HomeMy WebLinkAbout20140090 Ver 2_U2579 permit site 3a and 3b agency meeting on 04022015_20150522From:Wanucha, Dave
To:Euliss, Amy; Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil)
Cc:Guy, Jeremy M; Moore, Byron G; Panek, Lindsey F; Crespo, Angel (acrespo@Dragados-USA.com);
tim.morris@kci.com
Subject:RE: U2579 permit site 3a and 3b agency meeting on 4.2.15
Date:Thursday, May 07, 2015 4:41:52 PM
I do not need to approve them first but would like to have an electronic version at some point.
Yes proceed, unless the Corps has objections.
Dave Wanucha
Sent from my Verizon Wireless 4G LTE smartphone
336-403-5655
-------- Original message --------
From: "Euliss, Amy"
Date:05/07/2015 10:25 AM (GMT-05:00)
To: "Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil)" , "Wanucha, Dave"
Cc: "Guy, Jeremy M" , "Moore, Byron G" , "Panek, Lindsey F" , "Crespo, Angel
(acrespo@Dragados-USA.com)" , tim.morris@kci.com
Subject: RE: U2579 permit site 3a and 3b agency meeting on 4.2.15
We’re working on finalizing the restoration plans for the temporary impacts at sites 3a and 3b. Do
you need to approve the plans prior to us filling in the existing channel? The plan development has
taken a little longer than anticipated, and the contractor would like to proceed with the detour as
quickly as possible. Thanks.
-Amy
From: Euliss, Amy
Sent: Monday, April 06, 2015 8:32 AM
To: Thomas, John T JR SAW (John.T.Thomas.JR@usace.army.mil)
Cc: Guy, Jeremy M; Wanucha, Dave; Chapman, Amy; Panek, Lindsey F; Suggs, Phillip H; Moore, Byron G
Subject: U2579 permit site 3a and 3b agency meeting on 4.2.15
Attached is a letter documenting our discussions on permit sites 3a and 3b on April 2, 2014. Thanks.
Amy Euliss
NCDOT Division 9 Environmental Officer
375 Silas Creek Parkway
Winston Salem, NC 27127
336-747-7802 (work)