Loading...
HomeMy WebLinkAboutNC0020338_2023_05_Audit Cover Letter_20230505ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Town of Yadkinville Jacob Swaim Public Work Director PO Box 816 Yadkinville, NC 27055 SUBJECT: Pretreatment Audit Town of Yadkinville NORTH CAROLINA Environmental Quality May 8, 2023 Main Program Permit (NPDES) #NC0020338 Yadkin County Dear Mr. Swaim: On 4/27/2023, a Pretreatment Audit was performed by Tricia Lowery of the Winston-Salem Regional Office. Grant Trivette, Pretreatment Coordinator, assisted Ms. Lowery and was present during the audit. The purpose of this audit was to determine the effectiveness of the Control Authority's pretreatment program regarding SIU inspections., which includes the initial interview, tour of SIU facility, sampling review, and an exit interview. Background The Control Authority has 4 Significant Industrial Users (SIUs), one of which is a 433.15 categorical user (CIU). Control Authority Interview No problems reported that are related to industrial discharges and no industries in SNC over the past 2 semi-annual periods. Three dental practitioners discharge to POTW and have complete compliance forms. Appropriate amalgam separators are in use. Yadkin County discharges into Town of Yadkinville's collection system/POTW. No issues from Yadkin County. The POTW receives waste from groundwater remediation project — Lydall. They have a general local permit with a limit of 10,000 gpd. No issues with Lydall have been reported. All files are in good order and well organized. Pretreatment Program Elements Review The Headworks Analysis (HWA) renewal was submitted on 8/17/2022, The HWA last approval date is 10/31/2017,. The next HWA due date is to be determined. The last Industrial Waste Survey (IWS) was submitted on 11/22/2021. The IWS was approved on 6/16/2022. The next IWS due is to be determined. The Sewer Use Ordinance (SUO) was approved on 1/3/2012. DffNorth Carolina Department of Environmental Quality I Division of Water Resources oan caaouNn Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 M336.776.9800 oep.m.m or em�nmen� Qualm The Enforcement Response Plan (ERP) was submitted on 9/13/2019 and approved on 11/19/2019. The Long -Term Monitoring Plan (LTMP) was submitted on 6/15/2020 and approval on 9/14/2020. LTMP File Review The Long -Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies. Industrial User Permit (IUP) File Review A review of the file for Austin, #IUP 0006 revealed that the monitoring data was well organized and compliant. The slug control plan for Austin, #IUP 0006 was in good order and in file. The Toxic Organic Management plan (TOMP) for Austin, #IUP 0006 was in good order and in file. Action Items No other action items were noted. The pretreatment program is considered satisfactory. The Control Authority runs an excellent pretreatment program. If you have any questions, please contact Tricia Lowery at (336) 776-9691, or me at (336) 776- 9800. Sincerely, Docu Siiggned by: �n, l . Jn,IAGf 145B49E225C94EA... Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO Cc: Grant Trivette (email) REQ� North Carolina Department ofEnvironmental Quality I Division ofWater Resources Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Winston-Salem, North Carolina 27105 NORTH CAROLINA 336.776.9800 naparMeM of EmironmanW 9uallly D North Carolina Department of Environmental Quality I Division of Water Resources ✓ Winston-Salem Regional Office 1 450 W. Hanes Mill Rd, Suite 300 1 Winston-Salem, North Carolina 27105 NORTH CAROLINA 336.776.9800 onparhnem of EmironmanW 9uallly