HomeMy WebLinkAboutNC0070394_NOVNOI2023PC0130_RESP_20230425AM
9FN9wamddhhshh
ENVIRONMENTAL
Inc.....,......,,�,.�,..,
Mailing Address: PO Box 954, Cullowhee, NC 28723
Phvsical Address: 2675 Skvland Drive, Svlva, NC 28779 (828) 586-5588
Phvsical Address: 240-D Swannanoa River Road, Asheville, NC 28805 (828) 350-8704
Toll Free: (800) 213-4035, Fax: (828) 586-0800, Email: ironm(_alinc(a)aol.com
http://www.environmentalinc.co/
Transmitted via email
April 25, 2023
NC Environmental Quality Water Resources
Attn: Daniel Boss, Assistant Regional Supervisor
2090 US 70 Highway
Swannanoa, NC 28778
Re: Notice of Violation
Willowbrook Run POA WWTP
Permit No. NCO070394
Macon County
Dear Mr. Boss,
This letter is in response to the Compliance Evaluation conducted at the
Willowbrook Run POA WWTP on March 23, 2023. Attending the inspection were
Mark Teague, ORC and Zach Storie, with Environmental, Inc. in addition to
Lauren Armeni, Mara Chamlee, and Melanie Kemp, with the Asheville Regional
Office.
We have reviewed the report with the The Willowbrook Run POA. The POA are
budgeting to correct the deficiencies listed in the inspection report.
Please see our response to the following deficiencies:
Operations & Maintenance:
There are multiple deferred maintenance issues at the facility that pose
safety hazards
Operations & Maintenance: Overall, the facility is in need of
maintenance and repair. There is no
ladder to get up to the aeration basin, clarifier, and digester. Some
components are rusting and need
to be painted. There are still missing and unstable rails around the
aeration basin and secondary
clarifier. The grates on top of the aeration basin and secondary clarifier
are rusted and missing in
some areas. Additionally, the ground adjacent to the secondary clarifier
is eroded with pipe exposed.
These issues pose safety hazards and need to be fixed and/or replaced.
Willowbrook Run POA is budgeting to correct the deficiencies.
Secondary Clarifier
The line that goes from the clarifier to the chlorine contact chamber
needs to be more thoroughly stabilized to prevent the line from
breaking.
Willowbrook Run POA is budgeting to correct the deficiencies.
Disinfection -Tablet
The chlorine contact chamber has a leak and treated wastewater is
ponding on the ground
Environmental, Inc. is in the process of completing this repair. Pictures will be
emailed to Lauren Armeni and Daniel Boss with Asheville Regional Office
once completed.
Effluent Pipe
The effluent pipe could not be located.
Willowbrook Run POA will budget to install a gate to access the effluent pipe.
If you have any questions, please feel free to contact me.
Si��nyl. d ta�erely,,7�--
%�l ai
Mark Teague
Environmental, Inc.
Cc: Willowbrook Run POA
Lauren Armeni, Asheville Regional Office