Loading...
HomeMy WebLinkAbout20150485 Ver 1 _Revised Sheet 5 Buffer Authorization _20150528C. Proposed Impacts Inventory 1. Buffer Impacts 1 a. Project is in which protected basin? ❑ Neuse Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ mitigation) required? (sq ft) (sq ft) or Temp ora T B1 2 P ❑ T Protection of Allowable Unnamed trib. ❑ Yes 9 No 988 1784 existing to Brandy Creek structures B2 P ❑ T Outlet pipe from Allowable Unnamed trib to ❑ Yes No 1160 372 wet detention Brandy Creek basin B3 ❑ P ❑ T ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 2148 2156 1c. Comments: Impact #2 now includes 15 ft wide maintenance access corridor D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 61 - Rip rap outlet protection from the existing apartment complex pipe will only be installed outside of the 50' buffer B2 — Proposed wet detention basin has been designed to remove 90% TSS 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 131 and B2 - No heavy equipment will be utilized within the 50' buffer; construction sequence calls for contractor to begin and complete work within 48 hours and only when dry weather is predicted FORM: BA 10 -2013 Page 5 of 7