transfer certificate is submitted to the Division
beforeconducting any of the authorized impacts.
The Mitigation Provider verifies that the mitigation requirements (credits) shown above, have been
released and are available at the identified bank site(s). By signing below, the Mitigation Provider is
accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider, no
more than 25 percent of the total mitigation required by Division can be met through preservation, unless
requested and approvedby the Division Director (15A NCAC 02H. 0506(c)(7)).
Signature Authority Name (print): ________________________________________________________
Signature: ____________________________________________ Date: ________________________
North Carolina Department of Environmental Quality Division of Water Resources
Raleigh Regional Office 3800 Barrett Drive Raleigh, North Carolina 27609
919.791.4200